PEKERJAAN Nilai Kontrak 2 Rp % KDN 3 I Bahan Material / Langsung 0% 100% 380,824,200.00 60% 380,824,200.00 60% II Tenaga Kerja Langsung 0% 100% 190,412,100.00 30% 190,412,100.00 30% III Biaya Tidak Langsung Pabrik 0% 100% 63,470,700.00 10% 63,470,700.00 10% 634,707,000.00 100% Rp % 634,707,000 Rehabilitasi Jembatan Jawong No. 24.127.007.0 Km. Smg. 15+025 Ruas : Semarang – Godong (127) Total Barang REKAPITULASI PERHITUNGAN TKDN Uraian Pekerjaan TKDN Barang LN DN TOTAL Wonosobo, 25 febuari 2015 Wonosobo, 25 febuari 2015 CV. HERONI INTI PERSADA WIWIK WIDAYANTI Direktur

Upload: heru-kurniawan

Post on 24-Dec-2015

561 views

Category:

Documents


69 download

TRANSCRIPT

Page 1: TKDN MLERENG.xls.pdf

PEKERJAAN

Nilai Kontrak2 =

Rp % KDN3

I Bahan Material / Langsung 0% 100% 380,824,200.00 60% 380,824,200.00 60%II Tenaga Kerja Langsung 0% 100% 190,412,100.00 30% 190,412,100.00 30%III Biaya Tidak Langsung Pabrik 0% 100% 63,470,700.00 10% 63,470,700.00 10%

634,707,000.00 100%

Rp %

634,707,000

Rehabilitasi Jembatan Jawong No. 24.127.007.0 Km. Smg. 15+025 Ruas : Semarang – Godong(127)

Total Barang

REKAPITULASI PERHITUNGAN TKDN

Uraian PekerjaanTKDN Barang

LN DNTOTAL

Wonosobo, 25 febuari 2015CV. HERONI INTI PERSADA

WIWIK WIDAYANTIDirektur

Wonosobo, 25 febuari 2015CV. HERONI INTI PERSADA