topic 2; measurement suspended floor slab

13
BUILDING WORKS MEASUREMENT 2 CQ203 TOPIC 2

Upload: abdul-muhaimin-zainol-abidin

Post on 29-Dec-2015

439 views

Category:

Documents


9 download

DESCRIPTION

takinf off tangga

TRANSCRIPT

BUILDING WORKS MEASUREMENT 2

CQ203TOPIC 2

Measurement of Suspended Floor SlabTaking off list:-

a)Vibtared reinf. Concrete grade 30:-1.In suspended floor slab (M3)

b)Formwork:-1.Soffit of suspended floor slab (M2)2.Edge of slab not exceeding 250mm deep (M)

c)Fabric reinforcement1.In suspended floor slab (M2)2.Extra over; 1200mm wide (M)

d) Bar reinforcement :-High tensile barIn suspended floor slab

- 12mm diameter (KG)

A B C

Y

x x

Y

1

2

36

00

18001800

A B C

BRC TYPE A7 Y12 - 150

1 2

BRC TYPE A7 Y12 - 150

3600

TYPICAL CROSS SECTION X-X

3600

TYPICAL CROSS SECTION Y - Y

600600 600 600 600

600 600

BRC TYPE A7 Y12 - 150

3600

600 600

QUANTITY OF CONCRETE SLAB

BRC TYPE A7 Y12 - 150

3600

600 600

QUANTITY OF FORMWORK TO SOFFIT OF SLABQUANTITY OF FORMWORK TO EDGE OF SLAB N.E 250MM DEEP

Heading:Vibrated reinforcement concrete Grade 30 as described:-

Description :

In suspended floor slab

Unit: m3

Qty.:

2.11

3.753.750.15

2.11

Gridline A-C/1-2Length

3600Add floor beam ½ / 2/ 150

3750

Width3600

Add floor beam ½ / 2/ 1503750

Depth150

SLIP NO.:

1 SLIP NO MUST BE WRITTEN

THE QUANTITIES MUST NETT QUANTITY

Heading:Sawn formwork as described:-

Description :

Soffit of suspended floor slab

Unit: m2

Qty.:

11.90

3.453.45

11.90

Gridline A-C/1-2Length

3600Less floor beam ½ / 2/ 150

3450

Width3600

Less floor beam ½ / 2/ 1503450

SLIP NO.:

2 SLIP NO MUST BE WRITTEN

THE QUANTITIES MUST NETT QUANTITY

Heading:Sawn formwork as described:-

Description :

Edge of slab not exceeding 250mm deep

Unit:

m

Qty.:

15.00

2

7.5015.00

Gridline A-C/1-2Length

3600Add floor beam ½ / 2/ 150

3750Add 3600

Add floor beam ½ / 2/ 1507500

SLIP NO.:

3 SLIP NO MUST BE WRITTEN

THE QUANTITIES MUST NETT QUANTITY

Heading:One Layer of steel fabric reinforcement well lapped at joint and embedded in floor slab (measured nett – no allowance made for laps; 200mm side laps; 200mm end laps:-Description :

Reference no. BRC A7

Unit:

m2

Qty.:

13.69

3.703.70

13.69

Gridline A-C/1-2Length

3600Add floor beam ½ / 2/ 150

3750Less concrete cover 2/25 50

3700

Width3600

Add floor beam ½ / 2/ 1503750

Less concrete cover 2/25 503700

SLIP NO.:

4 SLIP NO MUST BE WRITTEN

THE QUANTITIES MUST NETT QUANTITY

Heading:One Layer of steel fabric reinforcement well lapped at joint and embedded in floor slab (measured nett – no allowance made for laps; 200mm side laps; 200mm end laps:-Description :

Reference no. BRC A7; 1200mm wide

Unit:

m

Qty.:

3.70

3.703.70

Gridline B/1-2Length

3600Add floor beam ½ / 2/ 150

3750Less concrete cover 50

3700

SLIP NO.:

5 SLIP NO MUST BE WRITTEN

THE QUANTITIES MUST NETT QUANTITY

HIGH TENSILE / MILD STEEL REINFORCEMENT IN : FLOOR SLABS

JOB REFERENCE :

BLOCK : MAIN BLOCK

REFERENCE Bar Bar No. of No. in Length

Mark Size Mbars each (m)

Mbars Y10 Y12 Y16 Y20 Y25 R6 R8 R10 R12 R16

1 / A - C Top Bar - - - - - - - - - -

2 / A - C - - - - - - - - - -

A/ 1 - 2 - - - - - - - - - -

C/ 1 - 2 - - - - - - - - - -

Length Top Y12 25 4 0.76 - 76.00 - - - - - - - -

600 - - - - - - - - - -

Add 1/2 beam 75 - - - - - - - - - -

Less concrete cover 25 - - - - - - - - - -

650 - - - - - - - - - -

Add 9.5 d 114 - - - - - - - - - -

764 - - - - - - - - - -

- - - - - - - - - -

Number - - - - - - - - - -

150 centres ∟3600 Long - - - - - - - - - -

Number = 24 + 1 - - - - - - - - - -

Number = 25 - - - - - - - - - -

- - - - - - - - - -

Bottom Bar Bottom Y12 5 4 3.70 - 74.00 - - - - - - - -

Length - - - - - - - - - -

3600 - - - - - - - - - -

Add Beams 1/2 / 2/ 150 - - - - - - - - - -

3750 - - - - - - - - - -

Less concrete cover 2 / 25 50 - - - - - - - - - -

3700 - - - - - - - - - -

- - - - - - - - - -

Number - - - - - - - - - -

150 centres ∟600 Long - - - - - - - - - -

Number = 4 + 1 - - - - - - - - - -

Number = 5 - - - - - - - - - -

- - - - - - - - - -

- 150.00 - - - - - - - -

0.616 0.888 1.579 2.466 3.854 0.222 0.395 0.616 0.888 0.888

- 133.20 - - - - - - - -

REINFORCEMENT SCHEDULE

Size of Bars (in mm) M.S. / H.T. Stirrups / Links (mm)

TOTAL LENGTH IN METRE

KG / METRE

TOTAL WEIGHT IN KG

Heading:High tensile bar reinforcement to M.S. 146 as described:-

Description :

In suspended floor slab :-

12mm diameter; straight or bend

Unit: KG

Qty.:133.20

Refer Bar reinforcement

schedule

SLIP NO.:

6 SLIP NO MUST BE WRITTEN