PUBLIC HEARING Wednesday, October 1, 2014 Newberry’s, 402 Box Butte Ave., Alliance, NE Open House: 5:00-6:30 pm MDT / Public Forum: 6:30-7:00 pm MDT NH-385-3(118); C.N. 51432 JUNCTION L-62A/US-385 TO ALLIANCE This public hearing is being held to provide information and receive input on the Draft Environmental Assessment (DEA) regarding the construction of a portion of U.S. Highway 385 (US-385) from the junction of Nebraska Link 62A (L-62A) to the city of Alliance. This portion of US-385 is identified as part of the “Heartland Expressway.” LOCATION: The proposed project would begin on Nebraska Link 62A (L-62A), 2.19 miles west of the junction with U.S. Highway 385 (US-385) in Morrill County, and continue north on US-385 into the City of Alliance in Box Butte County, ending just north of the intersection with Nebraska Highway 2 (N-2), also known as West 3rd Street, for a distance of 24.75 miles on US-385. These portions of L-62A and US-385 are part of the “Heartland Expressway.” PURPOSE AND NEED SUMMARY (full purpose and need description can be found in the DEA): The purpose of this project is to: provide an improved north-south highway on a National Highway System (NHS) High Priority Corridor that increases the efficiency and safety of travel. fulfill legislative intent of previous transportation bills which provided federally “earmarked” funds for the Heartland Expressway. fulfill legislative intent of the Build Nebraska Act, which identified this project as a high priority project for state funds. address roadway and operational deficiencies. An additional project goal is to: improve the highway infrastructure in order to facilitate economic development. The need for the project is based on the mix of traffic, including a high percentage of heavy-truck traffic, in combination with some areas where the roadway geometry does not meet standards. SCOPE OF WORK: The proposed construction project would improve the existing US-385 two-lane highway from the Junction of US-385 and L62A, north to Alliance. The improvements would consist of constructing a four-lane divided highway with a depressed grass median throughout the rural portion of the project and five-lane section in Alliance that would provide two lanes in each direction and a center left-turn lane. The project would include reconstruction of the US-385/L62A intersection on a new alignment northwest of the existing highway junction. The proposed project would incorporate improvements to intersections, drainage structures, and lighting. TRAFFIC COUNT: US-385 – South of N-2 US-385 – North of L-62A L-62A – West of US-385 Year 2014 2036 2014 2036 2014 2036 Vehicles per Day 3885 4950 3550 4655 2520 3410 % Trucks 18% 18% 19% 19% 19% 19% ESTIMATED CONSTRUCTION SCHEDULE: Construction of the new southbound lanes is anticipated to be completed under two separate projects. The first, Alliance South, is anticipated to begin in 2016. The second, L-62A North, is anticipated to begin in 2017. The US-385/L62A Junction construction project and reconstruction of the existing northbound lanes is not yet programmed. I PUBL Wednesday, October 1, 2014 C NG HEARI Wednesday, October 1, 2014 s Thi ng i r a he c i publ A) DE ( t n e m s s e s As A 2 6 k n i L a k s a r b Ne e Op NH-385 JUNCTION L- ng ld e h g in e b is e d i v o r p to o i t c u r t s n o c e h t g n i d r a g e r A) L ( A an i l l A f o y t ci e h t o t ) 62A Newberry’s, 402 Box Butte Ave., Alliance, NE 0 0 : 5 : e s u o H n e - m p 30 6: 385- 51432 . N . C ; 118) 3( -62A/US-385 TO ALLIANCE n i e v i e c e r d n a n o ti a m r fo n i h g Hi . S U. f o n o i t r o p a f o n o S U f o n o i t r o p s i h T ce. an 385 Wednesday, October 1, 2014 Newberry’s, 402 Box Butte Ave., Alliance, NE MD : 6 : um For c i ubl P / T 51432 385 TO ALLIANCE m n o r i v n E ft a r D e th n o t u p n US ( 5 8 3 y a w h - h t m o r f 385) h t f o t ar p as ed i f i t en d i s i 385 Wednesday, October 1, 2014 Newberry’s, 402 Box Butte Ave., Alliance, NE 0 3- M m p 00 7: DT l ta n e m f o n o i ct n u j e d an l t ear H e h A 2 6 k n i L a k s a r b Ne . y a w s s e r p Ex : N O TI A C LO p e Th . S U. ( 5 8 3 y wa h g Hi of h t nor t us j ng endi S U on es l i m 75 24. -385. EED N D N A SE PO R PU s i h t f o e s o p r u p e Th de i ov pr i an r L ( A - an i l l A f o y t ci e h t o t ) 62A n i g e b d l u o w t c e j o r p d e s o p o r US- o C l l i r or M n i 385) and , y unt as ebr N h t i w on i t ec s er nt i he t L of ons i t por e hes T 385. -62A EED ( Y R A M M SU o p r rp u p l ll fu t ec oj pr : o t is h t nor ed ov pr m - a w h g i h h t u so S U f o n o i t r o p s i h T ce. an -385 L ( A 2 6 k n i L a k s a r b e N n o n -62A S U on h t nor nue i ont c and -385 N ( 2 ay ghw i H a k as - now k o s al , 2) S U and 62A -38 he t of t par e ar 5 n o ti o p i ip r c s e d e d e e n d n a e s o can yst S y a w h g i H l a n o i t a N a n o y a h t f o t ar p as ed i f i t en d i s i 385 j he t of t es w es l i m 19 2. , ) 62A n i e anc i l l A of y t i C he t o nt i 385 or f , eet r t S d 3r t es W as n now . ay w s es pr x E and l t ear H he d n u o f o e b can A E A D e h t h in ): C y t i r o i r P h g i H ) S H N ( m e yst d an l t ear H e h h t i w on i t unc , y ount C e t ut B ox B of e anc t s di a t a h t r o d i r r o de i ov pr i an h t s e s a e r c in a l s i g e l l l fi l fu y a w s s e r p Ex a l s i g e l l l fi l fu . s d n fu oadw r s es addr c e j o r p l a n o i t i d d a An h t nor ed ov pr m a w h g i h h t u so a r t f o y t e f a s d n a y c n ie ic f f e e h p s n a tr s u o i v e r f p t o n te n i e v ti . y a r b e N d l i u B e f th t o n te n i e v ti i c i def onal i at oper and ay oadw : o t s i l a o g t c r yst S y a w h g i H l a n o i t a N a n o y a l. e v a d e d i v o r p h c i h w s l l i b n o ti ta r o p i th d e fi ti n e d i h c i h t, w c A a k s a . es i enc C y t i r o i r P h g i H ) S H N ( m e yst d n fu d e k r a m r a e y l l a r e d fe d p ty i r o i r p h g i h a s t a c e j o r p s t a h t r o d i r r o e th r fo s d n a l t r a He te ta s r t fo c e j o r j p e h t e v o r p im o r p e h t r o f d e e n e Th wh s a e r a e m o s h t wi O SC K R O W F O PE S U f o n o i ct n Ju -385 depr a h t i w ay ghw hi a l wo t e d i v o r p d l u wo US- s er nt i L62A 385/ g i y a w h ig h e or n i e ur t uc r t as r nf t f o x i m e h t n o d e s a b s i t c e j o d y r t e m o e g y wa d a o r e h t e r e wh : n o i t c u r t s n o c d e s o p o r p e Th e. anc i l l A o t h t nor , L62A and e m s as gr ed s es depr oughout hr t an di o i t c e r i d h c a e n i s e n a a and n ent gnm i al new a on on i t ec nor rt dev c i onom ec e at t i l i ac f o t der or g n i d u l c n i , c i f f a r t a gh hi ent c per . s d r a d n a t s t e e m t o n s e o d e h t e v o r p m i d l u o w t c e j o r p n c d l u o w s t n e m e v o r p m i e Th pr he t of on i t por al ur r he t oughout t ef l er ent c - . e n a l n r tu r p e Th n i t s i ex he t of t es hw t nor ghw hi g ent opm el dev . y heav of age ent - , i c ffi a tr k c u tr S U g n i t s i x e - o w t 385 - ig h e n la u o f a g n i t c u r t s n o c f o t s i s n o c and t ec oj pr e v fi - n io t c e s e n la t c e j o r d l u wo r t s n o c e r e d lu c in on. i t unc j ay ghw d e s o p o r p e Th n o ti a n i b m o c n , i e h t m o r f y a w h ig r- d e id iv d e n la t a h t e c n llia A in e h t f o n io t c u r d l u o w t c e j o r p d e v o r p im e t a r o p r o c in T: N U O C C FFI A TR r a Ye D r e p s e l c i h Ve s k s c u r T r % gnm in a r d , s n io t c e s r e t in o t s t n e m e US-385 – S h out h 2014 y a D 3885 18% ghw g g in t h lig d n a , s e r u t c u r t s e g a in N of h 2 2 - US-385 – N t or 2036 2014 4950 3550 18% 19% j ay p p . L of h t h -62A L-62A – s We 2036 2014 4655 2520 19% 19% j p S U f o t s -385 2036 3410 19% ST N O C ED T A M I EST under te a r a p e s o tw n begi o t ed pat i c i ant s i anes l hbound t nor E: L U ED H SC N O I T C U R ST Co S e c n a i l l t, A s r fi e h . T ts c e j o r p 2017. n i S U e Th - L62A 385/ ogr pr et y not ed. m am h t u o s w e n e h t f o n o i t c u r t s n Co n i g e b to d te a p i c ti n a s , i th u o S ec oj pr on i t uc r t ons c on i t unc J d e t a p i c i t n a s i s e n a l d n u o b h , L d n o c e s e h . T 6 1 0 2 n i n -62A ex he t of on i t uc r t ons ec r and t ec d e t e l p m o c e b o t s i h, t or N 62A ng i t s i ex N Junction L-62A / US-385 to Alliance NH-385-3(118); C.N. 51432 Send comments to: NDOR Public Involvement Sarah Kugler P.O. Box 94759; 1500 Hwy. 2 Lincoln, NE 68509-9983 402-479-4871 [email protected] For more Information: NDOR District 5 Engineer Craig Lind P.O. Box 220; 140375 Rundell Rd. Gering, NE 69341 308-436-6587 [email protected] www.transportation.nebraska.gov ACCOMMODATION OF TRAFFIC: Proposed construction would be built “under traffic,” or without a detour. Appropriate traffic control may be necessary to maintain traffic during construction. RIGHT-OF-WAY: Acquisition of property rights for new right-of-way (ROW) and temporary and permanent easement rights would be required. It is estimated approximately 300 acres of new ROW would be required to complete the project, with access control rights purchased along the entire corridor. It is anticipated three residential relocations would be required; no commercial relocations are expected. POTENTIAL IMPACTS: A draft Environmental Assessment (EA) has been prepared to determine the potential environmental impacts associated with the proposed project. Environmental resources evaluated include wetlands, threatened and endangered species, cultural resources, environmental justice, noise impacts, aesthetics and required acquisition of property rights for new ROW. The draft EA document may be viewed on the NDOR website at http://www.transportation.nebraska.gov/projects/. Copies are available at the FHWA and NDOR headquarters in Lincoln, the NDOR District 5 Office in Gering, in Alliance at the City Offices and Public Library, the Angora Post Office, and the City Office of Bridgeport. The information is available for a 30-day comment period: September 15—October 16, 2014. ESTIMATED COST: The first construction project, Alliance South, DPS-385-4(139), CN 51522, would construct US-385 from West 3 rd Street south to approximately Mile Marker (MM) 100+00 and is estimated at $25 million. The second construction project, L-62A North, S-385-3(1021), CN 51443, would construct US-385 from approximately MM 100+00 south to the junction of US-385 and L-62A, and is estimated at $30 million. The third project, which would construct a sweeping curve connecting L-62A to US-385, is currently not programmed. Preliminary engineering, ROW and utilities costs for the corridor are tracked under a separate project, NH-385-3(118), CN 51432, and are estimated at $10 million. The total cost (in today’s dollars) of the project contemplated is estimated at $90 million, which includes an estimated $25 million to construct the sweeping curve and reconstruct the northbound lanes.Funding sources would include federal, state (the Build Nebraska Act), and local funding (City of Alliance). The City of Alliance would participate with a 20% cost share for the portions of the project within or adjacent to the city limits.

Upload: others

Post on 28-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Thi is b eing held to provid e in fo rma ti npu t on th e ...dot.nebraska.gov/media/1816/meeting-handout-2014-heartland.pdf · ESTIMATED COST: The first construction project, Alliance

�PUBLIC HEARING

Wednesday, October 1, 2014 Newberry’s, 402 Box Butte Ave., Alliance, NE

Open House: 5:00-6:30 pm MDT / Public Forum: 6:30-7:00 pm MDT

NH-385-3(118); C.N. 51432�JUNCTION L-62A/US-385 TO ALLIANCE�

This public hearing is being held to provide information and receive input on the Draft Environmental Assessment (DEA) regarding the construction of a portion of U.S. Highway 385 (US-385) from the junction of Nebraska Link 62A (L-62A) to the city of Alliance. This portion of US-385 is identified as part of the “Heartland Expressway.”

LOCATION: The proposed project would begin on Nebraska Link 62A (L-62A), 2.19 miles west of the junction with U.S. Highway 385 (US-385) in Morrill County, and continue north on US-385 into the City of Alliance in Box Butte County, ending just north of the intersection with Nebraska Highway 2 (N-2), also known as West 3rd Street, for a distance of 24.75 miles on US-385. These portions of L-62A and US-385 are part of the “Heartland Expressway.”

PURPOSE AND NEED SUMMARY (full purpose and need description can be found in the DEA):

The purpose of this project is to:

• provide an improved north-south highway on a National Highway System (NHS) High Priority Corridor that increases the efficiency and safety of travel.

• fulfill legislative intent of previous transportation bills which provided federally “earmarked” funds for the Heartland Expressway.

• fulfill legislative intent of the Build Nebraska Act, which identified this project as a high priority project for state funds.

• address roadway and operational deficiencies.

An additional project goal is to:

• improve the highway infrastructure in order to facilitate economic development.

The need for the project is based on the mix of traffic, including a high percentage of heavy-truck traffic, in combination with some areas where the roadway geometry does not meet standards.

SCOPE OF WORK: The proposed construction project would improve the existing US-385 two-lane highway from the Junction of US-385 and L62A, north to Alliance. The improvements would consist of constructing a four-lane divided highway with a depressed grass median throughout the rural portion of the project and five-lane section in Alliance that would provide two lanes in each direction and a center left-turn lane. The project would include reconstruction of the US-385/L62A intersection on a new alignment northwest of the existing highway junction. The proposed project would incorporate improvements to intersections, drainage structures, and lighting.

TRAFFIC COUNT:

US-385 – South of N-2 US-385 – North of L-62A L-62A – West of US-385

Year 2014 2036 2014 2036 2014 2036

Vehicles per Day 3885 4950 3550 4655 2520 3410

% Trucks 18% 18% 19% 19% 19% 19%

ESTIMATED CONSTRUCTION SCHEDULE: Construction of the new southbound lanes is anticipated to be completed under two separate projects. The first, Alliance South, is anticipated to begin in 2016. The second, L-62A North, is anticipated to begin in 2017. The US-385/L62A Junction construction project and reconstruction of the existing northbound lanes is not yet programmed.

� �

� �

IPUBLWednesday, October 1, 2014

� �

C NGHEARIWednesday, October 1, 2014

� �

sThi ngirahecipublA)DE(tnemssesAsA 26kniLaksarbNe

� �

eOp

NH-385JUNCTION L-

ng lde hgine bis edivorptooitcurtsnocehtgnidragerA)

L(A anillAfoy tcie htot)62A

� �

Newberry’s, 402 Box Butte Ave., Alliance, NE00:5:esuoHne - mp30 6:

385- 51432.N.C;118)3(-62A/US-385 TO ALLIANCE

nieviecerdnanotiamrfonihgHi.SU.fonoitropafono

SUfonoitrops ihTce.an 385

� �

Wednesday, October 1, 2014Newberry’s, 402 Box Butte Ave., Alliance, NE

MD :6:umForciublP/T

51432385 TO ALLIANCE

mnorivnEft arDethnot upnUS(583yawh - htmorf385)

htfotarpas edifitendis i385

� �

Wednesday, October 1, 2014Newberry’s, 402 Box Butte Ave., Alliance, NE

03 - Mmp00 7: DT

ltanemfonoictnuje danltearH“e h

� �

A 26kniLaksarbNe”.yawsserpEx

:NOTIACLO peTh.SU. (583ywahgHi

ofh tnortusjng endiSUon eslim75 24. -385.

EEDNDNASE PORPU

sihtfoesoprupeTh

• deiovpr ian

� �

r

L(A - anillAfoy tcie htot)62A

nigebdluowtcejorpdesoporUS- oCllirorMn i385) and ,yunt

asebrNh tiwon itecserntihe tLofonsitpore hesT385. -62A

EED (Y RAMMSU oprrpuplllfu

tecojpr :otis

htnored ovprm - awhgihhtuso

� �

SUfonoitrops ihTce.an -385

L(A26kniLaksarbeNnon -62ASUon h tnornue iontcand -385

N(2 ayghwiHa kas - nowko sal,2)SUand 62A -38 he toftpare ar5

notiiopiiprcseddedeendnaeso can

ystSy awhgiHlanoitaNanoy a

� �

htfotarpas edifitendis i385

jhe toftesweslim19 2.,)62An ie ancillAofytiChe to nti385 orf,eetrtSd 3rtesWasn now

.aywsesprxEand ltearH“he ”

dnuoffoe bcan AEEADeehtthin ):

Cy tiroirPhgiH)SHN(meyst

� �

danltearH“e h

h tiwon itunc,yountCe tutBoxB

ofe anctsdia

tahtrodirro

� �

deiovpr ian htsesaercin

• alsige lllfilfuyawsserpEx

• alsige lllfilfu.sdnfu

• oadwrsesaddr

cejorplanoitiddaAn

� �

htnored ovprm awhgihhtusoartfoytefasdnaycnieicffeeh

psna trsuoiverf pt onten ievti.y

arbe Ndliu Bef tht onten ievti

icidefonaliatoperand ayoadw

:otsilaogtc

� �

r

ystSy awhgiHlanoitaNanoy al.eva

dedivor phcih wslli bnotitarop

i thdefitined ihciht, wc Aaksa

.esienc

� �

Cy tiroirPhgiH)SHN(meyst

dn fu”dekramrae “yllared fed

ptyiroir phgi h ast acejor ps

� �

tahtrodirro

e thr fos dnaltraHe

teta srt focejor

� �

jp

• ehtevorpim

orpehtrofdeeneThwhsaeraemoshtwi

OSC KROWFOPE SUfonoictnJu -385

depra h tiwayghwhialwotedivorpdluwo

US- serntiL62A385/

� �

g

iyawhighe orn ie urtucrtasrnf

tfoximehtnodesabsitcejodyrtemoegywadaorehterewh

: noitcurtsnocdesoporpeThe.ancillAo th tnor,L62Aand

emsasgred sesdepr oughouthrtan dioitceridhcaenisena a and n

entgnmialnewa on on itec nor

� �

rt

devcionomece attiliacfo tderor

gnidulcni,ciffart a ghhi entcper.sdradnatsteemtonseod

ehtevorpmidluowtcejorpncdluowstnemevorpmieThprhe tofon itporalurrhe toughout

teflerentc - . ena lnrtu rpeThnitsiexhe tofteshwtnor ghwhig

� �

entopmeldev .

yheavofage ent - , icffia trkcutr

SUgnitsixe - owt385 - ighenlauofagnitcurtsnocfotsisnoc

and tecojpr evfi - niotcesenlatcejor dluwo rtsnoceredlucin

on.ituncjayghw desoporpeTh

� �

notianibmo cn, i

ehtmorfyawhigr- deidivdenla

tahtecnlliaAinehtfoniotcur

dluowtcejorpd

� �

evorpimetaroprocin

T:NUOCCFFIATR

raYe

DrepselcihVe

skkscurTTr%

� �

gnminard,sniotcesretinotstneme

US-385 – S houtth

2014

yaD 3885

18%

� �

ghwg ginthligdna,serutcurtsegain

Nofh -22- US-385 – N tor

2036 2014

4950 3550

18% 19%

� �

jay pp.

Lofh tth -62A L-62A – sWe

2036 2014

4655 2520

19% 19%

� �

jp

SUfots -385

2036

3410

19%

� �

STNOCEDTAMIESTunder tearape sotw

n begio ted paticiantsianeslhbound tnor

� �

E:LUEDHSCNOITCURST Co Secnaillt, Asr fieh. Ttscejor p

2017.n i SUeTh - L62A385/ogrpretynot ed.mam

� �

htuosw enehtfonoitcurtsnConige b todteapictin as, ithuo S

ecojpron itucrtonscon ituncJ

� �

detapicitnasisenaldnuobh, Ldnoce seh. T610 2n in -62A

exhe tofon itucrtonsecrand tec

� �

detelpmocebotsih,torN62A

ng itsiex

N

Junction L-62A / US-385 to AllianceNH-385-3(118); C.N. 51432

Send comments to:NDOR Public InvolvementSarah KuglerP.O. Box 94759; 1500 Hwy. 2Lincoln, NE [email protected]

For more Information:NDOR District 5 EngineerCraig LindP.O. Box 220; 140375 Rundell Rd.Gering, NE [email protected]

www.transportation.nebraska.gov

�ACCOMMODATION OF TRAFFIC: Proposed construction would be built “under traffic,” or without a detour. Appropriate traffic control may be necessary to maintain traffic during construction.

RIGHT-OF-WAY: Acquisition of property rights for new right-of-way (ROW) and temporary and permanent easement rights would be required. It is estimated approximately 300 acres of new ROW would be required to complete the project, with access control rights purchased along the entire corridor. It is anticipated three residential relocations would be required; no commercial relocations are expected.

POTENTIAL IMPACTS: A draft Environmental Assessment (EA) has been prepared to determine the potential environmental impacts associated with the proposed project. Environmental resources evaluated include wetlands, threatened and endangered species, cultural resources, environmental justice, noise impacts, aesthetics and required acquisition of property rights for new ROW. The draft EA document may be viewed on the NDOR website at http://www.transportation.nebraska.gov/projects/. Copies are available at the FHWA and NDOR headquarters in Lincoln, the NDOR District 5 Office in Gering, in Alliance at the City Offices and Public Library, the Angora Post Office, and the City Office of Bridgeport. The information is available for a 30-day comment period: September 15—October 16, 2014.

ESTIMATED COST: The first construction project, Alliance South, DPS-385-4(139), CN 51522, would construct US-385 from West 3rd Street south to approximately Mile Marker (MM) 100+00 and is estimated at $25 million. The second construction project, L-62A North, S-385-3(1021), CN 51443, would construct US-385 from approximately MM 100+00 south to the junction of US-385 and L-62A, and is estimated at $30 million. The third project, which would construct a sweeping curve connecting L-62A to US-385, is currently not programmed. Preliminary engineering, ROW and utilities costs for the corridor are tracked under a separate project, NH-385-3(118), CN 51432, and are estimated at $10 million. The total cost (in today’s dollars) of the project contemplated is estimated at $90 million, which includes an estimated $25 million to construct the sweeping curve and reconstruct the northbound lanes.�Funding sources would include federal, state (the Build Nebraska Act), and local funding (City of Alliance). The City of Alliance would participate with a 20% cost share for the portions of the project within or adjacent to the city limits.

Page 2: Thi is b eing held to provid e in fo rma ti npu t on th e ...dot.nebraska.gov/media/1816/meeting-handout-2014-heartland.pdf · ESTIMATED COST: The first construction project, Alliance

4- LANE DIVIDED(SOUTH END OF PROJECT to ROCK ROAD)

5- LANE W/TWO WAY LEFT TURN LANEIN ALLIANCE (ROCK ROAD to N-2 (3RD STREET))IN ALLIANCE (ROCK ROAD to N-2 (3 STREET))

Junction L-62A / US-385 to AllianceNH-385-3(118); C.N. 51432

ALLIANCE