third seminar of tempus- formder volos 6-8 july 2006 activities achieved by the egyptian team during...

12
Third Seminar of TEMPUS- FORMDER Volos 6-8 July 2006 Activities Achieved by the Egyptian Team During the period August 2005 – July 2006

Upload: edward-stafford

Post on 18-Dec-2015

225 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Third Seminar of TEMPUS- FORMDER Volos 6-8 July 2006 Activities Achieved by the Egyptian Team During the period August 2005 – July 2006

Third Seminar of TEMPUS- FORMDER

Volos6-8 July 2006

Activities Achieved by the

Egyptian Team During the period

August 2005 – July 2006

Page 2: Third Seminar of TEMPUS- FORMDER Volos 6-8 July 2006 Activities Achieved by the Egyptian Team During the period August 2005 – July 2006

CONTENTS

Development of the two courses (R2&R4)

Data bank establishment progress (R5)

Establishment of the E-communication lab (R3)

Dissemination of information: posters and announcements

Team meetings and sharing in seminars

Page 3: Third Seminar of TEMPUS- FORMDER Volos 6-8 July 2006 Activities Achieved by the Egyptian Team During the period August 2005 – July 2006

First- Development of the two courses (R2&R4)

A- Upgraded Course:

LEADERSHIP and DEVELOPMENT of RURAL COMMUINTY (R2)

65% achievement

In a separate presentation

Page 4: Third Seminar of TEMPUS- FORMDER Volos 6-8 July 2006 Activities Achieved by the Egyptian Team During the period August 2005 – July 2006

B- New Course initiative :

Social evaluation of Intangible Impacts of Rural

Development projects (R4)

20% achievement

In a separate presentation

First- Development of the two courses (R2&R4) (cont.)

Page 5: Third Seminar of TEMPUS- FORMDER Volos 6-8 July 2006 Activities Achieved by the Egyptian Team During the period August 2005 – July 2006

55

Second: Data bank establishment progress (R5)

A model format was designed for collection of A model format was designed for collection of the data needed and almost 75% of this stage the data needed and almost 75% of this stage has already been collected.has already been collected.

Next step until mid November 06 will be to Next step until mid November 06 will be to complete gathering the rest of data needed complete gathering the rest of data needed

Last step will be the upload of data organized in Last step will be the upload of data organized in he aapproved format on the webhe aapproved format on the web

Page 6: Third Seminar of TEMPUS- FORMDER Volos 6-8 July 2006 Activities Achieved by the Egyptian Team During the period August 2005 – July 2006

Posters:

A new poster was prepared for

presentation In the National TEMPUS

Forum which was held on March 7th,

2006 .

Third- Dissemination of information :posters and representation of the project in national seminars

Page 7: Third Seminar of TEMPUS- FORMDER Volos 6-8 July 2006 Activities Achieved by the Egyptian Team During the period August 2005 – July 2006

Logo of the project

University logo

Pictu

res, Ch

arts, diagram

s….

Basic data of the project

Project objectives

Time schedule of activities

Achieved activities and

outputsExpenditures by

item

Plan of action for next 6 months

Preliminary evaluations available about the project activities

TEMPUSLogoP

ictures, C

harts, d

iagrams…

.

Design for a progressive report poster

Page 8: Third Seminar of TEMPUS- FORMDER Volos 6-8 July 2006 Activities Achieved by the Egyptian Team During the period August 2005 – July 2006

88

Representation of the project in The NTO Egypt Forum held in Faculty of Engineering, Cairo University (The Social Club) on March 7th, 2006

Page 9: Third Seminar of TEMPUS- FORMDER Volos 6-8 July 2006 Activities Achieved by the Egyptian Team During the period August 2005 – July 2006

Meetings with the National TEMPUS Office- Egypt (NTO)

Presentation of a power point show about the project

Formation Multipole et Pluridisciplinaire en Development Rural FORMDER-CD_JEP-31059-2003

FORMDER-EGYPT

March 7th, 2006NTO Egypt Forum

Faculty of Engineering, Cairo University (The Social Club)

Page 10: Third Seminar of TEMPUS- FORMDER Volos 6-8 July 2006 Activities Achieved by the Egyptian Team During the period August 2005 – July 2006

Electric network installation

Furnishing the lab with PC disks, chairs and library

Establishment of a LAN and ADSL service

Fourth- E-communication lab establishment

Lab is ready for operation Lab is in action (1st video conference)

Page 11: Third Seminar of TEMPUS- FORMDER Volos 6-8 July 2006 Activities Achieved by the Egyptian Team During the period August 2005 – July 2006

1111

Video-Conference Meetings the second

Great attention

Direct interaction

Attention

Page 12: Third Seminar of TEMPUS- FORMDER Volos 6-8 July 2006 Activities Achieved by the Egyptian Team During the period August 2005 – July 2006

Fifth- Team Meetings and Seminars

Team Meetings

Six meetings with the data bank establishment team

Five monthly meetings of the scientific team

National TEMPUS projects Forum

1-The National TEMPUS project Forum was held on the 13th of Nov. 2005. 2- The NTO Egypt Forum held in Faculty of Engineering, Cairo University (The Social Club) on March 7th, 2006