tkr 14 - cargo equipment status
TRANSCRIPT
-
7/31/2019 TKR 14 - Cargo Equipment Status
1/13
FLEET MANAGEMENT LIMITED
CARGO EQUIPMENT STATUS
VESSELS NAME: MT DATE:
1. TANK CLEANING MACHINES
A.
FIXED:
MAKE:
TYPE: NOZ DIA: JET LENGTH:
NUMBERS:
STATUS:
B.
PORTABLE:
MAKE:
TYPE:
NUMBERS:
STATUS:
C.
PORTABLE HOSES & SADDLES ON BOARD:
LENGTH:
NUMBERS:
RECORD OF CONTINUITY MAINTAINED:
STATUS:
2. CARGO HEATING SYSTEM
DATE LAST PRESS TESTED:
DATE LAST HEATED CARGO CARRIED:
MATERIAL:
HEATING RATIO: SURFACE AREA/VOLUME:
STATUS:
TKR-14 REV 0/ 10-02
-
7/31/2019 TKR 14 - Cargo Equipment Status
2/13
-
7/31/2019 TKR 14 - Cargo Equipment Status
3/13
5. BALLAST PUMPS
NUMBERS:
TYPE:
MAKE:
CAPACITY:
STATUS:
6. TANK CLEANING PUMPS
NUMBERS:
TYPE:
CAPACITY:
STATUS:
7. CARGO PIPELINES / MANIFOLD
MATERIAL:
LAST PRESSURE TESTED:
STATUS:
PRESSURE GAUGE FITTED OUTBOARD OF MANIFOLD:
8. BUTTERWORTH HEATER
MAKE:
TYPE:
CAPACITY:
MAX TEMP RISE AT RATED CAPACITY:
DATE LAST CLEANED:
TKR-14 REV 0/ 10-02
-
7/31/2019 TKR 14 - Cargo Equipment Status
4/13
9. PORTABLE TANK GAUGES
NUMBER OF MMC TAPE:
TYPE:
MAKE:
STATUS:
NUMBER OF CARGO SAMPLER:
TYPE:
MAKE:STATUS:
VAPOUR LOCKS FOR PORTABLE GAUGES:
MAKE:
10. CARGO TANKS HIGH LEVEL & OVERFILL ALARM
TYPE:
MAKE:
STATUS:
SETTING (AT WHAT LEVEL):
11. CARGO TANKS LEVEL & TEMPERATURE GAUGE
TYPE:
MAKE:
STATUS:
12. CARGO TANKS GAS FREEING SYSTEM
A.
FIXED:
MAKE:
CAPACITY:STATUS:TKR-14 REV 0/ 10-02
-
7/31/2019 TKR 14 - Cargo Equipment Status
5/13
B.
PORTABLE:
MAKE:
TYPE:
NUMBERS:
CAPACITY:
STATUS:
13. PORTABLE PUMPS ON BOARD
TYPE:
NUMBER:
MAKE:
CAPACITY:
STATUS:
DATE WHEN LAST TRIED OUT:
14.OIL DISCHARGE MONITOR
TYPE:
MAKE:
STATUS:
16. GAS MEASURING INSTRUMENTS
A.
OXYGEN METERS:
NUMBERS:
TYPE:
MAKE:
SERIAL NUMBERS:
LAST CALIBRATED: SHORE: SHIP:
STATUS:
TKR-14 REV 0/ 10-02
-
7/31/2019 TKR 14 - Cargo Equipment Status
6/13
B.
COMBUSTIBLE GAS DETECTORS:
NUMBERS:
TYPE:
MAKE:
SERIAL NUMBERS:
LAST CALIBRATED: SHORE: SHIP:
STATUS:
C.
TOXIC GAS DETECTORS:
NUMBERS:
TYPE:
MAKE:
SERIAL NUMBERS:
STATUS:
17. CHEMICAL SPRAY PUMP
NUMBERS:
TYPE:
MAKE:
STATUS:
18. PNEUMATIC LIGHTS
NUMBERS:
MAKE:
STATUS:
TKR-14 REV 0/ 10-02
-
7/31/2019 TKR 14 - Cargo Equipment Status
7/13
19. LOADICATOR
TYPE:
MAKE:
STATUS:
20. WALKIE TALKIE AVAILABLE FOR CARGO OPERATIONS
MAKE:
TYPE:
NUMBERS:
STATUS:
21. CARGO TANK OPENINGS WATER TIGHTNESS
ACCESS HATCHES & BUTTERWORTH POCKETS
STATUS:
REMARKS:
22. CHEMICALS ON BOARD FOR TANK WASHING
TKR-14 REV 0/ 10-02
-
7/31/2019 TKR 14 - Cargo Equipment Status
8/13
23. OTHER EQUIPMENT ON BOARD
A.
CARGO HOSES:
NUMBERS:
MANUFACTURERS CERTIFICATE:
CERTIFICATES:
MAX SAFE WORKING PRESSURE:
LAST PRESSURE TESTED: DATE: PRESS:
TYPE:
TYPE:
TYPE:TYPE:
B.
REDUCERS:
SIZES:
NUMBERS:
MATERIAL:
C.
U PIECES:
SIZES:
NUMBERS:
MATERIAL:
D.
Y PIECES:
SIZES:
NUMBERS:
MATERIAL:
TKR-14 REV 0/ 10-02
-
7/31/2019 TKR 14 - Cargo Equipment Status
9/13
24. PIPE LINES
STATUS & GENERAL CONDITION
CARGO
HYDRAULIC
TANK
CLEANING
BUNKER
STEAM
FIRE
25. PROTECTIVE CLOTHING
NUMBERS STATUS & GENERAL CONDITION
CLOTHES
GLOVES
BOOTS
PROTECTIVE
MASK
CANISTER
CHEMICAL
CARTRIDGE
TKR-14 REV 0/ 10-02
-
7/31/2019 TKR 14 - Cargo Equipment Status
10/13
26. MISCELLANEOUS
NUMBERS STATUS & GENERAL CONDITION
STEAMING HOSE
DUCTS FOR GAS
FREEING
NON-SPARKING
TOOLS
*To be sent to office every three months on 31stMarch, 30thJune, 30thSeptember,
31st December and to be attached with Chief Officers handling / taking over
report.
Master CHIEF OFFICER
TKR-14 REV 0/ 10-02
-
7/31/2019 TKR 14 - Cargo Equipment Status
11/13
FLEET MANAGEMENT LIMITED
INSPECTION REPORT OF PORTABLE
CARGO PUMP
M.T. ___________________________________CARGO NAME _______________________________
VOY. NO. _______________________________ TANK NO. __________________________________
DATE OF DISCH. _________________________QUANTITY _______________________________M/T
PORT OF DISCH. _________________________ RATE OF DISCH. _______________________MT/H
CHIEFOFFICER___________________________ MASTER __________________________________
Inspection before operation (Condition has to be inspected in ample time advance)
No Detail of Inspection Result of Inspection
1
2
3
4
5
Have you reported to Company why you must useportable pump?
Are the Hydraulic Oil pump, pipe line system, couplingof Hydraulic Oil hoses and valves in sound condition?(The hydraulic oil hose should be actually tested incase of long time kept unless use).
Are the Hydraulic Oil hose, coupling of hose and nut insound condition? (If any damage are found, should berepaired without fail).
Are the cargo hose, which intended to use in normalcondition?
Is the pump condition normal?
Has visual inspection being done for hydraulicoil hose, connection coupling flange of cargo
hose, any contamination of pump and foreignmatters in pump impeller?
Has the plug of the cofferdam shaft sealopened and checked any inflow of driving oil orcargo?
If any leak is found, measure the quantity andrecheck after test running which is necessary whenbig quantity is found. After inspection is done, theplug with seal tape is secured without fail.
** How much the leaked quantity** What kind of liquid.
TKR-15 REV 0/ 10-02
-
7/31/2019 TKR 14 - Cargo Equipment Status
12/13
6
7
8
Is the portable lifting gear normal condition?(Check the condition of wire, hook by actual lifting test)
Has the hydraulic oil lines been connected properly ?(you must observe instruction manual)The return hose must be connected first and then thehigh-pressure hose has to be connected. Open themain valve by inches. Caution if hoses are connectedin inverse way, this is one of the causes of pumpdamage. If there is some air in hose at first stage, airdischarge is necessary.
Has the pump running test been done?
Pump testing:Put a blind flange on outlet of pump and put the pumpbody into half sized drum with water and try the test.Caution if pump is running dry, the shaft seal oncargo side might be damaged by overheat.During pump testing, put a blind on the cargo hoseoutlet, then pressure test of the cargo hose can alsobe done.
Confirm whether any leak, deformation ofhydraulic line, hose and connection parts
(especially, connection part of high pressurehose).
Confirm whether any leak, deformation, etc. oncargo hose.
Confirm whether any leak, deformation onpump body.
Is there any leak from shaft seal of pump incofferdam? If any abnormal leak is found, try touse other pump or renewed the shaft seal.
Is the hydraulic oil pressure normal? (See
instruction manual). The hydraulic pressure willbe indicated about 60-80 kg/cm2 during closerunning test and make sure that the hydraulicoil pressure can be adjusted by Flow ControlValve.
If ship has the equipment for measuring ofdelivery pressure, then confirm whetherpressure is normal or not (under the normalRPM of pump, the delivery pressure will beindicated about 9 kg/cm2)
TKR-15 REV 0/ 10-02
-
7/31/2019 TKR 14 - Cargo Equipment Status
13/13
9
10
11
12
13
14
15
16
17
If any air remains in cargo hose, pressure will bevariable and hard to get exact pressure.And if output pressure is lower than normal, theimpeller and mouth ring have to be checked by
engineers. After complete the running test, all the water in the
pump hose must be drained out before use ofcargo.
Cargo pump can be dipped into cargo but hydraulic oilhose should be remained above cargo level because itis necessary to check any leak from these hosesduring cargo operation?
Have you maintained the continuous monitoring to
adjust pump position and find any problems?
Do you consider to prevent spark by bump into pumpbody and the structures inside the tank.
Do you consider and monitor against the unexpecteddamage on cargo hose, hydraulic oil hose and line.(Especially leaking of hydraulic oil)
AFTER OPERATIONAre hydraulic oil hose and cargo hose in normalcondition?
Is cargo pump in normal condition?How much is the leaked quantity of hydraulic oil orcargo in cofferdam?
Has the disconnection procedure been done as perthe instruction? Caution (Return hose should bedisconnected at last)
Have the proper cleaning of cargo pump, cargo hoseand hydraulic oil hose been done?
Are the cargo hose, pump and hydraulic oil hosestowed properly?If hydraulic hose is stowed with big bend, it is liable toget damaged because the material is thiokol rubber.Cover the hose and pump to prevent any foreignmatters.
Above check list to be filled every 6 months when the pump is being tried out.TKR-15 REV 0/ 10-02