tompkins consolidated area transit inc...tompkins consolidated area transit inc 737 willow ave list...

8
TOMPKINS CONSOLIDATED AREA TRANSIT INC 737 WILLOW AVE LIST OF DRAWINGS BUS WAS REPLACEMENT CONSTRUCTION DOCUMENTS JANUARY 15, 2018 HUNT NO. 2940-002 COVER G1.1 SYMBOLS AND ABBREVIATIONS SITE L1.1 OIL-WATER SEPARATOR PLAN AND DETAILS ARCHITECTURAL A0.1 FIRST FLOOR DEMOLITION PLAN A1.1 FIRST FLOOR PLAN MECHANICAL H1.1 BUS WASH MECHANICAL PLANS PLUMBING P0.1 FLOOR DEMOLITION PLAN P1.1 PARTIAL FLOOR PLANS, SCHEMATICS & SCHEDULE ELECTRICAL E1.0 ELECTRICAL PLAN LOCATION MAP THIS IS TO CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE, INFORMATION AND BELIEF - THESE PLANS AND SPECIFICATIONS ARE IN ACCORDANCE WITH APPLICABLE REQUIREMENTS OF THE BUILDING CODE, FIRE CODE, AND ENERGY CONSERVATION CONSTRUCTION CODE OF NEW YORK STATE. HORSEHEADS, NY ROCHESTER, NY TOWANDA, PA AIRPORT CORPORATE PARK 100 HUNT CENTER HORSEHEADS, N.Y. 14845 607 358 1000 FAX 358 1800 ITHACA, NEW YORK PROJECT LOCATION

Upload: others

Post on 24-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TOMPKINS CONSOLIDATED AREA TRANSIT INC...TOMPKINS CONSOLIDATED AREA TRANSIT INC 737 WILLOW AVE LIST OF DRAWINGS BUS WAS REPLACEMENT CONSTRUCTION DOCUMENTS JANUARY 15, 2018 HUNT NO

TOMPKINS CONSOLIDATED AREA TRANSIT INC

737 WILLOW AVE

LIST OF DRAWINGS

BUS WAS REPLACEMENT

CONSTRUCTION DOCUMENTS

JANUARY 15, 2018HUNT NO. 2940-002

COVERG1.1 SYMBOLS AND ABBREVIATIONS

SITEL1.1 OIL-WATER SEPARATOR PLAN AND DETAILS

ARCHITECTURALA0.1 FIRST FLOOR DEMOLITION PLANA1.1 FIRST FLOOR PLAN

MECHANICALH1.1 BUS WASH MECHANICAL PLANS

PLUMBINGP0.1 FLOOR DEMOLITION PLANP1.1 PARTIAL FLOOR PLANS, SCHEMATICS & SCHEDULE

ELECTRICALE1.0 ELECTRICAL PLAN

LOCATION MAP

THIS IS TO CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE,INFORMATION AND BELIEF - THESE PLANS AND SPECIFICATIONSARE IN ACCORDANCE WITH APPLICABLE REQUIREMENTS OF THEBUILDING CODE, FIRE CODE, AND ENERGY CONSERVATIONCONSTRUCTION CODE OF NEW YORK STATE.

HORSEHEADS, NY ROCHESTER, NY TOWANDA, PA

AIRPORT CORPORATE PARK100 HUNT CENTERHORSEHEADS, N.Y. 14845

607 358 1000FAX 358 1800

ITHACA, NEW YORK

PROJECT LOCATION

Page 2: TOMPKINS CONSOLIDATED AREA TRANSIT INC...TOMPKINS CONSOLIDATED AREA TRANSIT INC 737 WILLOW AVE LIST OF DRAWINGS BUS WAS REPLACEMENT CONSTRUCTION DOCUMENTS JANUARY 15, 2018 HUNT NO

A

A/C

AB

ABV

AC

ACT

AD

ADD

ADH

ADJ

AESS

AGG

AHU

AL

ALIGN

ALLOW

ALT

AMP

ANC

ANOD

APPROX

ARCH

ASB

ASBC

ASPH

AUX

AVG

AWG

BCU

BCJ

BD

BEJ

BEL

BEV

BF

BIT

BLDG

BLK

BLKG

BM

BOF

BOT

BPL

BRG

BRK

BRKT

BS

BTU

BUR

BW

C

C-C

CAB

CAP

CB

CBF

CD

CEM

CER

CF

CFLG

CFM

CFMF

CFS

CH

CHBD

CI

AREA

AIR CONDITIONING COOLING

ANCHOR BOLTS

ABOVE

ALTERNATING CURRENT

ACOUSTICAL TILE

AREA DRAIN

ADDENDUM

ADHESIVE

ADJACENT

ARCHITECTURAL EXPOSED STRUCTURAL STEEL

AGGREGATE

AIR HANDLER

ALUMINUM

ALIGNMENT

ALLOWANCE

ALTERNATE

AMPERAGE

ANCHOR(AGE)

ANODIZED

APPROXIMATE

ARCHITECTURAL

ASBESTOS

ASBESTOS CONTRACTOR

ASPHALT

AUXILIARY

AVERAGE

AMERICAN WIRE GAGE

BLOWER COIL UNIT

BRICK CONTROL JOINT

BOARD

BRICK EXPANSION JOINT

BELOW

BEVELED

BOARD FEET

BITUMINOUS

BUILDING

BLOCK

BLOCKING

BENCH MARK

BOTTOM OF FOOTING

BOTTOM

BEARING PLATE

BEARING

BRICK

BRACKET

BOTH SIDES

BRITISH THERMAL UNITS

BUILT-UP ROOF

BOTH WAYS

CHANNEL

CENTER TO CENTER

CABINET

CAPACITY

CATCH BASIN

HUNDRED BOARD FEET

COLD DRAWN

CEMENT

CERAMIC

CUBIC FOOT

COUNTER FLASHING

CUBIC FOOT/MINUTE

COLD-FORMED METAL FRAMING

CUBIC FEET/SECOND

CABINET HEATER

CHALKBOARD

CAST IRON

CIP

CIR

CJ

CK

CLG

CLO

CLR

CLS

CMP

CMU

CO

COL

COMB

COMP

CONC

CON

CONST

CONT

CONTR

COORD

CP

CPG

CPR

CPT

CR

CRS

CSMT

CST

CT

CTR

CU

CULV

CV

CW

CY

DBL

DC

DEG

DEMO

DF

DIA

DIAG

DIM

DIV

DL

DLV

DN

DOZ

DP

DPR

DR

DS

DT

DTA

DTL

DWG

EA

EC

EF

EJ

EL

ELEC

ELEV

EMER

ENC

ENG

ENT

CAST-IN PLACE CONCRETE

CIRCLE

CONTROL JOINT

CAULK(ING)

CEILING

CLOSET

CLEAR(ANCE)

CLOSURE

CORRUGATED METAL PIPE

CONCRETE MASONRY UNIT

CLEANOUT, COMPANY

COLUMN

COMBINATION

COMPRESS (ED), (ION), (IBLE)

CONCRETE

CONNECTOR, CONNECTION

CONSTRUCTION

CONTINUOUS, CONTINUE

CONTRACT(OR)

COORDINATE

CLAY PIPE

COPING

COPPER

CARPET(ED)

COLD ROLLED

COURSE(S)

CASEMENT

CAST STONE

CERAMIC TILE

COUNTER

CUBIC

CULVERT

CHECK VALVE

COLD WATER

CUBIC YARD

DOUBLE

DIRECT CURRENT

DEGREE

DEMOLITION

DRINKING FOUNTAIN

DIAMETER

DIAGONAL

DIMENSION

DIVISION

DEAD LOAD

DOOR LOUVER

DOWN

DOZEN

DAMP-PROOFING

DAMPER

DOOR

DOWNSPOT

DRAIN TILE

DOVETAIL ANCHOR

DETAIL

DRAWING

EACH

ELECTRICAL CONTRACTOR

EACH FACE

EXPANSION JOINT

ELEVATION

ELECTRIC(AL)

ELEVATOR

EMERGENCY

ENCLOSE, ENCLOSURE

ENGINEER

ENTRANCE

EOC

EOD

EOS

EP

EQ

EQP

EST

EW

EWC

EWF

EXC

EXG

EXH

EXP

EXT

FA

FAI

FAS

FB

FBD

FBO

FC

FCU

FD

FDR

FE

FEC

FF

FFE

FGL

FIG

FIN

FLCO

FLEX

FLG

FLOUR

FLR

FND

FO

FOC

FOF

FOM

FOS

FP

FPL

FR

FRT

FT

FTG

FUR

FURN

FXT

GAS

GA

GALV

GB

GC

GCMU

GD

GF

GFI

GI

GL

GP

GPM

GSS

GST

EVERY OTHER COURSE

EDGE OF DECK

EDGE OF SLAB

ELECTRICAL PANEL BOARD

EQUAL

EQUIPMENT

ESTIMATE(D)

EACH WAY

ELECTRICAL WATER COOL

ELECTRIC WALL FAN

EXCAVATE

EXISTING

EXHAUST

EXPOSED

EXTERIOR

FIRE ALARM/FRESH AIR

FRESH AIR INTAKE

FASTENER

FACE BRICK

FIBERBOARD

FINISHED BY OTHERS

FAN COIL

FAN COIL UNIT

FLOOR DRAIN

FOLDING DOOR

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FINISH FLOOR

FINISH FLOOR ELEVATION

FIBERGLASS

FIGURE

FINISH(ED)

FLOOR CLEANOUT

FLEXIBLE

FLASHING

FLOURESCENT

FLOOR,FLOORING

FOUNDATION

FRAMED OPENING

FACE OF CONRETE

FACE OF FINISH

FACE OF MASONRY

FACE OF STUDS

FIREPROOF

FLOOR PLATE

FRAME, FRAMED, FRAMING

FIRE-RETARDANT

FOOT(')

FOOTING

FURRED, FURRING

FURNITURE

FIXTURE

GAS

GAGE, GAUGE

GALVANIZED

GRAB BAR

GENERAL CONTRACT(OR)

GLAZED CMU

GRADE,GRADING

GRANULAR FILL

GROUND FAULT INTERRUPTER

GALVANIZED IRON

GLASS, GLAZING

GALVANIZED PIPE

GALLONS PER MINUTE

GALVANIZED STEEL SHEET

GLAZED STRUCTURAL TILE

GVL

GWB

GYP

HB

HC

HCP

HD

HDR

HDW

HH

HI

HDJT

HK

HM

HOR

HP

HR

HT

HTG

HTR

HTX

HVAC

HW

HWH

HYD

ID

IN

INCIN

INCL

INFO

INS

INT

INV

IP

JC

JF

JST

JNT

KIT

KO

KPL

L

LAB

LAD

LAM

LAT

LAV

LBL

LF

LH

LIC

LIN

LINO

LIQ

LKR

LL

LLH

LLV

LMS

LONG

LP

LPT

LRG

LT

GRAVEL

GYPSUM WALL BOARD

GYPSUM

HOSE BIB

HVAC CONTRACTOR

HANDICAP

HEAVY DUTY

HEADER

HARDWARE

HANDHOLE

HEIGHT OF INSTRUMENT

HEAD JOINT

HOOK, HOOKS

HOLLOW METAL

HORIZONTAL

HORSEPOWER

HANDRAIL

HEIGHT

HEATING

HEATER

HEAT EXCHANGER

HEATING, VENTILATION, & AIR CONDITIONING

HOT WATER

HOT WATER HEATER

HYDRANT

INSIDE DIAMETER

INCH(")

INCINERATOR

INCLUDE, INCLUDED, INCLUDING

INFORMATION

INSULATE, INSULATED

INTERIOR

INVERT(ELEVATION)

IRON PIPE/IRON PIPE SIZE

JANITORS CLOSET

JOINT FILLER

JOIST

JOINT

KITCHEN

KNOCKOUT

KICKPLATE

LENGTH

LABORATORY

LADDER

LAMINATE(D)

LATITUDE

LAVATORY

LABEL

LINEAR FOOT

LEFT HAND

LICENSE, LICENSED

LINEAR

LINOLEUM

LIQUID

LOCKER

LIVE LOAD

LONG LEG HORIZONTAL

LONG LEG VERTICAL

LIMESTONE

LONGITUDE, LONGITUDINAL

LIGHT PANEL

LOW POINT

LARGE

LIGHT

LTL

LVR

MAINT

MAS

MATL

MAX

MBF

MBR

MC

MECH

MED

MFD

MFG

MFR

MGR

MH

MIN

MIR

MKBD

MLD

MMB

MO

MOD

MON

MOV

MRB

MRD

MNT

MTFR

MTL

MULL

MULT

MWK

NA

NAT

NEC

NEG

N/F

NIC

NL

NMT

NOM

NRC

NS

NTS

OA

OBS

OC

OD

OFF

O/H

OHG

OWSJ

OPG

OPH

OPP

OPS

ORIG

PA

PAR

PB

PBD

PLBG

PC

PCC

LINTEL

LOUVER

MAINTENANCE

MASONRY

MATERIAL

MAXIMUM

1000 BOARD FEET

MEMBER

MECANICAL CONTRACT(OR)

MECANIC(AL)

MEDIUM

MANUFACTURED

MANUFACTURING

MANUFACTURE(R)

MANAGER

MANHOLE

MINIMUM

MIRROR

MARKERBOARD

MOULDING, MOLDING

MEMBRANE

MASONRY OPENING

MODULAR

MONUMENT

MOVABLE

MARBLE

METAL ROOF DECKING

MOUNT, MOUNTED, MOUNTING

METAL FURRING

METAL

MULLION

MULTIPLE

MILLWORK

NOT AVAILABLE/APPLICABLE

NATURAL

NATURAL ELECTRIC CODE

NEGATIVE

NOW OR FORMERLY

NOT IN CONTRACT

NAILABLE

NON-METALLIC

NOMINAL

NOISE REDUCTION COEFFICIENT

NEAR SIDE

NOT TO SCALE

OVERALL

OBSCURE

ON CENTER(S)

OUTSIDE DIAMETER

OFFICE

OVERHEAD

OVERHANG

OPEN-WEB STEEL JOIST

OPENING

OPPOSITE HAND

OPPOSITE

OPPOSITE SURFACE

ORIGINAL

PUBLIC ADDRESS

PARALLEL

PANIC BAR

PARTICLE BOARD

PLUMBING

PLUMBING CONTRACTOR

PRECAST CONCRETE

PCF

PE

PEN

PERF

PERI

PERM

PERP

PFB

PFN

PG

PKG

PL

PLAM

PLAST

PLF

PLS

PNL

PNT

POB

PR

PRF

PROJ

PRT

PSC

PSF

PSI

PT

PTD

PTN

PTR

PV

PVC

PVCP

PVMT

PWD

QT

QTR

QTY

R

RC

RS

RA

RAD

RBR

RBT

RCP

RD

REF

REFR

REG

REINF

REQ

RES

RET

REV

RFG

RFH

RFL

RH

RIM

RL

RM

RMV

RO

ROW

RP

POUNDS PER CUBIC FOOT

PORCELAIN ENAMEL

PENETRATION

PERFORATE(D)

PERIMETER

PERMANENT

PERPENDICULAR

PREFABRICATE(D)

PREFINISHED

PLATE GLASS

PARKING

PLATE

PLASTIC LAMINATE

PLASTER

POUNDS PER LINEAR FOOT

PLASTIC

PANEL

PAINT(ED)

POINT OF BEGINNING

PAIR

PREFORMED

PROJECT

PRESERVATIVE TREATED

PRE-STRESSED CONCRETE

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

POINT

PAPER TOWEL DISPENSER

PARTITION

PAPER TOWEL RECEPTOR

PAVE(D), PAVING

POLYVINYL CHLORIDE

PVC PIPE

PAVEMENT

PLYWOOD

QUARRY TILE

QUARTER

QUANTITY

RISE(R)

REINFORCED CONRETE

REINFORCING STEEL

RETURN AIR

RADIUS

RUBBER

RABBET

REINFORCED CONCRETE PIPE, REFLECTED CEILING PLAN

ROOF DRAIN

REFERENCE

REFRIGERAT-(OR),(ED)

REGISTER

REINFORCE(D), REINFORCING

REQUIRED

RESILIENT

RETURN

REVISED, REVISION(S)

ROOFING

ROOF HATCH

REFLECT(ED), (IVE), (OR)

RIGHT HAND

RIM(ELEVATION)

RAIL(ING)

ROOM

REMOVE

ROUGH OPENING

RIGHT OF WAY

RADIANT PANEL

RPM

RT

RTE

RWC

SAN

SB

SC

SCH

SCN

SD

SDG

SEC

SF

SFGL

SGT

SH

SHT

SHTG

SHWR

SIM

SKL

SL

SNT

SP

SPC

SPEC

SPKR

SPL

SQ

SSK

SS

STA

STC

STD

STL

STN

STOR

STR

SUBSTR

SUPT

SURF

SUSP

SW

SY

SYS

T

TRM

T&B

T&G

TAB

TC

TEL

TEMP

TF

THK

THR

TKBD

TKS

TOM

TMBR

TOF

TOJ

TOL

TOPO

TOS

TOW

TPD

REVOLUTIONS PER MINUTE

RUBBER TILE

ROUTE

RAINWATER CONDUCTOR

SANITARY, SANITARY SEWER

SPLASHBLOCK

SOLIDCORE

SCHEDULE

SCREEN

STORM DRAIN

SIDING

SECTION

SQUARE FOOT

SAFETY GLASS

STRUCTURAL GLAZED TILE

SHELF, SHELVING

SHEET

SHEATHING

SHOWER

SIMILAR

SKYLIGHT

SLEEVE

SEALANT

SOUND PROOF

SPACER

SPECIFICATION(S)

SPEAKER

SPECIAL

SQUARE

SERVICE SINK

STAINLESS STEEL

STATION

SOUND TRANSMISSION COEFFICIENT

STANDARD

STEEL

STAIN(ED)

STORAGE

STRUCTURAL

SUBSTRUCTURE

SUPERINTENDENT

SURFACE

SUSPENDED

SWITCH

SQUARE YARD

SYSTEM

TREAD

TOILET ROOM

TOP & BOTTOM

TONGUE & GROOVE

TABULATE

TERRA COTTA

TELEPHONE

TEMPORARY, TEMPERATURE

TRANSPARENT FINISH

THICK(NESS)

THRESHHOLD

TACKBOARD

TACKSTRIP

TOP OF MASONRY

TERMINATION BAR

TOP OF FOOTING

TOP OF JOIST

TOLERANCE

TOPOGRAPHIC

TOP OF STEEL

TOP OF WALL

TOILET PAPER DISPENSER

TPTN

TR

TV

TWP

TYP

TZ

U/G

UC

UN

UNF

UNO

UNP

UR

UV

V

VB

VCP

VCT

VENT

VERT (OR V)

VEST

VF

VIF

VIN

VJ

VOL

VWC

W

W/

W/O

WB

WC

WCO

WD

WF

WG

WH

WHB

WI

WM

WDW

WP

WR

WS

WSCT

WT

WTW

WV

WWF

WWM

XSECT

YD

YR

TOILET PARTITION

TRANSOM

TELEVISION, CABLE

TOWNSHIP

TYPICAL

TERRAZZO

UNDERGROUND

UNDERCUT

UNIT HEATER

UNFINISHED

UNLESS NOTED OTHERWISE

UNPAINTED

URINAL

UNIT VENTILATOR

VOLT

VINYL/RUBBER BASE

VITRIFIED CLAY PIPE

VINYL COMPOSITION TILE

VENTILATOR

VERTICAL

VESTIBULE

VINYL FABRIC

VERIFY IN FIELD

VINYL

V-JOINT(ED)

VOLUME

VINYL WALL COVER

WIDE, WIDTH

WITH

WITHOUT

WOODBASE

WATER CLOSET

WALL CLEANOUT

WOOD

WALL FIN RADIATION

WIRE(D) GLASS

WALL HYDRANT

WHEEL BUMPER

WROUGHT IRON

WIRE MESH

WINDOW

WATERPROOF(ED), (ING)

WATER REPELLENT

WATERSTOP

WAINSCOT

WEIGHT

WALL TO WALL

WET VENT

WELDED WIRE FABRIC

WELDED WIRE MESH

CROSS SECTION

YARD

YEAR

SITEWORK SYMBOLS SITEWORK SYMBOLS PLUMBING SYMBOLS HVAC SYMBOLS ELECTRICAL SYMBOLS ELECTRICAL SYMBOLS

TECHNOLOGY SYMBOLS

ARCHITECTURAL SYMBOLS ARCHITECTURAL SYMBOLS

ARCHITECTURAL MATERIAL SYMBOLS

ELECTRICAL SYMBOLS

HVAC SYMBOLS

PLUMBING SYMBOLS

G

90

+941.5

X 941.5

E

W

SAN

TEL

ST

O/H

UGE

CONTROL POINT

UTILITY POLE W/ANCHOR

SIGN

EXG. WATER VALVE

NEW WATER VALVE

UTILITY POLE W/ LIGHT

STREET LIGHT

EXG. FIRE HYDRANT

NEW FIRE HYDRANT

CATCH BASIN/ DRYWELL

CURB BOX VALVE

EXISTING DECIDIOUS TREE

EXISTING CONIFEROUS TREE

EXG. ELEVATION

NEW ELEVATION

GAS LINE

EXISTING MANHOLE

NEW MANHOLE

NEW CONTOUR*

EXISTING ELECTRIC*

WATER LINE*

SANITARY LINE*

TELEPHONE LINE*

STORM SEWER*

OVERHEAD UTILITY

UNDERGROUND ELECTRIC*

ROAD CENTER LINE

*LINES SHOWN AS SCREENED(GRAY)DENOTE EXISTING

...

X X

EDGE OF STREAM ORSWALE

SHUBBERY, WOODS

EXISTING CULVERT

NEW CULVERT WITH ENDSECTION

TEST PIT

TEST HOLE

TP-*

TH-*

RIP RAP

COORDINATE POINTLOCATION

5/8" REBAR WITH SURVEYCAP SET

EXISTING IRON ROD

EXISTING IRON PIPE

UTILITY POLE

ORIGINAL LOT LINE

DEED LINE

PROPERTY LINE

EXISTING FENCE}NEW FENCE

GUARD RAIL

EASEMENT LINE

CONCRETE MONUMENT

DOMESTIC COLD WATERPIPING

DOMESTIC HOT WATERPIPING

DOMESTIC RECIRCULATINGWATER PIPING

SHUT OFF VALVE

POINT OF CONNECTION

SPRINKLER HEAD

VOLUME DAMPER

PL

(CW)

(HW)

(HWR)

ST

RD

V (V)

(CD)CD

°

AW

AV

C

RS

RL

(OR)

(G)NATURAL GASPIPING

BELOW SLABSANITARY PIPING

ABOVE SLABSANITARY PIPING

BELOW SLAB STORM(ROOFDRAINAGE) PIPING

ABOVE SLAB STORM(ROOFDRAINAGE) PIPING

SANITARYVENT PIPING

CONDENSATEDRAIN PIPING

EXISTING PIPING TOREMAIN.

EXISTING PIPING ANDEQUIPMENT TO BEREMOVED

CHECK VALVE

FLOOR PENETRATION

ACID WASTE

ACID VENT

HOT WATER SUPPLYPIPING

HOT WATERRETURN PIPING

CONDENSATEDRAIN PIPING

REFRIGERANTSUCTION PIPING

REFRIGERANTLIQUID PIPING

EXG. PIPING &EQUIPTMENT TOREMAIN

SHUT-OFF VALVE

TOP-PIPECONECT

BOTTOM-PIPECONNECTION

BALANCING VALVE/ AUTOMATIC FLOW/CONTROL FITTING/ SPRINKLER UPRIGHT

AAD AUTOMATIC DAMPER

DIFFUSER NUMBERCFM

GRILLE NUMBER CFM

REGISTER NUMBER CFM

D-1

100

G-1

300

R-1

300

DUCT W/ MANUALVOLUME DAMPER

SUPPLY AIRDIFFUSER

GRILLER OR REG.

FIRE DAMPER

THERMOSTAT

THERMOSTAT W/GUARD

FD

T

TG

S

10/8

SENSOR

MITERED ELBOW W/TURNING VALVES

FIRST NUMBER IS SIZE SHOWN FORDUCT WIDTH

POINT OFCONNECTION

DUCT DOWN

DUCT UP

DUCT PENETRATION THRUFLOOR OR ROOF ABOVESUPPLY

DUCT PENETRATION THRU FLOOR OR ROOFABOVE EXHAUST OR RETURN

NON-FUSED DISCONNECT SWITCH

FUSED DISCONNECT SWITCH

MAGNETIC CONTACTOR

COMBINATION MAGNETIC MOTOR STARTER ANDFUSED DISCONNECT SWITCH

FLUSH WALL MOUNTED POWER PANEL BD.PP

PP

CP-1

HD

XX

SURFACE MOUNTED POWER PANEL BD.

MOTOR TYPE ELECTRICAL LOAD

HAND DRYER / HAIR DRYER ELEC. LOAD

UV-UNIT VENT

AHU-AIR HANDLING UNIT

FC- FAN COIL UNIT

P-PUMP

EF-EXHAUST FAN

CU-CONDENSING UNIT

DUPLEX RECEPTACLE WALL MOUNTED

GFI-GROUND FAULT CIRCUIT INTERRUPT

IG-ISOLATED GROUND TYPE

WP-GROUND FAULT TYPE IN WATERPROOF HOUSING

AC-MNT. ABOVE COUNTER BACKSPLASH

BC-MNT. BELOW COUNTER

SPECIAL RECEPTACLE WITH NEMA CONFIGURATIONSHOWN

14-50R

FLOOR RECEPTACLE

QUAD RECEPTACLE

TOGGLE SWITCH

KEYED TYPE TOGGLE SWITCH

LOW VOLTAGE MOMENTARYCONTRACT KEYED SWITCH

OCCUPANCY SENSOR TYPE SWITCH

CEILING MOUNTED LIGHT FIXTURE

WALL MOUNTED LIGHT FIXTURE

HID LIGHT FIXTURE - CLG. MNT.

TRACK LIGHTING WITH FIXTURES

STRIP TYPE FLUORESCENT LIGHT FIXTURE

NEW RECESS. FLUORESCENT LIGHTFIXTURE

2'X4' RECESSED LIGHT FIXTURE EM-DENOTED EMERGENCYFIXTURE, CONNECTED TO EMERGENCY CIRCUIT; NL-DENOTESNITE LIGHT CKT. TYPES VARY REFER TO FIXTURE SCHEDULE

EXISTING RECESSED FLUORESCENT LIGHT FIXTURE

PENDANT MOUNTED FLUORSCENT LIGHT FIXTURE

CEILING MOUNTED EMERGENCY EXIT SIGN(SINGLEFACE)

WALL MOUNTED EMERGENCY EXIT SIGN (DUAL FACE)ARROWS FOR EGRESS PATH DIRECTION

EXTERIOR EALL MOUNTED HID LIGHTFIXTURE

EMERGENCY EGRESS BATTERY BACKUPLIGHT FIXTURE

ILLUMINATED "AREA OF RESCUEASSISTANCE" SIGNAGE

CEILING MOUNTED OCCUPANCY SENSOR

FIRE ALARM ANNUNCIATOR

FIRE ALARM CONTORL PANEL

"AREA OF RESCUE ASSISTANCE" CONTROL STATION

MANUAL FIRE ALARM PULL STATION

FAA

FACP

RA

F

FIXED HEAT DETECTOR

SMOKE DETECTOR (REFER TO SPECIFICATIONS FORDEFAULT TYPE)

DUCT SMOKE DETECTOR

FIRE ALARM VISUAL ANNUNCIATOR

FIRE ALARM AUD.-VIS. ANNUNCIATOR

MAGNETIC DOOR HOLDER

MAG. DOOR HOLDER (W/EXTENSION)

DATA PORT

WALL MOUNTED FULL FEATURETELEPHONE & JACK

WALL MOUNTED CLOCK

WALL MOUNTED PA SPEAKER

CLOCK/SPEAKER IN INTEGRALHOUSING

PUBLIC ADDRESS SSYTEM "CALL" PUSHBUTTONS

C

S

S

C

W

M

M

F

F

SD

S

H

I

FL

SSSLV

K

OCS

TV

TV

P1-1

F B

BP

#

WAP

W

(#)

####

S

S

S

VC

C S

C

T V

PROJ

INTERACTIVE BOARD

A V

###

CR

IC

DC

REX

DS

RD

CB

COMBINATION TELEVISION JACK & CCOMPUTER MONITORINTERFACE

SINGLE TELEVISION JACK

HOME RUN OF WIRE AND CONDUIT

CABLE TRAY

FIBER OPTICAL CABLING

FLOOR POKE-THRU

MULTI COMPARTMENT POWER POLE

FLOOR BOX

PULL BOX

MULTI COMPARTMENT SURFACE RACEWAY

CATEGORY 6 DATA OUTLET

WIRELESS ACCESS POINT WITH CAT. 6 CABLING

WALL MOUNT STYLE CAT. 6 TELEPHONE OUTLET

CATEGORY 6 TELEPHONE OUTLET

# = QTY. OF OUTLETS IF GREATER THAN ONE

# = QUANTITY OF DATA OUTLETSIN FACEPLATE IF GREATER THAN ONE

IP TELEPHONE

LOCATION ### =

PHONE TYPE

CEILING MOUNT SPEAKER

WALL MOUNT SPEAKER

HORN TYPE SPEAKER

SPEAKER VOLUME CONTROL

CLOCK/SPEAKER

CLOCK

TELEVISION OUTLET

PROJECTOR

INTERACTIVE BOARD

AUDIO/VIDEO CONNECTIONS TO PROJECTOR

SECURITY CAMERA

CARD READER

#=CAM

NUMBER ##=

CAM. TYPE

INTERCOM

DOOR CONTRACT SWITCH

REQUEST TO EXIT SENSOR

ELECTRIC DOOR LOCK DEVICE (DOOR STRIKE)

LIGHTNING ARRESTOR

GENERAL SYMBOL ANNOTATIONS

"E"=EXISTING TO REMAIN

"R" =EXISTING TO BE REPLACED

"RE"=EXISTING TO BE RELOCATED

"WG" =PROVIDE WIRE GUARD

"W-MT" =WALL MOUNT

COMMUNICATIONS RACEWAY DEVICE LOCATION

COMMUNICATIONS BACKBOX LOCATION

ROOM

AREA

100ROOM NAME, NUMBER, &APPROXIMATE AREA

#

A3.1

#

A3.1

#

A4.1

BUILDING SECTION CALLOUT

WALL SECTION/ DETAILSECTION

INTERIOR ELEVATION CALLOUT

EXTERIOR ELEVATION CALLOUT

A5.1 2

1

4

31

A3.1

#

A5.1

A

CL

DETAIL/TITLE NUMBER

COLUMN GRID LINE

CUT LINE

MATCH LINE

CENTERLINE

ELEVATIONINDICATOR

FIN. 1ST FLOOR0'-0"

845.75'

000N

100-A

100-1

1A

D1

3

G

1

FEC

RD

V

CASEWORK NUMBER & TYPE -REFER TO CASEWORK SCHEDULE

WINDOW NUMBER

DOOR NUMBER

WALL PARTITION TYPE

DEMOLITION KEYNOTE

DRAWING KEYNOTE

MARKERBOARD AND TACKBOARDTYPES

TOILET ACCESSORY TAG

FIRE EXTINGUISHERCABINET

ELEVATION MARK ORCOORDINATE POINT

ROOF DRAIN

SLOPE

VENT PIPE

EXHAUST HOOD

EXISTING WALL/ CONSTRUCTIONTO REMAIN

DEMOLITION WORK

NEW MASONRY WALLCONSTRUCTION

NEW STUD WALL CONSTRUCTION

EARTH/COMPACT FILL

POROUS FILL/GRAVEL

CONCRETE/ STRUCTURAL CONCRETE

SAND/ ARCHITECTURAL PRECAST CONCRETE

CONCRETE MASONRY

BRICK/BRICK PAVERS

STEEL

FINISH WOODWORK

NOMINAL CUT LUMBER, CONTINUOUS BLOCKING

BLOCKING SHIM

PLYWOOD/ PARTICLEBOARD

PLASTIC/ SOLID SURFACE

BATT INSULATION

RIGID INSULATION

FIREPROOFING

GLAZING

LATH AND PLASTER

CARPET

TERRAZZO

CERAMIC TILE - SECTION

GYPSUM WALL BOARD

AIR

PO

RT

CO

RP

OR

AT

E P

AR

K

100 H

UN

T C

EN

TE

R

HO

RS

EH

EA

DS

, N

.Y. 14845

607 358 1000

FA

X 358 1800

HO

RS

EH

EA

DS

, N

YR

OC

HE

ST

ER

, N

YT

OW

AN

DA

, P

A

PROJECT NO:

Copyright: 2017

BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

#D

ATE

:D

ESCRIP

TIO

N O

F REV

ISIO

N:

"Unauthorized Alteration Or Addition To PlansBearing A Licensed Engineer's or ArchitectsSeal, Is A Violation of Section 7209 Of The

New York State Education Law."

12" = 1'-0"

1/1

0/2

01

8 3

:27

:07

PM

G1.1

2940-002

SY

MB

OL

S &

AB

BR

EV

IAT

ION

S

TO

MP

KIN

S C

ON

SO

LID

AT

ED

AR

EA

TR

AN

SIT

, IN

C737 W

ILL

OW

AV

E. IT

HA

CA

, N

Y 1

4850

BU

S W

AS

H R

EP

LA

CE

ME

NT

-

-

1/15/18

Page 3: TOMPKINS CONSOLIDATED AREA TRANSIT INC...TOMPKINS CONSOLIDATED AREA TRANSIT INC 737 WILLOW AVE LIST OF DRAWINGS BUS WAS REPLACEMENT CONSTRUCTION DOCUMENTS JANUARY 15, 2018 HUNT NO

D1REPAIR BAYS

101

WASH BAYS

102 BUS GARAGE

110

PARTS ROOM

103

COMPNENT REPAIRROOM104

FORMAN OFFICE

101B

T.R.

101A

TIRE ROOM

106

LUBE ROOM

108

MECH. ROOM

109

PAINTS/ BATTERIES

107

ELEC. ROOM

105

D4

D5

D2

D6

D2

D3

D6

AIR

PO

RT

CO

RP

OR

AT

E P

AR

K

100 H

UN

T C

EN

TE

R

HO

RS

EH

EA

DS

, N

.Y. 14845

607 358 1000

FA

X 358 1800

HO

RS

EH

EA

DS

, N

YR

OC

HE

ST

ER

, N

YT

OW

AN

DA

, P

A

N

PROJECT NO:

Copyright: 2017

BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

#D

ATE

:D

ESCRIP

TIO

N O

F REV

ISIO

N:

"Unauthorized Alteration Or Addition To PlansBearing A Licensed Engineer's or ArchitectsSeal, Is A Violation of Section 7209 Of The

New York State Education Law."

PROJECT LOCATION

1/8" = 1'-0"

1/1

0/2

01

8 3

:26

:57

PM

A0.1

2940-002

FIR

ST

FL

OO

R D

EM

O P

LA

N

TO

MP

KIN

S C

ON

SO

LID

AT

ED

AR

EA

TR

AN

SIT

, IN

C737 W

ILL

OW

AV

E. IT

HA

CA

, N

Y 1

4850

BU

S W

AS

H R

EP

LA

CE

ME

NT

EBP

SC

1/15/18

GENERAL DEMO NOTES:

A MAINTAIN EXG. STRUCTURAL STEEL, FLOOR, AND ROOF JOISTS AT ALL TIMES, EXCEPTWHERE NOTED. PROVIDE TEMORARY SHEETING AND SHORING AS REQUIRED FOREXCAVATIONS TO PROTECT THE EXG. STRUCTURE TO REMAIN. PROTECT THE EXG.STURCTURE SCHEDULED TO REMAIN FROM DAMAGE DURING DEMOLITION.

B CONTRACTOR TO PROVIDE PROTECTIVE BARRIER AT AREAS OF DEMOLITION. KEEP ALLEXITS FREE AND CLEAR AT ALL TIMES DURING DISTRICT OPERATIONS.

C THE OWNER RESERVES THE RIGHT TO RETAIN ANY REMOVED ITEMS AFTER CONTRACTORREMOVAL. THE CONTRACTOR SHALL REMOVE FROM THE SITE AND DIPOSE OF ALLREMOVED ITEMS THE OWNER DOES NOT WISH TO RETAIN.

D THE CONTRACTOR SHALL COORDINATE THE WORK OF THIS CONTRACT WITH THE WORKOF OTHER CONTRACTS.

E DIMENSIONS FOR ALL NEW OPENINGS IN EXG. CONSTRUCTION ARE TO BE COORIDNATEDWITH EXG. CONDITIONS IN THE FIELD.

F ITMES SHOWN ARE INTENDED TO GIVE APPROXIMATE QUNATITY, LOCATION, AND TYPE.THE CONTRACTOR IS RESPONSIBLE FOR VERFIYING ACTUAL QUANTITY AND EXG. FIELDCONDITIONS.

G CONTAMINATED SOILS MAY BE ENCOUNTERED DURING EXCAVATION. PROVIDE DISPOSALAND REPLACEMENT OF THESE SOILS AS PART OF ALLOWANCE.

H PATCH, REPAIR, PAINT, OR REFINISH EXG. CONSTRUCTION, MATERIALS, AND FINISHESDAMAGED DURING DEMOLITION OR NEW CONSTRUCTION.

DEMOLITION NOTES:

D1 REMOVE EXG. BUS WASH SYSTEM IN ITS ENTIRETY, INCLUDING BUT NOT LIMITED TO ALLPIPING, TANKS, TIRE GUIDE RAILS, SUPPORTS AND RELATED ACCESSORIES ANDEQUIPMENT. DISCONNECT AND REMOVE ALL ASSOCIATED WIRING BACK TO PANEL.

D2 SAW CUT AND REMOVE EXISTING CONCRETE SLAB TO EXTENTS SHOWN. REMOVE EXGSUB BASE MATERIAL AS REQUIRED FOR INSTALLATION OF NEW EQUIPMENT. PROTECTEXG TRENCH DRAIN SYSTEM TO REMAIN.

D3 REMOVE EXG. OIL/WATER SEPARATOR IN ITS ENTIRETY & INFILL.

D4 REMOVE EXG. OVERHEAD COILING DOOR COMPLETE, INCLUDING ALL FRAMES,HARDWARE, TRACK, AND ACESSORIES. DISCONNECT AND REMOVE ALL ASSOCIATEDELEC. WIRING BACK TO PANEL. PREPARE SURFACES FOR NEW MATERIALS.

D5 REMOVE EXG. FIBERGLASS SPLASH WALL. REMOVAL TO INCLUDE STEEEL SUPPORTSYSTEM. PATCH EXG. CONC. FLOOR SLAB TO MASTCH EXG. CONSTRUCTION.

D6 EXG. TRENCH DRAIN TO REMAIN.

1/8" = 1'-0"1

FIRST FLOOR DEMOLITION PLAN

Page 4: TOMPKINS CONSOLIDATED AREA TRANSIT INC...TOMPKINS CONSOLIDATED AREA TRANSIT INC 737 WILLOW AVE LIST OF DRAWINGS BUS WAS REPLACEMENT CONSTRUCTION DOCUMENTS JANUARY 15, 2018 HUNT NO

NEW CONCRETE SLAB WIDTHSAW CUT TOP 1 1/2"TO PROVIDE CLEANEDGE TO FINISHNEW SLAB - TYP

EXISTING CONCRETESLAB ON GRADE

6x6-W1.4xW1.4 WWF #4x1'-6" LONG @ 24" O.C. DRILL6" INTO EXISTING SLAB ONGRADE MID-DEPTH - TYPICALAROUND PERIMETER

EXISTING CONCRETESLAB ON GRADE

NEW CONCRETESLAB ON GRADE

ST

EE

L F

LO

OR

CA

M

V

R

N

TIO

EC

T

O

F

RA

DI

L

E

NA

UT

ICA

MA

CH

INE

1

NA

UT

ICA

RU

NN

ING

TR

AC

K2

NA

UT

ICA

RU

NN

ING

TR

AC

K2

22

5

66

7

NA

UT

ICA

PLU

MB

ING

MA

NIF

OLD

1

4

CH

EM

ICA

L D

RU

MS

(BY

OW

NE

R)

10

5

33

33

33

NA

UT

ICA

MA

CH

INE

JU

NC

TIO

N B

OX

PR

OV

IDE

D B

Y G

.C.

PO

WE

R S

UP

PLY

QU

ICK

DIS

CO

NN

EC

TP

RO

VID

ED

BY

G.C

.

WA

SH

BA

Y T

RE

NC

H

A

BB

(2 P

LA

CE

S)

DE

DIC

AT

ED

SIN

GL

E, W

AT

ER

PR

OO

F G

FI

RE

CE

PT

AC

LE

S (

FO

RC

HE

MIC

AL P

UM

P A

ND

RIN

SE

AID

PU

MP

) L

OC

AT

ED

ON

PO

ST

(18

" A

.F.F

.)

NO

TE

: IN

ST

ALL T

HE

UN

DE

RC

AR

RIA

GE

WA

SH

1/2

" A

WA

Y F

RO

M T

HE

EA

ST

MO

ST

CU

T-O

UT

AN

D 1

/8"

FR

OM

BO

TH

NO

RT

H A

ND

SO

UT

HS

IDE

S T

O C

EN

TE

R T

HE

PLA

TE

WIT

H T

HE

WA

SH

BA

Y.

∅1

/2"

LIN

E T

O A

CT

IVA

TIO

NS

YS

TE

M (

DR

IVE

R S

IDE

)

∅1

/2"

LIN

E T

O A

CT

IVA

TIO

NS

YS

TE

M (

PA

SS

EN

GE

R S

IDE

)

SA

ND

PIT

(2'L

X 2

'W X

4'D

)

6025 SF

REPAIR BAYS101

2848 SF

WASH BAY102

838 SF

PARTS ROOM103

28935 SF

BUS GARAGE110

443 SF

COMPONENTREPAIR ROOM

104

231 SF

Room106

299 SF

LUBE ROOM108

109 SF

FORMANOFFICE101B

44 SF

T.R.101A

89 SF

ELEC. ROOM105

59 SF

PAINTS/BATTERIES107

100 SF

MECH. ROOM109

5

3

1

4

2

6

8" 3" 8"#4 12'' O.C.#5 10'' O.C.

REUSE EXG. GRATEOR MATCH EXG.

ANGLE FRAME2LS 2X2X1/2

NEW CONC. SLAB ON GRADE

8 1/4"

DOWEL NEW CONC. INTOEXG. SEE STR. DETAIL

3/8

"3

7/8

"

EXG. STEEL LINTEL

V.I.F.

7 5/8"

EXG. MASONRY

COILING DOORMETAL RAIL CASING

GUIDE RAIL BEYOND

1 1/2" TOP HOOD BEAD

EXG. MASONRY

OVERHEAD COILING DOOR& TRACKS, PROVIDECLOSURE PIECES FORINFILL

V.I.F

.

7 5

/8"

AIR

PO

RT

CO

RP

OR

AT

E P

AR

K

100 H

UN

T C

EN

TE

R

HO

RS

EH

EA

DS

, N

.Y. 14845

607 358 1000

FA

X 358 1800

HO

RS

EH

EA

DS

, N

YR

OC

HE

ST

ER

, N

YT

OW

AN

DA

, P

A

N

PROJECT NO:

Copyright: 2017

BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

#D

ATE

:D

ESCRIP

TIO

N O

F REV

ISIO

N:

"Unauthorized Alteration Or Addition To PlansBearing A Licensed Engineer's or ArchitectsSeal, Is A Violation of Section 7209 Of The

New York State Education Law."

PROJECT LOCATION

As indicated

1/1

0/2

01

8 3

:27

:01

PM

A1.1

2940-002

FIR

ST

FL

OO

R P

LA

N

TO

MP

KIN

S C

ON

SO

LID

AT

ED

AR

EA

TR

AN

SIT

, IN

C737 W

ILL

OW

AV

E. IT

HA

CA

, N

Y 1

4850

BU

S W

AS

H R

EP

LA

CE

ME

NT

EP

SCC

1/15/18

1/8" = 1'-0"1

FIRST FLOOR PLAN

PLAN DRAWING NOTES:

1 PROVIDE NEW GANTRY TYPE, ROLLOVER BUS WASH SYSTEM. REFER TO SECTION 11 14 00.

2 PROVIDE NEW 12' X 14' ELECTRICALLY OPERATED OVERHEAD DOOR, SEE DETAILS 3,4/A1.1 & SECTION 08

3 PROVIDE NEW "WASH IN USE" LIGHT AT REPAIR BAY SIDE OF DOOR. LIGHT SHALL BE INTER-CONNECTED TO WASHACTIVATION SYSTEM SUCH THAT LIGHT IS LIT WHEN WASH SYS. IS ACTIVATED.

4 PROVIDE NEW CONC. SLAB ON GRADE AS INDICATED BY HATCHED AREA. NEW SLAB SHALL BE DOWNED INTOEXISTING. SEE DETAIL 5/A1.1.

5 PROVIDE NEW UNDERCARRIAGE WASH AND COVER. SEE DETAIL 2/A1.1

6 EXG. TRENCH DRAIN TO REMAIN.

GENERAL NOTES:

A THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK REQUIRED TO IMPLEMENT TO WORK OF THE CONTRACT,REGARDLESS OF WHETHER SPECIFICALLY INDICATED OR NOT, UNLESS NOTED OTHERWISE.

B THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISITNG CONDITIONS IN FIELD BEFORE COMMENCINGANY WORK AND NOTIFY ARCHITECT IMMEDIATELY IF ANY DISCREPENCIES ARE FOUND.

C THE CONTRACTOR SHALL COORIDNATE THE WORK OF THIS CONTRACT WITH THE WORK OF OTHERCONTRACTS.

D MAINTAIN ALL EXISITNG FIRE SEPERATIONS.

1 1/2" = 1'-0"2

TRENCH DETAIL AT UNDERCARRIAGE WASH 1 1/2" = 1'-0"

3DOOR HEAD DETAIL @ CMU COILING DOOR

1 1/2" = 1'-0"4

DOOR JAMB DETAIL @ CMU WALL COILING DOOR

NTS5

NEW INFILL AT EXISTING SLAB ON GRADE

Page 5: TOMPKINS CONSOLIDATED AREA TRANSIT INC...TOMPKINS CONSOLIDATED AREA TRANSIT INC 737 WILLOW AVE LIST OF DRAWINGS BUS WAS REPLACEMENT CONSTRUCTION DOCUMENTS JANUARY 15, 2018 HUNT NO

GAS FIRED UNIT HEATER SCHEDULE

MANUFACTURER &MODEL

GAS INDIRECT FIRED

LOCATIONUNIT NO. COMBUSTION TYPE SUPPLY CFM MAX INPUT (BTUH)GAS PRESSURE

REQUIRED (IN WC)FLUE DIAMETER

(IN)INTAKE

DIAMETER (IN)MAX OUTPUT (BTUH)

ELECTRICAL

V/PH/HZ MCA MOCPFAN RPM NOTES

GUH-1 BUS WASH MODINE HDC-125 1500 125,000 102,500 5-14 4 4 115/1/60 14.5 28 1100 1, 2, 3, 4, 5

NOTES:

1. INCORPORATE CONDENSATE DRAIN INTO VENT PIPING. PROVIDE FACTORY OPTION CONCENTRIC ADAPTOR BOX, INSTALL PER MANUFACTURER'S INSTRUCTIONS.

2. DISCONNECT SWITCH PROVIDED BY E.C.

3. HANG UNIT ACCORDING TO MANUFACTURER'S INSTRUCTIONS.

4. PROVIDE 24V THERMOSTAT.

5. ADD 30 DEGREE DEFLECTION HOOD.

1

4" COMBUSTIONAIR INTAKEPROVIDE WIRE

MESH SCREEN

4" FLUE UPTHROUGH ROOF

VD

D1

D1

D2

EXG 3"GAS LINE

GUH-1

1/2"

AIR

PO

RT

CO

RP

OR

AT

E P

AR

K

100 H

UN

T C

EN

TE

R

HO

RS

EH

EA

DS

, N

.Y. 14845

607 358 1000

FA

X 358 1800

HO

RS

EH

EA

DS

, N

YR

OC

HE

ST

ER

, N

YT

OW

AN

DA

, P

A

N

PROJECT NO:

Copyright: 2017

BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

#D

ATE

:D

ESCRIP

TIO

N O

F REV

ISIO

N:

"Unauthorized Alteration Or Addition To PlansBearing A Licensed Engineer's or ArchitectsSeal, Is A Violation of Section 7209 Of The

New York State Education Law."

1/8" = 1'-0"

1/1

1/2

01

8 1

0:2

6:1

4 A

M

H1.1

2940-002

BU

S W

AS

H M

EC

HA

NIC

AL

PL

AN

S

TO

MP

KIN

S C

ON

SO

LID

AT

ED

AR

EA

TR

AN

SIT

, IN

C737 W

ILL

OW

AV

E. IT

HA

CE

, N

Y 1

4850

BU

S W

AS

H R

EP

LA

CE

ME

NT

KTK

JDG

1/15/18

1/8" = 1'-0"2

BUS WASH HVAC PLAN 1/8" = 1'-0"

1BUS WASH DEMOLITION PLAN

1/8" = 1'-0"3

BUS WASH PIPING PLAN

DEMOLITION NOTES - MECHANICAL

D1 REMOVE EXISTING RADIATION HEATING SYSTEM INITS ENTIRETY. REMOVEOUTSIDE AIR INTAKE AND FLUE THROUGH ROOF AND PATCH.

D2 REMOVE EXISTING 12x12 DUCT BACK TO POINT INDICATED.

CONSTRUCTION NOTES - MECHANICAL

1 PROVIDE NEW 12x12 DUCT WITH BIRD SCREEN. BALANCE TO 790 CFM.

GENERAL NOTES - MECHANICAL

1 ALL WORK ON THIS DRAWING IS THE RESPONSIBILITY OFTHE CONTRACTOR UNLESS CLEARLY INDICATEDOTHERWISE.

2 THIS DRAWING IS INTENDED TO SHOW THE GENERALSCOPE OF ITEMS TO BE REMOVED. IT IS NOT INTENDEDTO BE ALL INCLUSIVE. THE CONTRACTOR SHALL FIELDVERIFY ALL ITEMS TO BE REMOVED. ANY ITEM IN

QUESTION SHOULD BE VERIFIED WITH THE ENGINEERPRIOR TO REMOVAL.

3 ALL ITEMS SCHEDULED FOR DEMOLITION ARE THEPROPERTY OF THE OWNER. THE CONTRACTOR SHALLPLACE WANTED EQUIPMENT IN AREA DESIGNATED, ONSITE BY THE OWNER. ANY ITEM THE OWNER WISHES NOT

TO KEEP SHALL BE DISPOSED OF BY THE CONTRACTOR.

4 THE CONTRACTOR WILL BE RESPONSIBLE FOR ALLCUTTING AND PATCHING UNLESS CLEARLY INDICATEDOTHERWISE. CONTRACTOR TO PATCH TO MATCH ALLEXISTING FINISHES RESULTING FROM DEMOLITION WORK

UNLESS INDICATED TO BE PART OF ANOTHER CONTRACT.

5 THE CONTRACTOR SHALL REMOVE, PROTECT, REPLACEAND/OR REINSTALL ANY CEILING OR GRID DAMAGED ORREMOVED AS A RESULT OF WORK INDICATED ON THESEDRAWINGS.

6 REINSULATE ALL PORTIONS OF EXISTING HVAC SYSTEMSDISTURBED DURING INSTALLATION OF NEW SYSTEMS.

7 PRIOR TO CONSTRUCTION AND INSTALLATION OF NEWWORK, THE CONTRACTOR SHALL FIELD VERIFY ALLEXISTING CONDITIONS (FRAMING, ELECTRICAL,PLUMBING, HVAC, ETC.). NOTIFY ARCHITECT/ENGINEER

OF ANY CONFLICTS THAT REQUIRE MODIFICATION TONEW HVAC SYSTEM INSTALLATION.

8 COORDINATE ALL NEW ROOF, WALL, AND FLOORPENETRATIONS WITH OTHER TRADES.

Page 6: TOMPKINS CONSOLIDATED AREA TRANSIT INC...TOMPKINS CONSOLIDATED AREA TRANSIT INC 737 WILLOW AVE LIST OF DRAWINGS BUS WAS REPLACEMENT CONSTRUCTION DOCUMENTS JANUARY 15, 2018 HUNT NO

ST

ST

ST

ST

EXG. 8" BURIED WATERFOR FIRE SUPPRESSIONTO REMAIN

CA

CA

CA

CA

CA

D1 D2

D2

D3

EXG. 8" BURIED DRAIN PIPINGTO REMAIN

D4

D4

D5

D6

EXG. 4" GASTO REMAIN D7

EXG. DOUBLE CHECKFIRE SUPPRESSIONBACKFLOW PREVENTIONDEVICE TO REMAIN

EXG. ELEVATED 4" CWTO REMAIN

D1

CA CA

EXG. 1-1/2" COMPRESSED AIR, CA,TO REMAIN

CA CA

EXG. 6" BURIED WATER FOR BUILDINGTO BE ABANDONED IN PLACE

CA

CA

D4

D8

D8

D9 D9

D10

EXG. 1" CWTO REMAIN

AIR

PO

RT

CO

RP

OR

AT

E P

AR

K

100 H

UN

T C

EN

TE

R

HO

RS

EH

EA

DS

, N

.Y. 14845

607 358 1000

FA

X 358 1800

HO

RS

EH

EA

DS

, N

YR

OC

HE

ST

ER

, N

YT

OW

AN

DA

, P

A

N

PROJECT NO:

Copyright: 2017

BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

#D

ATE

:D

ESCRIP

TIO

N O

F REV

ISIO

N:

"Unauthorized Alteration Or Addition To PlansBearing A Licensed Engineer's or ArchitectsSeal, Is A Violation of Section 7209 Of The

New York State Education Law."

1/8" = 1'-0"

1/1

1/2

01

8 1

0:2

6:1

6 A

M

P0.1

2940-002

FL

OO

R D

EM

OL

ITIO

N P

LA

N

TO

MP

KIN

S C

ON

SO

LID

AT

ED

AR

EA

TR

AN

SIT

, IN

C737 W

ILL

OW

AV

E. IT

HA

CE

, N

Y 1

4850

BU

S W

AS

H R

EP

LA

CE

ME

NT

NJS

GJB

1/15/18

1/8" = 1'-0"1

FLOOR DEMOLITION PLAN

GENERAL NOTES - PLUMBING

A THIS DRAWING IS INTENDED TO SHOW THE GENERAL SCOPE OF ITEMS TO BEREMOVED. IT IS NOT INTENDED TO BE ALL INCLUSIVE. THE CONTRACTOR SHALLFIELD VERIFY ALL ITEMS TO BE REMOVED. ANY ITEM IN QUESTION SHOULD BEVERIFIED WITH ENGINEER PRIOR TO REMOVAL.

B THE OWNER RESERVES THE RIGHT TO RETAIN ANY REMOVED ITEMS AFTERREMOVAL BY THE CONTRACTOR. THE CONTRACTOR SHALL REMOVE FROM THESITE AND PROPERLY DISPOSE OF ALL REMOVED ITEMS THE OWNER DOES NOTWISH TO RETAIN.

C PRIOR TO CONSTRUCTION AND INSTALLATION OF NEW WORK, THE CONTRACTORSHALL FIELD VERIFY ALL EXISTING CONDITIONS (FRAMING, ELECTRICAL, PLUMBING,HVAC, ETC.). NOTIFY ARCHITECT/ENGINEER OF ANY CONFLICTS THAT REQUIREMODIFICATION TO NEW PLUMBING SYSTEM INSTALLATION.

D THE CONTRACTOR TO REINSULATE ALL PORTIONS OF EXISTING PLUMBING SYSTEMDISTURBED DURING INSTALLATION OF NEW PIPING.

E THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL NEW FLOOR OPENINGS,EXCAVATIONS OF EXISTING SUBSTRATES AND WALL PENETRATIONS TO INSTALLNEW PIPING. ALL PIPE PENETRATIONS THROUGH WALLS AND FLOORS WILL BESEALED WITH FIRE-STOPPING.

F THE CONTRACTOR WILL BE RESPONSIBLE FOR PATCHING AND SEALING ALLDISTURBED SUBSTRATE TO EXISTING FINISHES.

G COORDINATE ALL NEW ROOF PENETRATIONS.

H THE CONTRACTOR TO PROVIDE IDENTIFICATION TO PLUMBING PIPING AND TAGS TOPLUMBING VALVES. REFER TO SPECIFICATION SECTION 22 05 53.

I FLOOR DRAIN SHALL BE PROVIDED WITH P-TRAP.

J THESE DRAWINGS ARE INTENDED TO SHOW THE GENERAL SCOPE OF ITEMS IN NEWWORK. IT IS NOT INTENDED TO BE ALL INCLUSIVE. ANY ITEM IN QUESTIONSHOULD BE VERIFIED WITH ENGINEER.

K ALL COLD WATER PIPING SHALL BE PROVIDED WITH SHUTOFF VALVE ON BRANCHPIPING.

L PROVIDE 2 INCH BURIED VENT PIPING TO FLOOR SINK BURIED PIPING.

DEMOLITION NOTES - PLUMBING

D1 REMOVE DOMESTIC WATER BACKFLOW PREVENTION DEVICE AND WATER METERSET IN ITS ENTIRETY. REMOVE INCOMING 6 INCH COLD WATER PIPING FROMBACKFLOW PREVENTION DEVICE DOWN TO BELOW SUBSTRATE AND CAP.REMOVE OUTGOING COLD WATER PIPING FROM BACKFLOW PREVENTION DEVICE

UP TO POINT INDICATED ON ELEVATED 4 INCH COLD WATER PIPING. RETAINREMAINING ELEVATED 4 INCH COLD WATER PIPING FOR USE IN NEWCONSTRUCTION.

D2 REMOVE ELEVATED 1-1/2 INCH CORRODED COMPRESSED AIR, CA, PIPING IN ITSENTIRETY BETWEEN POINTS INDICATED AT FITTING LOCATION. RETAIN REMAININGELEVATED 1-1/2 INCH COMPRESSED AIR PIPING/FITTINGS FOR USE IN NEWCONSTRUCTION.

D3 REMOVE OIL INTERCEPTOR IN ITS ENTIRETY AND DISCONNECT BURIED 8 INCHDRAIN PIPING. TRENCHING REQUIRED. RETAIN REMAINING BURIED 8 INCH DRAINPIPING FOR USE IN NEW CONSTRUCTION.

D4 DISCONNECT AND REMOVE COLD WATER PIPING FROM BUS WASH SYSTEM BACKTO POINT INDICATED ON ELEVATED 4 INCH COLD WATER PIPING. RETAINREMAINING ELEVATED 4 INCH COLD WATER PIPING FOR USE IN NEWCONSTRUCTION.

D5 DISCONNECT ELEVATED 1 INCH COLD WATER PIPING, FOR EXTERIOR HYDRANT,FROM ELEVATED 4 INCH COLD WATER PIPING. RETAIN REMAINING ELEVATED 1INCH COLD WATER PIPING FOR USE IN NEW CONSTRUCTION.

D6 REMOVE NON-WORKING EXTERIOR HYDRANT AND DISCONNECT COLD WATERPIPING. RETAIN REMAINING COLD WATER PIPING FOR USE IN NEW CONSTRUCTION.

D7 FIELD LOCATE EXISTING BURIED 6 INCH COLD WATER PIPING AND EXPOSE FOR USEIN NEW CONSTRUCTION FOR REDUCED PRESSURE ZONE ASSEMBLIES.APPROXIMATE LOCATION SHOWN. TRENCHING REQUIRED.

D8 TRENCH LOCATION REQUIRED FOR USE IN NEW CONSTRUCTION. TRENCHLOCATION SHOWN ON DRAWING IS FOR REFERENCE ONLY AND SHALL NOT BESCALED. CONTRACTOR TO TRENCH AS REQUIRED AND SHALL DETERMINEREQUIRED TRENCH WIDTH AND DEPTH NEEDED TO OBTAIN PROPER SLOPE TO

INSTALL NEW PLUMBING PIPING.

D9 DISCONNECT PIPING, AS NEEDED, AT POINTS INDICATED AND RAISE PIPINGAPPROXIMATELY 3 FEET TO AVOID INTERFERENCE WITH NEW BUS WASH SYSTEM.MATCH EXISTING PIPE SIZE.

D10 REMOVE ABANDONED PIPING BACK TO WALL AND CAP.

PROJECT LOCATION

Page 7: TOMPKINS CONSOLIDATED AREA TRANSIT INC...TOMPKINS CONSOLIDATED AREA TRANSIT INC 737 WILLOW AVE LIST OF DRAWINGS BUS WAS REPLACEMENT CONSTRUCTION DOCUMENTS JANUARY 15, 2018 HUNT NO

REPAIRBAYS

101

MECH.ROOM

109

PAINTS/BATTERIES

107

ELEC.ROOM

105

LUBEROOM

108

Room

106

COMPONENTREPAIRROOM

104

T.R.

101A

FORMANOFFICE

101B

4

P1.1

8"DRAIN

EXG. 8" BURIED DRAIN PIPING

6" DRAIN

RPZ-1

RPZ-2

1

BUSGARAGE

110

WASH BAY

102

1

2

10

ST

ST

ST

ST

BUSGARAGE

110

REPAIRBAYS

101

MECH.ROOM

109

PAINTS/BATTERIES

107

ELEC.ROOM

105

LUBEROOM

108

Room

106

COMPONENTREPAIRROOM

104

T.R.

101A

FORMANOFFICE

101B

PARTSROOM

103

CA

CA

CA

CA

CA

EXG. 4" GAS

EXG. DOUBLE CHECKFIRE SUPPRESSIONBACKFLOW PREVENTIONDEVICE

4

P1.1

M

EXG. 1-1/2" COMPRESSED AIR, CA,

EXG. 8" BURIED WATERFOR FIRE SUPPRESSION

EXG. 6" BURIED WATER FOR BUILDINGTO BE ABANDONED IN PLACE

EXG. DOUBLE CHECKFIRE SUPPRESSIONBACKFLOW PREVENTIONDEVICE

CA CA

6" WATER

RPZ-1

RPZ-2

CA

CA

RAISED PIPING

EXG. ELEVATED 4" CW

4" CW

1" CW

4" CW

HYD-1

WASH BAY

102

4

4

6" WATER RISER LOCATION

EXG. 1" CW

5

5

NEW 1-1/2" COMPRESSED AIR, CA,

6

7

CA

CA

9

1/2" COMPRESSED AIR, CA,ROUTED HIGH

10

M

30" (RPZ-1)

60" (RPZ-2)

AIR GAP

RPZ-1

RPZ-2

PROVIDE 2" WATER METER WITH REDUCERS

4" CW

6" BURIED WATER

ISOLATION VALVE(TYP.)

FLOOR

AIR GAP

4" CW UP AND CONNECT TOEXG. ELEVATED 4" CW

RPZ-1 AND RPZ-2 TO BE INSTALLED TO MAINTAIN 8 INCHESCLEAR SPACE FROM REAR OF UNIT TO NEAREST OBSTRUCTION,30 INCHES CLEAR SPACE IN FRONT OF UNIT TO NEAREST OBSTRUCTION,12 INCHES CLEAR SPACE ABOVE UNIT TO NEAREST OBSTRUCTION.

MAINTAIN MINIMUM 18 INCHES BETWEEN RELIEF VALVE AND FLOOR

EXG. FIRE SUPPRESSIONBACKFLOW PREVENTION 2"

PROVIDE 6" DRAIN TO EXTERIOR

4"

2"

8

COMBINATION FILTER REGULATOR / LUBRICATOR WITHADJUSTABLE RANGE AND WITH AUTOMATIC DRAIN,SIMILAR TO MODEL MANUFACTURED BY SPEEDAIRE

MANUAL BLOW-OFF

1/2" COMPRESSED AIRFROM ABOVE.REFER TO DRAWING 2/BGP1.1FOR CONTINUATION OF PIPING

FILTER REGULATORWITH DRAIN

1/2" COMPRESSED AIRFOR BUS WASH SYSTEMAND BUS LIFT

LUBRICATORWITH DRAIN

9

AIR

PO

RT

CO

RP

OR

AT

E P

AR

K

100 H

UN

T C

EN

TE

R

HO

RS

EH

EA

DS

, N

.Y. 14845

607 358 1000

FA

X 358 1800

HO

RS

EH

EA

DS

, N

YR

OC

HE

ST

ER

, N

YT

OW

AN

DA

, P

A

N

PROJECT NO:

Copyright: 2017

BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

#D

ATE

:D

ESCRIP

TIO

N O

F REV

ISIO

N:

"Unauthorized Alteration Or Addition To PlansBearing A Licensed Engineer's or ArchitectsSeal, Is A Violation of Section 7209 Of The

New York State Education Law."

N.T.S.

1/1

1/2

01

8 1

0:2

6:2

0 A

M

P1.1

2940-002

PA

RT

IAL

FL

OO

R P

LA

NS

, S

CH

EM

AT

ICS

& S

CH

ED

UL

E

TO

MP

KIN

S C

ON

SO

LID

AT

ED

AR

EA

TR

AN

SIT

, IN

C737 W

ILL

OW

AV

E. IT

HA

CE

, N

Y 1

4850

BU

S W

AS

H R

EP

LA

CE

ME

NT

NJS

GJB

1/15/18

1/8" = 1'-0"1

PARTIAL FLOOR SANITARY PLAN

1/8" = 1'-0"2

PARTIAL FLOOR DOMESTIC PLAN

GENERAL NOTES - PLUMBING_REFER TO P0.1.

CONSTRUCTION NOTES - PLUMBING

1 PROVIDE 6 INCH ABOVE GRADE DISCHARGE PIPING FROM AIR GAP FITTING FORRPZ-1 AND RPZ-2 AND ROUTE TO BUILDING EXTERIOR ENDING WITH DOWNWARDFACING 45 DEGREE FITTING, #24 MESH NON-CORRODIBLE RODENT SCREEN WITHFLAP VALVE.

2 PROVIDE 8 INCH DRAIN PIPING AND CONNECT TO EXISTING 8 INCH BURIED DRAINPIPING AT POINTS INDICATED.

4 PROVIDE 6 INCH BURIED WATER PIPING FROM EXISTING 6 INCH BURIED WATERPIPING AT POINT INDICATED AND ROUTE UP TO RPZ-1 AND RPZ-2. REFER TODRAWING 4/BG-P1.1 FOR PIPING SCHEMATIC. TRENCHING REQUIRED.

5 PROVIDE ELEVATED 1-1/2 INCH COMPRESSED AIR, CA, PIPING BETWEEN POINTSINDICATED AND CONNECT TO EXISTING FITTING LOCATION.

6 PROVIDE EXTERIOR HYDRANT, HYD-1, AND CONNECT TO EXISTING COLD WATERPIPING. SEAL HYDRANT TO BUILDING EXTERIOR.

7 PROVIDE ELEVATED 1 INCH COLD WATER PIPING, FOR EXTERIOR HYDRANT, ANDCONNECT TO ELEVATED 4 INCH COLD WATER PIPING.

8 BUS WASH MANUFACTURER TO PROVIDE ALL PIPING AND CONNECTIONS REQUIREDFROM 2 INCH REDUCED PRESSURE ZONE, RPZ-2, PIPING TO BUS WASH SYSTEM.

9 BUS WASH MANUFACTURER TO PROVIDE ALL PIPING AND CONNECTIONS REQUIREDFROM 1/2 INCH COMPRESSED AIR, CA, PIPING TO BUS WASH SYSTEM.COORDINATE LOCATION OF COMPRESSED AIR PIPING WITH BUS WASHMANUFACTURER. REFER TO DRAWING 3/BG-P1.1 FOR FILTER/REGULATOR PIPING

SCHEMATIC. COMPRESSED AIR PIPING TO BE ROUTED AS HIGH AS POSSIBLE TOAVOID INTERFERENCE WITH BUS WASH SYSTEM.

10 TRENCH LOCATION REQUIRED FOR USE IN NEW CONSTRUCTION. TRENCHLOCATION SHOWN ON DRAWING IS FOR REFERENCE ONLY AND SHALL NOT BESCALED. CONTRACTOR TO TRENCH AS REQUIRED AND SHALL DETERMINEREQUIRED TRENCH WIDTH AND DEPTH NEEDED TO OBTAIN PROPER SLOPE TO

INSTALL NEW PLUMBING PIPING.

N.T.S.4

DOMESTIC WATER PIPING SCHEMATIC

N.T.S.3

COMBINATION FILTER REGULATOR, LUBRICATOR SCHEMATIC

PLUMBING FIXTURE SCHEDULENO. TYPE MFG/MODEL TRIM REMARKS

HYD-1 HYDRANT, EXTERIOR WALL MOUNT ZURN:Z1310 (3/4")

INTEGRAL ANTI-SIPHON, NON-FREEZE LEAD FREE.

RPZ-1 REDUCED PRESSURE ZONEBACKFLOW PREVENTER ASSY.(DOMESTIC WATER)

WATTS:LF909OSY-S (4") WITH STRAINER(OUTSIDE STEM & YOKE)

PROVIDE WATTS AIRGAP FITTING MODEL 909AG-K PROVIDE LEAD FREE ASSEMBLY. INSTALL IN ACCORDANCE WITH NEW YORK STATEDEPARTMENT OF HEALTH CROSS CONNECTION STANDARD.

RPZ-2 REDUCED PRESSURE ZONEBACKFLOW PREVENTER ASSY.(BUS WASH SYSTEM WATER)

WATTS:LF909QT-S (2") WITH STRAINER(OUTSIDE STEM & YOKE)

PROVIDE WATTS AIRGAP FITTING MODEL 909AG-F PROVIDE LEAD FREE ASSEMBLY. INSTALL IN ACCORDANCE WITH NEW YORK STATEDEPARTMENT OF HEALTH CROSS CONNECTION STANDARD.

PROJECT LOCATION

Page 8: TOMPKINS CONSOLIDATED AREA TRANSIT INC...TOMPKINS CONSOLIDATED AREA TRANSIT INC 737 WILLOW AVE LIST OF DRAWINGS BUS WAS REPLACEMENT CONSTRUCTION DOCUMENTS JANUARY 15, 2018 HUNT NO

BUS WASH

BOLD STRIKETHROUGH INDICATES CIRCUIT TO BE DEMOLISHED

BUS LIFT BAY 10

MOHAWK MOBILE LIFT

SPARE

TIRE CHANGER

DRILL PRESS & BENCH GRINDER

AIR COMPRESSOR

VACUUM SYSTEM

POWER PANEL SCHEDULE - DEMOLITION

DESIGNATION: PANEL A

LOCATION: ELECTRIC ROOM

FRAME: ???????

MAIN BREAKER: MLO

DESIGNATION

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

40

BKR. TRIP CKT.

A

B

5

7

9

11

13

15

17

19

25 21

23

25

15 27

29

31

15 33

35

37

ADDITIONAL INFO:

125 39

41

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

/POLES NO. PHASE NO.

1 2

3 4

6

8

10

12

14

16

18

20

22

24

26

28

30

32

34

36

38

40

42

15

30

30

15 BUS LIFT #11

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

10075 KVA TRANSFORMER AND PANEL

ON MEZZANINE

STYLE: CUTLER HAMMER PRL3

SERVICE: 480/277V, 3PH, 4W

MOUNTING: SURFACE

FEED: ??????

CKT. BKR. TRIP DESIGNATION

/POLES

Unit ID Description

BS

BP

BW

GUH-1

NOTE:

1. REUSE CONDUIT FROM PANEL B TO FOREM CO RAY VAC CONTROLLER. SEE DEMO NOTE 5.

Location

BUS WASH AIR BLOWER SYSTEM WASH BAY

BUS WASH BOOSTER PUMP WASH BAY

BUS WASH CONTROL PANEL WASH BAY

GAS UNIT HEATER WASH BAY

POWER OUTLET SCHEDULE

480 3 13.7 A PANEL A

120 1 13.7 A PANEL B

Volt Phase Load Feeder Breaker / Fuse

480 3 112 A PANEL A EXISTING 125/3

480 3 2 HP PANEL A EXISTING 15/3

20/3

Wire/Conduit

3#1, 1# 6G - 1.5"C

3#12, 1#12G - 3/4"C

3#12, 1#12G - 3/4"CEXISTING 20/1 2#12, 1#12G - 3/4"C

Control Type Remarks

NOTE 1

BUS WASH UNDERCARRIAGE

WASH PUMP

BUS WASH BLOWER SYSTEM

BOLD INDICATES NEW

SPARE

20BUS WASH CONTROLLER

(GANTRY)

RECPTS-

BUS LIFT BAY 10

MOHAWK MOBILE LIFT

TIRE CHANGER

DRILL PRESS & BENCH GRINDER

AIR COMPRESSOR

VACUUM SYSTEM

POWER PANEL SCHEDULE

DESIGNATION: PANEL A

LOCATION: ELECTRIC ROOM

FRAME:

MAIN BREAKER: MLO

DESIGNATION

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

40

BKR. TRIP B CKT.

A

B

5

7

9

11

13

15

17

19

25 21

23

25

15 27

29

31

15 33

35

37

ADDITIONAL INFO:

125 39

41

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

/POLES NO. PHASE NO.

1 2

3 4

6

8

10

12

14

16

18

20

22

24

26

28

30

32

34

36

38

40

42

15

30

30

15

SPACE

SPACE

SPACE

10075 KVA TRANSFORMER AND PANEL

ON MEZZANINE

STYLE: CUTLER HAMMER PRL3

SERVICE: 480/277V, 3PH, 4W

MOUNTING: SURFACE

FEED:

CKT. BKR. TRIP DESIGNATION

/POLES

1

2

3

A

B

BS

BW

BP

A

B

1

GUH-12

AIR

PO

RT

CO

RP

OR

AT

E P

AR

K

100 H

UN

T C

EN

TE

R

HO

RS

EH

EA

DS

, N

.Y. 14845

607 358 1000

FA

X 358 1800

HO

RS

EH

EA

DS

, N

YR

OC

HE

ST

ER

, N

YT

OW

AN

DA

, P

A

N

PROJECT NO:

Copyright: 2017

BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

#D

ATE

:D

ESCRIP

TIO

N O

F REV

ISIO

N:

"Unauthorized Alteration Or Addition To PlansBearing A Licensed Engineer's or ArchitectsSeal, Is A Violation of Section 7209 Of The

New York State Education Law."

1/8" = 1'-0"

E1.0

2940-002

EL

EC

TR

ICA

L P

LA

N

TO

MP

KIN

S C

ON

SO

LID

AT

ED

AR

EA

TR

AN

SIT

, IN

C737 W

ILL

OW

AV

E. IT

HA

CE

, N

Y 1

4850

BU

S W

AS

H R

EP

LA

CE

ME

NT

Author

Checker

1/15/18

1/8" = 1'-0"1

PARTIAL FIRST FLOOR ELECTRICAL DEMOLITION PLAN

1/8" = 1'-0"2

PARTIAL FIRST FLOOR POWER PLAN

ELECTRICAL KEYNOTES

1 BUS WASHER IN USE INDICATOR LIGHT. EDWARDS 248LEDMA120 WITH TOP COVER AND BASE MOUNT ABOVE DOOR AND WIREBACK TO WASH BAY CONTROL PANEL USING #14AWG IN 1/2" C. PROVIDE PLACARD WITH 3/4" LETTERS "BUS WASHER IN USE".

2 120V SEPARATOR CONTROL PANEL. CONNECT TO RECEPTACLE CIRCUIT.

DEMOLITION NOTES - ELECTRICAL

1 REMOVE OVERHEAD DOOR 480V CIRCUIT AS REQUIRED TO FACILITATE EXTENSION TO NEW ROLL UP DOOR. ALSO REMOVE CONDUIT AND WIRINGTO PUSH BUTTON OPERATOR NEXT TO DOOR.

2 REMOVE BUS WASH 480V CIRCUIT (PANEL A). KEEP CONDUIT INTACT AS REQUIRED TO EXTEND TO NEW BUS WASH BLOWER SYSTEM.

3 REMOVE CO RAY VAC CONTROL CIRCUIT (PANEL B) TO FACILITATE REMOVAL OF CO RAY VAC SYSTEM. KEEP CONDUIT INTACT TO EXTEND TO NEWGUH-1.