thohoyandou botanical garden and nzg construction ... · provide the risk assessment and specific...
TRANSCRIPT
THOHOYANDOU BOTANICAL GARDEN AND NZG CONSTRUCTION/RENOVATION BASELINE RISK ASSESSMENT
1. INTRODUCTION AND OVERVIEW
The Occupational Health and Safety Act of 1993, and its relevant regulations, require employers to do baseline risk assessment for planned construction work and provide the risk assessment and specific health and safety specification to the principal contractor. The objective of this this baseline risk assessment is to inform the Principal contractor of the occupational health and safety risk factors to which persons will be exposed when renovating / demolition of structures/building. Measurements must be taken and the identified problems addressed by the employer. Improved conditions ensure better worker morale, loyalty and greater productivity. All construction and maintenance activities can subject workers to levels of environmental stressors and safety factors, e.g. noise, fumes and hazardous substances, revolving machinery, tools, moving vehicles, electricity, etc., which permanently harm the health and physical wellbeing of persons at work and greatly reduce productivity
2. SITE DESCRIPTION Main administration block, staff ablutions and education centre in the Thohoyandou Botanical Garden. The site has offices which will be in operation during construction work. The following are possible hazards which are related to construction and renovation work;
1. Physical hazards 2. Biological hazards 3. Chemical hazards
Other possible risks includes:
Collision with plant, equipment and other vehicles.
Collision with pedestrians and visitors
Injury to public from falling objects
Because of high density of people, noise and dust.
Special attention and consideration should be prearranged regarding the continued use of surrounding area for parking purposes and normal work during Construction period.
4. STATUTORY REQUIREMENTS Section 8 of the OCCCUPATIONAL HEALTH and SAFETY ACT 1993 (Act no. 85 of 1993), requires inter alia that the employer shall establish as far as is reasonably practicable, what the hazards to the health and safety of persons are attached to any work which is performed, further establish what precautionary measures should be taken with respect to such work and he shall provide the necessary means to apply such precautionary measures. The construction regulations 2014 further requires that a baseline risk assessment for an intended construction work project be compiled and a suitable, sufficiently documented and coherent site specific health and safety specification for the intended construction work based on the baseline risk assessment to be prepared.
5. Hazards identification. Based on the nature of work to be undertaken and the risks attached to it, the following must be complied with in order to ensure health and safety of both SANBI employees and visitors.
Agreed programme of work with clear completion time per phase to allow employees to organise alternative accommodation.
Clearly defined designated access route to and from work area/offices
Ensure all debris is removed from walkways and disposed of safely.
Daily inspection to be carried out by contractors.
Clear signage for visitors to main entrance / other services
Advise employees of restricted access to construction areas during team information sharing.
Contractors instructed not to engage in conversation with staff but to report to Centre manager if staff breach area.
Adequate supervision in the vicinity of the work area.
Contractors’ vehicles not permitted into grounds.
Pedestrian walkways maintained
Obtain Permission from SANBI Centre manager for Construction work undertaken out of normal working hours.
Hot work permit to be obtained first for any welding activities inside the building.
Adhere to emergency and evacuation procedures.
All construction employees must wear hard hat, coveralls, safety boots, high visibility vests and any other PPE as determined by risks attached to their activities.
NB/ Below is baseline risk assessment (not exhaustive) which must be supplemented by your activities risk assessment.
BASELINE RISK ASSESSMENT Centre Name: THOHOYANDOU BG/NZG
STEP 1.
Operation Name: RENOVATION AND CONSTRUCTION PROJECT
Year: 2018 Area:
Activity / Task Description:
Construction and renovation
STEP 2. STEP 3. STEP 4.
STEP
5.
STEP 6.
STEP 7. STEP 8.
STEP 9
Ref
No.
SPECIFIC TASK / ACTIVITY STEPS
IDENTIFIED POTENTIAL HAZARDS
RISK
CLASS
RISK RANKING
RISK CONTROL MEASURES
Hierarchy of Control – Elimination, Substitution, Isolation, Engineering, Administration, Personal Protection.
Additional information can be attached.
RESIDUAL RISK
Ac
tio
ne
r / In
itia
ls
S
Lik
elih
oo
d
Co
ns
eq
ue
n
ce
Ris
k R
ati
ng
Lik
elih
oo
d
Co
ns
eq
ue
n
ce
Re
sid
ua
l
Ris
k H
E
Site clearing & and establishment -manual labour & small tools.
Tools/machinery Noise, Dust
Injuries due to improper use of tools. Hearing impairment,
S H
3 4 12 Full safety plan for the entire project Communication Use proper PPE Develop WSWP
2 3 6
The disregard of the public’s health and safety could result in injuries or even fatalities with associated claims and reputation risks
S 4 4 16 The principal contractor will responsible for ensuring that non-employees affected by the construction work are made aware of the dangers likely to arise from said construction work as well as the precautionary measures to be observed to avoid or minimise those dangers. This includes among others: a. Non- employees entering the site for
3 3 9
Construction activities
whatever reason; b. The surrounding community; and c. Passers-by the site. Appropriate signage must be posted to this effect and all employees on site must be instructed to ensure that non-employees are protected at all times. All non-employees entering the site must receive site applicable induction into the hazards and risks and the control measures for these
Excavations - using manual
labour &motorised plan
Excavations - working inside >
1.5 metres
Tools, Underground services
Injuries, Damages to underground cables and pipelines, electrocution, Engulfment
S 3 3 9 Do task risk assessment before Develop WSWP Do toolbox talks All excavation work to comply with the following: a. Excavation work must be carried out under the supervision of a competent person with at least two years practical experience in excavation work who has been appointed in writing. b. Before excavation work begins the stability of the ground must be evaluated.
2 3 6
Batching plants - erection /
dismantle and general working
Loadings and unsafe maintenance condition
Stuck Injuries due to falling material
S 3 4 12 Detailed consideration to be given to all batching plant to ensure that it is properly planned to meet the working requirements, designed to carry the necessary loadings and maintained in a sound condition. It must also be ensured that there is sufficient material
2 3 6
Concrete mixing - using
manual labour and using
mechanical means
Noise, Dust Slippery surfaces
Inhalation Hearing impairment
H 3 4 12 WSWP 2 3 6
Concrete pours - using lifting Falling objects Injuries due hit S 3 4 12 WSWP 2 3 6
machinery (Cranes etc) by falling objects
Concrete pours - using
motorised plant (dumpers etc)
and mechanical pumps
Falling objects, Concrete, Slippery surfaces, Noise
Injuries due to slips and hit by objects
S 3 4 12 WSWP 2 3 6
Lifting Equipment - Tower
crane erection / operation and
dismantle
Tools, working at height Load
Injuries S 4 4 16 Use trained operators Inspect and test cranes as required WSWP Every lifting machine operator must be trained specifically for the type of lifting machine that he or she is operating.
2 4 8
Lifting Equipment - Forklift
operation and lifting tackle
Noise, Load
Hearing impairment, Collision and falling load Injuries
S H
3 4 12 Use trained operators Develop WSWP Regular tests and inspection
2 3 6
Formwork - general erection /
dismantling and lifting and
placing large panels, work on
support decks
Tools, working at height, load, unsecured deck
Injuries due to falling tools and load or deck collapse
S H
3 4 12 Use trained erectors Develop and follow WSWP
2 3 6
Scaffolding - erect / dismantle
small scaffolds < 2 m
Tools, working at height, load, unsecured deck
Injuries due to falling tools and load or deck collapse
S 3 4 12 Only skilled employees to be allowed to erect structures and that the skills of these employees are being verified at regular intervals. Steps to be taken to ensure that no structure becomes unstable or collapses due to construction work
Develop and follow WSWP
2 3 6
Demolition - using small
electric breakers, compressed
Noise, electrocution, dust,
Inhalation, Hearing
S H
4 4 16 Risk assessment Use trained employees
3 3 9
air breakers, motorised
mechanical means,
explosives/blasting
falling objects Asbestos
impairment and injuries
Develop WSWP Communication Demolition work to be carried out under the supervision of a competent person who has been appointed in writing. A detailed structural engineering survey of the structure to be demolished to be carried out and a method statement on the procedure to be followed in demolishing the structure to be developed by a competent person, before any demolition to be commenced.
Trades - Brickwork operations
and plastering operation
Cement dust, Bricks, tools, Working at height
Skin damages, Inhalation and injuries due to falling objects
S H
4 4 16 Risk assessment Training Develop WSWP Toolbox talks
3 3 9
Trades - Painting operations
Working at height, paint
Inhalation, Falling
S H
4 4 16 Risk assessment WSWP and toolbox talk Training
3 3 9
Trades - Ceiling operations Working at height, Tools
Injuries due to slips and fall
S 3 4 12 Risk assessment WSWP and toolbox talk
2 3 6
Trades - Roofing installations
Working at height Injuries due to falls
S 4 4 16 Risk assessment Fall protection plan Where work on roofs is carried out, the risk assessment must take into account the possibility of persons falling through fragile material, i.e. skylights and openings in the roof.
3 3 9
Trades - glazing installations Working at height, Tools
Injuries due to slips and fall
S 3 4 12 Risk assessment WSWP and toolbox talk
2 3 6
Trades - Tiling operations
Tools, talon Skin damage, Muscular pain due to bending
S 3 3 9 Risk assessment WSWP
Trades - Metal work (Doors /
Noise, Tools, cutting
Hearing impairment,
S H
4 4 16 Risk assessment WSWP
2 3 6
windows) and steel erection machines, Welders, Working at height
Eye damage due to glare Falling injuries
Trades - plumbing Tools, Manual handling
Muscular pain, Injuries
S 3 3 9 Risk assessment WSWP
2 2 4
Large plant - Earthmoving
equipment
Large plant - Material handling equipment
General site operations -
Welding
The unsafe use of welding and flame cutting equipment could result in employees and other persons suffering from burns or even result in fires that could cause injuries and fatalities as well as damage to property with subsequent claims and costs
S H
4 4 16 1. A competent person to be appointed to supervise welding, flame cutting or similar operations on site. 2. The following rules to govern all welding and flame cutting or similar operations: a. The welder will be trained regarding the safe use/operation of the equipment. b. The welder and his assistant will be provided with effective and appropriate personal protective equipment and/or clothing. c. Cables and electrode holders will be effectively insulated. d. The workplace will be effectively screened off to prevent bystanders from being affected by the welding rays
3 3 9
General site operations -
Grinding
Noise, flying objects
Eye injuries, Hearing impairement
S H
3 4 12 Risk assessment WSWP
2 3 6
General site operations -
Flame cutting
Flame and fumes Burns Fumes inhalation
S H
3 4 12 Risk assessment WSWP
2 3 6
General site operations -
Drilling
Noise, drill, dust Inhalation, hearing impairment
S H
3 4 12 Risk assessment WSWP
2 3 6
General site operations -
Compaction equipment
Noise, vibration Muscular pains, damage to property like glasses
S 3 3 9 WSWP 2 2 4
General site operations - Steel
fixing
Steel material, Electricity Working at height
Falling, Injuries due to improper handling of materials
S 3 4 12 Risk assessment WSWP PPE
2 3 6
General site operations - Stacking and storage
Unsecured material Unsafe stacking and storage practices may result in stacked items collapsing with subsequent injuries or even fatalities as well as asset damage with associated losses and costs.
S 3 4 12 The principal contractor to ensure that: a. A competent person is appointed in writing to supervise all stacking and storage on a construction site; b. Adequate storage areas are provided and demarcated; c. The storage areas are kept neat and under control; d. The height of any stack does not exceed 3 times the base unless stepped back at least half the depth of a single container at least every fifth tier or the approval of an inspector of the Department of Labour has been obtained to build the stacks higher with the aid of a machine. (The operator of the machine must be protected against items falling from overhead or off the stack and no items may overhang);
2 3 6
General site operations -
Housekeeping
Poor housekeeping may impact negatively on productivity, result in employees/persons tripping and falling or even
S 3 4 12 The principal contractor to ensure that: a. Housekeeping is continuously implemented and maintained; b. Materials and equipment is properly stored; c. Scrap, waste and debris is removed off site regularly; d. Materials placed for use are placed
2 3 6
cause a fire with subsequent asset damage and cost/claims as well as reputation exposures.
safely and not allowed to accumulate or cause obstruction to the free-flow of pedestrians and vehicular traffic; e. Where practicable, construction sites are fenced off to prevent entry of unauthorised persons; f. An unimpeded work space is maintained for every employee
General site operations -
Working under power lines
Electricity
Electrocution S 3 4 12 Risk asessment WSWP
2 3 6
General site operations - Dry
wall partitioning
Tools, Dust Noise
Inhalation Hearing impairment
S 3 4 12 Risk assessment WSWP
2 3 6
General site operations -
electrical installation and
Electrical and mechanical
lockout
Electricity
Unsafe electrical installations could result in employees and other persons being electrocuted with subsequent injuries or even fatalities as well as asset damage due to fire with subsequent costs and reputation risks.
S 4 4 16
Any electrical work undertaken as part of the project, including the installation of temporary electricity for construction use shall be in accordance with Construction Regulation and the Electrical Installation Regulations. The principal contractor to ensure that:
1. Existing services are to be located and clearly marked before construction commences and during the progress thereof;
2. All contractors on site must be informed of and adhere to this lockout procedure.
3 3 9
General site operations -
paving
Bricks, tools, Surface preparation
Injuries due to tools handling, Muscular pains
S 3 4 12 Risk assessment, WSWP
2 3 6
General site operations -
landscaping
Machinery Noise, Tools
Struck injuries Dust Muscular strains
S 3 4 12 Risk assessment WSWP
HCS - flammable liquid
storage and use
Flammable liquids The unsafe use and/or storage of flammables could result in fires or explosions with subsequent injuries or even fatalities as well as asset damage due to fire with subsequent costs and reputation risks.
S H
3 4 12 The principal contractor to ensure that: a. The risk of fire is avoided; b. Sufficient and suitable storage of flammables is provided; c. All employees are instructed in the use of the firefighting equipment and know how to attempt to extinguish a fire; d. A sufficient number of employees are appointed and trained to act as an emergency team to deal with fires and other emergencies; e. Employees are informed regarding emergency evacuation procedures and escape routes; f. Emergency escape routes are kept clear at all times and clearly marked; g. Evacuation assembly points are demarcated and made known to employees;
2 3 6
HCS - Diesel tanks storage
and use
HCS - Hazardous Chemical
substance storage / use
Chemicals The unsafe use of hazardous chemical substances could result in fires with subsequent injuries or even fatalities as well as asset damage due to fire with subsequent costs/claims.
H 4 4 16 The principal contractor to ensure that: a. Employees receive the necessary information and training to be able to use, handle and store hazardous chemical substances safely; b. The risk assessments required in terms of Construction Regulation 9 include employee exposure to hazardous chemical substances and that the necessary measures be taken to protect persons from being detrimentally affected by hazardous chemical substances present or used
3 3 9
Spilled chemical substances may also impact negatively on the health of employees and other persons or negative implications for the environment including legal and claim exposures.
in the workplace;
Construction of car parking
Tools/machinery Material Unsafe access
Injuries due to material handling
S 3 4 12 Risk assessment WSWP
2 3 6
Install irrigation system
Tools, materials Trenches
Muscular strain due manual handling Injuries due to improper handling of materials
S 3 4 12 Risk assessment WSWP PPE
2 3 6
STEP
10. Highest Remaining Residual Risk
5
STEP 11.
Risk assessment prepared by:
Risk assessment trained person =
Mulaudzi Tshavheni Edward
Date: 11/06/2018
Other participant names =
Consultation conducted with: Affected South African National Biodiversity Institute employees WSWP to be
developed? Yes / No
Residual Risk
APPROVAL REQUIRED TO PROCEED Approval Signature
Approval Date:
Extreme (E)
Stop Activity and seek approval from the SANBI OHS responsible person/Project manage
High (H) Approval must be obtained from Responsible site manager and when all control measures are in place.
Moderate (M)
Work can commence after supervisors’ approval and all control measures are in place
Low (L) Work can commence when the supervisor/SHE rep has approved this risk assessment, & all identified control measures are in place.
Responsible site manager must approve Risk Assessment if it is used to develop a WSWP.
* Discretion for OHS/Project manager to approve Extreme / High risk work to proceed only applies where there is a risk to production loss/plant. This
discretion does not apply to work if the Ext/High residual risk relates to the potential for personal injury or environment risk. In this case work
should stop and seek professional safety advice.
RISK CALCULATOR (Risk Rating = Consequences x Likelihood)
LIKELIHOOD
CONSEQUENCE
Insignificant (1) Minor (2) Moderate (3) Major (4) Catastrophic (5)
Almost Certain (5) M (11) H (13) E (20) E (23) E (25)
Likely (4) M (7) H (12) H (17) E (21) E (24)
Possible (3) L (4) M (8) H 16) E (18) E (22)
Unlikely (2) L (2) L (5) M (9) H (15) E (19)
Rare (1) L (1) L (3) M (6) M (10) H (14)
STEP QUICK GUIDE OF WHAT
TO DO MORE DETAILED INFORMATION ON EACH PROJECT/TASK RISK ASSESSMENT STEP
1. Complete a description of the Activity / Task
At the top of the risk assessment record the task name, a brief description of the task, and the relevant work area and section. Keep as simple as possible, but with enough information to identify the task.
If the Risk Assessment is being used to develop a Safe Work Procedure (WSWP), the risk assessment task name should correspond with the title of the WSWP.
2. Detail specific task steps In the first column “Ref No.” write the step no. starting from 1. Up until however many steps/tasks there are in the task. If
applicable, these should align with any associated WSWP to enable cross referencing. List each of the specific tasks, activities and/or steps associated with the activity/task that will be undertaken.
3.
Identify potential Hazards for each Task/Activity in Step 2.
Use Hazard Prompt Sheet (Appendix 2) for help.
In the column next to listed tasks/activities, identify all potential hazards relevant to each item. Record each hazard on a separate line.
A common mistake is to refer to a hazard as the actual harm or the health effects it caused rather than the hazard. E.g. If the task was hosing down an area, the hazard is the wet floor not the potential harm caused e.g. fall / cut knee.
If no hazards are found for a task/step or the risk has been addressed in a previous hazard, the task still needs to be listed to show it has been considered, and to keep the steps/tasks in line with any associated WSWP.
4.
Evaluate the possible Consequence of the Hazard
Use Risk Calculator above
Simply put if someone was exposed to the hazard, what would be the reasonable consequence? It is not always the “worst” case scenario; e.g. if you fell 1m off a ladder you could be killed as an extreme (e.g. land on your head), but the most likely consequence would be you might sprain your wrist or break a leg. Therefore the consequence is more likely to be moderate rather than catastrophic.
5.
Evaluate the Likelihood of that Consequence
Use Risk Calculator above
Ask yourself will it ever happen; if so what factors are needed for it to happen, and how often would those factors be around. Then ask yourself what you think the reasonable frequency would be, before determining the Likelihood.
6.
Determine Risk Ratings of hazards
Use Risk Calculator above
Determine each hazard’s risk rating by intersecting the “Consequence” and “Likelihood” levels on the Risk Calculator table.
7. Identify Controls to reduce hazard risk
Control measures need to reduce hazard risk ratings to an acceptable level if the current risk level is unacceptable; aim for a low risk.
Apply the Hierarchy of Control when determining control measures
8. Evaluate the Residual Risk (risk rating with controls in place)
After control measures have been identified, you need to reassess each hazards risk rating to determine what the remaining risk would be with the controls in place from Step 7 (follow the principles in Steps 4 & 5 above).
The aim is to achieve a Low Risk; if not achieved review controls again and/or ask for help.
9. Determine highest remaining residual risk
If the highest residual risk on the risk assessment is a Low Risk, or a Moderate Risk the task/project can commence once all control measures are in place and the risk assessment has been reviewed and approved.
If a High or Extreme risk still remains, then the task/project must not commence and further review must be undertaken involving the Budget Centre manager/ Senior Management Team such as SHEQ (an Elected Safety Representative should also be involved). Exemption: In exceptional circumstances, if the “Ext” or “High” risk rating does not apply to personal injury or environmental damage (e.g. potential for property damage only), and project/site manager in consultation with the OHS believe it is an acceptable risk for the Company, the task may be approved. This does not apply for Personal injury or Environmental risks; an “M” (Moderate) risk is the highest ranking allowable.
10. Approval / WSWP development
Once the risk assessment is complete, all participants should record their name at the bottom of the sheet, document any consultation that was had (e.g. tabled at SHE Committee) and the project/site manager or delegate should sign off the task for approval.
Specify if a safe work procedure (SWP) is required to be developed (e.g. for routine / regular tasks). If yes, this should be done in accordance with the Minimum Standard - Safe Work Procedure Development.
11. Sign on / off All persons involved in a project/task must acknowledge they have read and understood a risk assessment and agree
to comply with all steps and control measures.
12. Document Actioners Reference the initials of the person responsible for ensuring a particular control is implemented before progressing with
the task/project.
APPENDIX 2 Example Hazard Prompt Sheet Centre Name: General
ACTIVITY / TASK PREPARATION CONSIDERATIONS INCLUDE:
Minimum PPE
Safety glasses Double eye / Face shield Earplugs (Specify class:
___________) Helmet High-visibility Safety boots Long sleeves/trousers
Emergency Response /
Plant / Equipment /
Access
1st aid equipment/Trained first aiders
Fire equipment Other emergency response Chemicals approved for job Chemical/Oil spill kit Vehicular type / access / parking Amenities / Facilities / Hours of
Training / Competency
/ Compliance
High risk licenses Certificates of competency Experience Induction training required Project / Area Supervisor Any relevant legislation Consultation / Notifications Any literacy issues
Coveralls Respirator (Specify type:
__________) UV protection (Hat, glasses, etc) Gloves (Specify type:
_____________) Other:
work Signage / Barricades Communication equipment Registered plant
POTENTIAL HAZARDS ASSOCIATED WITH THE ACTIVITY/TASK RESULTING FROM (but not limited to):
CATEGORY CONSIDER CATEGORY CONSIDER CATEGORY CONSIDER
Chainsaw
A chain brake A chain catcher A throttle lock A rear hand guard Anti-vibration rubbers. An exhaust muffler An anti-kickback chain.
Manual Handling
(Ergonomic) / Human / Muscular
Repetition / Overuse High / Low reach High force / Heavy loads Awkward / Unbalanced loads Pushing / Pulling / Twisting Carrying & walking Over exertion (e.g. fatigue) Design / Layout Personal characteristics e.g.
height
Mechanical
Unguarded moving parts (e.g. crush)
Drawing in / cutting points (e.g. nips)
Impact and crushing areas Uncontrolled movement Tearing / Shearing (e.g.
abrasions) Unsafe access Auto-start equipment Inadequate isolation points Hand & power tool condition Stored energy (e.g. vessels) Failure of plant (e.g. loss of
load, plant ejection, collapse, fragmentation)
Emergency Working alone / Remote work
Fire / Explosion
Inappropriate chemical storage/use Self-ignition combustibles (e.g. dust) Fire (e.g. burns)
Thermal
Steam / Condensate Hot or cold materials/surfaces Heat stress / Cold
Gravitational
Injured by people or objects falling
Working at height / Unguarded edge Struck by falling/lowering object Rolling/Sliding objects Ascending/Descending stairs / ramp /
ladders / platform / mobile equipment Lifting equipment (e.g. crane, sling) Holes/Gaps or Slip/Trip hazards Scaffolding Unbalanced ladders Structural failure / Exceeding load
ratings
Chemical / Environment
Hazardous Subs/Dangerous Goods
Inadequate storage/bunds/labelling
Gas / Dust / Fumes (e.g. explosion)
Poor ventilation Inhalation / Absorption / Skin
contact Waste/Contamination e.g.
soil/water/air
Pressure
Compressed gases Hydraulic / Vacuum HP steam / Water
General Work Area
Time of day and illumination/glare
Wet / Slippery / Uneven surfaces
Weather & outdoors e.g. wind, UV, fog
Unauthorised personnel entry Noise / Vibration Biological – fluids, sharps,
insects Inadequate
maintenance/inspections Restricted work area
Procedural Inadequate training / experience Incorrect equipment selection /
use
Kinetic Energy /
Traffic / pedestrian interaction Vehicle instability e.g. rollover
Electrical
Hazards resulting in electrocution / burns; E.g. Cables: Unsafe condition/location No earth leakage protection High voltage / Switch rooms
Mobile Plant /
Pedestrians
Exceeding rated capacity Obstructed / Poor Visibility Being hit by the activities of
another person, moving vehicle or object
Any foreseeable abnormal conditions?
Any other hazardous conditions?
Dead trees Sharp slash points