tings lounge hotel under construction
TRANSCRIPT
![Page 1: Tings lounge hotel under construction](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a0d24b1a28ab59108b4720/html5/thumbnails/1.jpg)
Tings (Tea) Lounge Hotel
– under construction
This is how it looks – at the moment.
We will rebuild before the opening
![Page 2: Tings lounge hotel under construction](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a0d24b1a28ab59108b4720/html5/thumbnails/2.jpg)
This is a front
view of the
house - yet
![Page 3: Tings lounge hotel under construction](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a0d24b1a28ab59108b4720/html5/thumbnails/3.jpg)
But we’ll build on
the rooftop and
make a small
appartment to
ourselves.
And in the garden
we’ll make cosy
corners.
Our Land Lords will
paint the house
(the plaster work
has begun)
![Page 4: Tings lounge hotel under construction](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a0d24b1a28ab59108b4720/html5/thumbnails/4.jpg)
Og så laver vi små
hyggekroge i den
dejlige have.
And in the garden
we’ll make cosy
corners.
![Page 5: Tings lounge hotel under construction](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a0d24b1a28ab59108b4720/html5/thumbnails/5.jpg)
De små huse her i
forhaven laver vi
om til bungalows
med bad osv.
These small houses
in the front of the
house we will turn
into bungalows.
![Page 6: Tings lounge hotel under construction](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a0d24b1a28ab59108b4720/html5/thumbnails/6.jpg)
The backside looks like this – yet.
Next to the existing ’half-circle-tower’ we’ll make a twin - to contain
bathrooms for 4 of the rooms.
![Page 7: Tings lounge hotel under construction](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a0d24b1a28ab59108b4720/html5/thumbnails/7.jpg)
This is the plan of
the ground floor.
It’s not quite
correct, so the
architect is re-
doing it at the
moment.
![Page 8: Tings lounge hotel under construction](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a0d24b1a28ab59108b4720/html5/thumbnails/8.jpg)
And this is where
we’ll make the new
’half-circle-tower’
containing
bathrooms.
![Page 9: Tings lounge hotel under construction](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a0d24b1a28ab59108b4720/html5/thumbnails/9.jpg)
The Tea Louge will
be in the veranda
–
seen from inside and outside -
![Page 10: Tings lounge hotel under construction](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a0d24b1a28ab59108b4720/html5/thumbnails/10.jpg)
- and in the two ajoining rooms.
This is one of them, the other one
has a fireplace.