17
380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601 www.sentinelsolar.com Titan Lite 2L60 - Installation Guide V1.0.0

Upload: others

Post on 02-Oct-2020

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601www.sentinelsolar.com

Titan Lite 2L60 - Installation GuideV1.0.0

Page 2: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

This manual is an illustrated guide on how toinstall a Titan Lite Ground Mount system. Itis meant to cover each individual step of theassembly process. Throughout the guide,references will be called to the parts list inorder to assist in easily identifying the itemsrequired for a specific section. The guide isbroken into several sections, each covering themilestone assembly steps, with sub assemblysteps in-between where necessary. Eachassembly step will include an illustrated listof hardware to be used during that assemblyprocess. Where specified, some assemblysections include a preparation process. It isnecessary to follow these preparations in orderfor the installation to continue smoothly, withno need for back tracking.

Throughout the guide there are referencemarkings for warnings, and recommendations,identified by these symbols:

Be sure to look for and read these markings.They will provide information such asguidelines to prevent damage to equipment,safety measures to prevent serious injury orbodily harm, and advice on how to make theassembly quicker.

The installer and/or contractor or developer of each project shall be responsible and liable for safeand proper installation of each system, and also to initiate, maintain and supervise all safetyprograms and precautions for each project and project site, and to provide all required protection toprevent damage, injury, loss or death to any or all persons, property and work present or located onthe project site.

Sentinel Solar does not install any portion of its mounting systems and therefore will not have, andhereby specifically disclaims, any duty or responsibility for safe and proper installation of anymounting system or jobsite safety as to any jobsite where installation of any of its mounting systemsoccurs. Please follow the drawings and instructions, and report any issues or discrepancies toSentinel Solar.

DISCLAIMER

CONTACT INFORMATIONWestern Canada Division111-1440 Aviation Park NECalgary, AB T2E 7E2, Canada

+1 403 776 4055+1 (888) 950 6601 (Toll Free)+1 (905) 532 0593 (Fax)

[email protected]

www.sentinelsolar.com

Head Office380 Four Valley Dr.Vaughan, ON L4K 5Z1, Canada

+1 (905) 532 0770+1 (888) 950 6601 (Toll Free)+1 (905) 532 0593 (Fax)

[email protected]

www.sentinelsolar.com

Address:

Telephone:

Email:

Website:

Titan Lite 2L60 - Installation Guide

Using this Manual

Page 3: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

123456789

1011121314

1.02.03.03.13.24.04.14.24.35.05.16.06.17.0

Scope of DeliveryComponent OverviewBase ConnectionsBase SpacingAngle SelectionPreparing to Install the FramesInstalling the Elevation BarInstalling the Back BarInstalling the Cross BracePreparing to Install the RailsInstalling the RailsPreparing to Install the PV-ModulesInstalling the PV-ModulesPV-Module Bonding

Section Pg

Titan Lite 2L60 - Installation Guide

Contents

Page 4: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

Upon receipt of goods, make sure to check all packaging to ensure delivery of all parts required.

123456789

FootElevation BarBack BarCross BracePivot BracketTyphoon RailTyphoon Clip ATyphoon Clip CWEEB Washer

222124481612

QTYPARTIDComponents

FINISHQTYID SIZE TYPEABCDEFGHI

GalvGalvGalvZincZincZincStainlessStainlessStainless

244824323232484848

Hex BoltFlat WasherHex NutSerrated Flange BoltFlat WasherNyloc NutSerrated Flange BoltFlat WasherNyloc Nut

0.500 x 1.2500.5000.5000.312 x 1.0000.3120.3120.250 x 0.7500.2500.250

Assembly Hardware

Titan Lite 2L60 - Installation Guide

1.0 Scope of Delivery

PG 1

Page 5: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

19.5'

11'

1

2

6

3

45

Front

Back

Titan Lite 2L60 - Installation Guide

2.0 Component Overview

PG 2

Page 6: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

Lag Screw Connection

5.5" 3.875"

Bolted Connection

The two most common concrete foundations are the Pier Base and Pad Base. They both use 3/4" anchor bolts that are embedded in the concrete.

The racking may also be installed to a wood frame using 3/8" lag screws. Alternative foundation options may be used if approved by an engineer.

Spacing of the anchor bolts must be followed to ensure the racking fits together properly.

Consult with an engineer before proceeding with the base installation

Anchor bolts must be 3/4". Embedment and concrete dimensions to be confirmed by an engineer.

Titan Lite 2L60 - Installation Guide

3.0 Base Connections

PG 3

Page 7: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

132" (11') * 11'

7' o

r 10'

*

20'

Spacing is variable depending on minimum shadow angle

Spacing is variable depending on PV module length and desired space between arrays.

The rack spacing shown is generic and based on a typical system. It is important to verify array dimensions and determine the allowable shadow angle. This will minimize the footprint of the system while limiting shading between rows.

Other spacing may be used. Ensure there is enough space between the racks.

Take into account uneven terrain to limit shading. On some sites it may be recommended to increase the spacing.

Titan Lite 2L60 - Installation Guide

3.1 Base Spacing

PG 4

Page 8: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

SPACING

P1

P2

P3

P4

The Titan Lite can be installed at angles ranging from 35 to 55 . Use the following chart to properly space and position your system to the desired angle.

The foundations are to be spaced at the 7' or 10' marks as required.

ANGLE POSITION SPACING10'10'7'7'7'

P1P2P3P3P4

3540455055

Tilt angle must be selected before constructing the foundations.

Titan Lite 2L60 - Installation Guide

3.2 Angle Selection

PG 5

Page 9: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

Top End

Bottom End

2

1

1

3

5Before installing the frames, ensure the Feet are secured and properly aligned. All feet for the system should be installed prior to beginning with the frame assembly.

Frames must be fully assembled with Cross Braces to avoid putting unnecessary stress on the Foot connections. Avoid leaving them standing unsupported.

Refer to markings to correctly orient the Elevation Bar and Back Bar.

Titan Lite 2L60 - Installation Guide

4.0 Preparing to Install the Frames

PG 6

Page 10: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

CB

A

2

1

Torque to 57 lbs.ft

B

C

5

Open end facing out

ACA

0.500"

Hex Nutx12

0.500"

Flat Washerx24

0.500" x 1.250"

Hex Boltx12

B

Connect the bottom end of the Elevation Bar to the front Foot. Bolt through both sides as shown. Leave these bolts loose so the angle of the Elevation Bar can be set.

Fasten the Pivot Bracket to the top end of the Elevation Bar. Install the through bolts and fully tighten. Ensure the Pivot Bracket opening is facing outwards as shown.

The end of the Elevation Bar with 3 slots is the top.

Install the Foot bolts with the nut on the outside to allow easier access for tools.

Torque to 57 lbs.ft

Titan Lite 2L60 - Installation Guide

4.1 Installing the Elevation Bar

PG 7

Page 11: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

A B

C

A

B

C

3

Torque to 57 lbs.ft

Torque to 57 lbs.ft

0.500" x 1.250"Hex Bolt

x8

0.500"Flat Washer

x16

0.500"Hex Nut

x8

A B C

Connect the bottom end of the Back Bar to the back Foot. Bolt through both sides as shown. Leave these bolts loose so the angle of the Elevation Bar can be set.

Fasten the top end of the Back Bar to the Pivot Bracket. Allow the slot to bottom out. This can be adjusted as required to keep adjacent frames level and aligned.

The end of the Back Bar with the 'T' marking is the top.

Titan Lite 2L60 - Installation Guide

4.2 Installing the Back Bar

PG 8

Page 12: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

4

AB

C

4

0.500" x 1.250"Hex Bolt

x2

0.500"Flat Washer

x4

0.500"Hex Nut

x2

A B C

The Cross Brace bolts to the Back Bars. It connects from the top end of one side, to the bottom end of the other side. Attach at the mounting holes as shown using the provided hardware.

Install the end with the hole first. Swing the Cross Brace until the slotted end aligns with the mounting hole on the adjacent Back Bar.

Once the Cross Brace is installed, check the system for alignment. Make adjustments as required to level the system by moving along the Pivot Bracket slot. Once the frames are level, torque all hardware.

Torque to 57 lbs.ft

Titan Lite 2L60 - Installation Guide

4.3 Installing the Cross Brace

PG 9

Page 13: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

Distance based on PV module

Starter Position

Position the Rails on the Elevation Bar in line with the slotted connection points. Measure the spacing based on the width of the PV Modules.

Center the Rails over the frames so that the overhang is even on both ends. The Elevation Bar is slotted to allow adjustment. Fasten the rail in the 'Starter Position' and adjust adjacent rails as required.

Do not torque until rails are properly spaced.

Titan Lite 2L60 - Installation Guide

5.0 Preparing to Install the Rails

PG 10

Page 14: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

FE

D

8

6

8

Once the Rails have been centered, roll the Typhoon Clip C into the groove of the Rail and position it over top of the bolting holes on the Elevation Bar. Use the hardware provided to bolt it in place.

Ensure the Rail spacing fits the modules correctly before tightening connections.

Torque to 15 lbs.ft

Clip C has the larger slot to fit 5/16" hardware

D E F

0.312" x 1.000"

Flanged Hex Boltx32

0.312"

Flat Washerx32

0.312"

Nylock Nutx32

8

TyphoonClip Cx32

Titan Lite 2L60 - Installation Guide

5.1 Installing the Rails

PG 11

Page 15: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

To prepare for installing the PV-Modules, begin by spacing the Typhoon Rails. They are to be spaced according to the PV-modules. The bolting holes in the module frames must overhange the flange of the Typhoon Rail.

Verify the spacing before torquing the Rail hardware. Ensure the spacing is even across the length of the Rails.

The PV-Modules will rest on the flanges of the Typhoon Rails. The modules should be centered on the Rails.

PV Modules must be bolted at 4 points

Titan Lite 2L60 - Installation Guide

6.0 Preparing to Install the PV-Modules

PG 12

Page 16: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

G

7

HI

There may be a gap here

Torque to 5 lbs.ft

0.250 x 0.750Flanged Hex Bolt

x48

0.250Flat Washer

x48

HG

The PV-modules rest on flanges along the Typhoon Rails. The center rails will hold a module on each side. Place all of the PV-modules onto the rails and check their positioning.

Make sure to arrange the PV-modules so that they are centered along the length of the Rails.

I

0.250Nyloc Nut

x48

Once the PV-modules have been positioned and any adjustments have been made, secure the PV-modules down using the Typhoon Clip A's and the provided hardware.

TyphoonClip Ax48

7

Clip A has the smaller slot to fit 1/4" hardware

Titan Lite 2L60 - Installation Guide

6.1 Installing the PV-Modules

PG 13

Page 17: Titan Lite 2L60 - Installation Guide V1.0 · 380 Four Valley Drive Concord, ON. L4K 5Z1 1.888.950.6601  Titan Lite 2L60 - Installation Guide V1.0.0

9

G

H

I

WEEB Washer (GG)

The PV-Modules are bonded to the rails using WEEB washers. Each PV-module requires at least one WEEB washer.

The WEEB washer must be located in between the PV-Module frame and the rail flange. Bolts must be properly torqued.

Torque to 5 lbs.ft

Titan Lite 2L60 - Installation Guide

7.0 PV-Module Bonding

PG 14