Page 1: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

THUNDER BAY AREATHUNDER BAY AREADRAINAGE MASTER PLANDRAINAGE MASTER PLAN

Page 2: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Overall problem Vs. local solutions

• There are several areas with local flooding problems

• A review of the situation showed that the problem is not local, but that the existing outlets are insufficient to carry the storm water load

• The present goal is to determine a solution which will reduce the storm water load in the ditches and carry the water to an outlet as efficiently as possible.

Page 3: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Existing Condition• For a 5 year storm event• Almost all water is carried through

surface ditching• Some rain water goes to the

friendship trail• Some rain runs east on Thunder Bay

road to Six-Mile creek• Most rain goes out the Shirley road

outlet

Page 4: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Image of existing drainage pattern

Page 5: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Existing Condition

• Most rain travels through surface ditching• Effectiveness of the system is limited by

water level and storage capacity of the outlets

• The system’s ability to drain is significantly impacted by the wind direction over the lake and the water level in Six-Mile Creek

Page 6: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Problems with existing condition

• Friendship trail ditch running at capacity

• Thunder Bay ditches overflowing• Shirley outlet at capacity

– Provincially significant wetland– Species at risk– Areas which run over private property– Limits any significant maintenance

Page 7: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Images of Shirley Outlet

Page 8: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Proposed Master Plan

• Redistribute the drainage basins• Improve 3 existing outlets

– Friendship Trail – Burleigh – Thunder bay or Bernard

• Significantly reduce the flow going through the Shirley outlet

Page 9: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Friendship Trail

• New ditch on south side of trail (twinning the ditch)

• From Bernard to Six-Mile Creek• Double the storage capacity of the

outlet during heavy rain events • Significantly improve the drainage

for the Jewell & Hyman area• Approx cost $200 000

Page 10: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Image of proposed Friendship trail ditch outlet

Page 11: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Burleigh Road Outlet

• Will drain Burleigh Road and areas to the west

• Improve outlet into lake Erie at south end of Burleigh Road

• Outlet with a 1.8m x 1.2m (4 foot by 6 foot) box structure

• Approx cost $1.3 million

Page 12: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Image of proposed Burleigh Road outlet

Page 13: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Thunder Bay Outlet

• Possible outlet on Thunder Bay Road.• Will drain area south of Riselay, between

Burleigh & Bernard• Outlet at Thunder Bay Road into Six-Mile

Creek• Outlet structure will be twin 1.2m (4 foot)

diameter pipes• Approximate cost $4.0 Million

Page 14: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Image of proposed Thunder Bay Road outlet

Page 15: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Bernard Street Outlet

• Possible outlet on Bernard avenue into lake Erie

• Will drain area south of Riselay, between Burleigh & Bernard

• Outlet will be a 1.8m x 1.2m (4 foot by 6 foot) box structure

• Approximate cost $2.0 million

Page 16: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Image of proposed Bernard Avenue outlet

Page 17: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Image of proposed Bernard Avenue outlet

Page 18: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Image of proposed Bernard Avenue outlet

Page 19: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Image of proposed Bernard Avenue outlet

Page 20: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Design Considerations

• Streets will retain their ditches.• Ditches will be re-sloped to run

towards the appropriate pipe inlet.• Risk of ditch overflow should be

reduced or eliminated.

Page 21: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Design Considerations

• Attempted design with ditches only – IE: no pipes

• Ditch only design with outflows as proposed (Burleigh, Trail, Bernard, Thunder Bay, Shirley) would have ditches up to 1.8m deep (6 feet)

• Significant negative impact on these roads (deep ditches, tree removals, utility relocations)

Page 22: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Proposed 1.8m deep ditches

Page 23: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Proposed 1.8m deep ditches

•PICTURE

Page 24: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Bernard Vs Thunder Bay• Bernard and thunder Bay outlets should be seen as

alternatives to each other• Thunder Bay

– will cost approx $4.0 Million– Will outlet to Six Mile creek. – Note that during heavy storm events that the creek

backs-up which could back-up the system• Bernard Street

– Will cost approx $2.0 Million– Will outlet over beach (above high water mark)– Town must continue and improve its regular

maintenance over beach area. Especially after any storm event

Page 25: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Image of proposed overall drainage pattern

Page 26: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Expected cost

• Project including Bernard Outlet will cost approx $3.5 Million

• Project including Thunder Bay Ave outlet will cost approx $5.5 Million

Page 27: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Schedule

• Phase 1 (2007)– Bernard outlet to Thunder Bay Road– Twinning of Friendship trail ditch

• Phase 2– Piping on Thunder Bay and Cook– Local ditch improvements

• Phase 3– Burleigh outlet – Piping on Burleigh & Pleasant– Local ditch improvements

Page 28: THUNDER BAY AREA...Thunder Bay Outlet • Possible outlet on Thunder Bay Road. • Will drain area south of Riselay, between Burleigh & Bernard • Outlet at Thunder Bay Road into

Questions