top5 initiatives (2)

6
Taking India to the World Integrity Commitment Passion Seamlessnes s Speed 1 “TOP-5 initiative in FY-15”

Upload: jagadish-patra

Post on 14-Apr-2017

165 views

Category:

Government & Nonprofit


0 download

TRANSCRIPT

Page 1: Top5 initiatives (2)

Taking India to the World

Integrity

Commitment

Passion

Seamlessness

Speed

1

“TOP-5 initiative in FY-15”

Page 2: Top5 initiatives (2)

Integrity Commitment SpeedPassion Seamlessness

Taking India to the World

OBJECTIVE Flood ControlFlood Control PHR improvement.PHR improvement.

THR replacementTHR replacement

Boiler Efficiency:Boiler Efficiency:

Availability of BAC- addition of 2nos of new screwAvailability of BAC- addition of 2nos of new screw

Availability of CSF- Replacement of static ash cooler for Unit-3Availability of CSF- Replacement of static ash cooler for Unit-3

Coal sizing and Homogeneity Coal sizing and Homogeneity

Boiler-02 flue gas and air circuit revampingBoiler-02 flue gas and air circuit revamping Auxiliary ReductionAuxiliary Reduction

VFD installation in Unit-3 &5 PA fans- 6 no by Mar-15VFD installation in Unit-3 &5 PA fans- 6 no by Mar-15

Installation of VFD in CT fanInstallation of VFD in CT fan

HPBP spry valve passing- Over hauling of Unit 2,3&4 spray control valves.HPBP spry valve passing- Over hauling of Unit 2,3&4 spray control valves.

BFP recirculation valve passing – BFP recirculation valve passing –

Replacement of air heater tubes.Replacement of air heater tubes.

Condenser cleanness.Condenser cleanness.

Stringent Operational practice.Stringent Operational practice.

Reliability ImprovementReliability Improvement

Page 3: Top5 initiatives (2)

Taking India to the World

Integrity

Commitment

Passion

Seamlessness

Speed

3

“TOP-5 initiative in FY-15”

PHR Improvement      

Initiative Action taken

Implementation Status Responsibilty

1.THR improvement

Completion of U2 TG overhauling 

   

Revival of HPH-4&5 performance for U2&3Condensor cleaning for

U2&3(chem),4&5(high pr waterjet)

U2&3 HPBP system overhauling

2.Boiler Efficiency

1.Availability of BAC (addition of 2 nos of new screw)    2.Availability of CSF (Replacement of static ash cooler for Unit-3)    3.Coal sizing and Homogeneity    4.Boiler-2 flue gas and air circuit revamping.    

Page 4: Top5 initiatives (2)

Taking India to the World

Integrity

Commitment

Passion

Seamlessness

Speed

4

“TOP-5 initiative in FY-15”

Auxiliary Reduction

Initiative Action takenImplementation Status Responsibilty

1.VFD

1. Installation in Unit 3 &5 PA fans(6 Nos) by Mar-15    2.Installation of VFD in CT fan    

2.HPBP

1.Over hauling of Unit-2,3&4 spray control valves    

3.BFP 1.Overhauling of recirculation valve.    

4.Condenser cleanness      

5. Air heater tubes1.Replacement of tubes after inspection    

6.Stringent Operational practice.      

3.Coal sizing and Homogeneity    4.Boiler-2 flue gas and air circuit revamping.    

Page 5: Top5 initiatives (2)

Integrity Commitment SpeedPassion Seamlessness

Taking India to the World

OBJECTIVE EOHS&HR INITIATIVE:EOHS&HR INITIATIVE:

Installation and Commisioning of on-line BOD,COD,TDS monitoring system in flood Installation and Commisioning of on-line BOD,COD,TDS monitoring system in flood

control pit.control pit.

Compliance to on-line data transmission of stack(U5) & Ambient air quality (2 stations) Compliance to on-line data transmission of stack(U5) & Ambient air quality (2 stations)

parameters to SPCB completed.parameters to SPCB completed.

LOTO system implemented for U1 LOTO system implemented for U1

””Theme of the month “ celebration Theme of the month “ celebration

Solar street light for plant and colony.Solar street light for plant and colony.

Sprinkler network along the ash silo.Sprinkler network along the ash silo.

Awareness programme was conducted on road safety in IRC premises.Awareness programme was conducted on road safety in IRC premises.

Lifting tools,tackles &Pressure vessels testing was carried out for U5.Lifting tools,tackles &Pressure vessels testing was carried out for U5.

Supervisory devlopement through introduction of talent management initiative.Supervisory devlopement through introduction of talent management initiative.

Monthly communication meeting with supervisory group .Monthly communication meeting with supervisory group .

..