TOTAL MANAGEMENT PLANNING
Strategies for Water ServiceProvidersPresenters:
Craig Teske – Principal Engineer (DNR)
Aneurin Hughes – Manager, Asset Management(Cardno MBK)
Rob Drury – Manager, InfrastructureManagement (DNR)
2.
A concept which encourages water service providersto:-
• utilise best practice planning;
• achieve least cost outcomes; and
• achieve whole-of-business sustainable management
TOTAL MANAGEMENT PLANNING
3.
• Water Service Infrastructure in Queensland• Queensland Water Service Providers• What is Total Management Planning ?• TMP Development• Challenges in Developing the Guidelines• Typical TMP Documentation Structure• TMP Guideline Structure• Features of the Guidelines• KRA Guidelines• Links to other parts of the Water Industry• Where to from Here?
Total Management PlanningGuidelines (2000)
– Presentation Outline
4.
Extent:-
• Water-related infrastructure = $20 billion.
• $200 - $400 million new infrastructure per year.
• Urban water-related services:-$10,000 - $15,000 per household per year.
Benefits:-
• Improved living conditions
• Regional and local economic development
• Minimisation of environmental degradation
Queensland Water Service Infrastructure
5.
Rural Water Supply Boards
Urban Water Supply Boards
SunWater
Local Governments
Joint Local Governments
Aboriginal Community Councils
Torres Strait Island CommunityCouncils
WSP Category
18 drainage boards17 water supply boards (stockwater)11 water supply boards (irrigation)4 bore water boards
4 statutory water boards
1 (34 schemes)
125 operating over 400 water supplyschemes and 250 sewerage schemes
2
14
17
Number/Sub-Category
Queensland Water Service Providers
6.
Need for an overall, coordinated approach to ensure: -
� Sustainable essential services;
� Best practice to plan, design and build;
� Least-cost outcomes for the community.
Why TMP ?
7.
• Asset Management Guidelines developed -1989/91
• TMP Planning Guidelines developed 1990-1993
• TMP Manual published - 1994
• DCILGPS Subsidy to develop TMPs - 1994/95
• Approved TMPs for full subsidy since 1996/7
• TMP Guidelines are now being revised & updated
• TMP Guidelines complement Water Act 2000.
History of TMP
8.
• TMP Manual (1994) - 2 volume document(process-based).
• Subsidy link to TMP - an incentive
• After December 2000 - reduced subsidy if noTMP in place.
TMP Today
9.
Consultation with Local Government and ruralservice providers (TMP Workshop - November 1999)
Additional TMP guidelines being developed by DNR(Cardno MBK developed draft Guidelines)
DNR to finalise TMP guidelines - early 2001(Consultation with relevant stakeholders)
Development of Guidelines –Current Objectives
10.
• For different types of Water Service Providers
• More outcome oriented, less prescriptive andeasier to read
• More aligned with corporate objectives
• Provide methodologies for best practice andleast-cost planning processes
• Complementary to the Water Act 2000
• Integrated with other State Agency requirements(e.g. EPA)
The Aim of the New TMP Guidelines
11.
Aneurin Hughes (Cardno MBK)
12.
• Smart Thinking
• Smart Planning
• Smart Financing
• Smart Investment
• Smart Management
• Sustaining or Improving Services
What does Total Management PlanningMean ?
13.
• Diversity of WSPs
• Dispersed
• Autonomous
• Organisational sophistication, resources andskills
Getting the balance ‘right’
Challenges in Developing TMP Guidelines
14.
• Documentation Structure
• Guideline Structure
• Features of Guidelines
• KRA Guidelines
• Where to from Here?
Total Management Planning Guidelines(2000)
15.
Level Element Main Target Readership
1 Business Management Plan (Overview)Elected representatives;executive management;regulators
2 Operational sub-plans, includingaction plans
Operational management;regulators
3 Supporting documentation, includingprocedure manuals, reports, etc
Operational supervisors;technical staff
Basic TMP Structure
16.
BUSINESS MANAGEMENT PLANBUSINESS MANAGEMENT PLAN
ServiceStandards
FinancialSustainability
AssetManagement
EcologicalSustainability
RiskManagement
PerformanceManagement
OrganisationManagement &Development
KEYRESULTAREAS
Service StandardsPlan
Service StandardsPlan
Drinking WaterQualityManagement Plan
Drinking WaterQualityManagement Plan
FinancialManagementPlan
FinancialManagementPlan
Water DemandManagementPlan
Water DemandManagementPlan
Water LossManagementPlan
Water LossManagementPlan
InfrastructurePlanningOverview
InfrastructurePlanningOverview
AssetProcurementPlan
AssetProcurementPlan
AssetEvaluation andRenewal Plan
AssetEvaluation andRenewal Plan
OperationsManagementPlan
OperationsManagementPlan
MaintenanceManagementPlan
MaintenanceManagementPlan
Sewer I/IManagementPlan
Sewer I/IManagementPlan
Water SourceManagementPlan
Water SourceManagementPlan
EnergyManagementPlan
EnergyManagementPlan
EnvironmentalManagementPlan
EnvironmentalManagementPlan
RiskManagementPlan
RiskManagementPlan
EffluentManagementPlan
EffluentManagementPlan
BiosolidsManagementPlan
BiosolidsManagementPlan
Trade WasteManagementPlan
Trade WasteManagementPlan
PerformanceAssessmentPlan
PerformanceAssessmentPlan
QualityManagementPlan
QualityManagementPlan
InformationManagementPlan
InformationManagementPlan
Human ResourcesManagement Plan
Human ResourcesManagement Plan
Community Consultation
Marketing Plan
Customer Service Policy
Service Level Agreements
Water Supply Agreementswith Major Customers
Long-term FinancialModel
Financial ManagementPractice Manual
Developer ContributionsPolicy
Infrastructure ChargesPlan
Pricing Policy
Full Cost Pricing Strategy
Metering Policy
Water Conservation Strategy
Strategic Infrastructure Plan
Detailed Planning Studies
Capital Works Program
Project Evaluation Manual
Infrastructure Planning/Design Guidelines
Asset Registers
Asset Valuation Reports
Water Source Entitlements
Water Allocations
Outsourcing Strategy
O&M Manuals
Telemetry Strategy
Environmental Plansunder EPP (Water)
Water Reuse Agreements
Trade Waste Policy
ERA Licenses
Catchment ManagementPlans
WAMPs
Environmental FlowManagement Plan
On-site Treatment
Risk/HazardAssessment
Critical InfrastructureManagement Plan
Dam Safety
Counter Disaster Plans
DocumentedContingency Plans
Insurance Policies
Performance Reports
Performance Monitoring
Benchmarking
TMP Coordinator’sManual
Quality ManagementSystems
Organisational Structure
Staffing Plan
Training andDevelopment Program
WH&S Policy
CommercialisationPolicies
TYPICALSUB-PLANS
TYPICALSUPPORTINGDOCUMENT-ATION
Typical TMP Structure
17.
Service Standards
Financial Sustainability
Asset Management
Ecological Sustainability
Risk Management
Performance Management
Organisational Managementand Development
Key Result Area
Customer charters/guarantees, customer interaction,community consultation, drinking water guidelines
Financial modelling, commercial objectives, tariff structures
Full asset lifecycle from infrastructure planning to assetrehabilitation/disposal including demand management
Environmental compliance, environmental managementsystems, effluent quality, effluent reuse, biosolidsmanagement, trade waste management
Risk assessment, minimising risk exposure, risk monitoring
Performance monitoring and compliance, qualitymanagement, information management
Organisational culture, change management, staffdevelopment, industrial relations
Typical Issues Covered
Key Result Areas
18.
Variation in WSPs:
• user friendly
• easily understood by range of targetaudiences
• outcome focussed but expresses StateGovernment requirements
• flexibility to accommodate WSP processes
• readily updateable
Guideline Structure
19.
• TMP guideline - Overview
- Detailed
• KRA Guideline - Overview
- Detailed
• Process and Content Guideline
• Development Level
• Prioritisation Methodology
Features of Guidelines
20.
Develop, adopt &refine
infrastructure planningpolicies
Collect &analyse supporting
information
Ensure linkageswith other
planning activities
Project managethe infrastructureplanning process
Undertake planningstudies
Prioritiseinfrastructure
investment program
Document outputsof planning
studies
THEINFRASTRUCTURE
PLANNINGPROCESS
The Infrastructure Planning Process
21.
• Issues Covered• Purpose• Policies that May be Required• Other TMP Elements Intimately Linked to Sub-Plan• External Issues Contributing to Current Operating
Environment• What Issues Need to be Considered in
Summarising Status of Current Operations• What Should be the Strategic Basis of the Plan• Suggested Performance Measures• Supporting Documentation
Further Reading
Content Guideline - 1 Page
22.
Sub-Plan: Water Demand Management Plan
Issues Covered in Sub-Plan
• Supply metering;• Water pricing;• Customer education;• Water-efficient hardware;
• Irrigation efficiency;• Water restrictions (consumption regulation);• Supply reduction.
Purpose of Plan • To provide an overview of the WSP’s current water demand management practices.• To outline the WSP’s future objectives and initiatives in managing water demand.
What Policies may beRequired
• Pricing;• Customer metering;• Water use restrictions;
• Effluent reuse;• Trade waste minimisation;• Infrastructure service standards (re supply rates andpressures)
What Other TotalManagement PlanElements are LinkedIntimately to this Sub-Plan
• Infrastructure Service Standards Plan – considers supply-side service parameters (eg supply rates and pressures)which influence demands.• Financial Management Plan – considers implications of consumption-based pricing and falling demands.• Infrastructure Planning Overview – takes account of deferring future headworks consequent on falling demands.• Unaccounted-for Water Plan – provides for water audits which utilise demand data, and may incorporate commonstrategy(ies), eg pressure reduction.
What External IssuesContributing to theCurrent OperatingEnvironment Need to beConsidered
• New developments in Government WaterWise program.• Local Government Act requirements for two-part tariffs for certain urban supplies.• Increasing encouragement of WSPs by governments to develop formal demand management programs, with someoffering financial assistance on preparation and/or implementation.• Progressive implementation of COAG pricing principles for irrigation water pricing.• Requirements of EPP (water) for preparation of local government environmental plans on water conservation byJune 2002. (This sub-plan and the Water Loss Management Plan should jointly be formulated so as also to meet theserequirements.)• Consumption data from other WSPs for benchmarking current demands.• Efficiency improvements in irrigation practices.• Advances in efficiency of water appliances, irrigation equipment and other hardware.
What Issues Need to beConsidered inSummarising the Statusof Current Operations
• Scope of WSP’s demand management program.• Progress on environmental plan for water conservation under EPP (water), for local government WSPs.• Status of customer education programs, eg, WaterWise.• Extent of customer metering.• Water consumption trends and benchmarking results.• Current and planned pricing practices, and effects on consumption tends.• Promoting of water-efficient hardware, improved irrigation practices, trade waste minimisation recycling and reuse,etc.
d l i f l i
23.
What should be the StrategicBasis of the Plan
The strategic elements forming the basis of the plan should include:� goal for asset management� objective(s) for water demand management� adopted KPIs� management strategies and performance targets.
The management strategies developed will be based on the identified key strategic issues and SWOTfindings, including risk assessment, in respect of water demand management, and on the requiredTMP development level.
Many WSPs are likely to require strategies for enhancing their customer educational and promotionalprograms; optimising water-pricing policies in terms of water demand and projected revenue; andminimising consumption on all WSP-owned properties.
The strategies should be supported by detailed action plans that would cover up to a 3-year period.
Suggested PerformanceMeasures
Outcome: Infrastructure investment cost (new works): base year cost ratioOutput: Average water demand/customer
Maximum day: average day demand ratioPeak hour: average day demand ratio
Supporting Documentation These will depend on the WSP, but typically would include:� current WaterWise (or similar) water conservation program;� strategic demand management reports; and� water consumption analysis/benchmarking reports.
24.
• Levels 1 - 4 Based mainly on current cost ofinfrastructure
Development Level
Prioritisation of Strategies/Actions
• Suggested methodology based onassessment of benefits/risks
25.
• Service Standards
• Financial Sustainability
• Asset Management
• Risk Management
KRA Guidelines
26.
FinancialManagement
Plan
Model
INPUTS(from other TMP Sub-Plans)• Operating revenue and
expenditure• Capital related revenue
and expenditure• Current ‘cash’ position• Asset values, depreciation• Growth projections
OUTPUTS
• Estimated impact on charges• KPIs• Optimised infrastructure
investment program• estimated future ‘ cash’ position
Relationship Between the FinancialManagement Plan and the Model
27.
General Inputs
CurrentEstimatedConnectedPopulation POPULATION 2,400CurrentEstimatedNoofConnections CONNECTIONS 730
Variable Inputs 0Demographics Year 1999/2000
ProjectedPopulationGrowthRate
%ChangeinGrowthinFlows
ExpenditureProjections-aboveCPI
Revenue
ChangeinRatesandChargesChangeinNon-CapitalGrantsandSubsidiesChangeinOtherRevenueExpenses
ChangeinOperationsExpenseChangeinMaintenanceCostChangeinManagementandAdministrationExpenseChangeinInfrastructurechargesincashForecastChangeinDonatedassetsChangesinOtherExpenses
1 2 3 4 5 6 7 8 92000/2001 2001/2002 2002/2003 2003/2004 2004/2005 2005/2006 2006/2007 2007/2008 2008/2009 2009/2010
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
9.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
-20.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
-3.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%0.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
-14.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
SHIRE COUNCIL - WATER SUPPLYGrowth and Demand Projections
28.
Year 1999/2000 2000/2001 2001/2002 2002/2003OPERATINGREVENUE
Water/Sewer RatesandCharges 714,500$ 786,593$ 794,459$ 802,404$Interest Revenue $0 $0 $1,176 $1,651Non-Capital GrantsandSubsidies -$ -$ -$ -$Other Revenue 3,000$ 2,400$ 2,400$ 2,400$Total OperatingRevenue 717,500$ 788,993$ 798,035$ 806,454$
OPERATINGEXPENDITUREOperations 362,000$ 351,140$ 354,651$ 358,198$MaintenanceCost -$ -$ -$ -$Management andAdministration 82,000$ 70,520$ 71,225$ 71,937$Interest Expense 88,500$ 61,134$ 52,825$ 43,550$Depreciation 413,840$ 422,190$ 439,113$ 449,547$Other operatingexpenses(specifybywayof note) 17,500$ 17,500$ 17,500$ 17,500$Total OperatingExpenditure 963,840$ 922,484$ 935,314$ 940,732$
OPERATINGSURPLUS/(DEFICIENCY) -$246,340 -$133,491 -$137,279 -$134,278CAPITALRELATEDREVENUE
Capital GrantsandSubsidies -$ 333,480$ 616,850$ 272,000$Developer Contributions(Infrastructurecharges) -$ -$ -$ -$Donatedassets -$ -$ -$ -$Funds fromDisposal of Noncurrent assets -$ -$ -$ -$Total Capital relatedRevenue -$ 333,480$ 616,850$ 272,000$
CAPITALRELATEDEXPENSECapital relatedexpense -$ -$ -$ -$Abnormal andExtraordinaryItems -$ -$ -$ -$Total Capital RelatedExpense -$ -$ -$ -$
TOTALOPERATINGSURPLUS/(DEFICIENCY) -$246,340 $199,989 $479,571 $137,722
2003/2004 2004/2005 2005/2006 2006/2007 2007/2008 2008/2009 2009/2010
810,428$ 818,532$ 826,717$ 834,984$ 843,334$ 851,768$ 860,285$$3,934 $6,456 $9,105 $11,282 $17,734 $24,391 $31,581
-$ -$ -$ -$ -$ -$ -$2,400$ 2,400$ 2,400$ 2,400$ 2,400$ 2,400$ 2,400$
816,761$ 827,388$ 838,222$ 848,667$ 863,468$ 878,559$ 894,266$
361,780$ 365,398$ 369,052$ 372,742$ 376,470$ 380,234$ 384,037$-$ -$ -$ -$ -$ -$ -$
72,657$ 73,383$ 74,117$ 74,858$ 75,607$ 76,363$ 77,127$33,198$ 21,644$ 8,748$ -$ -$ -$ -$
453,214$ 453,214$ 455,714$ 460,089$ 460,089$ 460,089$ 460,089$17,500$ 17,500$ 17,500$ 17,500$ 17,500$ 17,500$ 17,500$
938,348$ 931,138$ 925,130$ 925,189$ 929,665$ 934,186$ 938,752$-$121,587 -$103,750 -$86,908 -$76,522 -$66,197 -$55,627 -$44,486
160,000$ 160,000$ 280,000$ -$ -$ -$ -$-$ -$ -$ -$ -$ -$ -$-$ -$ -$ -$ -$ -$ -$-$ -$ -$ -$ -$ -$ -$
160,000$ 160,000$ 280,000$ -$ -$ -$ -$
-$ -$ -$ -$ -$ -$ -$-$ -$ -$ -$ -$ -$ -$-$ -$ -$ -$ -$ -$ -$
$38,413 $56,250 $193,092 -$76,522 -$66,197 -$55,627 -$44,486
SHIRE COUNCIL - WATER SUPPLYOperating Statement
29.
Operating Surplus
-$300,000
-$250,000
-$200,000
-$150,000
-$100,000
-$50,000
$0
1999
/2000
2000
/2001
2001
/2002
2002
/2003
2003
/2004
2004
/2005
2005
/2006
2006
/2007
2007
/2008
2008
/2009
2009
/2010
Year
$
Charge per Connection
$-
$100.00
$200.00
$300.00
$400.00
$500.00
$600.00
$700.00
$800.00
$900.00
$1,000.00
1999
/2000
2000
/2001
2001
/2002
2002
/2003
2003
/2004
2004
/2005
2005
/2006
2006
/2007
2007
/2008
2008
/2009
Year
$
Return on Equity
-2.0%
-1.8%
-1.6%
-1.4%
-1.2%
-1.0%
-0.8%
-0.6%
-0.4%
-0.2%
0.0%
1999
/2000
2000
/2001
2001
/2002
2002
/2003
2003
/2004
2004
/2005
2005
/2006
2006
/2007
2007
/2008
2008
/2009
Year
$
Infrastructure Investment Profile
$-$100,000$200,000$300,000$400,000$500,000$600,000$700,000$800,000$900,000
1999
/2000
2000
/2001
2001
/2002
2002
/2003
2003
/2004
2004
/2005
2005
/2006
2006
/2007
2007
/2008
2008
/2009
2009
/2010
Year
$
New Capital Works Repl. Cap Wrks
Debt
-$100,000
$-
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
1999
/2000
2000
/2001
2001
/2002
2002
/2003
2003
/2004
2004
/2005
2005
/2006
2006
/2007
2007
/2008
2008
/2009
2009
/2010
Year
$
Reserves
-$200,000
$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
$1,400,000
$1,600,000
$1,800,000
1999
/2000
2000
/2001
2001
/2002
2002
/2003
2003
/2004
2004
/2005
2005
/2006
2006
/2007
2007
/2008
2008
/2009
2009
/2010
Year
$
Cash Movement (Closing Cash Bal)
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
1999
/2000
2000
/2001
2001
/2002
2002
/2003
2003
/2004
2004
/2005
2005
/2006
2006
/2007
2007
/2008
2008
/2009
2009
/2010
Year
$
Return on Assets
-2.0%
-1.8%
-1.6%
-1.4%
-1.2%
-1.0%
-0.8%
-0.6%
-0.4%
-0.2%
0.0%
1999
/2000
2000
/2001
2001
/2002
2002
/2003
2003
/2004
2004
/2005
2005
/2006
2006
/2007
2007
/2008
2008
/2009
Year
$
Reserves to Accumulated Depreciation
-$2,000,000
$0
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
1999
/2000
2000
/2001
2001
/2002
2002
/2003
2003
/2004
2004
/2005
2005
/2006
2006
/2007
2007
/2008
2008
/2009
2009
/2010
Year
$
Reserves Accumulated Depreciation
SHIRE COUNCIL - WATER SUPPLYGraphs
30.
General Checklist
HAVE YOU?
Automatic Check 1 - CASHFLOW
Are Cashflows Positive (Y/N) YESAutomatic Check 2 - BALANCE SHEET
Does the Balance Sheet Balance? YESDoes the Business Grow over time? YESAutomatic Check 3 - OPERATING SURPLUS
Does the Business Provide a return on funds invested? NOAutomatic Check 4 - CAPITAL FUNDING
Does the Capital Funding Sheet Balance? YES
Identified Key Constraints?gfedcb
Completed the Growth/Demand Projections?gfedcb
Calculated & Entered Depreciaton andReplacement Cap X data?gfedcb
Entered Base Yr Ops Revenue and Expense data?gfedcb
Completed New Cap X Budgetgfedcb
SHIRE COUNCIL - WATER SUPPLYCheck Sheet
31.
Dispose ofAssets andDe-register
Customerand
BusinessRequirements
Man
age
Dem
and
Manage Demand
OperateAssets
ProcureAssets
MaintainAssets
RenewAssets
Set or ReviewService Levels
Plan forAsset andNon-AssetSolutions
EvaluateAsset Conditionand Performance
OptimiseOperationalEfficiency Monitor
Costs
Register andValue Assets
ConstructAsset
DesignAsset
OptimiseInfrastructureInvestment (CapitalWorks) Program
Plan at aDetailed Level
PlanStrategically
Replace orRehabilitate Assets
Modify Assets orConfirm Need forAssets
Optimise AssetMaintenance/Rehabilitation/Replacement
Manage Demand
The Asset Management Process
32.
Service StandardsService StandardsAsset/system performance.
Financial SustainabilityFinancial Sustainability
Ecological SustainabilityEcological Sustainability
Risk ManagementRisk Management
Performance AssessmentPerformance Assessment
Organisation Management& Development
Organisation Management& Development
Asset ManagementAsset Management
Service standards/levels will drive investmentin new/replacement assets and O&M strategies.
Infrastructure investment (new/replacement) costs,O&M costs, depreciation, renewals annuity.
Financial targets to be achieved.
Infrastructure investment to meetenvironmental requirements.
Ecologically sustainability ofO&M practices.Minimisation of water demands,energy and sewer overflows.
Infrastructure extent, conditionand performance.
Infrastructure and servicedelivery related risks.
Asset related informationAsset/system performance and condition
Human resource requirementsprocesses/procedures.
Human resources.
BusinessManagement
Plan
BusinessManagement
Plan
Strategic Direction.
Benchmarking and performance comparisonInformation management systems.Quality management systems.
RelationshipBetween AssetManagementand Other KeyResult Areas
33.
Establish contextEstablish context
Identify risksIdentify risks
Analyse risksAnalyse risks
Evaluate risksEvaluate risks
Define risktreatment
strategies/controls
Define risktreatment
strategies/controls
Assess risksDetermine tentative scope of TMPDetermine tentative scope of TMP
Collate and analyse informationCollate and analyse information
Confirm scope of TMPConfirm scope of TMP
Prepare draft TMPPrepare draft TMP
Finalise TMPFinalise TMP
Implement TMPImplement TMP
Prioritised strategies andcontrols for inclusion inrelevant sub-plans
Collected information (egSWOT analysis) as basisfor summary risktreatment schedule
TMP Development Process(based on Reference 3)
Simplified Risk Management Process(based on Reference 1)
Integration of Risk Management and TMPDevelopment Processes
34.
Rob Drury (DNR)
35.
1. Councils are adopting a more rigorousinfrastructure investment decision makingprocesses, with non-asset based solutions, fulllifecycle costs, risks and various alternatives beingconsidered before deciding to constructinfrastructure;
2. Need to optimise the performance and utilisation ofexisting infrastructure;
3. Need to ensure that infrastructure can sustainagreed customer service standards; and
4. Recognition that asset management is a corebusiness function to support service delivery.
Links to COAG/NCP/Commercialisation
36.
The current TMP review process provides forapproval as part of the TMP by DNR of CouncilsEnvironmental Management Plans for water andsewerage services required under the EPP (Water).
The EMP would cover Sewer Inflow Infiltration,Demand Management, Trade Waste and StormwaterManagement Plans. Material is currently beingdeveloped and negotiations are under way with EPAregarding how this will be put in place.
Links to EPA
37.
A major part of the TMP is related to performance andimprovement. The Performance Monitoring andBenchmarking (PM&B) process managed by DNR willprovide not only the basis for the relevant sections ofthe TMP guidelines, but will provide the basic systemand data for a Council developing a TMP for thoseCouncils participating in the process.
Similarly, much of the data utilised in the PM&Bprocess will also be used when Service Providersdevelop Standards of Service required under theWater Act 2000.
Links to Performance Monitoring &Benchmarking
38.
The TMP includes sub-plans for addressing otherareas relating to best practice water use such as :
• Demand Management – to manage and minimisewater consumption and ensure it is included in futurewater demand planning as an option
• Unaccounted for water – to manage and reduce waterloss
• Water Source Management – to monitor and managewater sources and catchments
• Energy Management – to make best use reduce costsassociated with power use
Links to Water Use Efficiency andConservation
39.
The Water Act 2000 requires the preparation of aStrategic Asset Management Plan (SAMP). A fullTMP will cover virtually all of the requirements of aSAMP. Hence, although a different approvalprocess, a SAMP will require minimal extra work,reducing administrative duplication and the impactof compliance with the Act.
The new TMP guidelines are thus being developedin conjunction with SAMP guidelines under the Act.
TMP Approvals
40.
Key Result Areas and Sub Plans
EPP(Water)
SAMP’sUnderWater Act
PossibleWQMPHealthDept
Corporate/Business Plan
Water Service Provider TMP
PM&B
TMP Links to Other Approvals
41.
KEYRESULTAREAS
TYPICALSUB - PLANS
TYPICALSUPPORTINGDOCUMENTATION
ServiceStandards Sustainability
FinancialManagement
AssetSustainability
EcologicalManagement
RiskManagementPerformance
TOTAL MANAGEMENT PLAN
ModelLong-term Financial
Metering Policy
ManagementFinancial
Practice Manual
Pricing PolicyMajor CustomersAgreements withWater Supply
Strategy
Detailed Planning
Water Conservation
InfrastructurePlanning / DesignGuidelines WAMP's
ERA Licenses
Water Re-use
under EPP (Water)Environmental Plans
CatchmentManagement Plans
EnvironmentalFlow ManagementPlan
On-siteTreatment
AgreementsService Level
StrategyFull Cost Pricing
Counter Disaster
Dam Safety
Risk / HazardAssessment
Critical InfrastructureManagement Plan
Plans
Insurance Policies
ReportsPerformance
Benchmarking
CommunityConsultation
Marketing Plan
Customer ServicePolicy Studies
Capital Works
DocumentedContingency Plans
MonitoringPerformance
Agreements
Charges PlanInfrastructure
StrategicInfrastructure Plan
Trade Water Policy
Drinking WaterQualityManagement Plan
Plan
ServiceStandards
Plan
FinancialManagement
PlanManagementWater Demand Unaccounted -
forWater Plan
Infrastructure
OverviewPlanning
AssetProcurement
PlanManagementOperations
Renewal PlanEvaluation andAsset
Sewer I/IManagementPlan
MaintenanceManagementPlan
Water SourceManagementPlan
Biosolids
Management
Management
Trade Waste
EffluentManagement
ManagementPlan
Environmental
PlanManagementInformation
PlanManagementQuality
ManagementPlan
RiskAssessmentPlan
Performance
EnergyManagement
Plan
Plan
Plan
Plan
Plan
- Plans required for TMP
- Supporting Plans (required in whole or in part) for
&
ContributionsDeveloper
Policy
Asset Registers
Asset Valuation Reports
Water Source
Program
Entitlements
Water Allocations
Strategy
Telemetry Strategy
Outsourcing
O & M Manuals
Quality ManagementSystems
TMP Coordinator'sManual
Water Act 2000
TMP/SAMP Relationship
42.
TMP’s are becoming more holistic in theapplication and will provide:
• A tool to plan and manage water andsewerage infrastructure in a manner thatprovides the best outcomes for their customers
• A system for integrating different watermanagement mechanisms into the overallplanning process and ensuring all aspects ofwater planning is linked
The Future of TMP’S
43.
• A mechanism that will provide concurrentapproval with legislative requirements of otherDepartments and the Water Act 2000.
• A system to ensure all parts of the water basedinfrastructure systems are planned in the mostefficient, balanced manner with strong linksbetween financial and technical issues.
• An ongoing plan to ensure water schemes aresustainable both financially and operationally.
The Future of TMP’S (cont’)
44.
TOTAL MANAGEMENT PLANNING
- a concept which encourages water serviceproviders to utilise best practice planning,achieve least cost outcomes and whole-of-business sustainable management
45.
Any Questions ?