total productive maintenance - maintenance (jishu hozen) of the machines · 2017-10-12

41
TPM Total Productive Maintenance An introduction Presented by Bülent Taşkıran

Upload: truongbao

Post on 12-Mar-2018

380 views

Category:

Documents


26 download

TRANSCRIPT

Page 1: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

TPM –

Total Productive Maintenance

An introduction

Presented by

Bülent Taşkıran

Page 2: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

What is Total Productive Maintenance

(TPM) ?

the medical science of machines

a maintenance program which involves a

concept for maintaining plants and

equipment.

increasing production

increasing employee morale and job

satisfaction

Page 3: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

TPM history

Toyota used to improve its global position

(1950s)

After TPM suppliers and customers were

involved

this next methodology was called lean

manufacturing

Page 4: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

TPM - deterioration prevention

approach that aims to identify

issues as soon as possible

plan to prevent any issues before

occurrence

zero error, zero work-related accident,

and zero loss

approach that aims to identify issues as

soon as possible

plan to prevent any issues before

occurrence

zero error, zero work-related accident, and

zero loss

Page 5: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

Why TPM ?

Avoid wastage in a quickly changing economic environment

Producing goods without reducing product quality

Reduce cost

Produce a low batch quantity at the earliest possible time

Goods send to the customers must be non defective

Page 6: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

How can TPM eliminate loss?

Available time

Available operating time

Actual operating time

Effective operating time

Equipment Six big losses

1 breakdowns

2 setup/adjustment

3 idlings/minor stoppages

4 Speed

5 defects in process and rework

6 Start up losses

Page 7: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

Introduction of TPM into the

organization

Step A – Preparation Announcement by Management

Initial education

Setting up TPM

Establishing the TPM working system A master plan for institutionalizing

Page 8: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

Introduction of TPM into the

organization

STEP B - INTRODUCTION

inviting suppliers and customers to the

conception

Communication for quality output

Page 9: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

Introduction of TPM into the

organization

STAGE C – Implementation

8 activities/8 pillars in the development of TPM

establishing the system for production efficiency

initial control system of new products and equipment

improving the efficiency of administration

control of safety

sanitation of working environment

Page 10: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

Introduction of TPM into the

organization

Stage D - Institutionalising

TPM Office TPM

Responsible

5 S Autonomous

Maintenance

Planned

Maintenance

Individual

Improvement

Quality

Maintenance

Equipment

Maintenance Safety

Training People

Development

Page 11: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

Pillars of TPM

Improve Overall Equipment Effectiveness

application of Total Productive

Maintenance’s (TPM) 8 Pillars

Page 12: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

Pillars of TPM

JIS

HU

HO

ZE

N

Au

ton

om

ou

s m

ain

ten

an

ce

Kaiz

en

PL

AN

NE

D M

AIN

TE

NA

NC

E

Qu

ality

Main

ten

an

ce

Tra

inin

g

Offic

e T

PM

SA

FE

TY, H

EA

LT

H A

ND

EN

VIR

ON

ME

NT

5 S

JIS

HU

HO

ZE

N

Au

ton

om

ou

s m

ain

ten

an

ce

Kaiz

en

PL

AN

NE

D M

AIN

TE

NA

NC

E

Qu

ality

Main

ten

an

ce

JIS

HU

HO

ZE

N

Au

ton

om

ou

s m

ain

ten

an

ce

Kaiz

en

PL

AN

NE

D M

AIN

TE

NA

NC

E

Tra

inin

g

Qu

ality

Main

ten

an

ce

JIS

HU

HO

ZE

N

Au

ton

om

ou

s m

ain

ten

an

ce

Kaiz

en

PL

AN

NE

D M

AIN

TE

NA

NC

E

Offic

e T

PM

Tra

inin

g

Qu

ality

Main

ten

an

ce

JIS

HU

HO

ZE

N

Au

ton

om

ou

s m

ain

ten

an

ce

Kaiz

en

PL

AN

NE

D M

AIN

TE

NA

NC

E

SA

FE

TY, H

EA

LT

H A

ND

EN

VIR

ON

ME

NT

Offic

e T

PM

Tra

inin

g

Qu

ality

Main

ten

an

ce

JIS

HU

HO

ZE

N

Au

ton

om

ou

s m

ain

ten

an

ce

Kaiz

en

PL

AN

NE

D M

AIN

TE

NA

NC

E

Page 13: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

TPM starts with 5S

Sort

Sustain

Straighten

Standardize Sweep

Eliminate

waste

Page 14: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

[Pillar 1-5s] SEIRI - Sort out

This means sorting and organizing the items

as

critical

important

frequently used

useless

Page 15: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

[Pillar 1-5s]

SEITON - Organise

Each items has a place, and only one

place

To identify items easily, name plates and

colored tags has to be used.

Page 16: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

[Pillar 1-5s]

SEISO - Shine the workplace

cleaning the work place free of burrs,

grease, oil, waste, scrap etc.

No loosely hanging wires or oil leakage

from machines

Page 17: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

[Pillar 1-5s]

SEIKETSU - Standardization

standardization for keeping the work place

/ machines / pathways neat and clean

implementation for whole organization and

testing / Inspectation randomly

Page 18: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

[Pillar 1-5s]

SHITSUKE - Self discipline

Considering 5S as a way of life

self-discipline among the employees of the organization

wearing badges

following work procedures

Punctuality

dedication to the organization

Page 19: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

[Pillar 2-JISHU HOZEN]

Autonomous maintenance

developing operators to be able to take

care of small maintenance tasks

skilled maintenance people spending time

on more value added activity and technical

repairs

Page 20: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

[Pillar 2-JISHU HOZEN]

Policy

uninterrupted operation of equipments

flexible operators to operate and maintain

other equipments

eliminating the defects at source through

active employee participation

Stepwise implementation of JH activities

Page 21: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

[Pillar 2-JISHU HOZEN]

Targets

Increase use of JH by 50%

Reduce oil consumption by 50%

Reduce process time by 50%

Page 22: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 3 - KAIZEN

"Kai" means change

"Zen" means good – better

kaizen is for small improvements

carried out on a continual basis

a very large number of small improvements are

move effective in an organizational environment

than a few improvements of large value

Page 23: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 3 – KAIZEN

Policy

Practice concepts of zero losses in every

sphere of activity.

relentless pursuit to achieve cost reduction targets in all resources

Relentless pursuit to improve over all plant equipment effectiveness.

Extensive use of PM analysis as a tool for eliminating losses.

Focus of easy handling of operators.

Page 24: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 3 – KAIZEN

Target

Achieve and sustain zero loses with respect

to

minor stops

measurement and adjustments

defects

achieving 30% manufacturing cost reduction

Page 25: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 4 - PLANNED

MAINTENANCE

trouble free machines and equipments

producing defect free products for total

customer satisfaction

4 groups of maintenance

Page 26: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 4 - PLANNED MAINTENANCE

groups of maintenance

Preventive Maintenance

Breakdown Maintenance

Corrective Maintenance

Maintenance Prevention

Page 27: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 4 - PLANNED MAINTENANCE

Policy

Achieve and sustain availability of

machines

Optimum maintenance cost.

Reduces spares inventory.

Improve reliability and maintainability of

machines.

Page 28: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 4 - PLANNED MAINTENANCE Six steps of implementation

Equipment evaluation and recoding present status.

Restore deterioration and improve weakness.

Building up information management system.

Prepare time based information system, select equipment, parts and members and map out plan.

Prepare predictive maintenance system by introducing equipment diagnostic techniques and

Evaluation of planned maintenance.

Page 29: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 5 –

QUALITY MAINTENANCE

customer delight through highest quality

through defect free manufacturing

focus on eliminating non-conformances in

a systematic manner

Transition is from reactive to proactive

(Quality Control to Quality Assurance)

Page 30: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 5 - QUALITY MAINTENANCE

Policy

Defect free conditions and control of

equipments.

QM activities to support quality assurance.

Focus of prevention of defects at source

Focus on poka-yoke. ( fool proof system )

In-line detection and segregation of defects.

Effective implementation of operator quality

assurance.

Page 31: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 5 - QUALITY MAINTENANCE

Target

Achieve and sustain customer

complaints at zero

Reduce in-process defects by 50 %

Reduce cost of quality by 50 %.

Page 32: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 6 - TRAINING

multi-skilled revitalized employees

performing all required functions

effectively and independently

Training the employees to achieve four

steps of skills

Page 33: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 6 – TRAINING

different phases of skills

Phase 1 : Do not know.

Phase 2 : Know the theory but cannot do.

Phase 3 : Can do but cannot teach

Phase 4 : Can do and also teach.

Page 34: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 6 – TRAINING

Policy

Focus on improvement of knowledge, skills

and techniques.

Creating a training environment for self

learning based on felt needs.

Training curriculum / tools /assessment etc

conductive to employee revitalization

Training to remove employee fatigue and

make work enjoyable.

Page 35: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 6 – TRAINING

Target

Achieve and sustain downtime due to

want men at zero on critical machines

Achieve and sustain zero losses due to

lack of knowledge / skills / techniques

Aim for 100 % participation in suggestion

scheme.

Page 36: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 7 - OFFICE TPM

should be started after activating four other pillars of

TPM (JH, KK, QM, PM)

Office TPM must be followed to improve

productivity, efficiency in the administrative functions

identify and eliminate losses

• analyzing processes and procedures towards increased

office automation

• twelve major losses

Page 37: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 7 - OFFICE TPM

twelve major losses Processing loss

Cost loss including in areas such as procurement, accounts, marketing, sales leading to high inventories

Communication loss

Idle loss

Set-up loss

Accuracy loss

Office equipment breakdown

Communication channel breakdown, telephone and fax lines

Time spent on retrieval of information

Non availability of correct on line stock status

Customer complaints due to logistics

Expenses on emergency dispatches/purchases

Page 38: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 7 - OFFICE TPM

How office TPM supports plant TPM

supporting the plant, initially in doing

Autonomous maintenance (Jishu Hozen) of the

machines

Initial stages machines are more and

manpower is less, so the help of commercial

departments can be taken, for this

Office TPM can eliminate the lodes on line for

no material and logistics.

Page 39: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

PILLAR 8 - SAFETY, HEALTH AND

ENVIRONMENT

Target

Zero accident,

Zero health damage

Zero fires.

active role in each of the other pillars

on a regular basis

Page 40: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

Conclusion

TPM may be the only thing that stands

between success and total failure for some

companies

proven to be a program that works

can be adapted to work not only in

industrial plants, but in construction,

building maintenance, transportation

Page 41: Total Productive Maintenance -   maintenance (Jishu Hozen) of the machines · 2017-10-12

Questions