think connect the dots using four lines and not taking your pencil off the paper
DESCRIPTION
THINK Connect the dots using four lines and not taking your pencil off the paper. Answer: We must Think outside the box. 1-5 Year Capital Development Plan. Restore the Core and Plan for the Future Robert T. Ungaro - Dir. Of Operations. & Maintenance. Lake Park High School District 108 - PowerPoint PPT PresentationTRANSCRIPT
1-5 Year Capital Development Plan
Restore the Core and Plan for the FutureRobert T. Ungaro - Dir. Of Operations. & Maintenance.
Lake Park High School District 108John Conlon - FacilityTree
Rich Bubula – Director of Buildings & Grounds Downers Grove School District 58
Where To Start?
Ask Questions Seek/Research Information Compile Information Interpret Information Present Information
Ask Questions
History of the District Staff Members Board Members Parents Prior Employees Peers of Neighboring Districts Community Municipality Architect Vendors
Seek/Research Information Life Safety Surveys
ROE Architect
Plat of Surveys Deeds Building Plans
Additions Remodeling
Inspection Reports AHERA (Asbestos) Boilers Bleachers Playgrounds
Insurance reports Asset Reports Past Strategic Plan Past Facility Plans Developer Plans
Life Safety Survey
What is the need for the survey Meets state mandate Yearly Survey
Safety concerns Ten Year Survey
Very detailed Provides opportunity to get funding
Plat of Survey
What does a Plat of Survey tell you Property lines Size of Property Property Description and Pin Number
Find out who your neighbors are Location of utilities
Electrical Natural Gas Water and Sewer Telephone and Cable
Location of all buildings on site Right of Ways
Deeds
What does a Deed tell you The original property owner Who else owned the property Property description itself Pin Number
Building and Addition Plans
When the buildings where built How they where constructed
Construction Bid Documents What type of materials used What was specified Way it is to be built
Who was the architect/contractor/engineer When additions where done As-built drawings very important
Inspection Reports
Asbestos Original Management Report and Inspection Six Month Inspection Three Year Inspection
Boilers Type used
Steam Hot Water
Pressure rating Capacity Manufacture and Model/Serial Number Inspection due date
Bleachers Inside and Outside
Age Type Seating Capacity Condition
Playgrounds Type Age/Weight Capacity Condition
Inspection Reports
Other Reports Insurance Reports
Claims Inspections
Asset Reports Inventory/Bar Code Values
Past Strategic Plan Do you have one?
Past Facility Plans What was done? What needs to be finished? Does it need to be
updated? Developer Plans
What’s happening around you How will the devolvement effect you When is it going to happen because it will
Compile Information Committee formed to analyze and organize the information
10-year Life Safety Survey Strategic Plan
Facilities Finance Curriculum Administration Technology Staff Development
Facilities Plan Enrollment Total Number of Staff Members Demographic Study Survey to Staff, Survey to Parents, Survey to Community Time Line
Inspections Miscellaneous Reports
Interpret Information
Take the data and formulate into a plan Understand the plan needs to be flexible
Anticipate the unusual Funding will effect it’s outcome Board of Education needs involvement Community input can change the course of
action
East Campus Other Project Needs/Wants Communication In Classrooms
Call Buttons or Telephones Call Buttons $40,423 Phone System $200,000
Two New Score Boards In Gym $10,500
Seal Coat and Re-stripe Parking Lots
$30,625 Replace East Balcony Railing
$17,500 Roof Ladders
$28,000 Total:$327,048
Remodeling of Food Labs $50,000
New Softball Scoreboard $5,000
New Softball Press Box $60,000
Total:$143,000
West Campus Other Project Needs/Wants Redo Tennis Courts
$150,000 Communication In Classrooms
Call Buttons or Telephones Call Buttons $40,423 Phone System $200,000
Roof Ladders $12,000
Replace Football Scoreboard $16,450
Concession Stand Enlarged $50,000-75,000
Total:$241,450
Remodel Auditorium
$2,660,000 Build Auditorium
Entrance/Lobby
$663,750 Replace Field House Floor
$318,450 New Baseball Concession
Stand and Press Box
$125,000 Total:$3,779,200
Educational Service Center Other Project Needs/Wants
New Furnaces$20,000 New Carpeting $ Lunch Room
Remodeled $4,000 Painting $5000 New Lighting $8000 Seal Coat and Stripe
Parking Lot $5,000 Total: $
Sell Existing Building Value($) Lease Space ($/sq/ft)
yearly cost $ Building New Building
$ Add on to East or West
Campus $2,000,000
Butler Building Other Project Needs/Wants Operations and
Maintenance East and West Combined Grounds Equipment
$35,000 Truck $40,000
Total:$75,000
Operations and Maintenance East and West Combined Trucks
Two Pickups/plows $40,000
Trailer For Skid Loader and
Tractors $7,000 Heavy Duty Equipment
Skid Loader $20,000 Forklift
$20,000 Grounds Equipment
$100,000 Total:$187,000
Rich Bubula (Five Year Plan)
DOWNERS GROVE GRADE SCHOOL DISTRICT 58 update:SEPTEMBER 5, 2006.SECOND FIVE YEAR PLAN- PROPOSED (Roofs on separate plan)
PRI. LOC. PROJECT & COMMENTS2007-08 2008-09 2009-10 2010-11 2011-12
B1 B.A. ASPHALT- TEAR OUT PARKING LOT AND DRIVE, REPLACE85000
Br5 B.A. ROOF- REPLACE @$22/sq.ft. SEE SEP.ROOF PLAN
B2 B.A. CARPET- REPLACE PRI & INT CLASSRM AREAS & KG 1541YDS @$3762000
Br4 E.S. ROOF- REPLACE @$22/sq.ft. SEE ROOF PLAN
B2 E.S. CARPET- REPLACE PRI & INT CLASSRM AREAS & KG 1541 YDS @$3762000
B3 E.S. ASPHALT- N. half of mn. drive & front parking area- tear out, repave.13500
B1 DIST. AHERA TRIENNIAL INSPECTION (due Sept.2009) 6000
B1 DIST LIGHT POLES- REPLACE DETERIORATED 8 per year for 3 years8800 8800 8800
C DIST. ENERGY MANAGEMENT- BACnet $13700/bldg +10%: stage the work30000 30000 30000 30000 30000
B1 DIST ASPHALT- ANNUAL REPAIR, SEALCOAT, STRIPING25000 25000 25000 55000 55000
B1 DIST EQUIPMENT- FOR MAINTENANCE AND CUSTODIANS13000 13000 13000 13000 13000
B1 DIST EXTERNAL BUILDING- REPAIR, ALUMINUM AND BRICK10000 10000 10000 10000 10000
B1 DIST PAINTING- INTERIOR UPKEEP32000 32000 32000 32000 32000
B1 DIST PLAYGROUND AND SITEWORK PROJECTS20000 20000 20000 20000 20000
B1 DIST VEHICLE- FLEET REPLACEMENT PLAN resulting in lowest annual cost34000 34000 34000 34000 34000
E DIST Maintenance center, 10,460 sqft= $1.6 million + land
Funding Mechanisms
Working Cash Capital Improvement Fund/Life Safety Fund Operations and Maintenance Fund Non-Referendum Bonds Referendum
Present Information
Present to the District Administration Union Representatives All Staff Board of Education Community
Use whatever Media means you can District Newsletter School Newspaper Internet News Media
Software: Board Perspective
It is your Information – your Responsibility Owner Mentality
Increase Efficiencies Operations: Incorporate into daily activities/process Contractors
Vendors/Contractors on the Team They feed / supply your data Use their expertise
Eliminate Surprises / Allocate Funds
Software Feature: Drawings
Drawing Management
Master Drawing for Operations As Built Authoritative Used for Operations
Drawing Layers
Software Feature: Inspections
Benjamin SD 25
Primary Groupings Per Building Asset = PMPrimary GroupingsInspection Name Asset Type Catagories/Asset Standards SubCatagories/Description Frequency/When Inspector/Vendor Asset/ItemSite Exterior Site AssetsExterior - Site Paving Paving-Parking Lot Annual Aug-Nov GCA AssetSite Exterior Site Assets Exterior - Site Paving Paving-Road Annual Aug-Nov GCA AssetSite Exterior Site Assets Exterior - Site Septic Annual Aug-Nov GCA AssetSite Exterior - Site n/a Concrete Curbs Annual Aug-Nov GCA ItemSite Exterior - Site n/a Concrete Walks Annual Aug-Nov GCA ItemSite Exterior - Site n/a Fencing Annual Aug-Nov GCA ItemSite Exterior - Site n/a Stairs/Ramps Annual Aug-Nov GCA ItemSite Exterior - Site n/a Handrails/Guardrails Annual Aug-Nov GCA ItemSite Exterior Site Assets Exterior - Site Fields Play Grounds Sheds Athelitic Fields Annual Aug-Nov GCA AssetSite Exterior Site Assets Exterior - Site Fields PlayGrounds Sheds Playgrounds Annual Aug-Nov GCA AssetSite Exterior Site Assets Exterior - Site Fields PlayGrounds Sheds Garage Sheds Annual Aug-Nov GCA AssetSite Exterior - Site n/a Signage Annual Aug-Nov GCA ItemSite Exterior - Site n/a Project(s) Annual Aug-Nov GCA ItemCapital EquipmentFixed Equip Asset Capital Vehicle/Equipment Truck Annual Aug-Nov GCA AssetCapital Equipment Fixed Equip ? Annual Aug-Nov GCABldg Exterior Roof Exterior - Building Roof ? Roofer AssetBldg System Electircal Bldg System Electrical Distribution Panel Electrician AssetBldg System HVAC/Mechanical Bldg System HVAC/Mechnical Univents Annual Aug-Nov HVAC Contractor AssetBldg System HVAC/Mechanical Bldg System HVAC/Mechnical AHU HVAC Contractor AssetBldg System HVAC/Mechanical Bldg System HVAC/Mechnical RT HVAC Contractor AssetBldg System HVAC/Mechanical Bldg System HVAC/Mechnical RTU HVAC Contractor AssetBldg System HVAC/Mechanical Bldg System HVAC/Mechnical Boilers HVAC Contractor AssetBldg System HVAC/Mechanical Bldg System HVAC/Mechnical Furnace HVAC Contractor AssetBldg System HVAC/Mechanical Bldg System HVAC/Mechnical Condenser Unit HVAC Contractor AssetBldg System HVAC/Mechanical Bldg System HVAC/Mechnical Water Heater HVAC Contractor AssetBldg System HVAC/Mechanical Bldg System HVAC/Mechnical Heat Pump HVAC Contractor AssetBldg System HVAC/Mechanical Bldg System HVAC/Mechnical Exhaust Fan HVAC Contractor AssetBldg System Plumbing n/a Plumbing Pipes GCA ItemBldg System Plumbing n/a Plumbing Fixtures GCA ItemBldg System Plumbing n/a Plumbing Urinals GCA ItemBldg System Plumbing n/a Plumbing Toilets GCA ItemBldg System Plumbing n/a Plumbing Pumps: Ejector GCA ItemBldg System Plumbing n/a Plumbing Pumps: Sump GCA ItemBldg Exterior Envelope n/a Windows Annual Aug-Nov GCA ItemBldg Exterior Envelope n/a Exterior Doors GCA ItemBldg Exterior Envelope n/a Exterior Non-Masonary Walls GCA ItemBldg Exterior Envelope n/a Masonary Walls GCA ItemBldg Interior Building Interior n/a Floors GCA ItemBldg Interior Building Interior n/a Doors, Frames & Hardware GCA ItemBldg Interior Building Interior n/a Walls GCA ItemBldg Interior Building Interior n/a Cielings GCA ItemBldg Interior Building Interior n/a Casework GCA ItemBldg Interior Building Interior n/a Writing/Display Boards GCA ItemBldg Interior Building Interior n/a Specialty Equipment GCA ItemBldg System Security Safety n/a Eagress GCA ItemBldg System Security Safety n/a Emergency GCA ItemBldg System Security Safety n/a Fire Alarm GCA ItemBldg System Security Safety n/a Access GCA ItemBldg System Security Safety n/a Defibrulator GCA ItemBldg System Structure & Code n/a Building Structure Architect ItemBldg System Structure & Code n/a Foundation Architect ItemBldg System Structure & Code n/a Code Compliance Architect ItemQ. C.Satisfaction Exterior n/a Landscaping GCA ItemQ. C.Satisfaction Interior n/a Custodial GCA Item
Software Feature: Inspections
Benjamin SD 25
Inspections
Calendar
Per Building Surveys per BuildingInspection Name # of Floors Frequency/When Inspector/Vendor
1 Exterior Site Assets Site Bi-Annual Aug-Nov GCA2 Exterior - Site Site Bi-Annual Aug-Nov GCA3 Fixed Equip Asset Bi-Annual Aug-Nov GCA4 Fixed Equip Bi-Annual Aug-Nov GCA5 Roof Roof Bi-Annual Aug-Nov Roofer6 Electircal 1st Floor Bi-Annual Aug-Nov Electrician7 2nd Floor Bi-Annual Aug-Nov Electrician8 Penthouse Bi-Annual Aug-Nov Electrician9 HVAC/Mechanical Roof Bi-Annual Aug-Nov HVAC Contractor10 Site Bi-Annual Aug-Nov HVAC Contractor11 1st Floor Bi-Annual Aug-Nov HVAC Contractor12 2nd Floor Bi-Annual Aug-Nov HVAC Contractor13 Plumbing 1st Floor Bi-Annual Aug-Nov GCA14 2nd Floor Bi-Annual Aug-Nov GCA15 Envelope Site Bi-Annual Aug-Nov GCA16 Building Interior 1st Floor Bi-Annual Aug-Nov GCA17 2nd Floor Bi-Annual Aug-Nov GCA18 Security Safety 1st Floor Bi-Annual Aug-Nov GCA19 2nd Floor Bi-Annual Aug-Nov GCA20 Structure & Code 1st Floor Bi-Annual Aug-Nov Architect21 2nd Floor Bi-Annual Aug-Nov Architect22 Statisfaction Landscaping Bi-Annual Aug-Nov GCA23 Custodial Bi-Annual Aug-Nov GCA
Ju ly Aug ust September Oct ober Novmeber DecemberImplement Projects
Conduct Inspections Survey Build Budget
January February March April M ay Ju ne
Software Feature: Inspections
Key Data to Collect Condition Priority Repair Cost Date Comments Work Order
Ability to Analyze & Edit