Agenda
• Datacentre challenges
• Modular datacentres and the need for HP POD
• Site Requirements & Services
• Real Installations
4
Existing Datacentre Environment
• Datacentre challenges
• Power, cooling and space capacity limiting IT
• Expansion bound by datacentre build times
• More energy efficiency needed
• Increasing energy costs
• Conventional datacentre infrastructure
incapable of max density
• Increased pressure on
capital expense
• Capacity forecast multiplier
• Pay as you grow enables
capex postponement
7
HP POD Addresses datacentre challenges
Lower construction &
acquisition costs
Reduced construction &
deployment time
Reduced
operating expenses
Higher
equipment density
Modular
Up to 45% less
than brick & mortar
POD avail 6 weeks U.S.
12 weeks worldwide
Energy efficient:
PUE ratio as low as 1.25
Up to avg 27kW/rack
(max 34kW)
Pay as you grow
8
HP POD Key Features
Class-leading, industry-standard and flexible 22 x 50U, 19” full-depth industry-standard
racks support HP, Dell, IBM, Sun, Cisco, etc.
Best-in-class density Support for 3,520 compute nodes,
12,000 LFF drives, or any combination
Built-in redundancy
Pre-configured and tested
Energy efficient PUE ratio <1.25 (1.07 excluding chiller)
Full lifecycle support
9
Customer Case Studies
HPC
Computer aided
design
• Quick
deployment
• IT dense
• Energy efficient
Datacentre Expansion
• Telco / ISP
− Rapid growth
− Blade support
Cloud as a Service
Software company / ISP
• Elastic
• Rapid growth
• Energy efficient
Private Cloud
• Business
• Government
− Scalable
− Repeatable
− Agile
10
Interior View
Standard 50U racks
Hot aisle with rear access
through doors in the container
Serviceable high efficiency
heat exchangers
(HEX) from HP MCS
36” cold aisle
can run at >90F
Facilities
management on
exterior of cold
aisle
Serviceable high
efficiency,
variable speed
blowers from HP
MCS
11
Customer Site Requirements
• Level surface capable of supporting POD’s weight • System utilities
• Cooling water • Domestic water for humidifier • Drain • Power
• Connections to central facility • BMS • Security system • Convenience outlet power • Site networking
• Environmental considerations • Consider installing an awning or other minimal physical structure to
aid in serviceability and security • Lightning protection • Grounding
• Operating temperature • ~-30C to 55C
12
POD vs. New Brick and Mortar
Advantages
Tier I
Brick & Mortar 600KW
Tier I
40’ POD ($1.3M ILP) 600KW
kW per Rack 12 30
# racks 50 22 or 10
IT floorspace 2000 320
Watts / sq ft 300 1891
kW cooling 270 103
Aux kW 150 42
Total kW 1020 745
Annual MWhr 8997 7076
PUE 1.7 1.24
Total CapEx 2,000,000 1,300,000
•~6x savings in footprint
• >60% less cooling power
• >25% less power consumption
• >35% less CAPEX
• >60% less annual OpEx
13
HP POD Services Services for the complete lifecycle of your POD
Solution
• Data centre integration and planning o Critical Facilities Services delivered by EYP MCF
• Tailored factory express POD o Build, integrate test and ship
• Onsite implementation
o Deployment, commissioning, acceptance testing
• Ongoing maintenance and support
o Options include proactive and critical service named services account team
15
Verb IT – Managed Services – Data Centre outsourcing and hosting. Built on
HP POD and Blade Technology.
Offer DC capacity and
service
Oriented compute power
Establishing a Managed
Services business
Scalability, Efficiency and
business continuity issues
Reliability and availability of
IT systems and solutions
HP POD
EYP Implementation
Services
HP Finance
HP Blade & Storage
product
Microsoft Hyper V
Business needs HP solution Customer benefits
• Better end-to-end visibility
of processes
• Scalability issues have
been addressed
• Efficiency & Productivity
gains
• Improved storage
capabilities
• High reliability and
availability of systems
• IT as a Service
25
POD1
POD2
PowerHouse1
PowerHouse2 Chiller Skid
1A and 1B
Chiller Skid
2A and 2B
Site Transformer
760 kW Critical Load –
Parking lot to Data centre in 16 weeks
37
HP POD – The complete solution
Technology HP POD & CI portfolio
+ Design EYP customization service
+ Deployment HP Services
+ Finance HP Financial Services
+ Servers & Storage HP Blades and SL servers
= HP Perfomance Optimised Datacentre
40
• Company Information • ICANN accredited registrar
since 2000
• Fastest growing B2B
Domain Name Reseller
Network in Asia Pacific
• What We Offer • Widest selection of Asian
ccTLDs at rock-bottom
prices
• Other Services: 1EPP, SEO,
CNNIC Internet Keywords
webnic www.webnic.cc
• Your shortcut to the Registries –
eliminate the need for separate
accreditation processes from different
registries!
Our New Plugins
Parallels Partnership
Our Partners
• 8 Years and counting!
• More than 2000 Resellers around the
globe with over 1000 resellers with us
for more than 5 years
We are celebrating our 10th
anniversary!