tigard 2035 tsp

31
Tigard 2035 TSP City Council Public Hearing October 12, 2010

Upload: symona

Post on 13-Feb-2016

61 views

Category:

Documents


0 download

DESCRIPTION

Tigard 2035 TSP . City Council Public Hearing October 12, 2010. TSP Organization. Volume 1. TSP Policy & plan substance Volume 2. Supporting Information For reference Volume 3. Background Technical memoranda. TSP Organization. Introduction Goals and Policies - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Tigard 2035 TSP

Tigard 2035 TSP

City Council Public HearingOctober 12, 2010

Page 2: Tigard 2035 TSP

TSP Organization Volume 1. TSP

Policy & plan substance Volume 2. Supporting Information

For reference Volume 3. Background

Technical memoranda

Page 3: Tigard 2035 TSP

TSP Organization1. Introduction2. Goals and Policies 3. Transportation Planning Toolbox 4. Development of the TSP5. Transportation System Plan6. Transportation Funding Element7. Glossary

Page 4: Tigard 2035 TSP

1. Introduction Initiated in 2007 Funded by TGM Grant Agency partners

ODOT DLCD Metro TriMet

Washington County Beaverton Tualatin TVF&R

Page 5: Tigard 2035 TSP

1. Introduction Element of the Comprehensive Plan TSP Purpose

Long-range plan for growth Coordinate with land use planning Coordination with other agencies Blueprint for transportation investments

Required by State of Oregon Required for Federal funds

Page 6: Tigard 2035 TSP

1. Introduction Building on Past Efforts

Current TSP (2002) WSRC Plan Tigard Downtown Improvement Plan Tigard Highway 99W Improvement Plan Wash. Co. 2020 Transportation Plan 2035 Regional Transportation Plan (RTP)

Page 7: Tigard 2035 TSP

1. Introduction Planning Environment

Growing congestion Natural & constructed barriers Limited transportation funds Rising fuel costs Environmental impacts

Make the Most of What We Have!!

Page 8: Tigard 2035 TSP

1. Introduction Public Involvement

Web site Cityscape articles (5) Public Forums (2) Open House (1)  Civic Group Outreach (4) Citizen Advisory Committee Planning Commission Work Sessions

Page 9: Tigard 2035 TSP

2. Goals & Policies1. Coordination with Land Use2. Transportation Efficiency3. Multi-Modal System4. Safety5. Inter-Agency Coordination6. Transportation Funding

Page 10: Tigard 2035 TSP

3. Toolbox Informational Section

Tools & terms

Page 11: Tigard 2035 TSP

3. Toolbox Travel Mode Shares Land Use Connectivity/Circulation Transportation System Management

Traffic signal improvements Access management Neighborhood traffic management

Page 12: Tigard 2035 TSP

3. Toolbox Transportation Demand Management

Coordination for alternative travel modes

Specific Projects Walkways & crossing treatments Bicycle facilities

Page 13: Tigard 2035 TSP

4. Development of the TSP 2008 Baseline Conditions Analysis 2035 Forecast Analysis

9,000 households (34%) 25,000 jobs (57%) Growth in the surrounding area

Page 14: Tigard 2035 TSP

4. Development of the TSP

Household Growth: 34%

Page 15: Tigard 2035 TSP

4. Development of the TSP

EmploymentGrowth: 57%

Page 16: Tigard 2035 TSP

4. Development of the TSP Reinforcing Congested Travel Patterns

Morning Rush Hour Evening Rush Hour

Page 17: Tigard 2035 TSP

4. Development of the TSP Reliance on a Few Major Roadways Connectivity Barriers

Highway 217 Railroad/WES Track Fanno Creek Topography Existing Neighborhoods

Page 18: Tigard 2035 TSP

4. Development of the TSPThe Challenge Congestion is already a problem Growth will make it worse Connectivity barriers

Page 19: Tigard 2035 TSP

4. Development of the TSPStrategies Land Use Changes Connectivity Multi-Modal Improvements Systems Operating Improvements Management/Design Measures

Page 20: Tigard 2035 TSP

4. Development of the TSP Project Evaluation Evaluation Criteria

Multimodal mobility System capacity Interagency consistency Safety Cost effectiveness Environmental resources Environmental equity

Page 21: Tigard 2035 TSP

4. Development of the TSP Significant New Projects

Plan for HCT from Portland to Sherwood Hwy 217 over-crossing at N Dakota-Pfaffle

Updated Projects Reduced planned cross sections (Hall Blvd,

121st, and Walnut). Hwy 217 Northern WSRC over-crossing

changed to pedestrian/bicycle only

Page 22: Tigard 2035 TSP

4. Development of the TSP Significant Projects Removed

Wall Street extension across Fanno Creek and RR switching yard

Nimbus Road extension to Greenburg Significant Projects Retained

Hwy 217 Overpass at Hunziker/Hampton Ash Avenue Fanno Creek Bridge Walnut Street Extension to Ash Avenue

Page 23: Tigard 2035 TSP

5. Transportation System PlanA. Management, Design & OperationsB. Multimodal Projects

Page 24: Tigard 2035 TSP

5a. Management & Operations Land Use Planning Functional Classifications Street Design Standards Connectivity Standards Transportation System Management Transportation Demand Management Travel Modes Parking Management

Page 25: Tigard 2035 TSP

5a. Management & Operations

Future Plans and StudiesLand Use – Commercial nodes in residential neighborhoods

Land Use – Mixed-use compact developmentsStreet cross section design guidelinesSpecial area parking management plansAsh/Walnut extension corridor studyCirculation/connectivity study

Additional Studies

Page 26: Tigard 2035 TSP

5b. Projects Nearly 150 Multimodal Projects

Roadways Complete Streets Bicycle Facilities Sidewalks Multi-Use Trails Transit Improvements Transportation System Management

Page 27: Tigard 2035 TSP

5b. Projects High Level Evaluation & Planning Range in Certainty

Pacific Highway-99W/Hall intersection vs. Hall Blvd bridge to Tualatin

Range in Project Scale Commercial Street sidewalks vs.

Highway 217 interchange

Page 28: Tigard 2035 TSP

5b. Projects Financially Constrained Projects

“Reasonably likely” Includes all expected resources Eligible for federal funds Included in 2035 RTP Zone/Comp plan amendments

Page 29: Tigard 2035 TSP

6. Funding Element Historical Capital Revenue Revenue Forecast for Capital Projects

$69 Million over 25 years Total TSP Projects

$657 Million Prioritized Projects

$283 Million Includes all funding sources

Page 30: Tigard 2035 TSP

7. Implementation Identifies measures to ensure

development code reflects the updated policies

Page 31: Tigard 2035 TSP

Potential Council Actions Approve as Recommended by

Planning Commission Approve with Changes Reject