think bim nick tune
TRANSCRIPT
![Page 1: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/1.jpg)
BRE: Think BIM
Set up for delivery, what next?
Nick TuneDirector BuildingSMART
![Page 2: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/2.jpg)
Level 2, BIM ready?
– BS1192/ PAS; Digital plan of works; Protocol, Demand Matrix; Uniclass 2; File Based collaboration - COBie
Input Output
Output
Output• One type of input in to
one resource
• Many outputs depending on choice
• Modifying data is simple, quick and efficient
©Autodesk
![Page 3: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/3.jpg)
Digital Plan of Work
1
2
3
4
5
N
N
N
MC
LD
E
S
ME
M
Tier 1Tier 2Tier 3Tier N
A
CPortfolio
Mgt
PPM
PUSH SIDE – SUPPLY CHAIN PULL SIDE - CLIENT
![Page 4: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/4.jpg)
Where is the industry now ?
– BIM 4 SME
– Mostly design based proprietary software, limited use in construction phase, little use in maintenance
– Most haven't used level 2 tools protocol/tools ie COBie etc
– Not aware of interoperability issues
![Page 5: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/5.jpg)
Can we deliver 2 now?
– Almost! If we all used the same software we could probably do level 2.5 but we don’t and wont!!!!
– Still difficult to get COBie outputs from proprietary software.
![Page 6: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/6.jpg)
What next
– Software vendors can develop tools to give COBie outputs – YES
– But by having COBie etc does fix interoperability issues
• What about common dictionaries?• Software not speaking to each other• Shared collaboration spaces• Limitations of COBie move to IFC• Information delivery requirements
![Page 7: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/7.jpg)
Move to level 3
– IFC:– Industry Foundation Classes– Information for Construction– Data model
– IDM:– Information Delivery Manuals– Types of information required in at points in a process
– IFD:– International Framework for Dictionaries– Data Dictionary
![Page 8: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/8.jpg)
Benefits of going to level 3
Need to explain convince people why we need open iBIM-Information provided not at given snapshot in time ie data drops - ie historic/live/future-Use of data/model in construction phase and most importantly real time for FM-Fully integrated supply chain-Improved interoperability
![Page 9: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/9.jpg)
BuildingSMART & open BIM
– BuildingSMART: a community of people and organisations who are working with open-BIM & sharing their experiences
– Working with government & industry to develop standards, tools and training to ensure that open BIM is used effectively
– We created the Industry Foundation Classes (IFC) standard and building data dictionary & are leading the development and roll out of COBie in the UK
![Page 10: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/10.jpg)
Who is behind BuildingSMART?
– We are a part of the international BuildingSMART programme, with representation across Europe, North America, the Middle East, Far East & Australasia.
– BRE taken control from Jan 13, because we have a background in driving positive change through programmes such as
![Page 11: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/11.jpg)
Activity
– Technical and User working groups (members only)
– Monthly technical working group meetings – Level 2/COBie, Infrastructure, building in-use, Level 3(ibim)
– Training – COBie & Competent person scheme (25% off for members)
– Development of level 3, standards/tools (direct input from members)
– Technical guidance papers, information hub
![Page 12: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/12.jpg)
Activity
– April 25th Tech workshop IFC development
– April 29th COBie training
– May 24th Level 3 data dictionary
– June 27th Level 2 COBie
– June first BSUKI training – Business Manager, Project Manager, Design Manager
![Page 13: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/13.jpg)
BuildingSMART UK - members
![Page 14: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/14.jpg)
– Ongoing:• GovernBIM• RegBIM• TrainBIM (+COBie)• KnoholEM
– Due to start:• Resilient• DIM Cities (Mini-KnoholEM)• Energy management of districts (Mini-Resilient)• C4C (Clouds for Co-ordination)
BRE/BuildingSMART UK projects;
![Page 15: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/15.jpg)
– Governance for projects
– Explores how different disciplines should interact with one another
– Based off Digital plan of works/Demand Matrix; defining the documents and the data transfer
GovernBIM
![Page 16: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/16.jpg)
–Emphasises heavily upon the integration of data transfer and management in the Cloud
–Will be created using existing cloud technologies and tested in a real business environment
–Deliverable is a system that manages data stored on a cloud in an effective manner and allows for a controlled project environment for the end-user
Clouds-for-Coordination
![Page 17: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/17.jpg)
– Building Regulations AD, Code for Sustainable Homes and BREEAM to be automatically checked
– Procedure to be carried out:– Extracting data requirements and logical
relationship– Translate the above in to a language
understandable off-shelf- rules engine– Integrate rule engine to allow for information
retrieval from the BIM– Validation against original requirements
– Deliverable is a rule engine (software) that carried out the checks for the regulations automatically
TSB RegBIM
![Page 18: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/18.jpg)
– Using Building Information Modelling (BIM) approaches we will control (and therefore reduce) energy performance of buildings via a building the loop simulation/visualisation environment, that monitors the buildings energy usage and allows control in a real time basis.
– Energy saving through intelligent energy management by: – Systematic avoidance of energy wasting in buildings– knowledge-based holistic optimization of energy
consumption
KnoholEM
22. November 2012, 1. Review Meeting in Brussels 18
![Page 19: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/19.jpg)
19
![Page 20: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/20.jpg)
– Need to increase awareness requirements of BIM/openBIM
– Vendor specific courses
– One-day courses; different messages
– Am I BIM compliant now?
– One message, approved compliance.
OpenBIM training
![Page 21: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/21.jpg)
Training plan
Course Business Management BIM Project Management BIM Design Management BIM
Main topics General Understanding
Executive leadership
Management of change
Governance
Contract management
Methods of delivery
General Understanding
Governance
Contract management
Methods of delivery
Data formats
BIM process
Data sharing
Collaboration
General Understanding
Software vendor overview
3D modelling demonstrations
Data formats
BIM process
Data sharing
Collaboration
Designed for Associates
Clients
Directors
Managers
Senior Architects
Senior Design Engineers
Senior Technicians
Senior Contractors
Design Architects
Design Engineers
Technicians
FM managers
Contractors
![Page 22: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/22.jpg)
– buildingSMART BIM Designer/Project Manager/Business Manager
– BRE has a certification body that will certify the competency of the people on the course
– To retain the competency, you need to:– Have relevant CPD hours– Produce short BIM reports on work done
BIM competency
Training
Proof
Test Competency
![Page 23: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/23.jpg)
Membership
– Non SMEs £1500 pa
– SMEs £550 pa
– Sole trader £100 pa
![Page 24: Think Bim Nick Tune](https://reader035.vdocuments.net/reader035/viewer/2022062702/554a56a7b4c905522f8b4c7f/html5/thumbnails/24.jpg)
Thank you for listening, any questions and feedback?