Title V Oil and Gas General Operating Permits. Whitney Hill Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014. Objectives. Learn the differences between a GOP and a SOP Learn the technical review procedures for an ATO application - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Title V Oil and Gas  General  Operating  Permits

Title V Oil and Gas General Operating

Permits

Whitney HillAir Permits Division

Texas Commission on Environmental QualityEnvironmental Trade Fair 2014

Page 2: Title V Oil and Gas  General  Operating  Permits

Objectives▼Learn the differences between a GOP

and a SOP▼Learn the technical review

procedures for an ATO application▼Learn the procedures for a GOP

renewal or revision

The difference between a GOP and a SOP.

Technical review procedures for an ATO application.

The procedures for a GOP renewal or revision.

Page 4: Title V Oil and Gas  General  Operating  Permits

Important Terminology

GOP:The documents that contain all permit requirements for the industry type.

ATO:Authorization to operate under a general operating permit.

Page 5: Title V Oil and Gas  General  Operating  Permits

GOPs vs. SOPs• General

requirements• De minimis,

standard permits, & PBRs only• No public

notice/EPA review done by TCEQ

•Site specific review•Compliance plans allowed

• Public notice/ EPA review for each site

• FOPs• Renewed

every 5 years• Legislative

notification

• General requirements• De minimis,

standard permits, & PBRs only• No public

notice/EPA review for ATO

•Site specific review•Compliance plans allowed

• Public notice/ EPA review for each site

• FOPs• Renewed

every 5 years• Legislative

notification

Page 6: Title V Oil and Gas  General  Operating  Permits

Permit Content▼ATO Letter▼GOP Cover Letter▼GOP Terms▼GOP Tables▼CAM/PM (if applicable)▼Statement of Basis▼Application (federally enforceable)

• GOP Tables

• CAM/PM (if applicable)

• Statement of Basis

• Application (federally enforceable)

• ATO Letter

• GOP Cover Letter

• GOP Terms

Page 7: Title V Oil and Gas  General  Operating  Permits

Initial ATO Application Procedure

▼Qualify▼Required information▼Forms▼Applicable requirements▼Compliance assurance

monitoring/Periodic monitoring

Qualify

Required Info.

Forms

Applicable Reqs.

CAM/PM

Page 8: Title V Oil and Gas  General  Operating  Permits

Initial Application

Qualify

• County• Criteria• PCAs• Compliance

Qualification • County for appropriate GOP• Qualification criteria• Preconstruction authorizations• Compliance with GOP requirements

Page 9: Title V Oil and Gas  General  Operating  Permits

Required Information

Required Information

• Process description• Process flow• Area map• Plot plan

Required Information▼ Process description▼ Process flow▼ Area map▼ Plot plan

Page 10: Title V Oil and Gas  General  Operating  Permits

Required FormsAdministrative Forms• Core Data

Form• OP-1• OP-CRO1• OP-DEL

(optional)• OP-SUM• OP-ACPS

Applicable Requirement Forms• OP-REQ1• OP-UA• OP-MON

(optional)• OP-REQ3

(optional)

▼ Admin. Forms• Core Data Form• OP-1• OP-CRO1• OP-DEL (optional)• OP-SUM

▼ Applicable Req. Forms• OP-REQ1• OP-UA• OP-MON (optional)• OP-REQ3 (optional)

Page 11: Title V Oil and Gas  General  Operating  Permits

OP-REQ1

ATO indicator

Page 12: Title V Oil and Gas  General  Operating  Permits

Applicable RequirementsGOP Index No.

GOP TableOP-UA

Page 13: Title V Oil and Gas  General  Operating  Permits

Example▼ Site

• Webb County• Major source of HAPs

▼ Unit Attributes• Stationary RICE (non-emergency)• > 500 HP• Four stroke lean burn (4 SLB)• Constructed on/after 12/19/2002• REDCO - Reducing CO emissions by 93% or more

Site

Webb County

Major Source of HAPS

Attributes

RICE (non-

emerg)

> 500 HP

4 SLB Post 12/19/200

2

REDCO

Page 14: Title V Oil and Gas  General  Operating  Permits

Example GOP 514 TableUnit Attributes

GOP Index No.

Requirements

> 500 hp

Page 15: Title V Oil and Gas  General  Operating  Permits

Example GOP 514 Table (cont.)Constructed

On/ After 12/19/2002

Normal Service

4SLBReducing CO emissions 514-21-013 Requirements

Page 16: Title V Oil and Gas  General  Operating  Permits

Compliance Assurance Monitoring/

Periodic MonitoringCompliance Assurance Monitoring (CAM) ▼Is in section (d) of

the GOP▼Has applicability

criteria ▼May be required

for standard permits or permits by rule

Periodic Monitoring (PM) ▼In section (f) of

the GOP▼Has applicability

criteria▼May be indicated

in the tables

CAM

Section (d) of GOP

Applicability Criteria

Standard Permits and

PBRs

PM

Section (f) of GOP

Applicability Criteria

Indicated in Tables

Page 17: Title V Oil and Gas  General  Operating  Permits

Example GOP Table With PM

Page 18: Title V Oil and Gas  General  Operating  Permits

Example PM TablePollutant

Indicator Monitored

Periodic Monitoring Requirement

Min. Freq.Averaging Period

PM Option No.

Both Options are Required

Page 19: Title V Oil and Gas  General  Operating  Permits

ATO Technical Review

▼Provisional terms and conditions▼TCEQ reviews application▼Deficiencies resolved▼TCEQ issues ATO letter

Page 20: Title V Oil and Gas  General  Operating  Permits

Revision to ATO

▼Correction of typographical errors▼Change, add, or remove

applicability determinations▼Change in name/ownership (Form)▼Revision to GOP

Page 21: Title V Oil and Gas  General  Operating  Permits

Revision to ATO FormsRequired▼OP-2▼OP-CRO1

Potentially Required▼OP-1▼OP-REQ1▼OP-SUMR▼OP-UA▼OP-MON▼OP-REQ3▼OP-CRO2

Required▼ OP-2▼ OP-CRO1

Potentially Required

▼ OP-1▼ OP-REQ1▼ OP-SUMR▼ OP-UA▼ OP-MON▼ OP-REQ3▼ OP-CRO2

Page 22: Title V Oil and Gas  General  Operating  Permits

Revision Review Policies

▼PBR effective dates▼Scope of revision▼Expected timeline of review

Page 23: Title V Oil and Gas  General  Operating  Permits

ATO Renewal

ATO issue

dATO

expiration

Five year authorization term

Application due(6-18 months before

expiration)

TCEQ sendsrenewal

notification

Page 24: Title V Oil and Gas  General  Operating  Permits

ATO Renewal FormsRequired▼OP-1▼OP-2▼OP-CRO1▼OP-ACPS▼OP-REQ1

Potentially Required▼OP-SUMR▼OP-UA▼OP-MON▼OP-REQ3

Required▼ OP-1▼ OP-2▼ OP-CRO1▼ OP-ACPS▼ OP-REQ1

Potentially Required

▼ OP-SUMR▼ OP-UA▼ OP-MON▼ OP-REQ3

Page 25: Title V Oil and Gas  General  Operating  Permits

Void Requests

Lowering PTE▼ATO Void Request

Letter▼APD-Cert or PI-7-

Cert

Application Area or Site Shutdown▼Void Request Letter▼PCAs Voided▼OP-CRO1

Lowering PTE

ATO Void Request Letter

APD-CERT or PI-7-CERT

Application Area or Site Shutdown

Request to Void PCAs

ATO Void Request Letter

Page 26: Title V Oil and Gas  General  Operating  Permits

GOP Revisions and Renewals

▼Renewal -- every 5 years

▼Revision -- between renewals

▼Update tables and terms

▼Procedures• Public notice• Affected states review• EPA review

▼ATO responsibility

Page 28: Title V Oil and Gas  General  Operating  Permits

Signing Up for E-mail Updates

Page 29: Title V Oil and Gas  General  Operating  Permits

Submitting ATO Applications(Initial, Revisions, and

Renewals)TCEQ

APIRT, MC 161P.O. Box 13087

Austin, TX 78711-3087

Copies must be mailed to the appropriate TCEQ regional office.

Page 30: Title V Oil and Gas  General  Operating  Permits

Submitting ATO ApplicationUpdates

[Name of Assigned Permit Reviewer]

TCEQAPD, MC 163

P.O. Box 13087Austin, TX 78711-3087

Page 31: Title V Oil and Gas  General  Operating  Permits

Submitting ATO Application to EPA

Air Permits Section (6PD-R)EPA, Region 6

1445 Ross Ave., Suite 1200Dallas, TX 75202-2733

Submit application updates to EPA at [email protected]. Identify the associated permit number when submitting information.

Page 32: Title V Oil and Gas  General  Operating  Permits

Oil and Gas GOP

Questions?Air Permits Division

512-239-1250Air Permits Division

512-239-1250