toronto...73.00 74.00 75.00 76.00 77.00 78.00 79.00 80.00 81.00 82.00 73.00 74.00 75.00 76.00 77.00...

22
73.00 74.00 75.00 76.00 77.00 78.00 79.00 80.00 81.00 82.00 73.00 74.00 75.00 76.00 77.00 78.00 79.00 80.00 81.00 82.00 EXISTING GROUND ELEVATION DATUM ELEV. PIPE INVERT ELEVATION CHAINAGE 79.210± 78.294± 78.253± 78.438± 78.056± 77.794± 77.879± 77.650 77.650 77.650 76.445 76.548 76.651 76.754 0+000.00 0+010.00 0+020.00 0+030.00 0+040.00 0+050.00 0+060.00 X X X X X X X X X X X X X X X X X X X X X CONTRACT No. DRAFTING: SCALE: DATE: DESIGN: CHECK: NUMBER: DRAWING SIGNED INITIAL REVISIONS DATE No. DIRECTOR, WATER INFRASTRUCTURE MANAGEMENT GRAHAM HARDING, P. ENG. DIRECTOR, BILL DE ANGELIS, P. ENG. DESIGN & CONSTRUCTION MAJOR INFRASTRUCTURE ENGINEERING AND CONSTRUCTION SERVICES DON & WATERFRONT WET WEATHER FLOW SYSTEM COXWELL BYPASS TUNNEL Water ARE IN METERS UNLESS OTHERWISE NOTED MEASUREMENTS SHOWN ON THESE PLANS METRIC engineering environment infrastructure R.V. Anderson Associates Limited in association with 17ECS-MI-04DC IHES-2(B) SANITARY SEWER PLAN & PROFILE SEPTEMBER 2017 AS SHOWN CIVIL 1078-2014-02-49 C44 AP AT DGC PATCH OPENING SURROUNDING THE FLEX DUCT CONCRETE FIN FLOOR FLEX CAULKING CAULK SEAM ALL AROUND AT WALL INCLUDING SIDES BOLT ON TOP WITH 100mm LIP ALL AROUND ALL SIDES LAG BOLT TO SECURE TOP 150mm DIA FLEX DUCT (FLEXMASTER TYPE 6 OD) URETHANE INSULATION ALL AROUND (POURED IN PLACE) GRADE USE PLY ON ENCLOSURE BELOW GRADE (12mm THK) 50mm SAN PIPE HDPE SDR 7.3 AS REQUIRED 1.5m MIN SECTION FILL INSIDE AREA WITH POURED IN PLACE URETHANE INSULATION DOWN TO 500mm BELOW GRADE PREFABRICATED METAL ENCLOSURE SHEET STEEL 12 GAUGE ( 10 BEND) 2 PRIMER & 2 FINISH COATS DARK BRONZE WITH BOLT CAP 150mm DIA FLEXDUCT MOUNTING LUGS 2 PER SIDE TO BOLT ENCLOSURE TO WALL 150mm ANCHOR TO CONCRETE FLOOR) LEAVE SPACE OPEN BETWEEN FLEX DUCT & SAN PIPE IN ORDER TO ALLOW AMBIENT AIR FROM BLDG TO SURROUND THE SAN PIPE DOWN TO 1500mm BELOW OF ROAD CORE DRILL FLOOR PROFILE VERTICAL = 1 : 50 HORIZONTAL = 1 : 200 DETAIL '1' FINISHED GROUND 150 X 150 X 150 TEE 90° BEND PROTECT EXISTING ELECTRIC DUCT BANK PLAN (STA 0+00.00 TO STA 0+65.00) 1 : 200 90° VERT. BEND 90° VERT. BEND 150MM FM PVC DR35 @1% PREFABRICATED METAL ENCLOSURE FIELD MEASURE TOP OF PLATFORM FLOOR FOR PREFABRICATED METAL ENCLOSURE 355 457 RIM EL 78.56 EX.ELECT.DUCT BANK EX.200mm WATERMAIN INV EL 76.27 EX.600mm STORM SEWER INV EL 75.51 IE 77.80 EX. CONDUIT IE 76.43 SERVICE PLATFORM NO.2 SANITARY PUMPING STATION SEE DWG. C47 FOR DETAIL EX. 150mm SAN FM PVC DR 35 EX. 50mm SAN FM HDPE SDR 7.3 355 45° HOR. BEND 78.548± 76.505 0+064.59 150 X 150 X 150 TEE 90° BEND "D BUILDING PRIMARY SEDIMENTATION TANKS DETAIL - EXISTING CONNECTION TO D BUILDING CONTRACTOR TO DESIGN SITE CONNECTIONS BEYOND SANITARY STUB CONNECTION AS REQUIRED NOTES: 1. SANITARY SEWER AND SANITARY PUMPING STATION ARE TO BE CONSTRUCTED IN ADVANCE OF CONSTRUCTION UNDER A SEPARATE CONTRACT. 2. VERTICAL DATUM: IHES-2(B) EXISTING GRADING PLAN, EXISTING INVERT ELEVATIONS AND SURVEY CONTROL ARE BASED ON THE ASHBRIDGES BAY TREATMENT PLANT SPECIFIC DATUM. IHES-2(B) STRUCTURAL DRAWING ELEVATIONS ARE BASED ON THE CANADIAN GEODETIC VERTICAL DATUM (CGVD28). CONVERSION FROM PLANT DATUM TO GEODETIC DATUM REQUIRES LOWERING OF THE PLANT DATUM ELEVATION BY A FACTOR 0.289m (CGVD28 = PLANT DATUM - 0.289m). 3. HEAT TRACING CABLES INSTALLED ON SANITARY DISCHARGE PIPES CROSSING THE ABTP NORTH ACCESS ROAD UNDER ADVANCED CONTRACT. POWER SUPPLY CONNECTION TO THE HEAT TRACING CABLES HAS NOT BEEN PROVIDED. THE CONTRACTOR IS TO DESIGN AND PROVIDE THE POWER SUPPLY AND ANCILLARY EQUIPMENT REQUIRED TO OPERATE HEAT TRACING ON THE 200mm PVC and 50mm FM HDPE SANITARY DISCHARGE PIPES. 11.25° BENDS EX. 50mm SAN FM HDPE SDR 7.3 PARALLEL TO 200mm PVC DR28 90° BEND IE 76.80 NTS 1 MOUNTING LUGS 2 PER SIDE TO BOLT ENCLOSURE TO WALL (150mm ANCHOR TO CONCRETE FLOOR) PLAN SANITARY PUMPING STATION COMPLETED BY OTHERS. CONTRACTOR TO INSTALL AND SUPPLY GRINDER PUMPS AND ANY RELATED PUMP CONTROLS (REFER TO C47 FOR PUMP DETAILS) PROTECT EXISTING ELECT.MH. 0 SEP 2017 ISSUED FOR TENDER DGC 0.50m 0.20m 1 1 1 NOV 2017 ISSUED FOR ADDENDUM 1 DGC

Upload: others

Post on 23-Jul-2020

41 views

Category:

Documents


0 download

TRANSCRIPT

  • 73.00

    74.00

    75.00

    76.00

    77.00

    78.00

    79.00

    80.00

    81.00

    82.00

    73.00

    74.00

    75.00

    76.00

    77.00

    78.00

    79.00

    80.00

    81.00

    82.00

    EXISTING

    GROUND

    ELEVATION

    DATUM ELEV.

    PIPE

    INVERT

    ELEVATION

    CHAINAGE

    79

    .2

    10

    ±

    78

    .2

    94

    ±

    78

    .2

    53

    ±

    78

    .4

    38

    ±

    78

    .0

    56

    ±

    77

    .7

    94

    ±

    77

    .8

    79

    ±

    77

    .6

    50

    77

    .6

    50

    77

    .6

    50

    76

    .4

    45

    76

    .5

    48

    76

    .6

    51

    76

    .7

    54

    0+

    00

    0.0

    0

    0+

    01

    0.0

    0

    0+

    02

    0.0

    0

    0+

    03

    0.0

    0

    0+

    04

    0.0

    0

    0+

    05

    0.0

    0

    0+

    06

    0.0

    0

    X

    X

    X X X X

    X X

    X X X

    X X X X

    X

    X

    X X

    X X

    CONTRACT No.DRAFTING:

    SCALE:

    DATE:

    DESIGN: CHECK:

    NUMBER:DRAWING

    SIGNEDINITIALREVISIONSDATENo.

    DIRECTOR, WATER INFRASTRUCTUREMANAGEMENT

    GRAHAM HARDING, P. ENG.DIRECTOR,BILL DE ANGELIS, P. ENG.

    DESIGN & CONSTRUCTIONMAJOR INFRASTRUCTURE

    ENGINEERING AND CONSTRUCTION SERVICES DON & WATERFRONT WET WEATHER FLOW SYSTEMCOXWELL BYPASS TUNNELWater

    ARE IN METERS UNLESS OTHERWISE NOTED

    MEASUREMENTS SHOWN ON THESE PLANS

    METRIC

    engineering environment infrastructure

    R.V.Anderson Associates Limited

    in association with

    17ECS-MI-04DC

    IHES-2(B) SANITARY SEWER PLAN & PROFILE

    SEPTEMBER 2017

    AS SHOWN

    CIVIL

    1078-2014-02-49 C44

    AP AT DGC

    PATCH OPENING SURROUNDING

    THE FLEX DUCT

    CONCRETE

    FIN FLOOR

    FLEX

    CAULKING

    CAULK SEAM ALL AROUND AT

    WALL INCLUDING SIDES

    BOLT ON TOP WITH 100mm LIP ALL

    AROUND ALL SIDES

    LAG BOLT TO SECURE TOP

    150mm DIA FLEX DUCT

    (FLEXMASTER TYPE 6 OD)

    URETHANE INSULATION

    ALL AROUND (POURED IN

    PLACE)

    GRADE

    USE PLY ON ENCLOSURE BELOW

    GRADE (12mm THK)

    50mm SAN PIPE

    HDPE SDR 7.3

    AS

    R

    EQ

    UIR

    ED

    1.5

    m

    MIN

    SECTION

    FILL INSIDE AREA WITH

    POURED IN PLACE URETHANE

    INSULATION DOWN TO 500mm

    BELOW GRADE

    PREFABRICATED METAL ENCLOSURE

    SHEET STEEL 12 GAUGE ( 10 BEND)

    2 PRIMER & 2 FINISH COATS DARK

    BRONZE WITH BOLT CAP

    150mm DIA FLEXDUCT

    MOUNTING LUGS 2 PER SIDE

    TO BOLT ENCLOSURE TO WALL

    150mm ANCHOR TO CONCRETE FLOOR)

    LEAVE SPACE OPEN BETWEEN

    FLEX DUCT & SAN PIPE IN ORDER

    TO ALLOW AMBIENT AIR FROM

    BLDG TO SURROUND THE SAN PIPE

    DOWN TO 1500mm BELOW OF ROAD

    CORE DRILL FLOOR

    PROFILE

    VERTICAL = 1 : 50

    HORIZONTAL = 1 : 200

    DETAIL '1'

    FINISHED GROUND

    150 X 150 X 150 TEE

    90° BEND

    PROTECT EXISTING

    ELECTRIC DUCT BANK

    PLAN (STA 0+00.00 TO STA 0+65.00)

    1 : 200

    90° VERT. BEND

    90° VERT. BEND

    150MM FM PVC DR35 @1%

    PREFABRICATED METAL

    ENCLOSURE

    FIELD MEASURE TOP OF PLATFORM

    FLOOR FOR PREFABRICATED

    METAL ENCLOSURE

    355

    45

    7

    RIM EL 78.56

    EX.ELECT.DUCT BANK

    EX.200mm WATERMAIN

    INV EL 76.27

    EX.600mm STORM SEWER

    INV EL 75.51

    IE 77.80

    EX. CONDUIT

    IE 76.43

    SERVICE PLATFORM NO.2

    SA

    NIT

    AR

    Y P

    UM

    PIN

    G S

    TA

    TIO

    N

    SE

    E D

    WG

    . C

    47

    F

    OR

    D

    ET

    AIL

    EX. 150mm SAN

    FM PVC DR 35

    EX. 50mm SAN FM HDPE SDR 7.3

    355

    45° HOR.

    BEND

    78

    .5

    48

    ±7

    6.5

    05

    0+

    06

    4.5

    9

    150 X 150 X 150 TEE

    90° BEND

    "D BUILDING PRIMARY

    SEDIMENTATION TANKS

    DETAIL - EXISTING CONNECTION TO D BUILDING

    CONTRACTOR TO DESIGN

    SITE CONNECTIONS BEYOND

    SANITARY STUB CONNECTION

    AS REQUIRED

    NOTES:

    1. SANITARY SEWER AND SANITARY PUMPING STATION ARE TO BE

    CONSTRUCTED IN ADVANCE OF CONSTRUCTION UNDER A SEPARATE

    CONTRACT.

    2. VERTICAL DATUM: IHES-2(B) EXISTING GRADING PLAN, EXISTING INVERT

    ELEVATIONS AND SURVEY CONTROL ARE BASED ON THE ASHBRIDGES

    BAY TREATMENT PLANT SPECIFIC DATUM. IHES-2(B) STRUCTURAL

    DRAWING ELEVATIONS ARE BASED ON THE CANADIAN GEODETIC

    VERTICAL DATUM (CGVD28). CONVERSION FROM PLANT DATUM TO

    GEODETIC DATUM REQUIRES LOWERING OF THE PLANT DATUM

    ELEVATION BY A FACTOR 0.289m (CGVD28 = PLANT DATUM - 0.289m).

    3. HEAT TRACING CABLES INSTALLED ON SANITARY DISCHARGE PIPES

    CROSSING THE ABTP NORTH ACCESS ROAD UNDER ADVANCED

    CONTRACT. POWER SUPPLY CONNECTION TO THE HEAT TRACING CABLES

    HAS NOT BEEN PROVIDED. THE CONTRACTOR IS TO DESIGN AND PROVIDE

    THE POWER SUPPLY AND ANCILLARY EQUIPMENT REQUIRED TO OPERATE

    HEAT TRACING ON THE 200mm PVC and 50mm FM HDPE SANITARY

    DISCHARGE PIPES.

    11.25° BENDS

    EX. 50mm SAN FM HDPE SDR 7.3

    PARALLEL TO 200mm PVC DR28

    90° BEND

    IE 76.80

    NTS

    1

    MOUNTING LUGS 2 PER SIDE

    TO BOLT ENCLOSURE TO WALL

    (150mm ANCHOR TO

    CONCRETE FLOOR)

    PLAN

    SANITARY PUMPING STATION

    COMPLETED BY OTHERS.

    CONTRACTOR TO INSTALL AND

    SUPPLY GRINDER PUMPS AND ANY

    RELATED PUMP CONTROLS

    (REFER TO C47 FOR PUMP DETAILS)

    PROTECT EXISTING

    ELECT.MH.

    0 SEP 2017 ISSUED FOR TENDER DGC

    0.5

    0m

    0.2

    0m

    1

    1

    1 NOV 2017 ISSUED FOR ADDENDUM 1 DGC

  • TAG

    #

    COMMON

    NAME

    DBH

    (cm)

    PROTECT REMOVE

    122 Manitoba Maple 41.0 X

    126 Black Locust 24.0 X

    127 Black Locust 15.0 X

    128 White Elm 15.0 X

    129 Black Locust 48.0 X

    130 Manitoba Maple 14.0 X

    133 Manitoba Maple 16.0 X

    134 Manitoba Maple 43.0 X

    135 Black Locust 20.0 X

    181 Manitoba Maple 28.0 X

    182 Manitoba Maple 30.0 X

    183 Manitoba Maple 31.0 X

    184 Manitoba Maple 33.0 X

    185 Manitoba Maple 10.0 X

    186 Manitoba Maple 17.0 X

    191 Manitoba Maple 11.0 X

    194 White Mulberry 16.0 X

    195 White Mulberry 16.0 X

    4

    1

    1

    1

    2

    1

    3

    T

    2

    1

    9

    2

    6

    2

    8

    3

    0

    3

    2

    3

    4

    4

    04

    1

    4

    3

    4

    4

    4

    7

    5

    0

    5

    4

    8

    1

    1

    3

    0

    1

    4

    3

    1

    7

    3

    1

    8

    3

    2

    9

    3

    1

    3

    3

    3

    7

    3

    8

    3

    9

    4

    2

    5

    3

    5

    5

    5

    6

    5

    7

    5

    8

    5

    9

    6

    0

    6

    1

    6

    2

    6

    3

    6

    4

    6

    5

    6

    6

    6

    7

    6

    8

    6

    9

    7

    0

    7

    1

    7

    2

    7

    3

    7

    87

    9

    8

    0

    8

    2

    8

    3

    8

    48

    5

    8

    6

    8

    7

    8

    8

    8

    9

    9

    09

    1

    9

    2

    9

    3

    9

    6

    9

    8

    9

    9

    1

    0

    0

    1

    0

    41

    0

    5

    1

    0

    6

    1

    0

    7

    1

    0

    8

    1

    0

    9

    1

    1

    0

    1

    1

    1

    1

    1

    2

    1

    1

    3

    1

    1

    4

    1

    1

    5

    1

    1

    6

    1

    1

    7

    1

    1

    8

    1

    1

    9

    1

    2

    0

    1

    2

    1

    1

    2

    3

    1

    2

    4

    1

    2

    5

    1

    2

    8

    1

    3

    1

    1

    3

    2

    1

    3

    3

    1

    3

    4

    1

    3

    5

    1

    3

    6

    1

    3

    7

    1

    3

    8

    1

    3

    9

    1

    4

    0

    1

    4

    1

    1

    4

    2

    1

    4

    4

    1

    4

    5

    1

    4

    6

    1

    4

    7

    1

    4

    8

    1

    4

    9

    1

    5

    0

    1

    5

    1

    1

    5

    2

    1

    5

    3

    1

    5

    4

    1

    5

    5

    1

    5

    6

    1

    5

    7

    1

    5

    8

    1

    5

    9

    1

    6

    0

    1

    6

    1

    1

    6

    2

    1

    6

    3

    1

    6

    4

    1

    6

    5

    1

    6

    6

    1

    6

    8

    1

    6

    9

    1

    7

    1

    1

    7

    4

    1

    7

    5

    1

    7

    8

    1

    7

    9

    1

    8

    0

    1

    8

    7

    1

    8

    8

    1

    8

    9

    1

    9

    3

    T

    2

    1

    7

    3

    5

    4

    5

    4

    6

    4

    8

    5

    1

    5

    2

    7

    4

    7

    5

    7

    6

    7

    7

    9

    5

    9

    7

    1

    0

    1

    1

    0

    2

    1

    0

    3

    1

    2

    2

    1

    2

    6

    1

    2

    7

    1

    2

    9

    1

    6

    7

    1

    7

    0

    1

    7

    2

    1

    7

    6

    1

    7

    7

    1

    8

    6

    1

    9

    0

    1

    2

    3

    5

    6

    7

    8

    9

    1

    0

    1

    4

    1

    5

    1

    6

    T

    2

    2

    31

    7

    1

    8

    1

    9

    2

    0

    2

    1

    2

    2

    2

    3

    2

    4

    T

    2

    1

    8

    2

    5

    2

    7

    3

    6

    4

    9

    9

    4

    1

    8

    1

    1

    8

    2

    1

    8

    41

    8

    5

    1

    9

    1

    1

    9

    2

    1

    9

    4

    1

    9

    5

    1

    3

    0

    1

    8

    3

    1

    2

    8

    1

    3

    3

    1

    3

    4

    1

    3

    5

    1

    2

    2

    1

    2

    6

    1

    2

    7

    1

    2

    9

    1

    8

    6

    1

    8

    11

    8

    2

    1

    8

    4

    1

    8

    5

    1

    9

    1

    1

    9

    4

    1

    9

    5

    BB1-7

    BB1-6

    BB1-5

    BB1-3

    BB1-4

    BB1-

    1 BB1-

    2LD-

    BD-2

    8507

    -BD-

    01

    TEST HOLES DATA TABLE

    TH

    #

    TH

    D

    ata

    (m

    /d

    /y

    )

    Utility

    T

    yp

    e

    Utility

    Ma

    te

    ria

    l

    Utility

    Wid

    th

    To

    p E

    le

    v. o

    f

    U

    tility

    (m

    )

    De

    pth

    o

    f

    Utility

    fro

    m

    Gra

    de

    ID

    'd

    B

    y

    1 08-02-2016 STM MET 400 80.39 1.85Rod & Cap

    2 08-02-2016 STM MET 400 80.27 1.89Rod & Cap

    3 08-02-2016 STM MET 400 80.27 1.90

    Rod & Cap

    4 08-02-2016 STM MET 400 79.36 3.00Rod & Cap

    5 08-02-2016 STM CON

    -

    78.77 3.58Rod & Cap

    6 08-02-2016 GAS MET 300 80.50 1.31

    Rod & Cap

    7 08-03-2016 GAS MET 300 80.95 1.36Rod & Cap

    8 08-03-2016 STM MET 400 78.86 3.36Rod & Cap

    9 08-03-2016 STM CON - 78.93 3.55

    Rod & Cap

    10 08-03-2016 STM UNK 200 79.79 2.26Rod & Cap

    11 08-03-2016 STM UNK 200 79.34 3.03Rod & Cap

    12 08-04-2016 STM CON 2700 78.88 3.50

    Rod & Cap

    13 08-04-2016 STM CON - 78.71 3.53Rod & Cap

    14 08-04-2016 STM CON - 77.72 4.56Rod & Cap

    CONTRACT No.DRAFTING:

    SCALE:

    DATE:

    DESIGN: CHECK:

    NUMBER:DRAWING

    SIGNEDINITIALREVISIONSDATENo.

    DIRECTOR, WATER INFRASTRUCTUREMANAGEMENT

    GRAHAM HARDING, P. ENG.DIRECTOR,BILL DE ANGELIS, P. ENG.

    DESIGN & CONSTRUCTIONMAJOR INFRASTRUCTURE

    ENGINEERING AND CONSTRUCTION SERVICES DON & WATERFRONT WET WEATHER FLOW SYSTEMCOXWELL BYPASS TUNNELWater

    ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

    MEASUREMENTS SHOWN ON THESE PLANS

    METRIC

    engineering environment infrastructure

    R.V.Anderson Associates Limited

    in association with

    17ECS-MI-04DC

    BB-1 CONSTRUCTION COMPOUND - REMOVAL PLAN

    OCTOBER 2017

    1:500

    CIVIL

    1078-2014-02-62 C57

    AP AT DGC

    PRINCE EDWARD VIADUCT

    B

    L

    O

    O

    R

    R

    A

    M

    P

    B

    A

    Y

    V

    IE

    W

    A

    V

    E

    N

    U

    E

    CITY OF TORONTO

    S

    T

    R

    E

    E

    T

    L

    I

    N

    E

    S

    T

    R

    E

    E

    T

    L

    I

    N

    E

    PR

    O

    PE

    R

    TY

    LIN

    E

    PR

    OP

    ER

    TY

    LIN

    E

    TRCA REGULATION LIMIT

    CITY OF TORONTO

    CITY OF TORONTO

    ST

    RE

    ET

    LIN

    E

    TORONTO BOARD OF EDUCATION

    ROSEDALE HEIGHTS SECONDARY

    SCHOOL

    GENERAL NOTES

    1. DURING REMOVALS, CONTRACTOR TO SECURE SITE TO PROTECT THE PUBLIC.

    2. CONTRACTOR TO PROTECT EXISTING TREES NOT DESIGNATED FOR REMOVAL.

    3. SHAFT BB-1 CONSTRUCTION COMPOUND AND HOARDING INSTALLATION TO BE DONE

    PRIOR TO STRIPPING OFF SITE.

    4. THE LOCATION OF ALL UNDER/ABOVE GROUND MUNICIPAL SERVICES, UTILITIES AND

    STRUCTURES ARE APPROXIMATE ONLY. NOT ALL MUNICIPAL SERVICES AND UTILITIES

    ARE SHOWN AND WHERE SHOWN ON THE DRAWINGS. THE COMPLETENESS AND

    ACCURACY OF THE LOCATION OF SUCH SERVICE, UTILITIES AND STRUCTURES ARE NOT

    GUARANTEED. THE CONTRACTOR SHALL DETERMINE THE LOCATION OF ALL SUCH

    SERVICES, UTILITIES AND STRUCTURES BY CONSULTING THE APPROPRIATE

    AUTHORITIES OR UTILITY COMPANIES CONCERNED. THE CONTRACTORS SHALL PROVE

    THE LOCATION OF ALL SUCH UTILITIES AND STRUCTURES AND SHALL ASSUME ALL

    LIABILITY FOR DAMAGE OR RESTORATION TO SAME. ALL CONNECTION POINTS AND

    MATERIAL TYPE TO BE VERIFIED IN THE FIELD PRIOR TO CONSTRUCTION. THE

    CONTRACT ADMINISTRATOR SHALL BE NOTIFIED IMMEDIATELY OF ANY CONFLICT WITH

    EXISTING SERVICES.

    5. DAYLIGHT ENBRIDGE GAS MAIN AT 10m SPACING ALONG GAS MAIN PRIOR TO HOARDING

    INSTALLATION. NOTIFY CONTRACT ADMINISTRATOR 2 WEEKS PRIOR TO WORK TO

    FACILITATE ENBRIDGE INSPECTION OF THE WORK.

    6. THE CONTRACTOR SHALL NOTIFY THE CONTRACT ADMINISTRATOR AND CONTACT

    TORONTO HYDRO TO HAVE THE POLE RELOCATED A MINIMUM OF 16 WEEKS PRIOR TO

    POLE RELOCATION. THE CONTRACTOR IS REQUIRED TO COORDINATE WITH TORONTO

    HYDRO TO FACILITATE RELOCATION OF POLE. THE CITY WILL PAY TORONTO HYDRO

    DIRECTLY FOR THE COST TO DESIGN AND RELOCATE THE POLE. THE CONTRACTOR

    WILL NOT BE ENTITLED FOR ADDITIONAL PAYMENT AND THE WORK REQUIRED TO

    COORDINATE RELOCATION SHALL BE CONSIDERED IN THE BASIC LUMP SUM BID PRICE.

    PROTECT FULL LENGTH OF

    EX. 300mm ENBRIDGE GAS

    MAIN (REFER TO NOTE 5)

    EXISTING FENCE

    REMOVE LIGHT POLE

    AND RELOCATE

    (REFER TO NOTE 6)

    7.5m WIDE ASPHALT

    SITE ACCESS

    STM 1500 AC

    T.H.E.S CABLE

    REMOVE BASEBALL

    FIELD FENCE

    CB TUNNEL

    (6.3m I.D.)

    R

    1

    5

    LEGEND:

    EXISTING CONTOUR

    EXISTING SPOT ELEVATION

    PROTECT TREE

    REMOVE TREE

    TEST HOLES

    REMOVALS

    SILT FENCE

    CONSTRUCTION HOARDING

    82.00

    82.168

    EXISTING DITCH

    R

    1

    5

    HOARDING OFFSET 1m

    FROM EXISTING FENCE,

    FIELD VERIFIED

    TH#4

    TH#5

    TH#10

    TH#9

    TH#11

    TH#12

    TH#13

    TH#14

    TH#3

    TH#2

    TH#1

    TH#6

    TH#7

    TH#8

    PROTECT EXISTING

    STORM SEWER

    EXISTING 400mm

    STORM SEWER

    ABANDONED STORM

    SEWER TO BE REMOVED

    AND CAPPED FOR SHAFT

    CONSTRUCTION

    EXISTING 2850mm

    RC STORM SEWER

    LIMITS OF CONSTRUCTION

    (HOARDING DETAILS REFER

    TO C84)

    CAP AND REMOVE

    ABANDONED STORM

    SEWER TO ALLOW

    HOARDING INSTALLATION

    PRUNE TREES AS REQUIRED TO

    INSTALL HOARDING REFER TO

    SPECIFICATION FOR DETAILS

    REMOVE EX. FENCE AS REQUIRED

    TO CONSTRUCT TEMPORARY SITE

    ACCESS

    REMOVE LIGHT POLE

    AND RELOCATE

    Date/Time, Plotted : 6/9/2017 3:23:01 PM

    0 OCT 2017 ISSUED FOR TENDER DGC

    PROTECT

    EXISTING STORM

    SEWER

    CONTROL POINTS

    1

    1 NOV 2017 ISSUED FOR ADDENDUM 1 DGC

    1

  • 1

    5 M

    @

    2

    00

    EXISTING STOP

    LOG

    PLAN AT ELEVATION 90.8SCALE 1:50

    17001

    EXISTING SEWER

    TUNNEL

    3000 mm I.D. NEW

    SEWER (SEE NOTE 1)

    NEW SLIDE GATE, SQUARE

    FRAME w/ 3048mm (120in)

    I.D. ROUND OPENING AND

    FLANGE

    EXISTING STOP LOG

    EXISTING SLIDE

    GATE

    1500

    3000

    450450

    4890

    2210

    300

    1100

    1493

    300

    1920

    3950

    500

    1500

    300

    300

    300mm THICK

    REMOVABLE

    SLAB

    L

    C G. AND CRANE

    HOOK

    L

    LIFTING DEVICE

    (4 PER EACH ROOF

    PANEL. (DETAIL 1)

    3

    9

    5

    01

    8

    7

    5

    1

    5

    0

    0

    1

    5

    0

    0

    1

    2

    5

    0

    2

    1

    5

    0

    4

    9

    0

    0

    3

    0

    0

    3

    0

    0

    3

    0

    0

    3

    0

    0

    L

    L

    300

    3

    0

    0

    20 GAP

    5

    0

    0

    3

    0

    0

    m

    m

    T

    H

    I

    C

    K

    R

    E

    M

    O

    V

    A

    B

    L

    E

    S

    L

    A

    B

    EXISTING 1500x1500 OPENING

    WITH DOUBLE LEAF ALUMINUM

    BILCO HATCH

    REFER TO GATE

    INSTALLATION SEQUENCE

    LIFTING

    UP

    4 CABLES

    EX RUBBER GASKET

    EX 12mm DIA.

    COUNTERSUNK BOLT

    EX CAST-IN

    LIFTING ANCHOR / BOLT

    FOAM

    PLUG

    EX 8mm THICK

    CAPPING PLATE

    EX WATER PROOFING +

    PROTECTION BOARD

    SECTION

    EX. CAPPING PLATE DETAIL

    N.T.S.

    150

    50 (TYP.)

    100

    PLAN

    EX. CONC.COVER

    300

    LIFTING CABLE

    AS REQUIRED

    LIFTING LOAD PER

    LIFTING EYE/

    BOLT = 80KN

    (UNFACTORED)

    LIFTING DEVICE (P51 SWIFT LIFT LIFTING EYE

    AND P-52 SWIFT LIFT ANCHOR BY DAYTON

    SUPERIOR OR APPROVED (EQUIVALENT)

    CONCRETE CAP LIFTING PROCEDURE

    1. SURVEY OF CONCRETE CAP AND SHAFT.

    2. MARK CAP AND SHAFT FITTING POINTS PRIOR TO LIFTING.

    3. PROVIDE HEAVY DUTY GREASE BOND BREAKER BETWEEN

    CAP AND SHAFT BEARING.

    4. REMOVE FORMWORK, BEDDING MATERIALS FROM UPPER

    SURFACE OF CONCRETE CAP AND AS REQUIRED TO ALLOW

    FOR REMOVAL.

    5. REMOVE EXISTING CAPPING PLATE AND PROVIDE A LIFTING

    CABLE AT EACH LIFTING EYE LOCATION. LENGTH TO BE

    DETERMINED BY CONTRACTOR TO PROVIDE A LEVEL LIFT.

    6. LIFT CONCRETE COVER UNIFORMLY FROM ALL SIDE,

    CONTRACTOR TO MONITOR.

    7. NO JERKING OR IMPACT ON COVER DURING LIFTING AND

    TRANSPORTING.

    8. PROVIDE GUYED GUIDANCE THROUGHOUT LIFTING AND

    TRANSPORTING WHERE NECESSARY.

    9. GENTLY LOWER CAP INTO FINAL SETTING POSITION ON SITE.

    SET CAP ON TIMBERS FOR UNIFORM SUPPORT AND STORE IN

    LOCATION PROTECTED FROM DAMAGE ON SITE.

    10. ALL LIFTING HARDWARE ASSEMBLY SHALL BE STAINLESS

    STEEL.

    11. REINSTALL EXISTING CAPPING PLATE AFTER COMPLETION OF

    LIFT AND REPLACE DAMAGED PARTS AS REQUIRED.

    12. IF DAMAGED DURING LIFT, REPLACE NEOPRENE GASKET ON

    UNDERSIDE OF CAP DURING REPLACEMENT OF CONCRETE

    CAP.

    1

    DETAIL

    NTS

    EX LIFTING ANCHOR/BOLT

    GATE INSTALLATION SEQUENCE NOTE:

    1. SURVEY EXISTING COXWELL SANITARY TRUNK SEWER

    CHAMBER AND PROPOSED GATE LOCATION TO ENSURE GATE

    FITS PRIOR TO MANUFACTURING OF GATE.

    2. GATE INSTALLATION AND CONFINED SPACE WORK

    PROCEDURE TO BE SUBMITTED AND APPROVED PRIOR TO

    COMMENCING MANUFACTURING.

    3. REMOVE EXISTING ASPHALT AND BOLLARDS, DETAILED ON

    C71, AS REQUIRED.

    4. REMOVE SOIL AND UNSHRINKABLE FILL TO ELEVATION 90.8m

    TO EXPOSE REMOVABLE SLAB.

    5. DETACH AND REMOVE EXISTING LADDER AND STOP LOG

    OPERATION BOX AS REQUIRED FOR REMOVABLE SLAB. REFER

    TO EXISTING COXWELL SANITARY TRUNK SEWER AS-BUILTS

    PROVIDED IN CONTRACT ANNEXURES.

    6. REMOVE 300mm THICK REMOVABLE SLAB, REFER TO DETAIL.

    7. INSTALL SLIDE GATE, REFER TO MECHANICAL DRAWINGS, AND

    COMPLETE TESTING AND COMMISSIONING.

    8. REINSTAE REMOVABLE SLAB AND RESTORE DISTURBED AREA

    TO MATCH PRE-CONSTRUCTION CONDITION.

    CONTRACT No.DRAFTING:

    SCALE:

    DATE:

    DESIGN: CHECK:

    NUMBER:DRAWING

    SIGNEDINITIALREVISIONSDATENo.

    DIRECTOR, WATER INFRASTRUCTUREMANAGEMENT

    GRAHAM HARDING, P. ENG.DIRECTOR,BILL DE ANGELIS, P. ENG.

    DESIGN & CONSTRUCTIONMAJOR INFRASTRUCTURE

    ENGINEERING AND CONSTRUCTION SERVICES DON & WATERFRONT WET WEATHER FLOW SYSTEMCOXWELL BYPASS TUNNELWater

    ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

    MEASUREMENTS SHOWN ON THESE PLANS

    METRIC

    engineering environment infrastructure

    R.V.Anderson Associates Limited

    in association with

    17ECS-MI-04DC

    CX-1(A) GATE INSTALLATION SEQUENCE

    1:40

    DGC SC DGC

    CIVIL

    0 SEP 2017 ISSUED FOR TENDER DGC

    SEPTEMBER 20171078-2014-02-85 C80

    1

    1 NOV 2017 ISSUED FOR ADDENDUM 1 DGC

  • W

    O

    O

    D

    F

    I

    E

    L

    D

    R

    O

    A

    D

    GREENWOOD SEWER

    EX. 150 mm WATERMAIN

    MAIN ACCESS GATE

    (9m WIDE DOUBLE

    SWING OPSD 972.102)

    REMOVE EX. CURB STOPS

    PROTECT FIRE

    HYDRANT

    CHAIN LINK

    FENCE

    PUBLIC ACCESS

    ROAD TO WEST

    PARKING LOT

    2100m

    m R

    .C

    .P

    . S

    TM

    . S

    EW

    ER

    1800mm X 2100mm CONC. TWIN CULVERT STM. SEWER

    1

    5

    0

    m

    m

    G

    A

    S

    M

    A

    IN

    5

    2

    5

    m

    m

    R

    .C

    .P

    . S

    T

    M

    . D

    R

    A

    IN

    3

    0

    0

    m

    m

    G

    A

    S

    M

    A

    IN

    CONSTRUCTION SITE

    HOARDING-PLYWOOD

    HOARDING, C84

    SITE

    TRAILER

    (REFER TO NOTE 11

    PARKING AREA

    (3m x 6m)

    26 SPOTS

    A

    C

    C

    E

    S

    S

    R

    O

    A

    D

    (

    8

    m

    W

    I

    D

    E

    )

    (

    R

    E

    F

    E

    R

    T

    O

    N

    O

    T

    E

    8

    )

    REMOVE EX. GUARDRAIL

    CURB CUT AND GRADE

    FOR CAR ACCESS

    REMOVE PARK SIGNAGE

    W

    O

    O

    D

    F

    I

    E

    L

    D

    R

    O

    A

    D

    E

    A

    S

    T

    E

    R

    N

    A

    V

    E

    N

    U

    E

    BS

    R-2

    BD

    -01

    BS

    R-1

    BD

    -02

    BD

    R-0

    3

    BD

    R-0

    5

    BT

    R-0

    2

    IPS CONTRACT AREA

    (OCCUPIED BY SEPARATE CONTRACTOR)

    IPS CONTRACT AREA

    (OCCUPIED BY SEPARATE CONTRACTOR)

    150mm WATERMAIN PVC DR 28

    (REFER TO NOTE 10 AND

    PROFILE 1)

    FIRE HYDRANT AS PER

    CITY STD T-1105.01

    50mm FM HDPE DR11 SAN SEWER

    (REFER TO PROFILE 2)

    COXWELL CONTRACT

    ADDITIONAL AREA

    (1800m²)

    SANITARY CONNECTION

    TO EX. LOWER LEVEL

    INTERCEPTOR (LLI)

    MANHOLE AS PER CITY

    STD. T-708-020

    EX. T.H.E.S. POLE

    (NOTE 16)

    9m WIDE DOUBLE SWING

    GATE, OPSD 972.102

    50mm COPPER SERVICE

    CONNECTION

    CONTRACTOR TO PROVIDE SIGNAGE:

    "NO PUBLIC PARKING AND ACCESS

    AVAILABLE. ACCESS LIMITED TO

    CONSTRUCTION VEHICLES ONLY"

    45° BEND

    45° BEND

    WATER METER CHAMBER AS PER CITY

    STD. T-1108.01-3 AND T-1107.02-2

    (DIMENSIONS AS PER 150mm PIPE SIZE

    POWER SUPPLY

    (NOTE 15)

    71.00

    72.00

    73.00

    74.00

    75.00

    76.00

    77.00

    78.00

    79.00

    80.00

    81.00

    82.00

    71.00

    72.00

    73.00

    74.00

    75.00

    76.00

    77.00

    78.00

    79.00

    80.00

    81.00

    82.00

    71.00

    72.00

    73.00

    74.00

    75.00

    76.00

    77.00

    78.00

    79.00

    80.00

    81.00

    71.00

    72.00

    73.00

    74.00

    75.00

    76.00

    77.00

    78.00

    79.00

    80.00

    81.00

    KEY PLAN

    NOT TO SCALE

    NORTH OF LAKE SHORE - SITE PLAN

    SITE PLAN

    CONTRACT No.DRAFTING:

    SCALE:

    DATE:

    DESIGN: CHECK:

    NUMBER:DRAWING

    SIGNEDINITIALREVISIONSDATENo.

    DIRECTOR, WATER INFRASTRUCTUREMANAGEMENT

    GRAHAM HARDING, P. ENG.DIRECTOR,BILL DE ANGELIS, P. ENG.

    DESIGN & CONSTRUCTIONMAJOR INFRASTRUCTURE

    ENGINEERING AND CONSTRUCTION SERVICES DON & WATERFRONT WET WEATHER FLOW SYSTEMCOXWELL BYPASS TUNNELWater

    ARE IN METERS UNLESS OTHERWISE NOTED

    MEASUREMENTS SHOWN ON THESE PLANS

    METRIC

    engineering environment infrastructure

    R.V.Anderson Associates Limited

    in association with

    17ECS-MI-04DC

    SCALE 1:500

    25 50 METERSMETER 0 2015105 30 35 40 45

    LEGEND

    X

    CHAIN LINK FENCE

    PLYWOOD

    GENERAL NOTES

    1. ALL EXCAVATED MATERIAL SHALL BE TRANSPORTED OFF SITE AND BE

    DISPOSED BY THE CONTRACTOR AT THE APPROPRIATE RECEIVER SITE.

    NO STOCKPILING OF EXCAVATED MATERIAL ON SITE SHALL BE

    PERMITTED.

    2. THE CONTRACTOR SHALL STRIP TOPSOIL FULL DEPTH TO MININUM

    300mm BELOW EXISTING GROUND SURFACE.

    3. THE SITE AND ACCESS ROADS SHALL BE PROOF ROLLED BY DRIVING A

    HEAVY CONSTRUCTION VEHICLE OVER THE AREAS TO IDENTIFY ANY

    WEAK OR UNSTABLE AREAS. ALL WEAK OR WET ZONES IDENTIFIED BY

    PROOF ROLLING SHALL BE SUB-EXCAVATED AND REPLACED WITH 50

    MM CRUSHER RUN LIMESTONE SUPPLIED, PLACED AND COMPACTED BY

    THE CONTRACTOR.

    4. THE CONTRACTOR SHALL SUPPLY AND PLACE A NON-WOVEN

    GEOTEXTILE (TERRAFIX 270R OR EQUIVALENT) OVER THE ENTIRE

    COMPOUND AREA INCLUDING THE ACCESS ROAD.

    5. THE CONTRACTOR SHALL DESIGN THE SITE AND TEMPORARY SITE

    ACCESS ROADS TO PROVIDE SUFFICIENT BEARING CAPACITY FOR THE

    PROPOSED EQUIPMENT LOADING BASED ON THE BOREHOLE LOGS

    PROVIDED IN THE THURBER GEOTECHNICAL INVESTIGATION REPORTS.

    THE CONTRACTOR SHALL PROVIDE TO THE CONTRACTOR

    ADMINISTRATOR A REPORT AND DRAWING STAMPED BY A

    PROFESSIONAL ENGINEER REGISTERED IN THE PROVINCE OF ONTARIO

    FOR THE PROPOSED LOADING DESIGN. THE CONTRACTOR SHALL

    EXCAVATE, DEWATER AS REQUIRED, SUPPLY, PLACE AND COMPACT

    GRANULAR MATERIALS AND ALL OTHER MATERIALS AS REQUIRED TO

    MEET THE BEARING CAPACITY REQUIREMENTS AND SITE GRADING. NO

    RECYCLED CONCRETE MATERIALS WILL BE ACCEPTED. AS A MINIMUM,

    THE CONTRACTOR SHALL SUPPLY, PLACE AND COMPACT MINIMUM

    150mm HL8 BINDER COURSE (MIN. 2 LIFTS) PLACED ON TOP OF 300mm

    MINIMUM DEPTH OF GRANULAR "A" AND 150mm MINIMUM DEPTH OF

    GRANULAR "B" MATERIALS AS PER ONTARIO PROVINCIAL STANDARD

    SPECIFICATION (OPSS) 1010 FOR THE ACCESS ROAD.

    6. THE CONTRACTOR SHALL MAINTAIN THE SITE AREA AND ACCESS

    ROADS GRANULAR MATERIAL AND SUPPLY AND PLACE ADDITIONAL

    GRANULAR MATERIAL DURING CONSTRUCTION AS REQUIRED TO

    MAINTAIN THE REQUIRED SITE GRADING AND THE CONSTRUCTION

    BEARING CAPACITIES.

    7. ALL EQUIPMENT, LABOUR AND MATERIAL REQUIRED TO UNDERTAKE

    THE WORK SHALL BE INCLUDED IN THE LUMP SUM PRICE BID FOR THE

    PROJECT.

    8. COXWELL CONTRACTOR TO SHARE ACCESS ROAD WITH THE FUTURE

    INTEGRATED PUMPING STATION CONTRACT.

    9. THE LOCATION OF ALL UNDER/ABOVE GROUND MUNICIPAL SERVICES,

    UTILITIES AND STRUCTURES ARE APPROXIMATE ONLY. NOT ALL

    MUNICIPAL SERVICES AND UTILITIES ARE SHOWN AND WHERE SHOWN

    ON THE DRAW NGS, THE COMPLETENESS AND ACCURACY OF THE

    LOCATION OF SUCH SERVICE, UTILITIES AND STRUCTURES ARE NOT

    GUARANTEED. THE CONTRACTOR SHALL DETERMINE THE LOCATION OF

    ALL SUCH SERVICES, UTILITIES AND STRUCTURES BY CONSULTING THE

    APPROPRIATE AUTHORITIES OR UTILITY COMPANIES CONCERNED. THE

    CONTRACTORS SHALL PROVE THE LOCATION OF ALL SUCH UTILITIES

    AND STRUCTURES AND SHALL ASSUME ALL LIABILITY FOR DAMAGE OR

    RESTORATION TO SAME. ALL CONNECTION POINTS AND MATERIAL

    TYPE TO BE VERIFIED IN THE FIELD PRIOR TO CONSTRUCTION. THE

    CONTRACT ADMINISTRATOR SHALL BE NOTIFIED IMMEDIATELY OF ANY

    CONFLICT WITH EXISTING SERVICES.

    10. WET TAPPING PROCEDURE TO BE PERFORMED IN ACCORDANCE WITH

    SPECIFICATION 02511 AND RELEVANT CITY OF TORONTO

    CONSTRUCTION SPECIFICATION INCLUDING TS 7.30 AND TS 7.70.

    11. SITE TRAILER TO BE IN ACCORDANCE WITH SPECIFICATION 01510.

    12. CONTRACTOR TO DESIGN DEWATERING SYSTEM BASED ON

    GROUNDWATER ELEVATION OF 76.40m

    13. CONTRACTOR TO DESIGN SITE CONNECTION BEYOND THE WATERMAIN

    AND SANITARY SEWER STUB CONNECTIONS.

    14. CONTRACTOR TO DEMOBILIZE SITE TRAILER TO BE RETAINED BY

    OWNER.

    15. CONTRACTOR TO DESIGN AND CONSTRUCT POWER SUPPLY FROM

    T.H.E.S. TRANSFORMER TO SITE TRAILER.

    16. POWER SUPPLY AVAILABLE AT T.H.E.S. POLE: 200A AT 120/240V.

    17. CONTRACTOR TO ARRANGE FOR ESA INSPECTION OF POWER SUPPLY.

    ONCE COMPLETED, CONTRACTOR TO CONTACT TORONTO HYDRO FOR

    METER AND FINAL CONNECTION.

    EXISTING TREE

    TREE REMOVED

    REMOVAL

    CONNECTION TO EX.

    150mm WATERMAIN

    I.E. 75.44m

    50mm FM HDPE

    DR 11 SAN SEWER

    WATER METER CHAMBER

    AS PER CITY STD. T-1108.01-3.

    INSTALL BACKFLOW PREVENTER

    AS PER CITY STD.

    EXISTING GROUND

    100mm OF HI-40

    POLYSTYRENE

    INSULATION

    150mm SERVICE CONNECTION

    TO FIRE HYDRANT

    AS PER CITY STD T-1105.01

    50mm COPPER WATER

    SERVICE CONNECTION

    CAPPED AT SURFACE,

    ISOLATION VALVE AS PER

    CITY STD T-1101.02-2

    (REFER TO NOTE 13)

    I.E. 75.45

    1.2

    8m

    150mm PVC DR28 WATERMAIN

    MIN

    1

    .8

    m

    CONNECTION TO EX. LLI MANHOLE

    AS PER CITY STD T-708-20

    I.E. 73.70

    1.2

    8m

    150mm DIA PVC DR28 WATERMAIN

    50mm F

    M HDPE

    DR11 S

    AN SEWE

    R

    EXISTING GROUND

    SAN SEWER CONNECTION

    CAPPED AT SURFACE

    (REFER TO NOTE 13)

    90° BEND

    I.E. 75.00

    0 OCT 2017 ISSUED FOR TENDER DGC

    DGC GRH DGC

    OCTOBER 2017

    1:5001078-2014-02-90 C85

    150mm WATERMAIN PROFILE

    1

    H 1:250 V 1:125

    50mm SANITARY SEWER PROFILE

    2

    H 1:250 V 1:125

    45° BEND

    45° BEND

    45° BEND

    1

    1 NOV 2017 ISSUED FOR ADDENDUM 1 DGC

    1

  • LS

    LS

    LS

    17ECS-MI-04DC

    DON & WATERFRONT WET WEATHER FLOW SYSTEM

    DGC RV

    PLAN

    1078-2014-02-96

    N

    TI06

    ARE IN METERS UNLESS OTHERWISE NOTED

    MEASUREMENTS SHOWN ON THESE PLANS

    METRIC

    PROP

    ERTY LI

    NE

    0 102.5 15 METERSMETER 5

    SCALE 1:250

    PROP

    ERTY LI

    NE

    PROP

    ERTY LI

    NE

    CONSERVATION AUTHORITY TORONTO AND REGION

    PROPOSED CB TUNNEL

    METROLINX

    METROLINX

    DON V

    ALLEY PK

    WY

    EUNEVA WEIVYAB

    DAOR Y

    R

    ET

    TO

    P

    N

    NOT TO SCALE

    KEY MAP

    48

    777

    53

    51

    55

    22

    20

    18

    16

    14

    12

    10

    24

    47

    45

    41

    43

    89

    87

    480

    789

    102

    LS

    T

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    T

    T

    T

    T

    T

    T

    T

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    LS

    LS

    LS L

    S

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS LS

    LS

    LS

    LS

    LS

    LS

    LS

    LSLS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    T

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS L

    S

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    U/C/2005

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    WE

    TL

    AN

    D

    WE

    TL

    AN

    D

    WE

    TL

    AN

    D

    WE

    TL

    AN

    D

    WE

    TL

    AN

    D

    PA

    RKIN

    G

    PA

    RKIN

    G

    PA

    RKIN

    G

    PA

    RKIN

    G

    PA

    RKIN

    G

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    TR

    EE

    D

    AR

    EA

    D

    D

    D

    OF

    D

    OF

    NATIO

    NAL

    BOROUGH

    EAST

    D

    D

    YORK

    TORONTO

    RAILWAYS

    D

    BAYVIEW AVENUE

    Guid

    e

    Rail

    BAYVIEW

    A

    VENUE

    EAST

    OF

    YOR

    K

    D. V. P.

    BOR

    OU

    GH

    Header

    AVENUE

    THORNCLIFFE

    HIL

    L

    CHES

    TE

    R

    BOR

    OU

    GH

    EAST

    OF

    YOR

    K

    LS

    15m

    ZONE OF INFLUENCE

    ZONE OF INFLUENCE

    E

    E

    (6.30m I.D.)C. B. TUNNELPROPOSED

    ZONE OF INFLUENCE (28.0m)

    RAIL

    7+828.7

    5

    5m (TYP)

    10.0

    m

    LEGEND:

    56.65m

    MILEAGE ± 207.57BELLEVILLE SUBDIVISION

    EGDIRB

    engineering environment infrastructure

    R.V.Anderson Associates Limited

    in association with

    TUNNEL INSTRUMENTATION - METROLINX CROSSING 5

    COXWELL BYPASS TUNNEL

    MPBX 45 MPBX 44 MPBX 43

    MPBX 51 MPBX 50 MPBX 47MPBX 49 MPBX 48 MPBX 46

    RAILWAY TRACKS

    PROPOSED TUNNEL ALIGNMENT

    SHALLOW IN-GROUND SETTLEMENT MONITORING POINTS (SMP)

    MULTIPOINT BOREHOLE EXTENSOMETER (MPBX)

    (MIN. 7.30m DIA)EXCAVATIONTUNNEL

    0 SEP 2017 ISSUED FOR TENDER DGC

    SEPTEMBER 2017SIGNEDINITIALREVISIONSDATENo.

    DESIGN:

    DATE:

    SCALE: 1:250

    DRAFTING: CHECK:

    DRAWING

    NUMBER:

    CH CONTRACT No.

    Water

    MANAGEMENT MAJOR INFRASTRUCTURE

    DIRECTOR, DESIGN & CONSTRUCTION

    BILL DE ANGELIS, P. ENG., MBAGRAHAM HARDING, P. ENG.

    DIRECTOR, WATER INFRASTRUCTURE

    ENGINEERING & CONSTRUCTION SERVICES

    TO TRACKS AT GRADETRANSITION OF METROLINX BRIDGE

    (NOTE 9)BRIDGE FOOTING

    AND MONITOR WITH FREQUENCY SPECIFIED FOR SMP'S9. INSTALL REFLECTIVE SURVEY MARKERS AT EACH OF THE 4 CORNERS OF THE BRIDGE FOOTING AT GRADE

    POST-CONSTRUCTION PHOTOS FOR GO TRANSIT/METROLINX RECORDS.8. THE CONTRACTOR SHALL PROVIDE STATUS/PROGRESS PHOTOS, INCLUDING PRE-CONSTRUCTION AND

    PIER (TWO POINTS TOTAL). MONITORING TO BE UNDERTAKEN AT THE SAME FREQUENCY OF THE SMP’S.LEVEL POINT IS TO BE INSTALLED ON BOTH THE EAST AND WEST SIDE OF THE NORTHERN MOST BRIDGE ABUTMENT WALL ON THE UNDERSIDE OF THE BRIDGE (TWO POINTS TOTAL). AN ADDITIONAL PRECISION

    7. PRECISION LEVEL POINTS ARE TO BE INSTALLED ON BOTH THE EAST AND WEST SIDE OF THE NORTH

    AT ANY TIME. THE CONTRACTOR SHALL PROMPTLY COMPLY WITH SUCH REQUESTS.6. AECOM (ON BEHALF OF GO TRANSIT/METROLINX) HAS THE RIGHT TO REQUEST ADDITIONAL MONITORING

    IF FURTHER MONITORING IS WARRANTED.CONSTRUCTION AND THE SURVEY DATA SHOULD BE REVIEWED AFTER THE MONITORING TO DETERMINE

    5. TRACK ALIGNMENT (LINE AND GRADE) IS TO BE MONITORED USING TOTAL STATION THROUGHOUT

    RIGHT-OF-WAY TO PRE-EXISTING CONDITIONS.ASSOCIATED WITH ANY WORK (INCLUDING TRACK WORK) REQUIRED TO RESTORE THE RAILWAY RESTORATION TECHNIQUES/METHODS. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS APPROPRIATE MEASURES TO PREVENT FURTHER GROUND MOVEMENT AS WELL AS APPROPRIATE OF THE CAUSE OF THE MOVEMENT, SUPPORTED BY ENGINEERING RATIONALE AND RECOMMEND TRANSIT/METROLINX). THE CONTRACTOR’S PROFESSIONAL ENGINEER SHALL PROVIDE AN ASSESSMENT SHOULD IMMEDIATELY NOTIFY THE CONTRACT ADMINISTRATOR AND AECOM (ON BEHALF OF GO

    4. IF ALARM LEVELS ARE ENCOUNTERED WORKS SHOULD IMMEDIATELY CEASE AND THE CONTRACTOR

    APPROPRIATE MEASURES TO PREVENT FURTHER GROUND MOVEMENT.OF THE CAUSE OF THE MOVEMENT SUPPORTED BY ENGINEERING RATIONALE AND RECOMMEND TRANSIT/METROLINX). THE CONTRACTOR’S PROFESSIONAL ENGINEER SHOULD PROVIDE AN ASSESSMENT IMMEDIATELY NOTIFY THE CONTRACT ADMINISTRATOR AND AECOM (ON BEHALF OF GO

    3. IF REVIEW LEVELS ARE ENCOUNTERED THE CONTRACTOR (OR THEIR REPRESENTATIVE) SHOULD

    DOCUMENT CORRECTIVE ACTION UNDERTAKEN IN ACCORDANCE WITH THE SPECIFICATION. OF ALERT LEVELS ARE REACHED REPORTS SHOULD BE SUBMITTED AS SOON AS POSSIBLE AND SIGNED, AND DATED BY A PROFESSIONAL ENGINEER LICENSED IN THE PROVINCE OF ONTARIO. IF REVIEW TUNNELLING, SHOWING COMPARISON TO THE BASELINE READINGS. THE REPORTS ARE TO BE STAMPED, CONTRACT ADMINISTRATOR AND AECOM (ON BEHALF OF GO TRANSIT / METROLINX) DURING ACTIVE

    2. THE CONTRACTOR SHALL SEND SETTLEMENT MONITORING REPORTS WITHIN 24 HOURS TO THE

    SUPERVISION OF A REGISTERED ONTARIO LAND SURVEYOR. THE ACTUAL ELEVATION SHALL BE RETAINED. THE SURVEYING SHALL BE CARRIED OUT BY, OR UNDER THE SURVEYING FIRM CAPABLE OF SURVEYING THE SETTLEMENT POINT ELEVATION TO WITHIN +/- 0.5 MM OF EQUIPMENT, THE MONITORING OF RAIL TRACKS IS TO BE DONE WITH A TOTAL STATION. AN INDEPENDENT

    1. SETTLEMENT MONITORING SHALL BE COMPLETED USING CONVENTIONAL PRECISION LEVELLING

    NOTES:

    1

    1

    1

    1 NOV 2017 DGCISSUED FOR ADDENDUM 1

    32

    90

    100

    102

    32

    90

    102

    -0+25 0+25

    100

    Scaled 1.00 Times Hor.

    Scaled 2.50Times Ver.

    0+00

    CROSS SECTION E-E AT STATION 7+828.75

    40 40

    50/80 50/80

    7+780.0

    0

    7+800.0

    0

    7+820.0

    0

    7+840.0

    0

    7+860.0

    0

    7+880.0

    0

    7+900.0

    0

    7+920.0

    0

  • NTS

    2

    NTS

    1

    NTS

    3

    INTEGRATED PUMPING STATION CONNECTION TUNNEL -

    TYPICAL SECTION (STATION 1+015 TO STATION 1+093

    NOTES:

    1. COMPLETE WORK ON TUNNEL FROM STATION 1+015 TO 1+025 AND INSTALL

    CONSTRUCTION DELINEATION BY FEBRUARY 1, 2021.

    2. TUNNEL FROM STATION 1+015 TO STATION 1+025 TO BE TURNED OVER TO OWNER IN

    ADVANCE OF COMPLETION OF COXWELL BYPASS TUNNEL. THE CONTRACTOR SHALL

    EXPECT THIS TO OCCUR AFTER FEBRUARY 1, 2021 AND PRIOR TO SUBSTANTIAL

    PERFORMANCE.

    3. THE CONTRACTOR IS REQUIRED TO FACILITATE ACCESS FOR THE OWNER AND

    CONTRACTOR ADMINISTRATOR FOR THE PURPOSE OF INSPECTION AND TESTING

    PRIOR TO OWNER ACCEPTANCE OF THE TUNNEL FROM STATION 1+015 TO STATION

    1+025, AS REQUESTED BY THE CONTRACT ADMINISTRATOR.

    4. THE OWNER WILL PROVIDE WRITTEN ACCEPTANCE OF THE SECTION OF TUNNEL

    FROM STATION 1+015 TO STATION 1+025. WRITTEN ACCEPTANCE BY THE OWNER

    SHALL CONFIRM COMPLETION AND ACCEPTANCE OF THIS SECTION BY THE OWNER.

    UNTIL WRITTEN ACCEPTANCE OF THIS SECTION OF TUNNEL IS OBTAINED THE

    CONTRACTOR IS REQUIRED TO MAINTAIN THE WORK AREA.

    5. ONCE ACCEPTED BY THE OWNER, THE CONTRACTOR WILL NOT BE PERMITTED TO

    ACCESS THE TUNNEL EAST OF STATION 1+015 WITHOUT PRIOR WRITTEN APPROVAL

    OF THE OWNER AND THE INTEGRATED PUMPING STATION CONTRACTOR.

    INTEGRATED PUMPING STATION CONNECTION TUNNEL

    TERMINUS STATION 1+015

    TYPICAL PRECAST TUNNEL LINING TO SHAFT WALL CONNECTION

    NTS

    4

    INTEGRATED PUMPING STATION CONNECTION TUNNEL

    CONTRACTOR DELINEATION (INSTALLATION AT STA 1+025)

    NOTE:

    1. THE CONTRACTOR SHALL SUBMIT A METHOD STATEMENT DETAILING THE PROPOSED METHODOLOGY TO MOVE THE TBM THROUGH EACH

    OF THE SHAFTS EXCAVATED IN ADVANCE OF THE TBM ARRIVAL. THE METHOD STATEMENT SHALL BE SUBMITTED TO THE CONTRACT

    ADMINISTRATOR A MINIMUM OF 60 DAYS PRIOR TO TBM ARRIVAL AT EACH SHAFT LOCATION.

    150mm

    SLOPE 0.15%

    FUTURE CONNECTION TO

    INTEGRATED PUMPING STATION

    150mm SHOTCRETE

    (30 MPa)

    STATION 1+015

    INV. EL 23.35m

    CAST-IN-PLACE LINING

    (REFER TO DETAIL 1)

    6300m

    m D

    IA

    .

    CB

    T T

    UN

    NE

    L

    35M@150 EF

    30M@300 EF

    6

    3

    0

    0

    D

    I

    A

    5

    0

    0

    CAST- IN PLACE

    CONCRETE LINING

    TUNNEL EXCAVATION MINIMUM 7.3M,

    CONTRACTOR CAN OVERSIZE TO SUIT TBM

    LAUNCH AND SITE LOGISTICS. HAND TUNNEL

    SUPPORT SHALL BE DESIGNED IN ACCORDANCE

    WITH SPECIFICATION SECTION 02318.

    NOTES:

    1. THE CAST-IN-PLACE CONCRETE LINING DESIGN IS BASED ON SECTION 5.1.8

    ENTITLED "TUNNEL CRITICAL LOAD CASES" OF THE "TUNNEL & SHAFT LINING

    EVALUATION STUDY" BY GOLDER ASSOCIATES, REPORT NUMBER: 1413095 (18000);

    DRAFT VER. 4.

    2. THE CONTRACTOR SHALL PUMP OUT THE INTEGRATED PUMPING STATION

    CONNECTION TUNNEL FROM STATION 1+093 TO STATION 1+015 TO PREVENT WATER

    ACCUMULATION IN THE INVERT.

    IHES-2(B) SHAFT

    INTEGRATED PUMPING STATION

    DRAINAGE MAT

    50mm PVC

    WHEEPHOLE

    3 STUDS EACH SIDE

    OF DOOR

    1200x2400x19mm PLYWOOD

    DOOR w/ HEAVY DUTY HINGES

    AND HASP FOR PADLOCK

    38x235 ANCHORED TO

    CONCRETE ALL AROUND

    6300m

    m D

    IA

    T

    UN

    NE

    L

    2-35M

    4-35M

    2-35M

    35M@150 U BARS

    35M@150 L BARS

    6300mm DIA TUNNEL

    INV EL VARIES

    T/BASE SLAB

    35M SHEAR FRICTION

    DWLS 2- BUNDLED

    BARS @125 WITH STD

    HOOK MIN LENGTH

    4000 FOR 3500mm EA

    SIDE OF TUNNEL, TYP

    25mm EXPANDING WATERSTOP

    ALL AROUND PERIMETER OF

    LINING

    PRECAST CONCRETE

    SEGMENT

    25M DWLS @150,

    600mm LONG, 300mm

    EMBD WITH

    HILTI HIT-RE 500 V3, TYP

    25mm EXPANDING

    WATERSTOP AROUND

    PERIMETER OF LINING

    25M DWLS @150,

    600mm LONG, 300mm

    EMBD WITH

    HILTI HIT-RE 500 V3, TYP

    (

    M

    I

    N

    )

    REINFORCEMENT NOT

    SHOWN FOR CLARITY

    300

    38 X235's @400mm OC w/19 mm

    PLYWOOD SHEATHING

    TUNNEL DETAILSSECTION AND DETAILS - STRUCTURAL

    CONTRACT No.DRAFTING:

    SCALE:

    DATE:

    DESIGN: CHECK:

    NUMBER:DRAWING

    SIGNEDINITIALREVISIONSDATENo.

    DIRECTOR, WATER INFRASTRUCTUREMANAGEMENT

    GRAHAM HARDING, P. ENG.DIRECTOR,BILL DE ANGELIS, P. ENG.

    DESIGN & CONSTRUCTIONMAJOR INFRASTRUCTURE

    ENGINEERING AND CONSTRUCTION SERVICES DON & WATERFRONT WET WEATHER FLOW SYSTEMCOXWELL BYPASS TUNNELWater

    ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

    MEASUREMENTS SHOWN ON THESE PLANS

    METRIC

    engineering environment infrastructure

    R.V.Anderson Associates Limited

    in association with

    17ECS-MI-04DC

    0 SEP 2017 ISSUED FOR TENDER DGC

    1

    1

    SEPTEMBER 2017

    NOT TO SCALE1078-2014-02-144 S36

    GDN GRH DT

    1

    1 NOV 2017 ISSUED FOR ADDENDUM 1 DGC

    1

    ryn86280Snapshot

  • ARE IN METERS UNLESS OTHERWISE NOTED

    MEASUREMENTS SHOWN ON THESE PLANS

    METRIC

    N

    CARLAW AVENUE

    STREET LINE

    STREET LINE

    CARLAW AVENUE

    STREET LINE

    DON & WATERFRONT WET WEATHER FLOW SYSTEM

    AR

    1078-2014-02-203

    17ECS-MI-04DC

    LA

    KE S

    HO

    RE B

    OU

    LE

    VA

    RD

    COXWELL BYPASS TUNNEL

    CIVIL

    JK

    HOARDINGLIMIT OF CONSTRUCTION

    ACCESS ROAD

    STR

    EET LIN

    E

    STR

    EET LIN

    E

    4CAR/4LES - REMOVAL PLAN

    EXISTING FENCE

    0 2 51 10

    SCALE 1:200

    METER METERS

    C91

    COMPOUND AREA LIMITSWITHIN PROPOSED SITE REMOVE EXISTING FENCE

    (SEE NOTE 4)SECURITY CAMERARELOCATE REMOVE AND TO BE PROTECTED.LIGHT STANDARD IS EXISTING

    engineering environment infrastructure

    R.V.Anderson Associates Limited

    in association with

    (SEE NOTE 4)CAMERAREMOVE AND RELOCATE SECURITY LIGHT STANDARD.REMOVE AND RELOCATE EXISTING

    TO BE PROTECTEDEXISTING LIGHT STANDARD

    LIMITSCOMPOUND AREA PROPOSED SITE FENCE WITHIN REMOVE EXISTING

    6.3m I.D. COXWELL BYPASS TUNNEL

    LOADS. SEE NOTE 6.ACCOMODATE TRAFFIC REQUIRED TO PLACE GRANULAR AS REMOVE TOPSOIL AND

    0 SEP 2017 ISSUED FOR TENDER DGC

    SEPTEMBER 2017SIGNEDINITIALREVISIONSDATENo.

    DESIGN:

    DATE:

    SCALE: HORIZONTAL 1:200

    DRAFTING: CHECK:

    DRAWING

    NUMBER:

    DGC CONTRACT No.

    Water

    MANAGEMENT MAJOR INFRASTRUCTURE

    DIRECTOR, DESIGN & CONSTRUCTION,

    BILL DE ANGELIS, P. ENG., MBAGRAHAM HARDING, P. ENG.

    DIRECTOR, WATER INFRASTRUCTURE

    ENGINEERING & CONSTRUCTION SERVICES

    SEE NOTE 6.CONSTRUCT DRILLED SHAFTS, GRANULAR AS REQUIRED TO REMOVE TOPSOIL AND PLACE

    REMOVE TREE AND STUMP, TYP

    ROADFACILITATE ACCESS BE CUT TO EXISTING CURB TO

    TRCA REGULATION LIMIT

    TR

    CA R

    EG

    ULATIO

    N LIMIT

    WITHIN THE SITE HOARDING LIMITS REMOVE AND REPLACE ALL CURBS AND SIDEWALKS 8.

    AREASSTANDARD SPECIFICATION (OPSS) 1010 IN GRASSED RUN LIMESTONE AS PER ONTARIO PROVINCIAL LIMESTONE AND 150MM DEPTH OF 19MM CRUSHER COMPACT 150MM DEPTH OF 50MM CRUSHER RUN THE CONTRACTOR SHALL SUPPLY, PLACE AND 7.

    FULL DEPTHACCESS ROAD, TOPSOIL AND SOD SHALL BE STRIPPED WITHIN THE LIMITS OF THE SITE COMPOUND AND 6.

    CONTAMINATED SOIL REMOVAL AND DISPOSAL.AND MADE USING THE SCHEDULE OF PRICES ITEM FOR DISPOSAL OF HAZARDOUS WASTE WILL BE MEASURED CONTRACT ADMINISTRATOR. PAYMENT FOR THE THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE HAZARDOUS WASTE DISPOSAL SITE IS ENCOUNTERED IF EXCAVATED MATERIAL REQUIRING DISPOSAL AT A 5.

    TORONTO HYDRO'S SATISFACTIONSECURITY CAMERAS. LOCATION AND POSITIONING TO FOR THE EXACT LOCATION AND ORIENTATION OF COORDINATION WITH TORONTO HYDRO IS REQUIRED PROPOSED CONSTRUCTION COMPOUND. RELOCATED SOUTH OF THE SOUTH LIMIT OF THE TORONTO HYDRO'S SECURITY CAMERAS ARE TO BE 4.

    DESIGNATED FOR REMOVALCONTRACTOR TO PROTECT ALL TREES NOT 3.

    REFER TO DRAWING G11 FOR GENERAL NOTES.2.

    CONFLICT WITH EXISTING SERVICES.ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY VERIFIED IN THE FIELD PRIOR TO CONSTRUCTION. THE CONNECTION POINTS AND MATERIAL TYPE TO BE FOR DAMAGE OR RESTORATION TO SAME. ALL AND STRUCTURES AND SHALL ASSUME ALL LIABILITY SHALL PROVE THE LOCATION OF ALL SUCH UTILITIES UTILITY COMPANIES CONCERNED. THE CONTRACTOR CONSULTING THE APPROPRIATE AUTHORITIES OR ALL SUCH SERVICES, UTILITIES AND STRUCTURES BY CONTRACTOR SHALL DETERMINE THE LOCATION OF STRUCTURES ARE NOT GUARANTEED. THE OF THE LOCATION OF SUCH SERVICES, UTILITIES AND THE DRAWING(S) THE COMPLETENESS AND ACCURACY AND UTILITIES ARE SHOWN AND WHERE SHOWN ON APPROXIMATE ONLY. NOT ALL MUNICIPAL SERVICES MUNICIPAL SERVICES, UTILITIES AND STRUCTURES ARE THE LOCATION OF ALL UNDER/ABOVE GROUND 1.

    GENERAL NOTES

    CURBBARRIER EXISTING REMOVE

    TO ACCOMODATE GATETO BE REMOVEDEXISTING FENCE

    1

    1 NOV 2017 DGCISSUED FOR ADDENDUM 1

    3R

    LSLS

    LS

    LS

    LS

    LS

    LS

    LS

    PARKING

    Concrete Cross Walk

    3R

    HW

    HM

    H

    GT

    HW

    G/P

    GT

    GT

    HM

    H

    GT

    Mwell

    RR

    LS

    SCB

    HW

    GT

    TL Mwell

    SCB

    WV

    RS

    GT

    GT

    HYD

    RS

    Bol

    WV

    GT

    PA

    RKIN

    G

    P

    HW

    RS

    Bol

    HW

    TL

    WV

    BM

    H

    Bol

    LS

    HM

    H

    WV

    BT Pedestal

    LS

    HW

    HM

    H

    GT

    HW

    G/P

    GT

    GT

    HM

    H

    GT

    Mwell

    RR

    LS

    SCB

    HW

    GT

    TL Mwell

    SCB

    WV

    RS

    GT

    GT

    HYD

    RS

    Bol

    WV

    GT

    PA

    RKIN

    G

    P

    HW

    RS

    Bol

    HW

    TL

    WV

    BM

    H

    Bol

    LS

    HM

    H

    WV

    BT Pedestal

    LS

    ?

    Bol

    Bol

    Mwell

    ?

    Bol

    Bol

    Mwell

    LS

    LS

    LS

    LS

    Gravel

    Gravel

    Gravel

    Gravel

    Gravel

    Gravel

    225

    226

    227

    228

    229

    230231

    232

    233

    234

    235

    236

    237

    238

    239

    240

    241

    242

    243

    244

    261262

    76.5

    77.0

    77.0

    77.0

    77.0

    77.0

    77.0

    77.0

    77.5

    77.5

    4CAR-BSR-04

    4CAR-BSR-03

  • Concrete Curb

    Steel Truss on Bridge

    East

    Limit of

    Don

    Valle

    y

    Park

    way

    EASE

    MENT

    West

    Limit of

    Do

    n

    Channel

    Co

    n. S

    ea

    wall E

    /S. o

    f

    Channel

    1A

    1B

    1C

    1

    155

    T

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    T

    T

    T

    T

    LS

    LS

    T

    LS

    LS

    LS

    LS

    LSLS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    U/C/

    2012

    PARKING

    West

    Limit of

    Do

    n

    Channel

    Co

    n. S

    ea

    wall E

    /S. o

    f

    Channel

    Bollard Lig

    ht

    Co

    n. R

    et. W

    all

    Concrete Curb

    Steel Truss on Bridge

    East

    Limit of

    Don

    Valle

    y

    Park

    way

    Chain Link Fence

    EASE

    MENT

    West

    Limit of

    Do

    n

    Channel

    Co

    n. S

    ea

    wall E

    /S. o

    f

    Channel

    Bollard Lig

    ht

    RS

    Bol

    RS

    O

    HW

    Bol

    HW

    O

    Bol

    O

    HW

    LS

    LS

    RS

    LS

    O

    LS

    HW

    HW

    O

    Bol

    LS

    HW

    Bol

    HW

    HW

    HW

    LS

    LS

    HW

    RS

    HW

    LS

    HW

    HW

    HW

    LS

    LS

    LS

    250 mm Pipeline (Trans. Northern)

    250 mm Pipeline (Imperial Oil)

    200 mm Pipeline (Sun Oil)

    250 mm Pipeline (Trans. Northern)

    250 mm Pipeline (Imperial Oil)

    200 mm Pipeline (Sun Oil)

    Pipeline (Trans. Canada)

    Pipeline (Trans. Canada)

    450 mm Conc. Stm.Sewer

    375 mm Conc. Stm.Sewer

    375 mm Conc. Stm.Sewer

    300 mm PVC Water Main

    300 mm PVC Water Main

    300 mm PVC Water Main

    Unknown

    Unknown

    78.0

    78.0

    78.0

    78.0

    79.0

    79.0

    79.0

    79.0

    79.0

    79.0

    79.0

    80.0

    81.0

    82.0

    83.0

    193

    194

    195

    196

    197

    198

    199

    200

    201

    202

    203

    204

    205

    206

    207

    208

    209210

    211

    212

    213

    214

    215

    216217

    218

    219220

    221

    222

    223

    224

    1404

    1401

    1402

    1403

    1405 1406

    1407

    1408

    1409

    14101411

    1412

    141314141415

    1416

    1417

    1418

    1419

    1420

    1421

    1422

    1423

    1424

    14251426

    14271428

    1429

    1430

    14311432

    1433

    1434

    1438

    1439

    1440

    1441

    14421443

    1444

    1445

    14461447

    1448

    14351436

    1437

    4SUN-BSR-01

    4SUN-BD-01

    LD-BSR-07

    LD-BSR-08

    N

    DO

    N RIV

    ER

    YAW

    KRAP Y

    ELLA

    V N

    OD

    OT

    PM

    AR

    STREET LIN

    E

    STREET LINE

    ARE IN METERS UNLESS OTHERWISE NOTED

    MEASUREMENTS SHOWN ON THESE PLANS

    METRIC

    DO

    N V

    ALLE

    Y P

    AR

    KW

    AY N

    OR

    TH

    DO

    N V

    ALLE

    Y P

    AR

    KW

    AY S

    OU

    TH

    PROPERTY LINE

    DON & WATERFRONT WET WEATHER FLOW SYSTEM

    AR

    1078-2014-02-209

    17ECS-MI-04DC

    CIVIL

    JK

    COXWELL BYPASS TUNNEL

    SIGNEDINITIALREVISIONSDATENo.

    DESIGN:

    DATE:

    SCALE: HORIZONTAL 1:400

    DRAFTING: CHECK:

    DRAWING

    NUMBER:

    DGC CONTRACT No.

    Water

    MANAGEMENT MAJOR INFRASTRUCTURE

    DIRECTOR, DESIGN & CONSTRUCTION,

    BILL DE ANGELIS, P. ENG., MBAGRAHAM HARDING, P. ENG.

    DIRECTOR, WATER INFRASTRUCTURE

    ENGINEERING & CONSTRUCTION SERVICES

    (CLOSED)

    EASTERN AVENUE

    0 4 102 20

    SCALE 1:400

    METER METERS

    LIMIT OF CONSTRUCTION HOARDING

    EASTERN AVENUE

    engineering environment infrastructure

    R.V.Anderson Associates Limited

    in association with

    4SUN/4QUE - REMOVAL PLAN

    C97

    6.3m I.D. COXWELL BYPASS TUNNEL

    0 OCT 2017 ISSUED FOR TENDER DGC

    SUNLIGHT PARK ROAD

    TRCA REGULATION LIMIT

    TR

    CA R

    EG

    ULATIO

    N LIMIT

    ACCESS ROADCUT TO FACILITATE EXISTING CURB TO BE

    STANDARD SPECIFICATION (OPSS) 1010RUN LIMESTON AS PER ONTARIO PROVINCIAL LIMESTONE AND 150MM DEPTH OF 19MM CRUSHER COMPACT 150MM DEPTH OF 50MM CRUSHER RUN THE CONTRACTOR SHALL SUPPLY, PLACE AND 6.

    FULL DEPTHACCESS ROAD, TOPSOIL AND SOD SHALL BE STRIPPED WITHIN THE LIMITS OF THE SITE COMPOUND AND 5.

    HAZARDOUS MATERIAL REMOVAL AND DISPOSAL.AND MADE USING THE SCHEDULE OF PRICES ITEM FOR DISPOSAL OF HAZARDOUS WASTE WILL BE MEASURED CONTRACT ADMINISTRATOR. PAYMENT FOR THE THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE HAZARDOUS WASTE DISPOSAL SITE IS ENCOUNTERED IF EXCAVATED MATERIAL REQUIRING DISPOSAL AT A 4.

    DESIGNATED FOR REMOVALCONTRACTOR TO PROTECT ALL TREES NOT 3.

    REFER TO DRAWING G11 FOR GENERAL NOTES.2.

    CONFLICT WITH EXISTING SERVICES.ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY VERIFIED IN THE FIELD PRIOR TO CONSTRUCTION. THE CONNECTION POINTS AND MATERIAL TYPE TO BE FOR DAMAGE OR RESTORATION TO SAME. ALL AND STRUCTURES AND SHALL ASSUME ALL LIABILITY SHALL PROVE THE LOCATION OF ALL SUCH UTILITIES UTILITY COMPANIES CONCERNED. THE CONTRACTOR CONSULTING THE APPROPRIATE AUTHORITIES OR ALL SUCH SERVICES, UTILITIES AND STRUCTURES BY CONTRACTOR SHALL DETERMINE THE LOCATION OF STRUCTURES ARE NOT GUARANTEED. THE OF THE LOCATION OF SUCH SERVICES, UTILITIES AND THE DRAWING(S) THE COMPLETENESS AND ACCURACY AND UTILITIES ARE SHOWN AND WHERE SHOWN ON APPROXIMATE ONLY. NOT ALL MUNICIPAL SERVICES MUNICIPAL SERVICES, UTILITIES AND STRUCTURES ARE THE LOCATION OF ALL UNDER/ABOVE GROUND 1.

    GENERAL NOTES

    ACCESS ROAD

    OCTOBER 2017

    1

    1

    1 NOV 2017 DGCISSUED FOR ADDENDUM 1

  • GENERIC HO

    LDINGS INC

    Concrete Curb

    Steel Truss on Bridge

    East

    Limit of

    Don

    Valle

    y

    Park

    way

    EASE

    MENT

    West

    Limit of

    Do

    n

    Channel

    Co

    n. S

    ea

    wall E

    /S. o

    f

    Channel

    1A

    1B

    1C

    1

    155

    T

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    T

    T

    T

    T

    LS

    LS

    T

    LS

    LS

    LS

    LS

    LSLS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    U/C/

    2012

    West

    Limit of

    Do

    n

    Channel

    Co

    n. S

    ea

    wall E

    /S. o

    f

    Channel

    Bollard Lig

    ht

    Concrete Island

    Co

    n. R

    et. W

    all

    Concrete Curb

    Steel Truss on Bridge

    East

    Limit of

    Don

    Valle

    y

    Park

    way

    Chain Link Fence

    EASE

    MENT

    West

    Limit of

    Do

    n

    Channel

    Co

    n. S

    ea

    wall E

    /S. o

    f

    Channel

    Bollard Lig

    ht

    Concrete Island

    RS

    Bol

    RS

    O

    Bol

    HW

    O

    Bol

    O

    HW

    LS

    LS

    RS

    LS

    O

    LS

    HW

    HW

    O

    LS

    HW

    HW

    HW

    HW

    LS

    LS

    HW

    RS

    HW

    LS

    HW

    HW

    HW

    LS

    LS

    LS

    193

    194

    195

    196

    197

    198

    199

    200

    201

    202

    204

    205

    206

    207

    208

    210

    211

    212

    213

    214

    215

    216217

    218

    219220

    221

    222

    223

    224

    1401

    1403

    1446

    1448

    N

    DO

    N RIV

    ER

    YAW

    KRAP Y

    ELLA

    V N

    OD

    OT

    PM

    AR

    STREET LIN

    E

    STREET LINE

    ARE IN METERS UNLESS OTHERWISE NOTED

    MEASUREMENTS SHOWN ON THESE PLANS

    METRIC

    DO

    N V

    ALLE

    Y P

    AR

    KW

    AY N

    OR

    TH

    DO

    N V

    ALLE

    Y P

    AR

    KW

    AY S

    OU

    TH

    PROPERTY LINE

    TORONTO CITY

    DON & WATERFRONT WET WEATHER FLOW SYSTEM

    AR

    1078-2014-02-210

    17ECS-MI-04DC

    CIVIL

    JK

    COXWELL BYPASS TUNNEL

    SIGNEDINITIALREVISIONSDATENo.

    DESIGN:

    DATE:

    SCALE: HORIZONTAL 1:400

    DRAFTING: CHECK:

    DRAWING

    NUMBER:

    DGC CONTRACT No.

    Water

    MANAGEMENT MAJOR INFRASTRUCTURE

    DIRECTOR, DESIGN & CONSTRUCTION,

    BILL DE ANGELIS, P. ENG., MBAGRAHAM HARDING, P. ENG.

    DIRECTOR, WATER INFRASTRUCTURE

    ENGINEERING & CONSTRUCTION SERVICES

    (CLOSED)

    EASTERN AVENUE

    TO BE COMPLETED BY OTHERS FUTURE DIVERSION STRUCTURE

    RELIE

    F LIN

    E

    FUTURE

    0 4 102 20

    SCALE 1:400

    METER METERS

    525 mm DIA AIR SHAFT

    RELIE

    F LIN

    E

    FUTURE

    RELIE

    F LIN

    E

    FUTURE

    EASTERN AVENUE

    CHAIN LINK FENCE

    CHAIN LINK FENCE

    4SUN/4QUE - CONSTRUCTION SITE PLAN

    15.00m

    R

    11.00m R

    C98

    SMP

    SUNLIGHT PARK ROAD

    6.3m I.D. COXWELL BYPASS TUNNEL

    TR

    CA R

    EG

    ULATIO

    N LIMIT

    DEAERATION CHAMBER

    0 OCT 2017 ISSUED FOR TENDER DGC

    ADIT TUNNEL

    COMPLETED BY OTHERSSTRUCTURE TO BE FUTURE DIVERSION

    COMPLETED BY OTHERSCHAMBER TO BE FUTURE VORTEX

    TRCA REGULATION LIMIT

    SCHEDULE.REFER TO SHEET TI01 FOR INSTRUMENTATION DETAILS AND 11.

    01050.TO BE COMPLETED IN ACCORDANCE WITH SPECIFICATION SHAFT CONSTRUCTION AND POST CONSTRUCTION SURVEYS PRE-CONDITION CONSTRUCTION SURVEYS PRIOR TO DROP 10.

    DETERMINE THE APPROPRIATE RECEIVER SITE. TEST THE GRANULAR TO BE REMOVED OFF SITE AND THE FINAL SITE PLAN GRADING. THE CONTRACTOR SHALL EXCEPT FOR GRANULAR MATERIALS INCORPORATED INTO EXCAVATE AND DISPOSE OF GRANULAR MATERIALS OFF SITE AT THE END OF CONSTRUCTION, THE CONTRACTOR SHALL 9.

    THE ACCESS ROAD.EQUIVALENT) OVER THE ENTIRE COMPOUND AREA INCLUDING PLACE A NON--WOVEN GEOTEXTILE (TERRAFIX 270R OR ACCESS ROAD), THE CONTRACTOR SHALL SUPPLY AND MATERIAL (WITHIN THE CONSTRUCTION COMPOUND AND PRIOR TO PLACEMENT OF THE COMPACTED GRANULAR 8.

    ROAD.THE CONSTRUCTION COMPOUND INCLUDING THE ACCESS SPECIFICATION (OPSS) 1010 FOR ALL OF THE AREAS WITHIN RUN LIMESTONE AS PER ONTARIO PROVINCIAL STANDARD LIMESTONE AND 150 MINIMUM DEPTH OF 19 MM CRUSHER COMPACT 150 MM MINIMUM DEPTH OF 50 MM CRUSHER RUN AS A MINIMUM, THE CONTRACTOR SHALL SUPPLY, PLACE AND 7.

    CONCRETE MATERIALS WILL BE ACCEPTED.REQUIREMENTS AND SITE GRADING. NO RECYCLED AS REQUIRED TO MEET THE BEARING CAPACITY COMPACT GRANULAR MATERIALS AND ALL OTHER MATERIALS EXCAVATE, DEWATER AS REQUIRED, SUPPLY, PLACE AND PROPOSED LOADING DESIGN. THE CONTRACTOR SHALL REGISTERED IN THE PROVINCE OF ONTARIO FOR THE DRAWING STAMPED BY A PROFESSIONAL ENGINEER TO THE CONTRACTOR ADMINISTRATOR A REPORT AND INVESTIGATION REPORTS. THE CONTRACTOR SHALL PROVIDE LOGS PROVIDED IN THE AMEC GEOTECHNICAL PROPOSED EQUIPMENT LOADING BASED ON THE BOREHOLE ROADS TO PROVIDE SUFFICIENT BEARING CAPACITY FOR THE THE CONTRACTOR SHALL DESIGN THE SITE AND ACCESS 6.

    CONTRACTOR.LIMESTONE SUPPLIED, PLACED AND COMPACTED BY THE SUB-EXCAVATED AND REPLACED WITH 50 MM CRUSHER RUN WET ZONES IDENTIFIED BY PROOF ROLLING SHALL BE TO IDENTIFY ANY WEAK OR UNSTABLE AREAS. ALL WEAK OR DRIVING A HEAVY CONSTRUCTION VEHICLE OVER THE AREAS THE SITE AND ACCESS ROADS SHALL BE PROOF ROLLED BY 5.

    THE CONTRACTOR SHALL STRIP TOPSOIL FULL DEPTH.4.

    EXCAVATED MATERIAL ON SITE SHALL BE PERMITTED.APPROPRIATE RECEIVER SITE NO STOCKPLING OF SITE AND BE DISPOSED BY THE CONTRACTOR AT THE ALL EXCAVATED MATERIAL SHALL BE TRANSPORTED OFF 3.

    REFER TO SHEET G11 FOR GENERAL NOTES2.

    SERVICES.BE NOTIFIED IMMEDIATELY OF ANY CONFLICT WITH EXISTING THE FIELD PRIOR TO CONSTRUCTION. THE ENGINEER SHALL CONNECTION POINTS AND MATERIAL TYPE TO BE VERIFIED IN LIABILITY FOR DAMAGE OR RESTORATION TO SAME. ALL UTILITIES AND STRUCTURES AND SHALL ASSUME ALL CONTRACTORS SHALL PROVE THE LOCATION OF ALL SUCH AUTHORITIES OR UTILITY COMPANIES CONCERNED. THE STRUCTURES BY CONSULTING THE APPROPRIATE LOCATION OF ALL SUCH SERVICES, UTILITIES AND GUARANTEED. THE CONTRACTOR SHALL DETERMINE THE SERVICE, UTILITIES AND STRUCTURES ARE NOT COMPLETENESS AND ACCURACY OF THE LOCATION OF SUCH SHOWN AND WHERE SHOWN ON THE DRAWINGS. THE ONLY. NOT ALL MUNICIPAL SERVICES AND UTILITIES ARE SERVICES, UTILITIES AND STRUCTURES ARE APPROXIMATE THE LOCATION OF ALL UNDER/ABOVE GROUND MUNICIPAL 1.

    GENERAL NOTES:

    COMPLETED BY OTHERSSTRUCTURE TO BE FUTURE DIVERSION

    INCLINOMETER (DETAIL 5 ON TI01)

    (DETAIL 3 ON DWG TI01)NOISE AND VIBRATION MONITOR

    (OPSD 972.102)9m WIDE GATE

    (OPSD 972.102)6m WIDE GATE

    CONNECTOR PIPE 525 mm DIA AIR

    mm DIA DROP SHAFT)4SUN & 4QUE (2100

    ECCENTRIC REDUCER (SEE C172)

    OCTOBER 2017

    1

    engineering environment infrastructure

    R.V.Anderson Associates Limited

    in association with

    1

    1 NOV 2017 DGCISSUED FOR ADDENDUM 1

    250 mm Pipeline (Trans. Northern)

    250 mm Pipeline (Imperial Oil)

    200 mm Pipeline (Sun Oil)

    250 mm Pipeline (Trans. Northern)

    250 mm Pipeline (Imperial Oil)

    200 mm Pipeline (Sun Oil)

    Pipeline (Trans. Canada)

    Pipeline (Trans. Canada)

    450 mm Conc. Stm.Sewer

    375 mm Conc. Stm.Sewer

    375 mm Conc. Stm.Sewer

    300 mm PVC Water Main

    300 mm PVC Water Main

    300 mm PVC Water Main

  • GENERIC HO

    LDINGS INC

    Concrete Curb

    Steel Truss on Bridge

    East

    Limit of

    Don

    Valle

    y

    Park

    way

    EASE

    MENT

    West

    Limit of

    Do

    n

    Channel

    Co

    n. S

    ea

    wall E

    /S. o

    f

    Channel

    1A

    1B

    1C

    1

    155

    T

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    T

    T

    T

    T

    LS

    LS

    LS

    T

    LS

    LS

    LS

    LS

    LSLS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    U/C/

    2012

    PARKING

    100mm PVC Rescu Transp. Conduit

    100mm PVC Rescu Transp. Conduit100mm PVC Rescu Transp. Conduit

    THW

    100mm PVC Rescu Transp. Conduit

    THW

    100mm PVC Rescu Transp. Conduit

    375mm V.P. San. Sewer

    375mm V.P. San. Sewer

    350mm x 525mm E.S.Br. Comb. Sewer Aband'd

    in the same Trench

    450mm V.P. San. Sewer (Metro)

    1650mm R.C.P. San. Sewer

    300mm V.P. San. Sewer

    450mm V.P. San. Sewer and 525mm V.P. Stm. Sewer

    375mm V.P. San. Sewer

    300

    mm

    V.P. S

    an. S

    ewer

    1650mm R.C.P. San. Sewer

    300mm V.P. San. Sewer Aband'd450mm V.P. San. Sewer

    300mm V.P. San. Sewer Aband'd

    750mm C.I. Pipe San. Sewer

    375mm V.P. San. Sewer

    1500mm Cir. Conc. San. Sewer

    300mm Conc. Stm. Connection

    225mm Conc. Stm. Connection

    Outfall

    450mm V.P. Stm. Sewer

    300

    mm

    V.P. S

    tm. S

    ewer

    Aband'd

    600mm x 900mm E.S.Br. Sewer Aband'd

    300mm V.P. Stm. Sewer Aband'd

    600mm x 900mm E.S.B. Stm. Sewer Aband'd

    1350mm R.C.P. Stm. Sewer

    525mm V.P. Stm. Sewer

    1350mm Monolithic Concrete Stm. Sewer

    1200mm R.C.P. Stm. Sewer

    750mm R.C.P. Stm. Sewer

    450mm V.P. Stm. Sewer

    750mm R.C.P. Stm. Sewer

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CBCB

    CB

    CB

    CB

    B

    CB

    CB

    CB

    CB

    CB

    CBCB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    150mm Water Main

    200mm Water Service

    300mm Water Main

    150mm Water Service

    200mm Water Service 300mm Water Main

    300mm Water Main Aband'd

    300mm Water Main

    150mm Water Main Aband'd

    150mm Water Main

    150mm Water Main Aband'd

    300mm Water Main

    300mm Gas Main Aband'd

    600mm Gas Main Aband'd

    300mm Gas Main Aband'd

    500mm Gas Pumping Main Aband'd

    300mm Gas Main Aband'd

    300mm Gas Main Aband'd

    600mm Gas Main Aband'd

    600mm Gas Main

    900mm Gas Main Aband'd

    Gas

    Valv

    e

    Cha

    mber

    750mm Gas Main

    300

    mm

    Gas

    Main

    Aband'd

    600mm Gas Main

    750mm Gas Main

    500mm Gas Main Aband'd

    600mm Gas Main Aband'd

    600mm Gas Main Aband'd

    600mm

    900mm

    900mm Gas Main Aband'd

    300mm Gas Main Aband'd

    Gas Drip Aband'd

    900mm Gas Main Aband'd

    300mm Gas Main Aband'd

    750mm Gas Main

    500mm Gas Pumping Main Aband'd

    T.H.E.S. Cable

    T.H.E.S. Cable

    T.H.E.S. Conduit

    T.H.E.S. Conduit

    T.H.E.S. Conduit Aband'd

    T.H.E.S. Cable

    Lever Bros. Meter Chamber

    T.H.E.S. Conduit

    T.H.E.S. Conduit

    H.E.P.C. C

    able

    s in steel P

    ipes

    Bell Canada Cable Aband'd

    Bell Canada Conduit

    Bell Canada Conduit

    Bell C

    anada

    Co

    nduit

    Aband'd

    Bell Canada Conduit

    Bell Canada Conduit Aband'd

    Bell Canada Cable Aband'd

    Bell Canada Conduit Aband'd

    Bell Canada Conduit

    Bell Canada Conduit

    Imperial Oil Co. 250mm Pipe

    Trans. Northern 250mm Pipe

    200mm Ammonia Pipe Aban'd

    200

    mm

    Am

    mo

    nia

    Pip

    e

    Aband'd

    Railway Siding

    C.N.R.

    Railw

    ay

    Tracks

    Sun Oil Co. 200mm Pipe

    Trans. Northern 250mm Pipe

    Imperial Oil Co. 250mm Pipe

    Private Drain Approx. Location Aband'd

    (closed) Concrete Bridge

    450mm V.P. Sewer

    Consumers Gas Company Easement

    200mm Ammonia Pipe Aban'd

    200mm Ammonia Pipe Aband'd

    450mm V.P. Sewer Aband'd

    450mm V.P. Sewer Aband'd

    360

    Net

    works

    360

    Net

    works

    in sa

    me

    Tre

    nch

    375mm V.P. San. Sewer

    450

    mm

    V.P. S

    an. S

    ewer

    375mm V.P. San. Sewer

    in the same Trench

    450mm V.P. San. Sewer and 525mm V.P. Stm. Sewer

    1650mm R.C.P. San. Sewer

    300mm V.P. San. Sewer Aband'd

    750mm C.I. Pipe San. Sewer

    375mm V.P. San. Sewer

    300mm Conc. Stm. Connection

    225mm Conc. Stm. Connection

    Outfall

    525

    mm

    V.P. S

    tm. S

    ewer

    450mm V.P. Stm. Sewer

    in

    Sa

    me

    Tre

    nch

    600mm x 900mm E.S.B. Stm. Sewer Aband'd

    450mm V.P. Stm. Sewer

    CB

    CB

    CB

    CB

    CB

    CB

    CBCB

    CB

    CB

    CB

    150mm Water Main

    300mm Water Main

    750

    mm

    Gas

    Main

    300mm Gas Main Aband'd

    750mm Gas Main

    600mm Gas Main

    500mm Gas Main Aband'd

    750mm Gas Main

    500mm Gas Pumping Main Aband'd

    T.H.E.S. Cable

    T.H.E.S. Cable

    T.H.E.S. Conduit

    H.E.P.C. C

    able in 750

    mm

    St. P

    ipe

    Bell Canada Cable Aband'd

    Bell C

    anada

    Co

    nduit

    Bell Canada Conduit

    Bell Canada Conduit Aband'd

    Bell Canada Cable Aband'd

    Bell Canada Conduit

    Imperial Oil Co. 250mm Pipe

    Trans. Northern 250mm Pipe

    Sun-Canadian Pipeline 200mm Pipe

    RS

    Bol

    RS

    O

    HW

    Bol

    HW

    O

    HW

    Bol

    O

    HW

    LS

    LS

    RS

    HE

    LS

    O

    LS

    HW

    HW

    O

    Bol

    LS

    HE

    HW

    Bol

    HW

    HW

    HW

    LS

    Bol

    LS

    HM

    HW

    RS

    HW

    LS

    Bol

    HW

    HE

    HE

    HW

    HW

    LS

    RS

    LS

    LS

    250 mm Pipeline (Trans. Northern)

    250 mm Pipeline (Imperial Oil)

    200 mm Pipeline (Sun Oil)

    250 mm Pipeline (Trans. Northern)

    250 mm Pipeline (Imperial Oil)

    200 mm Pipeline (Sun Oil)

    Pipeline (Trans. Canada)

    Pipeline (Trans. Canada)

    450 mm Conc. Stm.Sewer

    375 mm Conc. Stm.Sewer

    375 mm Conc. Stm.Sewer

    300 mm PVC Water Main

    300 mm PVC Water Main

    300 mm PVC Water Main

    78.0

    78.0

    78.0

    78.0

    79.0

    79.0

    79.0

    79.0

    79.0

    79.0

    79.0

    80.0

    81.0

    82.0

    83.0

    193

    194

    195

    196

    197

    198

    199

    200

    201

    202

    204

    205

    206

    207

    208

    210

    211

    212

    213

    214

    215

    216217

    218

    219220

    221

    222

    223

    224

    1401

    1403

    1446

    1448

    N

    DO

    N RIV

    ER

    YAW

    KRAP Y

    ELLA

    V N

    OD

    OT

    PM

    AR

    STREET LIN

    E

    STREET LINE

    ARE IN METERS UNLESS OTHERWISE NOTED

    MEASUREMENTS SHOWN ON THESE PLANS

    METRIC

    DO

    N V

    ALLE

    Y P

    AR

    KW

    AY N

    OR

    TH

    DO

    N V

    ALLE

    Y P

    AR

    KW

    AY S

    OU

    TH

    PROPERTY LINE

    DON & WATERFRONT WET WEATHER FLOW SYSTEM

    AR

    1078-2014-02-211

    17ECS-MI-04DC

    CIVIL

    JK

    COXWELL BYPASS TUNNEL

    SIGNEDINITIALREVISIONSDATENo.

    DESIGN:

    DATE:

    SCALE: HORIZONTAL 1:400

    DRAFTING: CHECK:

    DRAWING

    NUMBER:

    DGC CONTRACT No.

    Water

    MANAGEMENT MAJOR INFRASTRUCTURE

    DIRECTOR, DESIGN & CONSTRUCTION,

    BILL DE ANGELIS, P. ENG., MBAGRAHAM HARDING, P. ENG.

    DIRECTOR, WATER INFRASTRUCTURE

    ENGINEERING & CONSTRUCTION SERVICES

    (CLOSED)

    EASTERN AVENUE

    0 4 102 20

    SCALE 1:400

    METER METERS

    engineering environment infrastructure

    R.V.Anderson Associates Limited

    in association with

    4SUN/4QUE - EROSION AND SEDIMENT CONTROL PLAN

    C99

    78.26

    79.56

    79.27 78.52

    78.08

    ACCESS ROAD

    972.102OPSD SWING GATEDOUBLE 6m WIDE

    TRUCK MUD MAT

    TREATMENT TANKDEWATERING

    SEWEREXISTING SANITARYPUMPED TO DISCHARGE DEWATERING

    4SUN&4QUE

    HOARDINGCONSTRUCTION LIMIT OF

    6.3m I.D. COXWELL BYPASS TUNNEL

    0 SEP 2017 ISSUED FOR TENDER DGC

    SEPTEMBER 2017

    SUNLIGHT PARK ROAD

    (REFER TO C84)CONSTRUCTION HOARDINGINSTALL SILT FENCE ALONG

    (REFER TO C84)ACCESS ROADINSTALL SILT FENCE ALONG

    TRCA REGULATION LIMIT

    TR

    CA R

    EG

    ULATIO

    N LIMIT

    EASTERN AVENUE

    SANITARY SEWER OFF SITE.CODE 681-2, TABLE 1, PRIOR TO DISCHARGE TO BY-LAW DISCHARGE LIMITATIONS, TORONTO MUNICIPAL TREATED TO MEET CITY OF TORONTO SEWER USE WATER PUMPED FROM SHAFT AND TUNNEL TO BE 6.

    RELEASE TO THE NATURAL ENVIRONMENT.SITE CONDITIONS CHANGE TO PREVENT SEDIMENT STATIC AND MAY NEED TO BE UPGRADED / AMENDED AS THE ESC STRATEGIES OUTLINES ON THE PLANS ARE NOT 5.

    ADMINISTRATOR.ONLY UPON DIRECTION FROM THE CONTRACT SILTATION AND EROSION CONTROLS TO BE REMOVED 4.

    TRCA.WATERCOURSES PERMIT (O.REG. 166/06) ISSUED BY WITH WETLANDS AND ALTERATION TO SHORELINES AND INFRACTION OF THE DEVELOPMENT, INTERFERENCE CONTACT TRCA ENFORCEMENT OFFICER IN CASE OF AN BE ALTERED OR CEASED. HE/SHE WILL IMMEDIATELY NECESSARY AND ORDER INAPPROPRIATE ACTIVITES TO WILL HAVE THE AUTHORITY TO STOP WORK AS MAY NEGATIVELY IMPACT NATURAL ENVIRONMENT AND WILL MONITOR ALL CONSTRUCTION ACTIVITIES THAT OF THE CONTRACTOR.THE CONTRACT ADMINISTRATOR ON-SITE MONITORING THE CONSTRUCTION ACTIVITIES THE CONTRACT ADMINISTRATOR WILL BE REGULARLY 3.

    DETAILS.REFER TO DRAWING C82 FOR SEDIMENT CONTROL 2.

    CONFLICT WITH EXISTING SERVICES.ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY VERIFIED IN THE FIELD PRIOR TO CONSTRUCTION. THE CONNECTION POINTS AND MATERIAL TYPE TO BE FOR DAMAGE OR RESTORATION TO SAME. ALL AND STRUCTURES AND SHALL ASSUME ALL LIABILITY SHALL PROVE THE LOCATION OF ALL SUCH UTILITIES UTILITY COMPANIES CONCERNED. THE CONTRACTOR CONSULTING THE APPROPRIATE AUTHORITIES OR SUCH SERVICES, UTILITIES AND STRUCTURES BY CONTRACTOR SHALL DETERMINE THE LOCATION OF ALL STRUCTURES ARE NOT GUARANTEED. THE THE LOCATION OF SUCH SERVICES, UTILITIES AND DRAWING(S) THE COMPLETENESS AND ACCURACY OF UTILITIES ARE SHOWN AND WHERE SHOWN ON THE APPROXIMATE ONLY. NOT ALL MUNICIPAL SERVICES AND MUNICIPAL SERVICES, UTILITIES AND STRUCTURES ARE THE LOCATION OF ALL UNDER/ABOVE GROUND 1.

    GENERAL NOTES

    SEE C82DEWATERING SILT POND TREATMENT TANK, SUMP TO BE PUMPED INTO

    1

    1

    1 NOV 2017 DGCISSUED FOR ADDENDUM 1

  • TO

    RO

    NT

    O CIT

    Y

    PR

    OVIN

    CE O

    F O

    NT

    ARIO MINIS

    TE

    R O

    F E

    NE

    RG

    Y A

    ND INFR

    ASTR

    UC

    TU

    RE

    GENERIC HO

    LDINGS INC

    Concrete Curb

    Steel Truss on Bridge

    East

    Limit of

    Don

    Valle

    y

    Park

    way

    EASE

    MENT

    West

    Limit of

    Do

    n

    Channel

    Co

    n. S

    ea

    wall E

    /S. o

    f

    Channel

    1A

    1B

    1C

    1

    155

    T

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    T

    T

    T

    T

    LS

    LS

    LS

    LS

    T

    LS

    LS

    LS

    LS

    LSLS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    U/C/

    2012

    PARKING

    300mm Conc. Stm. Connection

    225mm Conc. Stm. Connection

    Outfall

    450mm V.P. Stm. Sewer

    300

    mm

    V.P. S

    tm. S

    ewer

    Aband'd

    225mm C.P. Stm. Connection

    600mm x 900mm E.S.Br. Sewer Aband'd

    300mm V.P. Stm. Sewer Aband'd

    600mm x 900mm E.S.B. Stm. Sewer Aband'd

    1350mm R.C.P. Stm. Sewer

    525mm V.P. Stm. Sewer

    1350mm Monolithic Concrete Stm. Sewer

    1200mm R.C.P. Stm. Sewer

    750mm R.C.P. Stm. Sewer

    450mm V.P. Stm. Sewer

    750mm R.C.P. Stm. Sewer

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CBCB

    CB

    CB

    CB

    B

    CB

    CB

    CB

    CB

    CB

    CBCB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    West

    Limit of

    Do

    n

    Channel

    Co

    n. S

    ea

    wall E

    /S. o

    f

    Channel

    Bollard Lig

    ht

    Concrete Island

    Co

    n. R

    et. W

    all

    Concrete Curb

    Steel Truss on Bridge

    East

    Limit of

    Don

    Valle

    y

    Park

    way

    Chain Link Fence

    EASE

    MENT

    300mm Conc. Stm. Connection

    225mm Conc. Stm. Connection

    Outfall

    525

    mm

    V.P. S

    tm. S

    ewer

    450mm V.P. Stm. Sewer

    in

    Sa

    me

    Tre

    nch

    225mm C.P. Stm. Connection

    600mm x 900mm E.S.B. Stm. Sewer Aband'd

    450mm V.P. Stm. Sewer

    CB

    CB

    CB

    CB

    CB

    CB

    CBCB

    CB

    CB

    CB

    West

    Limit of

    Do

    n

    Channel

    Co

    n. S

    ea

    wall E

    /S. o

    f

    Channel

    Bollard Lig

    ht

    Concrete Island

    RS

    Bol

    RS

    O

    HW

    Bol

    HW

    O

    HW

    Bol

    O

    HW

    LS

    LS

    RS

    HE

    LS

    O

    LS

    HW

    HW

    O

    Bol

    LS

    HE

    HW

    Bol

    HW

    HW

    HW

    LS

    Bol

    LS

    HM

    HW

    RS

    HW

    LS

    Bol

    HW

    HE

    HE

    HW

    HW

    LS

    RS

    LS

    LS

    193

    194

    195

    196

    197

    198

    199

    200

    201

    202

    204

    205

    206

    207

    208

    210

    211

    212

    213

    214

    215

    216217

    218

    219220

    221

    222

    223

    224

    1401

    1403

    1446

    1448

    N

    DO

    N RIV

    ER

    YAW

    KRAP Y

    ELLA

    V N

    OD

    OT

    PM

    AR

    STREET LIN

    E

    STREET LINE

    ARE IN METERS UNLESS OTHERWISE NOTED

    MEASUREMENTS SHOWN ON THESE PLANS

    METRIC

    DO

    N V

    ALLE

    Y P

    AR

    KW

    AY N

    OR

    TH

    DO

    N V

    ALLE

    Y P

    AR

    KW

    AY S

    OU

    TH

    PROPERTY LINE

    DON & WATERFRONT WET WEATHER FLOW SYSTEM

    AR

    1078-2014-02-212

    17ECS-MI-04DC

    C100

    CIVIL

    JK

    COXWELL BYPASS TUNNEL

    SIGNEDINITIALREVISIONSDATENo.

    DESIGN:

    DATE:

    SCALE: HORIZONTAL 1:400

    DRAFTING: CHECK:

    DRAWING

    NUMBER:

    DGC CONTRACT No.

    Water

    MANAGEMENT MAJOR INFRASTRUCTURE

    DIRECTOR, DESIGN & CONSTRUCTION,

    BILL DE ANGELIS, P. ENG., MBAGRAHAM HARDING, P. ENG.

    DIRECTOR, WATER INFRASTRUCTURE

    ENGINEERING & CONSTRUCTION SERVICES

    (CLOSED)

    EASTERN AVENUE

    0 4 102 20

    SCALE 1:400

    METER METERS

    REMOVE ACCESS GATE

    EXISTING CONDITIONSRESTORE TO MATCH

    AREA WITH SODRESTORE GRASS

    engineering environment infrastructure

    R.V.Anderson Associates Limited

    in association with

    SILT FENCEHOARDING AND CONSTRUCTION REMOVE

    EASTERN AVENUE

    4SUN/4QUE - RESTORATION PLAN

    4SUN/4QUE

    6.3m I.D. COXWELL BYPASS TUNNEL

    0 SEP 2017 ISSUED FOR TENDER DGC

    SEPTEMBER 2017

    SUNLIGHT PARK ROAD

    TRCA REGULATION LIMIT

    TR

    CA R

    EG

    ULATIO

    N LIMIT

    REPLACE CURB AND SIDEWALK

    INFORMATIONREFER TO DRAWING L4 FOR LANDSCAPE RESTORATION 6.

    T-310.010-4REPLACE ALL COMBINED CURBS AND SIDEWALKS AS PER 5.

    AREAS AFFECTED BY THE WORKSIDEWALKS, DRIVEWAYS, ROADWAYS AND GRASSED CONTRACTOR SHALL RESTORE ALL DAMAGED CURBS, 4.

    RESTORE SITE TO MATCH EXISTING GRADE.3.

    REFER TO DRAWING G11 FOR GENERAL NOTES.2.

    CONFLICT WITH EXISTING SERVICES.ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY VERIFIED IN THE FIELD PRIOR TO CONSTRUCTION. THE CONNECTION POINTS AND MATERIAL TYPE TO BE FOR DAMAGE OR RESTORATION TO SAME. ALL AND STRUCTURES AND SHALL ASSUME ALL LIABILITY SHALL PROVE THE LOCATION OF ALL SUCH UTILITIES UTILITY COMPANIES CONCERNED. THE CONTRACTOR CONSULTING THE APPROPRIATE AUTHORITIES OR SUCH SERVICES, UTILITIES AND STRUCTURES BY CONTRACTOR SHALL DETERMINE THE LOCATION OF ALL STRUCTURES ARE NOT GUARANTEED. THE THE LOCATION OF SUCH SERVICES, UTILITIES AND DRAWING(S) THE COMPLETENESS AND ACCURACY OF UTILITIES ARE SHOWN AND WHERE SHOWN ON THE APPROXIMATE ONLY. NOT ALL MUNICIPAL SERVICES AND MUNICIPAL SERVICES, UTILITIES AND STRUCTURES ARE THE LOCATION OF ALL UNDER/ABOVE GROUND 1.

    GENERAL NOTES

    1

    1

    1 NOV 2017 DGCISSUED FOR ADDENDUM 1

    250 mm Pipeline (Trans. Northern)

    250 mm Pipeline (Imperial Oil)

    200 mm Pipeline (Sun Oil)

    250 mm Pipeline (Trans. Northern)

    250 mm Pipeline (Imperial Oil)

    200 mm Pipeline (Sun Oil)

    Pipeline (Trans. Canada)

    Pipeline (Trans. Canada)

    450 mm Conc. Stm.Sewer

    375 mm Conc. Stm.Sewer

    375 mm Conc. Stm.Sewer

    300 mm PVC Water Main

    300 mm PVC Water Main

    300 mm PVC Water Main

  • West

    Limit of

    Do

    n

    Channel

    Co

    n. S

    ea

    wall E

    /S. o

    f

    Channel

    124

    180

    LS

    T

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    199

    200

    201

    202

    204

    205

    206

    207

    208210

    211

    212

    213

    214

    215

    216217

    218

    219220

    221

    222

    223

    1401

    1403

    1446

    1448

    0+998

    0+998

    1+000

    1+025

    1+050

    1+075

    1+100

    1+125

    1+130

    LD-BD-06

    LD-BSR-08

    DON & WATERFRONT WET WEATHER FLOW SYSTEM

    COXWELL BYPASS TUNNEL

    PLAN & PROFILE

    JK

    N

    ARE IN METERS UNLESS OTHERWISE NOTED

    MEASUREMENTS SHOWN ON THESE PLANS

    METRIC

    TORONTO CITY

    TORONTO CITY

    DO

    N RIV

    ER

    SIGNEDINITIALREVISIONSDATENo.

    DESIGN:

    DATE:

    SCALE: HORIZONTAL 1:500 VERTICAL 1:200

    DRAFTING: CHECK:

    DRAWING

    NUMBER:

    CONTRACT No.

    Water

    MANAGEMENT MAJOR INFRASTRUCTURE

    DIRECTOR, DESIGN & CONSTRUCTION

    BILL DE ANGELIS, P. ENG., MBAGRAHAM HARDING, P. ENG.

    DIRECTOR, WATER INFRASTRUCTURE

    ENGINEERING & CONSTRUCTION SERVICES

    ADIT TUNNEL

    6.3m I.D. COXWELL BYPASS TUNNEL

    AND ADIT TUNNELALONG CENTRELINE OF DEAERATION TUNNELEXISTING GROUND PROFILE

    1078-2014-02-213 C101

    AR DGC

    DON