12 th Annual Total Building Management—From Cradle to Grave Presented By: Joel Davis, Principal, Director of Research Doug Smith, Director of Engineering Facility Condition Assessments Basic & Enhanced: Proactive Facilities Asset Management 5/3/2016 1

Upload: others

Post on 16-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

12th Annual

Total Building Management—From Cradle to Grave

Presented By:  Joel Davis, Principal, Director of Research

Doug Smith, Director of Engineering

Facility Condition AssessmentsBasic & Enhanced:

Proactive Facilities Asset Management

5/3/2016 1

Page 2: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG Analysis

• Performance Assessment based on 2015 EFC Theme: “Staying Smarter than your Buildings”

• 2015 EFC Presentation “Learn what your Buildings are telling You” through “Performance Assessment” in conjunction with AM/FCA programs.

• Packed room with strong interest, but many not familiar with basic FCA; hence this 2016 “FCA Basic & Enhanced (101 & 102)” presentation.

May 3, 2016 2

Basic & Enhanced FCAProactive Asset Management

Page 3: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG Analysis

Introduction to FCA• 2% Rule• WA State FCA Programs: JLARC; SBCTC; DSHS• GASB 34, FCA & PCA

Fundamental FCA• Prepare, Survey, Report

Exercise!• UNIFORMAT II ‐ Assessment

Enhanced FCA• Costs  Audits, Studies & Testing

Future of FCA• ISO 55 Asset Management• Performance Assessment

May 3, 2016 3

Basic & Enhanced FCAProactive Asset Management

Presentation Overview

Page 4: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 4

Basic & Enhanced FCAProactive Asset Management

INTRODUCTIONS

Page 5: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 5

Basic & Enhanced FCAProactive Asset Management

FCA EXPERTS• Local Systems• Local Costs• Local FCA Team

Page 6: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 6

O Romeo, Romeo! wherefore art thou Romeo?....….

What's in a name? that which we call a roseBy any other name would smell as sweet;

Basic & Enhanced FCAProactive Asset Management

Page 7: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 7

BCE: Building Condition EvaluationsBCA:  Building Condition Assessment

(qualitative buildings, + systems to 5’ from perimeter)FCS: Facility Condition SurveysPCA:  Property Condition Assessment – real estate 

due diligence (Purchase/Sale) ‐ ASTM 2018baseline PCA of commercial real estate…PCA should be conducted by a field observer…not to be construed as technically exhaustive… representative observations is to convey to the user the expected magnitude of commonly encountered or anticipated conditions…

FCA:  Facility Condition Assessment(buildings + site infrastructure + options)process of a qualified group of trained industry professionals performing  an analysis of the condition of a facility or group of facilities that may vary in terms of age, design, construction methods, and materials…

Basic & Enhanced FCAProactive Asset Management

Page 8: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG Analysis

• OSPI: BCEF – Building Condition Assessment (BCA)• GASB 34 – Federal Condition Assessment (FCA)• ASTM 2018 – Property Condition Assessment (PCA)• Navy & NASA Parametric FCA• Facility Condition Index (FCI)• Deferred Maintenance (DM)• Backlog in Maintenance & Repair (BMAR)• Current Replacement Value (CRV)• Remaining Useful Life (RUL)• Rapid Visual Inspection (RVI)

May 3, 2016 8

TERMINOLOGY, TAXONOMY & ACRONYMITY

MUST MEASURE TO MANAGE

Basic & Enhanced FCAProactive Asset Management

Page 9: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 9

CRADLE TO GRAVE?

Basic & Enhanced FCAProactive Asset Management

Page 10: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG Analysis

What about the fun before the cradle?

Or the lingering memories of life after death?

TOTAL BUILDING MANAGEMENT: CRADLE TO GRAVE?

Basic & Enhanced FCAProactive Asset Management

Page 11: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG Analysis

TEPCO’s Fukushima Legacy

Basic & Enhanced FCAProactive Asset Management

Page 12: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG Analysis

or….

From Lust… to Dust…

TOTAL BUILDING MANAGEMENT: CRADLE TO GRAVE?

Basic & Enhanced FCAProactive Asset Management

Page 13: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 13

TOTAL BUILDING MANAGEMENT: CRADLE TO GRAVE?

Basic & Enhanced FCAProactive Asset Management

Page 14: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 14

Basic & Enhanced FCAProactive Asset Management

Page 15: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 15

CollectData

AnalyzeData

PlanBudget

Implement

Condition Performance

“Fair” “Excellent!”

FUNDAMENTAL FCA PROCESS

Basic & Enhanced FCAProactive Asset Management

Page 16: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG Analysis

1. Preparation• Facility List, Site & Floor Plans, Historical Data, O&M  Workshop

2. Condition Surveys• Field Survey using RVI• Data Entry

3. Reporting• Analysis• Project Planning & Budgeting

Periodic Updates: 3 ‐ 6 yearsMay 3, 2016 16

Basic & Enhanced FCAProactive Asset Management

Page 17: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 17

Basic & Enhanced FCAProactive Asset Management

FCA Roadmap

Milestones

SOW

MESSAGE

Page 18: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 18

Basic & Enhanced FCAProactive Asset Management

Page 19: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 19

Basic & Enhanced FCAProactive Asset Management

Page 20: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 20

Basic & Enhanced FCAProactive Asset Management

Page 21: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 21

1) THOROUGHNESS OF ORGANIZATIONUNIFORMAT II – ASTMUniFormat TM – CSI

2) CONSISTENCY OF SCORING1 – 5: Excellent ‐ Unsatisfactory

3) TRACKING CONDITION SCORES OVER TIMEConsistent Replication of Assessment Process

Basic & Enhanced FCAProactive Asset Management

Page 22: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 22

WHY FCAs ????• Government Reporting Requirements (GASB 34; 2% Rule)• Lender Financial Risk Mitigation• Pre‐Purchase Due Diligence: Real Estate Negotiation• Establish Lease Rate Models (i.e., O&M cost recovery)• Establish Maintenance Reserve Funds• Capital Planning• O&M Planning

Beyond the Curb Appeal: O&M Funding ‐ Victims of Success

Basic & Enhanced FCAProactive Asset Management

Page 23: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 23

Basic & Enhanced FCAProactive Asset Management

PVC w/Hydronics???

Page 24: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 24

Basic & Enhanced FCAProactive Asset Management

System is atEnd of Useful Life…but roof locationIs out of sight, andOut of Mind.

Page 25: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 25

Basic & Enhanced FCAProactive Asset Management

Pneumatic T‐StatsUser Modifications

Page 26: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 26

Basic & Enhanced FCAProactive Asset Management

Lift Station Debris

Page 27: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 27

Basic & Enhanced FCAProactive Asset Management

Obsolete TechnologyRelay vs. DigitalElevator Controls

Page 28: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 28

Basic & Enhanced FCAProactive Asset Management

Roof Drainage toFoundation

Page 29: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 29

Basic & Enhanced FCAProactive Asset Management

Green Roofs

Painted Metal

Page 30: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 30

Basic & Enhanced FCAProactive Asset Management

Page 31: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 31

Basic & Enhanced FCAProactive Asset Management

Group Exercise

Page 32: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 32

WHY FCAs ????• Government Reporting Requirements (GASB 34; 2% Rule)• Lender Financial Risk Mitigation• Pre‐Purchase Due Diligence: Real Estate Negotiation• Establish Lease Rate Models (i.e., O&M cost recovery)• Establish Maintenance Reserve Funds• Capital Planning• O&M Planning

Beyond the Curb Appeal: O&M Funding ‐ Victims of Success

Basic & Enhanced FCAProactive Asset Management

Page 33: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 33

Good!

Bad!

Typical

Move your portfolio to left using FCA 

FCA – Funding vs. FCI

Basic & Enhanced FCAProactive Asset Management

Page 34: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 34

Basic & Enhanced FCAProactive Asset Management

Page 35: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 35

Basic & Enhanced FCAProactive Asset Management

MAINTENANCE RESERVE FUNDS

2% Rule

110% Capital Funding

Do Nothing• Accelerated Deterioration• Cost Escalation• Compounded BMAR

CAPITAL CENTRICFacility Replacement

Page 36: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 36

STRATEGIC ASSET MANAGEMENTBE MORE THAN A SQUEAKY WHEEL

Enhance your MessageCREDIBLE DATA & COST PROJECTIONS

SHORT‐TERM COST PROJECTIONS ‐ ODsLONG‐TERM COST PROJECTIONS ‐ PRs

Basic & Enhanced FCAProactive Asset Management

Page 37: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG Analysis

• Observed Deficiencies (ODs) are short term:• “Boots on Ground” observed by RVI• Major Maintenance >$5K • Under 5 to 6 years• Reactive

• Predicted Renewals (PRs) are long term:• Major Maintenance and Repair (MM&R)• Theoretically based costs on original date and system life• AKA “life cycle”• Proactive

May 3, 2016 37

Catch‐up

Keep‐up

REPORTING COST PROJECTIONS

Basic & Enhanced FCAProactive Asset Management

Page 38: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 38

Facility Summary Report

Basic & Enhanced FCAProactive Asset Management

Page 39: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 39

Basic & Enhanced FCAProactive Asset Management

Observed Deficiencies – Raw Costs

Page 40: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 40

Project Soft Costs include:Design Fees 13% SnoCo Management 10%Permitting 2% Project Contingency 15%Art 1% Sales Tax 9%

RAW COSTS + MARKUPS = PROJECT COSTS

Basic & Enhanced FCAProactive Asset Management

Page 41: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 41

Basic & Enhanced FCAProactive Asset ManagementODs by FACILITY

Page 42: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 42

Basic & Enhanced FCAProactive Asset Management

ODs by System

Page 43: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 43

Basic & Enhanced FCAProactive Asset Management

Long‐Term Liabilities

Renewal Model Factors: • Age of System; • Condition Scores; • Typical Lifecycle; • Adjusted Lifecycles; • CRVs

Predicted Renewals

Page 44: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG Analysis

• By Building or Use Type• Public Safety• Revenue Generating• General Use

• By System Type• Life/safety• Productivity

May 3, 2016 44

Basic & Enhanced FCAProactive Asset Management

Page 45: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 45

Basic & Enhanced FCAProactive Asset Management

Prioritization of Deficiencies

Page 46: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG Analysis

Messaging Need:• Project Packaging• Prioritization

Opportunities: “Step up” with non‐condition related improvements.

May 3, 2016 46

RAISING THE BAR

Basic & Enhanced FCAProactive Asset Management

Page 47: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG Analysis

FCA Opportunities – A chance to do better• Non‐required Code/ADA• Energy/Utility Conservation• Improved facility utilization• Increased safety & security (CPTED)• Speed‐up technology• Improved IAQ• Environment

May 3, 2016 47

Step‐up!

OPPORTUNITIES

Basic & Enhanced FCAProactive Asset Management

Page 48: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG Analysis

ENHANCEMENTS• Infrared Thermography• Seismic ASCE 41 Checklist• ADA Assessments• Energy Audits• CPTED/Security Audits• Inventory/CMMS• Critical Areas / Risk Assessments• Preventive Maintenance Analysis• Building Envelope ‐ Air Barrier Testing• Planning: Utilization; Level of Service; Educational Adequacy

May 3, 2016 48

Basic & Enhanced FCAProactive Asset Management

Page 49: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 49

ENERGY COMPARSION ‐ EUI

Basic & Enhanced FCAProactive Asset Management

Page 50: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 50

Basic & Enhanced FCAProactive Asset Management

Page 51: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG Analysis

• Asset Management – from reactive to proactive• Performance Assessment – fact based decision making

May 3, 2016 51

Basic & Enhanced FCAProactive Asset Management

Page 52: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 52

ISO: 55000

Basic & Enhanced FCAProactive Asset Management

Page 53: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 53

Performance Assessment!

Basic & Enhanced FCAProactive Asset Management

Page 54: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG AnalysisMay 3, 2016 54

Basic & Enhanced FCAProactive Asset Management

Basic Condition Assessments: Condition Based;Qualitative

Enhanced FCA:  Condition;Quantitative Costs;Options…. +, +, +, 

Effective Messaging of …Financial Risks & Liabilities

Take Aways

Page 55: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG Analysis

Please Remove from FCA survey list!

May 3, 2016 55

Basic & Enhanced FCAProactive Asset Management

Page 56: Total Building Management—From Cradle to Grave Facility ... · FCA: Facility Condition Assessment (buildings + site infrastructure + options) process of a qualified group of trained

MENG Analysis

Questions?

Joel Davis, MA, [email protected]‐587‐3797Doug Smith, PE, [email protected]‐587‐3797

May 3, 2016 56

Basic & Enhanced FCAProactive Asset Management