27 © TRACK | G |O&M, DDD, PLANT PERFORMANCE G3. OPERATIONS & PLANT PERFORMANCE G3.1 EFFECTIVE OPERATOR TRAINING WITH UNISIM OPERATIONS Pete Edwards, Vice President, Industrial Design Solutions, Inc. G3.2 INCREASE EFFICIENCY AND REDUCE DOWNTIME WITH DRY ICE CLEANING David Watson, Director, Business Development - Energy and Services, Cold Jet, LLC G3.3 SF6 EMISSIONS FROM GAS INSULATED SWITCHGEAR (GIS) CO-CHAIR - Yasmeen Sultana, Principal, Stantec; Jonya Blahut G3.4 DRIVING CULTURAL CHANGE-OPERATIONAL EXCELLENCE THRU OVATION SIMULATION Rob Barden, Technical Training, Platte River Power Authority; Johel Comas G3.5 POWER GENERATION EXCELLENCE THROUGH DATA-DRIVEN INSIGHT Mark Scherluebbe, Senior Manager, Ernst & Young; Pat Stiff, WEC Energy Group G4. UTILITY DATA MANAGEMENT G4.1 BETTER MANAGEMENT OF THE COVERSATIONS ABOUT YOUR DATA David Gloski, President, xOverTime; Michael Lehane G4.2 CONTINUOUS COMPLIANCE MANAGEMENT FOR UTILITY OPERATIONS CO-CHAIR - Adam Jackson, Managing Consultant, Trinity Consultants; Colt Sommers, Randall Nelson G4.3 SPREADING AN EHS CULTURE USING SIMPLIFIED SOFTWARE AND DATA ANALYTICS John Niemoller, President, Perillon Software G4.4 HIGH-FREQUENCY DATA COLLECTION AND ENVIRONMENTAL ACCOUNTING SESSION SPONSOR & CO-CHAIR - Kevin Jurica, Senior Solution Manager , Sphera Solutions G4.5 LEVERAGING TOMORROW’S TECHNOLOGY FOR EHS COMPLIANCE TODAY James Jensen, Director - Customer Success, Enablon G4.6 IMPROVED ENVIRONMENTAL DATA WORKFLOWS FOR ENERGY COMPANIES Taylor Ziolkowski, Sales Representative, EarthSoft, Inc.; Emily Mulford, Daniel Alexander, Mitch Beard, Mary Ann Parcher G5. PROJECT FINANCE, RISK MGMT G5.1 HEALTH RISK: KEEPING YOUR POWER PROJECT AFLOAT DURING THE EARLY STAGES Joseph Sabato, Senior Scientist, Epsilon Associates G5.2 MANAGING CONTRACTOR CHANGE WITH UPFRONT AND AGREED UPON RATES Brendan O’Brien, Project Engineer, Burns and McDonnell; Jeff Pope G5.3 A CAPITAL PROJECT RISK MANAGEMENT APPROACH CO-CHAIR - Carlos Mendizabal, President, ARETE, Lesli Del Rio G5.4 INVESTMENT STRATEGIES FOR ENV. MKTS UNDER CURRENT STATE OF NEW REGS Nedia Miller, Principal, MILLER CTA G5.5 HOW TO EFFECTIVELY TRANSFER ENVIRONMENTAL LIABILITIES AND POST-CLOSURE OBLIGATIONS DURING POWER PLANT DECOMMISSIONING Doug Willett, Executive Vice President, Environmental Liability Transfer, Inc. MILLER CTA ROOM 7B Tuersday | 10AM - 12PM Tuesday | 1PM - 3PM Tuesday | 7:30AM - 9:30AM 28 TRACK | G |O&M, DDD, PLANT PERFORMANCE G6. OPERATIONS & OPTIMIZATION G6.1 A THREE YEAR INTERNATIONAL ENERGY CHALLENGE Steven Driver, Global Energy Manager, Sanofi G6.2 OPERATIONAL EFFICIENCY GAINS THROUGH GEOSPATIAL TECHNOLOGY ADVANCES SESSION SPONSOR & CO-CHAIR - Randy Rhoads, Geospatial Industry Manager, Utilities, Harris Corporation G6.3 COMBINED CYCLE CYCLING - OPTIMIZING TGHROUGH BOP IMPROVEMENTS Kyle Kropf, Engineering Manager, Power Generation Svcs, Black & Veatch Corporation G6.4 FLUE GAS HUMIDITY MEASUREMENT BENEFITS FOR POWER PLANT APPLICATIONS Jeff Bossong, COO, H2O LLC G7. HEALTH & SAFETY G7.1 FIT-FOR-DUTY TESTING IN THE ENERGY INDUSTRY Richard Bunch, CEO, WorkSaver Systems G7.2 LAYERING DO’S AND DON’TS FOR ARC FLASH PROTECTION Derek Sang, Technical Training Manager, Bulwark Protective Apparel G7.3 SAFE AND EFFICIENT COMBUSTION CONTROL IN GAS-FIRED BOILERS / TURBINES Barbara Marshik, Power Market Segment Mgr, Servomex; Stephen Firth, Josh Christian G7.4 CREATING AN OPERATING CULTURE FOR PREDICTABLE, CONSISTENT PERFORMANCE CO-CHAIR - Peter Bridle, Managing Partner, Pegasus Risk Management G7.5 EXECUTION MEASUREMENTS TO INCREASE SAFETY PERFORMANCE CO-CHAIR - David Klocek, Director, Solutions Consulting, Sphera Solutions ROOM 7B Wednesday | 7:30AM - 9:30AM Wednesday | 10AM - 12PM Tuesday | 3:30PM - 5:30PM 26 TRACK | G |O&M, DDD, PLANT PERFORMANCE G1. DECOMMISSIONING OF POWER PLANTS G1.1 IN-PLACE RETIREMENT OF POWER PLANTS - KEY CONSIDERATIONS AND APPROACH CO-CHAIR - Jeffery Pope, Decommissioning & Demolition Services Mgr., Burns & McDonnell G1.2 CLOSURE OF THE D-AREA CCR FACILITIES AT THE SAVANNAH RIVER SITE Tammy DeRamo, Technical Director, Envirocon; Andrew White and Tripp Winfree G1.3 SOLVING PCB IMPEDIMENTS TO DECOMMISSIONING Stephen Mitchell, Senior Vice President, Weston Solutions, Inc.; J.D Groesbeck G1.4 CHANGES TO PROJECT OBJECTIVES REQUIRES CHANGES TO PROJECT SCOPE CO-CHAIR - Richard Cheatham, Scientist 5, APTIM; Gene Scott, Ken Beard, Andrew Schaaf G1.5 KCOM’S RIVERTON, KS EMPIRE DISTRICT ELECTRIC POWER PLANT IMPLOSION. Joel Spirtas, KCOM Demolition, Commercial / Industrial Demolition and Env. Remediation G1.6 THE UTILITIES INDUSTRY’S GREATEST CHALLENGE RIGHT NOW - DEMOLITION! CO-CHAIR - Tim Barker, D4 Program Director, AECOM G2. PLANT PERFORMANCE/CHALLENGES G 2.1 OPTIMIZATION OF PLANT PERFORMANCE USING MACHINE LEARNING Patrick Bangert, CEO, algorithmica technologies Inc. G2.2 DISRUPTION IN THE UNDERGROUND: INNOVATIVE UTILITY VAULT REPLACEMENT CO-CHAIR - Sean Gesell, Manufacturer’s Rep, Armorcast Products Company G2.3 CONNECTICUT UTILITIES TURNKEY SOLUTION TO BENCHMARKING 95% OF THE STATE Sheri Borrelli, Senior Business Manager, United Illuminating; Samantha Sojka, Eversource Energy G2.4 WIND EFFECTS ON AIR-COOLED CONDENSERS: WIND-TUNNEL 2-D FLOW FIELDS Ryan Parker, Project Engineer, CPP Wind Engineering G2.5 THE MULTI-SITE HABITAT CONSERVATION PLAN STRATEGY John Richter, Natural Resources Biologist, Black & Veatch Corporation ADVISORY BOARD TRACK G ROOM 7B Monday | 1PM - 3PM Monday | 3:30PM - 5:30PM This Track provides presentations on current technologies and strategies, for decommissioning of power plants, boiler optimization, project finance, risk management, EMIS, EHS, Health & Safety, operation and maintenance in the energy industry.

Upload: lytruc

Post on 27-Aug-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

26 27 ©

TRACK | G |O&M, DDD, PLANT PERFORMANCE

G3. OPERATIONS & PLANT PERFORMANCEG3.1 EFFECTIVE OPERATOR TRAINING WITH UNISIM OPERATIONSPete Edwards, Vice President, Industrial Design Solutions, Inc.

G3.2 INCREASE EFFICIENCY AND REDUCE DOWNTIME WITH DRY ICE CLEANINGDavid Watson, Director, Business Development - Energy and Services, Cold Jet, LLC

G3.3 SF6 EMISSIONS FROM GAS INSULATED SWITCHGEAR (GIS)CO-CHAIR - Yasmeen Sultana, Principal, Stantec; Jonya Blahut

G3.4 DRIVING CULTURAL CHANGE-OPERATIONAL EXCELLENCE THRU OVATION SIMULATIONRob Barden, Technical Training, Platte River Power Authority; Johel Comas

G3.5 POWER GENERATION EXCELLENCE THROUGH DATA-DRIVEN INSIGHTMark Scherluebbe, Senior Manager, Ernst & Young; Pat Stiff, WEC Energy Group

G4. UTILITY DATA MANAGEMENTG4.1 BETTER MANAGEMENT OF THE COVERSATIONS ABOUT YOUR DATADavid Gloski, President, xOverTime; Michael Lehane

G4.2 CONTINUOUS COMPLIANCE MANAGEMENT FOR UTILITY OPERATIONSCO-CHAIR - Adam Jackson, Managing Consultant, Trinity Consultants; Colt Sommers, Randall Nelson

G4.3 SPREADING AN EHS CULTURE USING SIMPLIFIED SOFTWARE AND DATA ANALYTICSJohn Niemoller, President, Perillon Software

G4.4 HIGH-FREQUENCY DATA COLLECTION AND ENVIRONMENTAL ACCOUNTINGSESSION SPONSOR & CO-CHAIR - Kevin Jurica, Senior Solution Manager , Sphera Solutions

G4.5 LEVERAGING TOMORROW’S TECHNOLOGY FOR EHS COMPLIANCE TODAYJames Jensen, Director - Customer Success, Enablon

G4.6 IMPROVED ENVIRONMENTAL DATA WORKFLOWS FOR ENERGY COMPANIESTaylor Ziolkowski, Sales Representative, EarthSoft, Inc.; Emily Mulford, Daniel Alexander, Mitch Beard, Mary Ann Parcher

G5. PROJECT FINANCE, RISK MGMT G5.1 HEALTH RISK: KEEPING YOUR POWER PROJECT AFLOAT DURING THE EARLY STAGESJoseph Sabato, Senior Scientist, Epsilon Associates

G5.2 MANAGING CONTRACTOR CHANGE WITH UPFRONT AND AGREED UPON RATESBrendan O’Brien, Project Engineer, Burns and McDonnell; Jeff Pope

G5.3 A CAPITAL PROJECT RISK MANAGEMENT APPROACHCO-CHAIR - Carlos Mendizabal, President, ARETE, Lesli Del Rio

G5.4 INVESTMENT STRATEGIES FOR ENV. MKTS UNDER CURRENT STATE OF NEW REGSNedia Miller, Principal, MILLER CTA

G5.5 HOW TO EFFECTIVELY TRANSFER ENVIRONMENTAL LIABILITIES AND POST-CLOSURE OBLIGATIONS DURING POWER PLANT DECOMMISSIONINGDoug Willett, Executive Vice President, Environmental Liability Transfer, Inc.

MILLER CTA

ROOM 7B

Tuersday | 10AM - 12PM

Tuesday | 1PM - 3PM

Tuesday | 7:30AM - 9:30AM

28 29 ©

TRACK | G |O&M, DDD, PLANT PERFORMANCE

G6. OPERATIONS & OPTIMIZATIONG6.1 A THREE YEAR INTERNATIONAL ENERGY CHALLENGESteven Driver, Global Energy Manager, Sanofi

G6.2 OPERATIONAL EFFICIENCY GAINS THROUGH GEOSPATIAL TECHNOLOGY ADVANCESSESSION SPONSOR & CO-CHAIR - Randy Rhoads, Geospatial Industry Manager, Utilities, Harris Corporation

G6.3 COMBINED CYCLE CYCLING - OPTIMIZING TGHROUGH BOP IMPROVEMENTSKyle Kropf, Engineering Manager, Power Generation Svcs, Black & Veatch Corporation

G6.4 FLUE GAS HUMIDITY MEASUREMENT BENEFITS FOR POWER PLANT APPLICATIONSJeff Bossong, COO, H2O LLC

G7. HEALTH & SAFETY G7.1 FIT-FOR-DUTY TESTING IN THE ENERGY INDUSTRYRichard Bunch, CEO, WorkSaver Systems

G7.2 LAYERING DO’S AND DON’TS FOR ARC FLASH PROTECTION Derek Sang, Technical Training Manager, Bulwark Protective Apparel

G7.3 SAFE AND EFFICIENT COMBUSTION CONTROL IN GAS-FIRED BOILERS / TURBINESBarbara Marshik, Power Market Segment Mgr, Servomex; Stephen Firth, Josh Christian

G7.4 CREATING AN OPERATING CULTURE FOR PREDICTABLE, CONSISTENT PERFORMANCECO-CHAIR - Peter Bridle, Managing Partner, Pegasus Risk Management

G7.5 EXECUTION MEASUREMENTS TO INCREASE SAFETY PERFORMANCECO-CHAIR - David Klocek, Director, Solutions Consulting, Sphera Solutions

ROOM 7B

Wednesday | 7:30AM - 9:30AM

Wednesday | 10AM - 12PM

Tuesday | 3:30PM - 5:30PM

26 27 ©

TRACK | G |O&M, DDD, PLANT PERFORMANCE

G1. DECOMMISSIONING OF POWER PLANTSG1.1 IN-PLACE RETIREMENT OF POWER PLANTS - KEY CONSIDERATIONS AND APPROACHCO-CHAIR - Jeffery Pope, Decommissioning & Demolition Services Mgr., Burns & McDonnell

G1.2 CLOSURE OF THE D-AREA CCR FACILITIES AT THE SAVANNAH RIVER SITETammy DeRamo, Technical Director, Envirocon; Andrew White and Tripp Winfree

G1.3 SOLVING PCB IMPEDIMENTS TO DECOMMISSIONINGStephen Mitchell, Senior Vice President, Weston Solutions, Inc.; J.D Groesbeck

G1.4 CHANGES TO PROJECT OBJECTIVES REQUIRES CHANGES TO PROJECT SCOPECO-CHAIR - Richard Cheatham, Scientist 5, APTIM; Gene Scott, Ken Beard, Andrew Schaaf

G1.5 KCOM’S RIVERTON, KS EMPIRE DISTRICT ELECTRIC POWER PLANT IMPLOSION.Joel Spirtas, KCOM Demolition, Commercial / Industrial Demolition and Env. Remediation

G1.6 THE UTILITIES INDUSTRY’S GREATEST CHALLENGE RIGHT NOW - DEMOLITION!CO-CHAIR - Tim Barker, D4 Program Director, AECOM

G2. PLANT PERFORMANCE/CHALLENGESG 2.1 OPTIMIZATION OF PLANT PERFORMANCE USING MACHINE LEARNINGPatrick Bangert, CEO, algorithmica technologies Inc.

G2.2 DISRUPTION IN THE UNDERGROUND: INNOVATIVE UTILITY VAULT REPLACEMENT CO-CHAIR - Sean Gesell, Manufacturer’s Rep, Armorcast Products Company

G2.3 CONNECTICUT UTILITIES TURNKEY SOLUTION TO BENCHMARKING 95% OF THE STATESheri Borrelli, Senior Business Manager, United Illuminating; Samantha Sojka, Eversource Energy

G2.4 WIND EFFECTS ON AIR-COOLED CONDENSERS: WIND-TUNNEL 2-D FLOW FIELDSRyan Parker, Project Engineer, CPP Wind Engineering

G2.5 THE MULTI-SITE HABITAT CONSERVATION PLAN STRATEGYJohn Richter, Natural Resources Biologist, Black & Veatch Corporation

ADVISORY BOARD TRACK GROOM 7B

Monday | 1PM - 3PM

Monday | 3:30PM - 5:30PM

This Track provides presentations on current technologies and strategies, for decommissioning of power plants, boiler optimization, project fi nance, risk management, EMIS, EHS, Health & Safety, operation and maintenance in the energy industry.

28 29 ©

TRACK | G |O&M, DDD, EHSTRACK | G |O&M, DDD, EHS

G1. DECOMMISSIONING OF POWER PLANTSG1.1 POWER PLANT DECOMMISSIONING - A PRACTICAL LOOK AT PROJECT EXECUTIONJeffrey Fleenor, Project Manager, Sega

G1.2 WHY ARE YOU BUYING THE COAL PLANT?Mark Hall, Vice President Power Development, TRC

G1.3 WHEN POWER PLANT DECOMMISSIONING IS NOT DEMOLITIONJeff Pope, Decommissioning & Demolition Manager, Burns & McDonnell Engineering Co.

G1.4 USING ASSET RECOVERY TO OFFSET COSTS AND REDUCE LIABILITIESCo-Chair - Mike Mitchum, Global Facility Closure/Asset Recovery, AECOM

G1.5 MANAGING NON-LIQUID PCBS IN DECOMMISSIONING POWER PLANTSJohn Woodyard, Senior Project Manager, Weston Solutions, Inc; Steve Mitchell

G1.6 OPTIMIZED VALUE DECOMMISSIONING IS POSSIBLECo-Chair - Richard Cheatham, Project Manager, CB&I; Andrew Schaaf & Kenneth Beard

G2. COMPLIANCE STRATEGIES & DECOMMISSIONINGG2.1 MANAGING INVESTMENT RISKS IN POWER PLANT DECOMMISSIONINGCo-Chair - James Groesbeck, P.G., Sr. Project Manager, Weston Solutions; Steve Mitchell

G2.2 COULD YOUR SCRAP BE WORTH TWICE WHAT YOU ARE GETTING?Greg Menen, Director Demolition Scrap Management, Rocky Mountain Recycling

G2.3 THE ENVIRONMENTAL IMPACT OF DECOMMISSIONING IN ISO-NEStephen Slocomb, Principal, Epsilon Associates

G2.4 ECOSYSTEM SERVICES VALUATION FOR SURPLUS PROPERTIESRick Black, Principal Environmental Planner/Ecologist, Stanley Consultants; David Yozzo

G2.5 BEYOND GOOD PR – CONSERVATION, A TOOL FOR ADVANCING SUSTAINABILITYCo-Chair - Josiane Bonneau, Senior Director, Wildlife Habitat Council; Margaret O’Gorman, Wildlife Habitat Council; Kimberly Long & Bill Brady, Exelon Corporation

G2.6 DECOMMISSIONING/CLOSURE OF MIDWEST COAL-FIRED POWER PLANT IMPOUNDMENTSNeal Kochis, PM, Haley & Aldrich; Steven F. Putrich

G3. POWER PLANT & BOILER OPTIMIZATIONG3.1 IMPROVING PLANT HEAT RATE USING AUTOMATIC CONDENSER TUBE CLEANING SYSCo-Chair - Guy Beauchesne, Global Marketing Manager, Ovivo USA

G3.2 CCS REHEAT SYSTEM- FLUE GAS HEAT RECOVERYCo-Chair - Mike Mengel, Lead Process Engineer, Marsulex Environmental Technologies(MET); Mark Ness, Great River Energy (GRE); Rodney Hendricksen, MET

G3.3 OPTIMIZING POWER PLANT PERFORMANCE THROUGH COAL BENEFICIATIONMark Ness, Principal Engineer, Great River Energy; Nenad Sarunac, UNC Charlotte; Una Nowling, Black & Veatch Corp.; Sandra Broekema, Great River Energy

G3.4 ENGINEERING SOLUTIONS TO ENVIRO. NOISE PROBLEMS ON POWER PROJECTSJeff Szymanski, Acoustical Consulting Services Manager, Black & Veatch

G4. EHS & EMISG4.1 REDUCING ENVIRO. COMPLIANCE RISK: LESSONS LEARNED & GOALS ACHIEVEDCo-Chair - Carrie Young, Managing Director, Sphera Solutions; Jeffrey West, Xcel Energy

G4.2 SO2 & NOX ALLOWANCE POSITION & PORTFOLIO MGMT AT A LARGE UTILITYCo-Chair - David Gloski, CEO, xOverTime

G4.3 ISO 14001:2015 ENVIRONMENTAL MANAGEMENT SYSTEMS FOR UTILITIESEmily McKeon, Senior Consultant, Trinity Consultants

G4.4 MOVING BEYOND THE SAFETY PERFORMANCE PLATEAUDuncan Kerr, Management Consultant, The Engine Room; Milan Trpin

G4.5 SELECTION, USE, CARE AND MAINTENANCE OF ARC RATED CLOTHINGDerek Sang, Technical Training Manager, Bulwark Protective Apparel

G5. PROJECT FINANCE, RISK MGMT & EMISG5.1 INVESTING IN AMERICAN ENERGY: DOE’S LOAN PROGRAMS OFFICECo-Chair - Kerri Neary, Project Manager, U.S. DOE; Sydney Schneir & Michael Reed

G5.2 USE OF LIABILITY TRANSFER PROCESS FOR RETIRED STATION REPURPOSINGAlex Cates, Partner, ERM

G5.3 ADDRESSING THE EFFECTS OF INDUCED SEISMICITY ON PLANT OPERATIONSSession Sponsor & Co-Chair - Eddie Guerra, Director of Structural Engineering, RIZZO Associates; Richard Quittmeyer & Michael Rosenmeier

G5.4 REPORT: LARGE UTILITY AIR DATA MANAGEMENT USING EXCEL & XOVERTIMEDavid Gloski, CEO, xOverTime; Tyler Gloski

G5.5 NETDMR-READY NPDES SOLUTIONSKate Candillo, Services Operations Manager, Enviance; Aaron Rapp & Jamie Blevens

G5.6 WILDFIRE RISK ASSESSMENT OF TRANSMISSION SYSTEMSBen McKinsey, Transmission Project Manager, HDR

G6. OPERATIONS & OPTIMIZATIONG6.1 THE INTERNET OF THINGS AND ITS IMPACT ON THE WATER TREATMENT INDUSTRYMichael Henk, Director of Automation & Service, U.S. Water

G6.2 THE SYNERGY OF ENERGY EFFICIENCY AND WATER CONSERVATIONCo-Chair - Kevin Hwang, Director Product Mgmt., Smart Utility Systems; Ken Roberts

G6.3 WHY IS EARNED VALUE BASED PROJECT MANAGEMENT DIFFICULT TO IMPLEMENT?Robert Prowant, Partner, UnitsPro; Brett Houghton

G6.4 THE UTILITY DIRECTOR LEVEL LEADERSHIP CHALLENGEDuncan Kerr, Management Consultant, The Engine Room; Milan Trpin

G6.5 UNDERSTANDING ELECTROSTATIC WATER TREATMENT, USING SIDE STREAM PRECIPITATIONGeorge Wagner II, CEO, ElectroCell Systems; Dan Wheatly & Paul Q. McLain

G6.6 A RISK-BASED APPROACH TO PRIORITIZING UTILITY SYSTEM INVESTMENTSSession Sponsor & Co-Chair - Aaron Fishman, Consultant, Propeller

ROOM 7B ROOM 7BWednesday | February 8 | 1PM - 3PM

Thursday | February 9 | 7:30AM - 9:30AM

Wednesday | February 8 | 3:30PM - 5:30PM

Thursday | February 9 | 3:30PM - 5:30PM

Thursday | February 9 | 10AM - 12PM

Thursday | February 9 | 1PM - 3PM

30 31 ©

TRACK | G |O&M, DDD, EHS

G7. HEALTH & SAFETYG7.1 CHANGES IN 1910.269 AND THE SELECTION OF ARC RATED CLOTHINGSession Sponsor & Co-Chair - Derek Sang, Technical Training Manager, Bulwark

G7.2 ENVIRONMENTAL HEALTH AFFECTING HUMAN HEALTH: CAREGIVER’S PROSPECTIVEBapaniah Penugonda, Associate Professor, NYU Dentistry; Katie Baron

G7.3 JOURNEY TO SAFETY EXCELLENCE: CULTIVATING SAFETY LEADERSHIP CULTUREDr. Wes Scott, Director - Consulting Services/Safety Mgmt., National Safety Council

G7.4 HOW TO MANAGE & DEPLOY AN AUTOMATED EXTERNAL DEFIBRILLATOR PROGRAMCo-Chair - Brian Leonard, President, Cardio Partner Resources

G7.5 RADIATION POLLUTION & THE IMPACTS ON HUMAN HEALTH & THE ENVIRONMENTKatie Baron, Dental Student, NYU Dentistry; Dr. Bapaniah Penugonda

G7.6 SAFETY LEADERSHIP: BE THE CHANGE THAT YOU WANT TO SEECassandra Dillon, Principal Consultant, Compliance Solutions

G8. OPERATIONS & MANAGEMENTG8.1 UNLOCKING THE POWER OF YOUR INFORMATION ASSETSCo-Chair - Sloane Whiteley, Expert Practitioner, North Highland

G8.2 TRANSFORMER COOLING SYSTEMS MAINTENANCEKevin Riley, Product Development Manager, Trantech Radiator Products

G8.3 IMPROVING TECHNICAL COMPETENCY IN POWER PLANTSCo-Chair - Matthew Zuehls, Power Section Manager, HDR; Robert Moss, Synterprise, LLC

INTERPRETING RESULTS FROM INFRARED TECHNOLOGYSteven Driver Ph.D., Global Energy Program Manager, Sanofi Genzyme

ROOM 7B Friday | February 10 | 7:30AM - 9:30AM

POSTER

Friday | February 10 | 10AM - 12PM

This new era of continuous disruption needs a new brand of management consulting that is laser-focused

on helping large organizations nimbly negotiate an increasingly volatile business landscape.

We chose the name

PROPELLERbecause we are a

firm that is always moving toward the future and helping clients do the same.

WWW.PROPELLERCONSULTING.COM

26 27 ©

TRACK | G |OPERATIONS & MANAGEMENTTRACK | G |OPERATIONS & MANAGEMENT

G1. DECOMMISSIONING OF POWER PLANTSG1.1 DECOMMISSIONING, DEMOLITION & DECONTAMINATION (DDD) PROCESS Co-chair - Jeffery Pope, Decommissioning & Demolition Services Mgr., Burns & McDonnell

G1.2 HOW TO MAXIMIZE SCRAP VALUES AS PART OF DECOMMISSIONING PROCESSGreg Menen, Director - Demolition Scrap Management, Rocky Mountain Recycling

G1.3 NUCLEAR WASTE STORAGE OPPORTUNITIES FOR DECOMMISSIONED POWER PLANTSEmily Lewis, AAAS Fellow, U.S. DOE, Office of Energy Policy & Sys. Analysis; Lara Pierpoint

G1.4 DECOMMISSIONING SCALABILITYCo-chair - Richard Cheatham, Scientist 5, CB&I; Daniel Davis, Ken Beard & Andrew Schaaf

G1.5 POWER PLANT RETIREMENT - GOALS AND STRATEGY’SChristopher Dowdell, Decommissioning and Demolition Manager, HDR Engineering

G1. 6 RECLAIMING AND RECYCLING COAL FLY ASH FOR BENEFICIAL REUSEBill Fedorka, Director, Engineering, The SEFA Group

G2. COMPLIANCE STRATEGIES & PLANT CONVERSIONSG2.1 FORMER MANUFACTURED GAS PLANTS (MGP): LEGACIES FROM LAST TWO CENTURIESKevin White, Environmental Engineer, Burns & McDonnell Engineering Company, Inc.

G2.2 BIOCONVERSION OF COAL & GAS FIRED POWER STATIONSPreben Messerschmidt, Project Director, Ramboll Environ

G2.3 REPURPOSING POWER PLANT CHIMNEYS FOR CLEAN RENEWABLE ENERGYThomas Farber, Division Manager, Commonwealth Dynamics, Inc.; Jose Franco

G2.4 ENVIRONMENTAL MANAGEMENT SYSTEMS & ISO-14001 CERT. FOR SMALL UTILITIESCo-chair - Erik Haas, Principal, HMH Consulting LLC; Tom Chappel

G2.5 CCR & ELG: DEVELOPING A SIMULTANEOUS COMPLIANCE STRATEGYCo-chair - Jonathan Shimko, Director, Power & Water Solutions, Tetra Tech, Inc.

G2.6 EASE OF COMPLIANCE THROUGH DOCUMENT MANAGEMENTMark Buckley, President & CEO, Requordit Inc.

G3. POWER PLANT & BOILER OPTIMIZATIONG3.1 POWER PLANT FUEL TREATMENT TECHNOLOGIESCo-chair - Chris Wedig, Senior Technology Specialist - AQCS, CB&I

G3.2 ENGINEERING ANALYSIS PATENTED MULTISTAGE EVAPORATIVE COOLING SYSTEM Co-chair - Dr. Darrell Richardson, CEO, R4 Ventures LLC; Mike Reytblat

G3.3 OPTIMISING FUEL FLOW IN PULVERISED COAL & BIOMASS-FIRED BOILERSMalgorzata (Maggie) Wiatros-Motyka, Analyst & Author, IEA Clean Coal Centre

G3.4 NEW SIDE STREAM FILTRATION TECHNOLOGY WILL REVOLUTIONIZE THE INDUSTRYGeorge Wagner II, Partner, ElectroCell Systems; Paul McLaine & Dan Wheatley, ElectroCell Systems; Loraine Huchler, MarTech Systems, Inc.

G4. EHS & EMISG4.1 “FIXING” HUMAN ERRORCo-chair - Peter Bridle, Executive Director, Pegasus Risk Management

G4.2 INTEGRATING DAS WITH EMIS - KEY CONCEPTS AND CONSIDERATIONSGreg Gasperecz, Sr VP, EHS, Enviance, Inc.; Philip Black, Wood Group Mustang, Inc.

G4.3 MOBILE-ENABLED ENV. HEALTH & SAFETY MANAGEMENT INFORMATION SYSTEMCo-chair - Anne Heinrich, Client Manager, E2 ManageTech; Ian Cohen, NextEra

G4.4 INTEGRATING ENMS & EHS MGMT SYSTEM TO ACHIEVE A COHERENT SYSTEMNitin Shahani, Green Services Associate Program Manager, Intertek

G4.5 COMBINING COMPLIANCE & ENV. MGMT. FOR A 360 0 VIEW OF EHS PERFORMANCEJames Miller, Account Executive, Dakota Software; Jeff Cross

G4.6 THE ART OF EVERGREENING COMPLIANCE MANAGEMENT SYSTEMSMargery Moore, Director, Bloomberg BNA; David Kleen, regAction

G5. EHS & RISK MANAGEMENTG5.1 ARC FLASH RISK ASSESSMENT – WHAT DOES IT MEAN?Dennis Neitzel, Director Emeritus, AVO Training Institute, Inc.

G5.2 DRIVING OPERATIONAL EXCELLENCE BY AUTOMATING RISK MANAGEMENTCo-chair - Doug Hatler, VP, EHS, Energy & Utilities, 360factors, Inc.

G5.3 5 REASONS WHY MOBILE APPS ARE CHANGING HOW EHS WORKSCo-chair - John Niemoller, President, Perillon Software Inc.

G5.4 OFFICE OF ENV. HEALTH & HAZARD ASSESSMENT GUIDELINES & CHALLENGESEverest Yan, Senior Engineer, PCR Services Corporation; Heidi Rous & Alan Sako

G5.5 EHS OF AUTOMATED BIRD CONTROL TECHNOLOGY FOR THE UTILITY INDUSTRYJim Beaumont, National Account Manager, BirdBuffer, LLC; Walt Beals & Gary Crawford

G5.6 UTILITY CEMS AND EMISSION INVENTORY DATA IN THE CLOUDDon Ahearn, Director of Sales, xOverTime Inc.; David Gloski

G6. OPERATIONS & OPTIMIZATIONG6.1 SAFETY MANAGEMENT LEADERSHIP: YOUR ROLE IN ACHIEVING SAFETY EXCELLENCEDr. Wes Scott, Director, Consulting Services, National Safety Council

G6.2 PUMPING SYSTEMS EVOLUTIONCo-chair - Jessica Morrison, Business Development Manager, Grundfos; Stephen Putnam

G6.3 CONTINUOUS PERFORMANCE ASSURANCE AT BUDGET CONSTRAINED POWER PLANTSRodrigo Camargos, Process Optimization Engineer, Primex Process Specialists; S. Nicholson

G6.4 AN INTERNATIONAL APPROACH TO SUSTAINABILITYSteven Driver Ph.D., Global Energy Program Manager, Sanofi Genzyme

G6.5 CAP AND TRADE POSITION MANAGEMENT WITH COMPLIANCEDavid Gloski, President, xOverTime Inc.; Don Ahearn

G6.6 VIGILANCE: BUILDING A CULTURE OF HIGH RELIABILITYCo-chair - Bob Newhouse, President, Newhouse Consultants

ROOM 8 ROOM 8

Thursday | February 4 | 3:30PM - 5:30PM

Thursday | February 4 | 10AM - 12PM

Thursday | February 4 | 1PM - 3PM

Wednesday | February 3 | 1PM - 3PM

Thursday | February 4 | 7:30AM - 9:30AM

Wednesday | February 3 | 3:30PM - 5:30PM

28 29 ©

TRACK | H |CLIMATE, ELG, CCS & CCRTRACK | G |OPERATIONS & MANAGEMENT

G7. OPERATIONS & MANAGEMENTG7.1 INTERNET OF FACILITIES - SMART CAMPUS INITIATIVE AT ARGONNE NATIONAL LABDejan Ristic, Energy/Pressure Systems Engineer, Gr. Leader, Argonne National Laboratory

G7.2 CHANGE CULTURE & ACHIEVE ENERGY MANAGEMENT SUCCESS IN HEALTHCARECo-chair - Kim Hughes, Senior Initiative Manager, Northwest Energy Efficiency Alliance

G7.3 INTERNET OF THINGS: CONVERGENCE OF BIG DATACo-chair - Phil Carroll, Vice President, Finley Engineering Company, Inc.

G7.4 PORTFOLIO O&M: ONE PLANT, FLEET BENEFITSDouglas Machon, Director - Business Development, NAES Corporation

G7.5 STAKEHOLDER OUTREACH AND THE ROLE IT PLAYSLoren Locher,Director of Public Affairs, TRC Companies, Inc.

G8. O&MG8.1 CULTIVATING THE UTILITY WORKING ENVIRONMENTKevin Smith, Senior Consultant, Ephektiv

G8.2 SITUATION AWARENESS & HIGH PERFORMANCE HMI CONCEPTS IN POWER SYSTEMSRicardo Olsen, Electronics Engineer, CEEE-GT

G8.3 ELECTRIC UTILITY RATE STUDIES WITH PUBLIC INVOLVEMENTCo-chair - Chris Deffenbaugh, Public Involvement Specialist, Burns & McDonnell; Ted Kelly

G8.4 POSITIVE ENERGY: ACQUIRING & RETAINING CUSTOMERS THE RIGHT WAYCo-chair - Derek Dressler, Senior Vice President of Sales, Virtual Incentives

H1. CLIMATE CHANGE & GHGH1.1 ADDRESSING CLIMATE CHANGE UNDER THE NEW CEQ GUIDELINESCo-chair - Bruce Macdonald, Principal Scientist, SLR International Corporation

H1.2 BIRDS, CLIMATE CHANGE AND POWERLINESDavid Lee, Senior Biologist, Davey Resource Group

H1.3 FUNDING AFRICAN POWER INFRASTRUCTURE, CLIMATE CHANGE & US CARBON TAXCo-chair - Stephen Sewalk Burns School of Real Estate & Construction; Lydia Patton

H1.4 ELECTRIC POWER GENERATION GHG MEASUREMENT PROTOCOL REVISIONColin High, Co-Founder and Principal Consultant, RSG

H2. POST COP21 & INVENTORIES H2.1 SUSTAINABLE PATENT STRATEGIESCo-chair - Michael Messinger, Director, Sterne Kessler

H2.2 CARBON EMISSIONS REPORTING: IMPACTE FOLLOWING CPP & COP21Co-chair - Hari Gupta, Director, Coriolis Enterprises, Inc.

H2.3 PRIVATE SECTOR OPPORTUNITIES & PARTICIPATION UNDER THE PARIS AGREEMENTDouglas Marett, Head of Energy & Environment, Grue + Hornstrup

H2.4 ENERGY, ENVIRONMENT, AND COMMUNITIES: LOCAL V. GLOBAL CLIMATE GOALS Deidre Sanders, Environmental Justice Manager, Pacific Gas & Electric Company

H3. ELG - UTILITY PERSPECTIVEH3.1 ELG COMPLIANCE STRATEGIES FOR UTILITIESPatricia Scroggin, Sr. Water/Wastewater Treatment Consultant , Burns & McDonnell

H3.2 IMPLEMENTATION OF THE ELG RULEJared Morrison, Manager - Water & Wastewater Programs, Westar Energy

H3.3 COMPLIANCE ISSUES ASSOCIATED WITH IMPLEMENTATION OF THE ELG RULEGerald Butcher, Sr. Environmental Coordinator , Western Farmers Electric Cooperative

H3.4 ELG & OTHER RULES EFFECT ON THE GENERATION FLEETBlock Andrews, Director of Strategic Environmental Solutions, Burns & McDonnell

H3.5 COMPLIANCE ISSUES ASSOCIATED WITH IMPLEMENTATION OF THE ELG RULEJerry Purvis, Environmental Affairs Manager, East Kentucky Power Cooperative

H3.6 COMPLIANCE ISSUES ASSOCIATED WITH IMPLEMENTATION OF THE ELG RULEMaggie Skelton, Chemical Engineer - Boswell Station, Minnesota Power

Coriolis Enterprises

ROOM 9ROOM 8 Friday | February 5 | 7:30AM - 9:30AM

Friday | February 5 | 10AM - 12PM

Thursday | February 4 | 7:30AM - 9:30AM

Wednesday | February 3 | 1PM - 3PM

Wednesday | February 3 | 3:30PM - 5:30PM