  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    1/51

    10/15/2014 1

    Operat ionsManagement

    Top ic 7AProduct ionPlann ing and Contro l

    (Aggregate Plann ing)

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    2/51

    10/15/2014 NY - KJP 585 2009 2

    Organizational Strategy and

    Production Planning

    Decision Level Decision Process Forecast NeededProduction

    Planning and

    Allocation

    Determines

    seasonal plan by

    product type

    Determines

    monthly itemproduction

    schedules

    Monthly Demandfor 6 mths by items

    Monthly Demand

    for 12 mths by

    product types

    Annual Demand by

    Item and Region

    Corporate

    (Top Management)

    ShopSupervisor

    Plant Manager

    It explains the relationship between planning structure and organizational structure

    It also tells who are responsible for the for the decision making.

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    3/51

    10/15/2014 NY - KJP 585 2009 3

    The Planning Process

    Long Range Planning

    Covers a period of 5 years and made up of :

    Product & Market Planning

    Financial Planning Resource Planning

    Medium Range Planning

    Covers 3 18 months and made up of :

    Aggregate Planning Item Forecasting

    Master Production Schedule (MPS)

    Capacity Planning

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    4/51

    10/15/2014 NY - KJP 585 2009 4

    The Planning Process

    Short Range Planning Covers from 1 day to a few weeks and consists of :

    Material Requirement Planning (MRP)

    (Speci fy w hen prod uct ion and p urchase orders must be made)

    Capacity Requirement Planning(Provid e detai led schedu le wh en each operat ion is to b e run on each

    wo rk center and how long i t wi l l take to proc ess).

    Final Assembly Scheduling

    (Operat ion s required to pu t prod uct in its f inal form ).

    Production Planning and Control

    (Schedu l ing and shop -f loo r contro l act iv i t ies) .

    Purchase Planning and Control

    (Acq uis i t ion and c ontro l of purch ased i tems) .

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    5/51

    10/15/2014 5

    Planning Horizons

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    6/51

    Example: Snapper, produces many different models of lawnmowers, for a total of 145 models. For each month in the

    upcoming 3 quarters, the aggregate plan for Snapper might

    have the following units of production.

    10/15/2014 6

    Aggregate Planning

    Operations personnel

    build an aggregate

    plan using the total

    expected demand for

    all of the familyproducts.

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    7/51

    10/15/2014 NY - KJP 585 2009 7

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    8/51

    10/15/2014 8

    Aggregate Planning

    The objective of aggregate planning is

    to meet forecasted demand while

    minimizing cost over the planning

    period

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    9/51

    10/15/2014 9

    The Planning Process

    Objective is to minimize cost over the

    planning period by adjusting

    Production rates

    Labor levels

    Inventory levels

    Overtime work

    Subcontracting rates

    Other controllable variables

    Determine the quantity and timing ofproduction for the intermediate future

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    10/51

    10/15/2014 10

    Aggregate Planning

    Combines appropriate resourcesinto general terms

    Part of a larger production planningsystem

    Disaggregation breaks the plan

    down into greater detail

    Disaggregation results in a masterproduction schedule

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    11/51

    10/15/2014 11

    Aggregate Planning Strategies

    1. Use inventories to absorb changes indemand

    2. Accommodate changes by varyingworkforce size

    3. Use part-timers, overtime, or idle time toabsorb changes

    4. Use subcontractors and maintain a stableworkforce

    5. Change prices or other factors to

    influence demand

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    12/51

    12

    Aggregate Planning Strategies

    1)Capacity Option do not try to change demand but attempt to absorbdemand fluctuations

    Changing inv entory levels

    Varying w ork fo rce size by h ir ing or layoffs.

    Varying p roduct io n rates through overt ime or idle t ime.

    Subcontract ing. Using part-t ime workers.

    2)Demand Option firms try to smooth out changes in the demand patternover the planning period

    Inf luencin g demand.

    Back order ing dur ing h igh demand periods.

    Coun ter-seasonal prod uct m ixing.

    These 8 options, along their advantages and disadvantages are summarized

    in Table 13.1.(Please refer Heizer and Render textbook)

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    13/51

    10/15/2014 13

    Methods for Aggregate

    Planning A mixed strategy may be the best

    way to achieve minimum costs

    There are many possible mixedstrategies

    Finding the optimal plan is notalways possible

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    14/51

    10/15/2014 NY - KJP 585 2009 14

    Mixing Options toDevelop a Plan

    Chase strategy

    Match output rates to demand forecast foreach period

    Vary workforce levels or vary productionrate

    Favored by many service organizations

    Disadvantages constantly changingshort term capacity. (hire/fire, overtime,part time, subcontract)

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    15/51

    10/15/2014 15

    Mixing Options toDevelop a Plan

    Level strategy Daily production is uniform

    Maintains a constant workforce

    Stable production leads to better qualityand productivity

    Disadvantages Build inventory, or uses

    back orders, lost sales.

    Some combination of capacityoptions, a mixed strategy, might be

    the best solution

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    16/51

    10/15/2014 NY - KJP 585 2009 16

    Aggregate Planning Strategies

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    17/51

    10/15/2014 NY - KJP 585 2009 17

    Summary of Planning Techniques

    Technique Solution Characteristics

    Spreadsheet Heuristic (trial

    and error)

    Intuitively appealing, easy to

    understand; solution not

    necessarily optimal.

    Linearprogramming

    Optimizing Computerized; linear assumptionsnot always valid.

    Simulation Heuristic (trial

    and error)

    Computerized models can be

    examined under a variety of

    conditions.

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    18/51

    Technique for Aggregate

    Planning

    10/15/2014 18

    1. Determine demand for each period.

    2. Determine capacities for each period. (regular time,overtime and subcontracting for each period)

    3. Consider company policies that may apply to

    the workers or to stock levels

    4. Determine units costs. (Find also labour costs, hire/lay offcosts, inventory holding costs)

    5. Develop alternative plans and examine total

    costs

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    19/51

    10/15/2014 19

    Example of spreadsheet for Aggregate Planning

    Period 1 2 3 4 5 6 Total

    Demand

    Output

    Regular workerPart time

    Overtime

    Subcontract

    Hire/Lay off

    Output (O) - Demand (D)

    Inventory

    Beginning

    Ending

    Average

    Backlog

    Costs:

    Output

    Regular worker

    Part time

    Overtime

    Subcontract

    Hire/Lay off

    Inventory

    Backorders

    Total

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    20/51

    10/15/2014 NY - KJP 585 2009 20

    Aggregate Planning

    Example 1:

    Period 1 2 3 4 5 6 Total

    Forecast 200 200 300 400 500 200 1800

    Planners for a company that makes several models of skateboards have gathered

    the following information:

    Associated data and costs:

    Current work force = 15 peopleRegular time labour = RM0.25 per hour

    Overtime labour = RM3.00 per unit

    Inventory = RM1.00 per unit per period on average inventory.

    Back orders = RM5.00 per unit per period

    Hire workers = RM50 per worker.

    (A temporary worker can produce 15 units per period).

    Layoff workers = RM50 per worker.

    Labour hours = 8 hour per unit

    Workdays = 20 days per period

    Subcontract = RM6.00 /unit

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    21/51

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    22/51

    10/15/2014 NY - KJP 585 2009 22

    Aggregate Planning

    Example 4: Month Jul Aug Sept Oct Nov Dec

    Forecast 400 500 550 800 700 700

    Cost:

    Holding Cost = RM6 per DVD per mth

    Normal time labour = RM8 per hr

    Overtime = RM12 per hr

    Hiring = RM 400 per worker

    Layoff = RM 800 per worker

    Current work force = 8 workers

    Labour hrs per DVD = 4 hrs

    Work days per mth = 20 days

    Begin inventory = 100

    DVDs

    No backlog is allowed

    Labour hr per day = 8hrs

    Max hrs for OT are 50% of

    the normal working hrs

    Solutions

    http://localhost/var/www/apps/conversion/tmp/scratch_2/Aggrgt%20plan_ex4.xlshttp://localhost/var/www/apps/conversion/tmp/scratch_2/aggre_examples.dochttp://localhost/var/www/apps/conversion/tmp/scratch_2/Aggrgt%20plan_ex4.xlshttp://localhost/var/www/apps/conversion/tmp/scratch_2/aggre_examples.doc
  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    23/51

    10/15/2014 NY - KJP 585 2009 23

    Master Production Schedule

    (MPS) A time table that specif ies what is to be

    made and w hen

    Must be in acco rdance w ith the agg regate

    product ion plan

    The MPS is the resul t of the product ion

    plann ing process

    The AP is establ ished in overal l terms, the

    MPS is establ ished in terms o f speci f ic

    produc ts

    The MPS is a statement o f what is to be

    produced, no t a forecast of demand

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    24/51

    10/15/2014 NY - KJP 585 2009 24

    MPS Example

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    25/51

    10/15/2014 NY - KJP 585 2009 25

    Material Requirements

    Planning (MRP) A sys tem of planning and schedul ing the

    materials requ irements for prod uct ion operat ions

    Material Requirement Plann ing is a tool gearedspeci f ical ly to assemb led operat ions

    MRP provides answers fo r several quest ions for

    the suppl iers:

    What items are required?

    How many are requ ired?

    When are requ ired ?

    MRP is common techn ique for dependent demand

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    26/51

    MRP

    The structure of the system:

    10/15/2014 NY - KJP 585 2009 26

    MRP

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    27/51

    MRP requires 3 main inpu ts:

    1. Mas ter Product ion Schedu le(what is to

    be made and when)

    This governs the MRP systems actions on the timing of procuringmaterials and producing sub-components so that it meets the MPS

    output schedule.

    2. B il l of materials (materials and parts

    required to make the product) Bill of materials is a listing of the components, their description, and

    the quantity of each required to make one unit of a product.

    This provides the product structure information to the MRP system.

    10/15/2014 NY - KJP 585 2009 27

    MRP

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    28/51

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    29/51

    10/15/2014 NY - KJP 585 2009 29

    Bills of Material

    List o f components, ingredients,

    and mater ials needed to make

    product

    Prov ides product structure

    Items above given level are cal led

    parents

    Items below given level are cal led

    chi ldren

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    30/51

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    31/51

    10/15/2014 NY - KJP 585 2009 31

    BOM Example 2

    B(2)Std. 12 Speaker kit C(3)Std. 12 Speaker kit w/amp-booster

    1

    E(2)E(2) F(2)

    Pack ing bo x and

    instal lat ion ki t of wire,bol ts , and sc rews

    Std. 12 Speakerboo ster assembly

    2

    D(2)

    12 Speaker

    D(2)

    12 Speaker

    G(1)

    Amp-booster

    3

    Product structure for Awesome (A )

    A

    Level

    0

    Independent Demand

    Dependent Demand

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    32/51

    10/15/2014 NY - KJP 585 2009 32

    BOM Example

    B(2)Std. 12 Speaker kit C(3)Std. 12 Speaker kit w/amp-booster

    1

    E(2)E(2) F(2)

    Pack ing bo x and

    instal lat ion ki t of wire,bol ts , and sc rews

    Std. 12 Speakerboo ster assembly

    2

    D(2)

    12 Speaker

    D(2)

    12 Speaker

    G(1)

    Amp-booster

    3

    Product structure for Awesome (A )

    A

    Level

    0

    Part B : 2x num ber of As = (2)(50) = 100

    Part C: 3x num ber of As = (3)(50) = 150

    Part D: 2x number of Bs+ 2x number of Fs = (2)(100) + (2)(300) = 800

    Part E: 2x number of Bs

    + 2x num ber of Cs = (2)(100) + (2)(150) = 500

    Part F: 2x num ber of Cs = (2)(150) = 300

    Part G: 1x number of Fs = (1)(300) = 300

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    33/51

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    34/51

    10/15/2014 NY - KJP 585 2009 34

    The Planning Process

    Figure 14.1

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    35/51

    10/15/2014 NY - KJP 585 2009 35

    Time-Phased Product Structure

    | | | | | | | |

    1 2 3 4 5 6 7 8Time in w eeks

    F

    2 weeks

    3 weeks

    1 week

    A

    2 weeks

    1 week

    D

    E

    2 weeks

    D

    G

    1 week

    1 week

    2 weeks toproduce

    B

    C

    E

    Start produ ct ion of DMust h ave D and Ecom pleted here soproduct ion can

    begin on B

    Figure 14.4

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    36/51

    10/15/2014 NY - KJP 585 2009 36

    MRP Structure

    Figure 14.5

    Output Reports

    MRP byper iod repor t

    MRP bydate report

    Planned orderrepor t

    Purchase advice

    Except ion repor ts

    Order early or lateor not needed

    Order quant i ty toosmal l or too large

    Data Files

    Purchasing d ata

    BOM

    Lead t imes

    (Item m aster file)

    Inventory d ata

    Masterproduct ion schedu le

    Materialrequirementplanningprograms

    (computer andsoftware)

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    37/51

    10/15/2014 NY - KJP 585 2009 37

    Material Resource Planning II

    (MRP II)

    Once an MRP system is in p lace, inventory

    data can be augmented by other useful

    in format ion

    Labor hours

    Material co sts

    Capital costs

    Virtual ly anyresource

    System is general ly cal led MRP II or

    Material Resource Planning

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    38/51

    10/15/2014 NY - KJP 585 2009 38

    Is an integrated information system that shares data amongand synchronizes the activities of production and otherfunctional areas of the business.

    MRP II is an extension of MRP to synchronize all aspects ofthe business (i.e. not only manufacturing).

    Therefore MRP II system coordinates sales, purchasing,

    manufacturing, finance, engineering by adopting a focal

    production plan and by using one unified data base to plan andupdate the activities in all the systems.

    MRP IIMaterial Resource Planning II(MRP II)

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    39/51

    10/15/2014 NY - KJP 585 2009 39

    Material Requirements Planning

    ExampleDraw up a product ion schedule for 2000 uni ts o f prod uct A.As sum e the units are required on week 20

    DB

    A

    C

    E

    E E

    DC E E

    I tem LT BatchQty

    OnHand

    A 4 - 0

    B 4 100 200

    C 3 500 750

    D 4 200 400

    E 3 400 2000

    Solution

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    40/51

    10/15/2014 NY - KJP 585 2009 40

    Material Requirements Planning

    DB

    A

    C

    E

    E E

    DC E E

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    41/51

    10/15/2014 NY - KJP 585 2009 41

    Material Requirements Planning

    Week Item Gross

    Reqmt

    On

    Hand

    Net

    Reqmt

    LT Order

    Week

    Order

    Qty

    Remain

    20 A 2000 0 2000 4 16 2000 0

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    42/51

    10/15/2014 NY - KJP 585 2009 42

    Material Requirements Planning

    DB

    A

    C

    E

    E E

    DC E E

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    43/51

    10/15/2014 NY - KJP 585 2009 43

    Material Requirements Planning

    Week Item Gross

    Reqmt

    On

    Hand

    Net

    Reqmt

    LT Order

    Week

    Order

    Qty

    Remain

    20 A 2000 0 2000 4 16 2000 0

    16 B 2000 200 1800 4 12 18(100) 0

    16 C 2000 750 1250 3 13 3(500) 250

    16 D 2000 400 1600 4 12 8(200) 0

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    44/51

    10/15/2014 NY - KJP 585 2009 44

    Material Requirements Planning

    DB

    A

    C

    E

    E E

    DC E E

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    45/51

    10/15/2014 NY - KJP 585 2009 45

    Material Requirements Planning

    Week Item Gross

    Reqmt

    On

    Hand

    Net

    Reqmt

    LT Order

    Week

    Order

    Qty

    Remain

    20 A 2000 0 2000 4 16 2000 0

    16 B 2000 200 1800 4 12 18(100) 0

    16 C 2000 750 1250 3 13 3(500) 250

    16 D 2000 400 1600 4 12 8(200) 0

    12 C 1800 0 1800 3 9 4(500) 200

    12 D 1800 0 1800 4 8 9(200) 0

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    46/51

    10/15/2014 NY - KJP 585 2009 46

    Material Requirements Planning

    DB

    A

    C

    E

    E E

    DC E E

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    47/51

    10/15/2014 NY - KJP 585 2009 47

    Material Requirements Planning

    Week Item Gross

    Reqmt

    On

    Hand

    Net

    Reqmt

    LT Order

    Week

    Order

    Qty

    Remain

    20 A 2000 0 2000 4 16 2000 0

    16 B 2000 200 1800 4 12 18(100) 0

    16 C 2000 750 1250 3 13 3(500) 250

    16 D 2000 400 1600 4 12 8(200) 0

    12 C 1800 0 1800 3 9 4(500) 200

    12 D 1800 0 1800 4 8 9(200) 0

    13 E 1250 1250 0 3 - - 0

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    48/51

    10/15/2014 NY - KJP 585 2009 48

    Material Requirements Planning

    DB

    A

    C

    E

    E E

    DC E E

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    49/51

    10/15/2014 NY - KJP 585 2009 49

    Material Requirements Planning

    Week Item Gross

    Reqmt

    On

    Hand

    Net

    Reqmt

    LT Order

    Week

    Order

    Qty

    Remain

    20 A 2000 0 2000 4 16 2000 0

    16 B 2000 200 1800 4 12 18(100) 0

    16 C 2000 750 1250 3 13 3(500) 250

    16 D 2000 400 1600 4 12 8(200) 0

    12 C 1800 0 1800 3 9 4(500) 200

    12 D 1800 0 1800 4 8 9(200) 0

    13 E 1250 1250 0 3 - - 0

    12 E 2(1600) 750 2450 3 9 7(400) 350

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    50/51

  • 8/10/2019 Topic 7A-Aggregate Planning (1)

    51/51

    10/15/2014 NY - KJP 585 2009 51

    Material Requirements Planning

    Week Item Gross

    Reqmt

    On

    Hand

    Net

    Reqmt

    LT Order

    Week

    Order

    Qty

    Remain

    20 A 2000 0 2000 4 16 2000 0

    16 B 2000 200 1800 4 12 18(100) 0

    16 C 2000 750 1250 3 13 3(500) 250

    16 D 2000 400 1600 4 12 8(200) 0

    12 C 1800 0 1800 3 9 4(400) 200

    12 D 1800 0 1800 4 8 9(200) 0

    13 E 1250 1250 0 3 - - 0

    12 E 2(1600) 750 2450 3 9 7(400) 350

    8 E 2(1800) 0 3600 3 5 9(400) 0