nerc this page%pdf-1.6 %âãÏÓ 444 0 obj > endobj 449 0 obj...

58
1 Lauren Koller From: Dartnell, Alan D [[email protected]] Posted At: Monday, September 14, 2009 1:52 PM Conversation: GOTO Report Comments Posted To: Standards Subject: GOTO Report Comments Sycamore Cogeneration Company, registered as a GO and GOP, is in agreement with the GO-TO Draft report published by the group reviewing Generator Requirements at the Transmission Interface. The recommended Reliability Standard changes will close reliability gaps at the transmission interface without burdening GO and GOP entities with additional requirements that would not add value to the reliable operation of the Bulk Electric System. Thank you, Alan Dartnell, P.E. Control Systems Supervisor Sycamore Cogeneration Company SW China Grade Loop, Bakersfield, CA, 93308-9700 Tel 661 615 4733 Fax 661 615 4610 Mobile 661 303 5694 [email protected]<mailto:[email protected]>

Upload: duongnguyet

Post on 16-Apr-2018

215 views

Category:

Documents


0 download