tpc in heavy ion experiments
DESCRIPTION
TPC in Heavy Ion Experiments. Jørgen A. Lien, Høgskolen i Bergen and Universitetet i Bergen, Norway for the ALICE Collaboration. Outlook: Presenting some typical TPCs used in Heavy Ion Experiments Fixed target – SPS energies: NA49 and CERES/NA45 Collider energies RHIC: STAR LHC: ALICE. - PowerPoint PPT PresentationTRANSCRIPT
TPC in Heavy Ion Experiments
Jørgen A. Lien, Høgskolen i Bergen and Universitetet i Bergen, Norway for the ALICE Collaboration.
Outlook:Presenting some typical TPCs used in Heavy Ion Experiments
•Fixed target – SPS energies: NA49 and CERES/NA45•Collider energies
•RHIC: STAR•LHC: ALICE
TPC constituents
• Drift volume– Linear drift (NA49, STAR central TPC, ALICE)– Radial drift (NA45, STAR forward TPCs)
• Readout chambers– MWPC
• Readout electronics– Analog charge storage, Switched Capacitor Arrays
(SCAs)– Fast digitalisation (ALICE)
• Channels: 182 000• Spatial resolution: 200 m
dE/dx as function of momentum for positive particles produced inp+Pb collisions
dE/dx distribution at a fixed momentum of 10 GeV/c forcentral Pb+Pb collisions
Operational 1998Radial drift fieldLength: 2 mOuter diameter: 2.6 mGas mixture: Ne(80%)CO2(20%)Readout channels: 15360
Main TPCFor tracking and PID via dE/dx
•Collider at RHIC•Operational 2000•Length: 4.2 m•Outer diameter: 4 m•Gas mixture: 10% methane 90 % argon•E-field: 135 V/cm•Readout channels (pads): 136 608•Covers the pseudorapidity range of -1.8 < |η| < 1.8•3000 tracks per event•Pad size: 2.85 mm x 11.5 mm(inner)•Space resolution:~0.5 mm (along pad rows)
STAR Forward TPC:Extend the acceptanceof the experimentThe 2 FTPCs cover the pseudorapidityrange of 2.5 < |η| < 4.0on both sides of the experiment.
75 cm in diameter and 120 cm longRadial readoutGas mixture: Ar(50%)CO2(50%)9600 readout pads (1.6 x 20 mm2)
25 µm aluminized Mylar on Al frameCentral Electrode Prototype
for tracking and PID via dE/dx- 0.9 < < 0.9
~ 3 m diameter
drift gas90% Ne - 10%CO2
Length 5.1 m
Outer diameter 5.6 m
E-field: 400 V/cm
Drift time ~88 μs
Time Projection Chamberlargest ever: 88 m3,
570 k channels
The ALICE TPC becomes real
(outer field cage and end plates)
Loc
al
Con
trol
ler
DD
L - IN
TS
low-C
ontrolInterface
TTC-RX
BOARDCTRL
RCU
Slow – Control(1 Mbit – serial link)
Detector Link(200 MB / s)
(#216)
COUNTING ROOM
1
2
25
Each TPC Sector is served by 6 Readout Subsystems
Front-end bus(200 MB / sec)
LocalSlow- Control
Serial link
ON DETECTOR
FEC128 ch
DataCompr.
FEC128 ch
FEC128 ch
PASA – ADC – DIG.
THE END