track | g |o&m, ddd, plant performance - … · session sponsor & co-chair- randy rhoads,...
TRANSCRIPT
26 27 ©
TRACK | G |O&M, DDD, PLANT PERFORMANCE
G3. OPERATIONS & PLANT PERFORMANCEG3.1 EFFECTIVE OPERATOR TRAINING WITH UNISIM OPERATIONSPete Edwards, Vice President, Industrial Design Solutions, Inc.
G3.2 INCREASE EFFICIENCY AND REDUCE DOWNTIME WITH DRY ICE CLEANINGDavid Watson, Director, Business Development - Energy and Services, Cold Jet, LLC
G3.3 SF6 EMISSIONS FROM GAS INSULATED SWITCHGEAR (GIS)CO-CHAIR - Yasmeen Sultana, Principal, Stantec; Jonya Blahut
G3.4 DRIVING CULTURAL CHANGE-OPERATIONAL EXCELLENCE THRU OVATION SIMULATIONRob Barden, Technical Training, Platte River Power Authority; Johel Comas
G3.5 POWER GENERATION EXCELLENCE THROUGH DATA-DRIVEN INSIGHTMark Scherluebbe, Senior Manager, Ernst & Young; Pat Stiff, WEC Energy Group
G4. UTILITY DATA MANAGEMENTG4.1 BETTER MANAGEMENT OF THE COVERSATIONS ABOUT YOUR DATADavid Gloski, President, xOverTime; Michael Lehane
G4.2 CONTINUOUS COMPLIANCE MANAGEMENT FOR UTILITY OPERATIONSCO-CHAIR - Adam Jackson, Managing Consultant, Trinity Consultants; Colt Sommers, Randall Nelson
G4.3 SPREADING AN EHS CULTURE USING SIMPLIFIED SOFTWARE AND DATA ANALYTICSJohn Niemoller, President, Perillon Software
G4.4 HIGH-FREQUENCY DATA COLLECTION AND ENVIRONMENTAL ACCOUNTINGSESSION SPONSOR & CO-CHAIR - Kevin Jurica, Senior Solution Manager , Sphera Solutions
G4.5 LEVERAGING TOMORROW’S TECHNOLOGY FOR EHS COMPLIANCE TODAYJames Jensen, Director - Customer Success, Enablon
G4.6 IMPROVED ENVIRONMENTAL DATA WORKFLOWS FOR ENERGY COMPANIESTaylor Ziolkowski, Sales Representative, EarthSoft, Inc.; Emily Mulford, Daniel Alexander, Mitch Beard, Mary Ann Parcher
G5. PROJECT FINANCE, RISK MGMT G5.1 HEALTH RISK: KEEPING YOUR POWER PROJECT AFLOAT DURING THE EARLY STAGESJoseph Sabato, Senior Scientist, Epsilon Associates
G5.2 MANAGING CONTRACTOR CHANGE WITH UPFRONT AND AGREED UPON RATESBrendan O’Brien, Project Engineer, Burns and McDonnell; Jeff Pope
G5.3 A CAPITAL PROJECT RISK MANAGEMENT APPROACHCO-CHAIR - Carlos Mendizabal, President, ARETE, Lesli Del Rio
G5.4 INVESTMENT STRATEGIES FOR ENV. MKTS UNDER CURRENT STATE OF NEW REGSNedia Miller, Principal, MILLER CTA
G5.5 HOW TO EFFECTIVELY TRANSFER ENVIRONMENTAL LIABILITIES AND POST-CLOSURE OBLIGATIONS DURING POWER PLANT DECOMMISSIONINGDoug Willett, Executive Vice President, Environmental Liability Transfer, Inc.
MILLER CTA
ROOM 7B
Tuersday | 10AM - 12PM
Tuesday | 1PM - 3PM
Tuesday | 7:30AM - 9:30AM
28 29 ©
TRACK | G |O&M, DDD, PLANT PERFORMANCE
G6. OPERATIONS & OPTIMIZATIONG6.1 A THREE YEAR INTERNATIONAL ENERGY CHALLENGESteven Driver, Global Energy Manager, Sanofi
G6.2 OPERATIONAL EFFICIENCY GAINS THROUGH GEOSPATIAL TECHNOLOGY ADVANCESSESSION SPONSOR & CO-CHAIR - Randy Rhoads, Geospatial Industry Manager, Utilities, Harris Corporation
G6.3 COMBINED CYCLE CYCLING - OPTIMIZING TGHROUGH BOP IMPROVEMENTSKyle Kropf, Engineering Manager, Power Generation Svcs, Black & Veatch Corporation
G6.4 FLUE GAS HUMIDITY MEASUREMENT BENEFITS FOR POWER PLANT APPLICATIONSJeff Bossong, COO, H2O LLC
G7. HEALTH & SAFETY G7.1 FIT-FOR-DUTY TESTING IN THE ENERGY INDUSTRYRichard Bunch, CEO, WorkSaver Systems
G7.2 LAYERING DO’S AND DON’TS FOR ARC FLASH PROTECTION Derek Sang, Technical Training Manager, Bulwark Protective Apparel
G7.3 SAFE AND EFFICIENT COMBUSTION CONTROL IN GAS-FIRED BOILERS / TURBINESBarbara Marshik, Power Market Segment Mgr, Servomex; Stephen Firth, Josh Christian
G7.4 CREATING AN OPERATING CULTURE FOR PREDICTABLE, CONSISTENT PERFORMANCECO-CHAIR - Peter Bridle, Managing Partner, Pegasus Risk Management
G7.5 EXECUTION MEASUREMENTS TO INCREASE SAFETY PERFORMANCECO-CHAIR - David Klocek, Director, Solutions Consulting, Sphera Solutions
ROOM 7B
Wednesday | 7:30AM - 9:30AM
Wednesday | 10AM - 12PM
Tuesday | 3:30PM - 5:30PM
26 27 ©
TRACK | G |O&M, DDD, PLANT PERFORMANCE
G1. DECOMMISSIONING OF POWER PLANTSG1.1 IN-PLACE RETIREMENT OF POWER PLANTS - KEY CONSIDERATIONS AND APPROACHCO-CHAIR - Jeffery Pope, Decommissioning & Demolition Services Mgr., Burns & McDonnell
G1.2 CLOSURE OF THE D-AREA CCR FACILITIES AT THE SAVANNAH RIVER SITETammy DeRamo, Technical Director, Envirocon; Andrew White and Tripp Winfree
G1.3 SOLVING PCB IMPEDIMENTS TO DECOMMISSIONINGStephen Mitchell, Senior Vice President, Weston Solutions, Inc.; J.D Groesbeck
G1.4 CHANGES TO PROJECT OBJECTIVES REQUIRES CHANGES TO PROJECT SCOPECO-CHAIR - Richard Cheatham, Scientist 5, APTIM; Gene Scott, Ken Beard, Andrew Schaaf
G1.5 KCOM’S RIVERTON, KS EMPIRE DISTRICT ELECTRIC POWER PLANT IMPLOSION.Joel Spirtas, KCOM Demolition, Commercial / Industrial Demolition and Env. Remediation
G1.6 THE UTILITIES INDUSTRY’S GREATEST CHALLENGE RIGHT NOW - DEMOLITION!CO-CHAIR - Tim Barker, D4 Program Director, AECOM
G2. PLANT PERFORMANCE/CHALLENGESG 2.1 OPTIMIZATION OF PLANT PERFORMANCE USING MACHINE LEARNINGPatrick Bangert, CEO, algorithmica technologies Inc.
G2.2 DISRUPTION IN THE UNDERGROUND: INNOVATIVE UTILITY VAULT REPLACEMENT CO-CHAIR - Sean Gesell, Manufacturer’s Rep, Armorcast Products Company
G2.3 CONNECTICUT UTILITIES TURNKEY SOLUTION TO BENCHMARKING 95% OF THE STATESheri Borrelli, Senior Business Manager, United Illuminating; Samantha Sojka, Eversource Energy
G2.4 WIND EFFECTS ON AIR-COOLED CONDENSERS: WIND-TUNNEL 2-D FLOW FIELDSRyan Parker, Project Engineer, CPP Wind Engineering
G2.5 THE MULTI-SITE HABITAT CONSERVATION PLAN STRATEGYJohn Richter, Natural Resources Biologist, Black & Veatch Corporation
ADVISORY BOARD TRACK GROOM 7B
Monday | 1PM - 3PM
Monday | 3:30PM - 5:30PM
This Track provides presentations on current technologies and strategies, for decommissioning of power plants, boiler optimization, project fi nance, risk management, EMIS, EHS, Health & Safety, operation and maintenance in the energy industry.
28 29 ©
TRACK | G |O&M, DDD, EHSTRACK | G |O&M, DDD, EHS
G1. DECOMMISSIONING OF POWER PLANTSG1.1 POWER PLANT DECOMMISSIONING - A PRACTICAL LOOK AT PROJECT EXECUTIONJeffrey Fleenor, Project Manager, Sega
G1.2 WHY ARE YOU BUYING THE COAL PLANT?Mark Hall, Vice President Power Development, TRC
G1.3 WHEN POWER PLANT DECOMMISSIONING IS NOT DEMOLITIONJeff Pope, Decommissioning & Demolition Manager, Burns & McDonnell Engineering Co.
G1.4 USING ASSET RECOVERY TO OFFSET COSTS AND REDUCE LIABILITIESCo-Chair - Mike Mitchum, Global Facility Closure/Asset Recovery, AECOM
G1.5 MANAGING NON-LIQUID PCBS IN DECOMMISSIONING POWER PLANTSJohn Woodyard, Senior Project Manager, Weston Solutions, Inc; Steve Mitchell
G1.6 OPTIMIZED VALUE DECOMMISSIONING IS POSSIBLECo-Chair - Richard Cheatham, Project Manager, CB&I; Andrew Schaaf & Kenneth Beard
G2. COMPLIANCE STRATEGIES & DECOMMISSIONINGG2.1 MANAGING INVESTMENT RISKS IN POWER PLANT DECOMMISSIONINGCo-Chair - James Groesbeck, P.G., Sr. Project Manager, Weston Solutions; Steve Mitchell
G2.2 COULD YOUR SCRAP BE WORTH TWICE WHAT YOU ARE GETTING?Greg Menen, Director Demolition Scrap Management, Rocky Mountain Recycling
G2.3 THE ENVIRONMENTAL IMPACT OF DECOMMISSIONING IN ISO-NEStephen Slocomb, Principal, Epsilon Associates
G2.4 ECOSYSTEM SERVICES VALUATION FOR SURPLUS PROPERTIESRick Black, Principal Environmental Planner/Ecologist, Stanley Consultants; David Yozzo
G2.5 BEYOND GOOD PR – CONSERVATION, A TOOL FOR ADVANCING SUSTAINABILITYCo-Chair - Josiane Bonneau, Senior Director, Wildlife Habitat Council; Margaret O’Gorman, Wildlife Habitat Council; Kimberly Long & Bill Brady, Exelon Corporation
G2.6 DECOMMISSIONING/CLOSURE OF MIDWEST COAL-FIRED POWER PLANT IMPOUNDMENTSNeal Kochis, PM, Haley & Aldrich; Steven F. Putrich
G3. POWER PLANT & BOILER OPTIMIZATIONG3.1 IMPROVING PLANT HEAT RATE USING AUTOMATIC CONDENSER TUBE CLEANING SYSCo-Chair - Guy Beauchesne, Global Marketing Manager, Ovivo USA
G3.2 CCS REHEAT SYSTEM- FLUE GAS HEAT RECOVERYCo-Chair - Mike Mengel, Lead Process Engineer, Marsulex Environmental Technologies(MET); Mark Ness, Great River Energy (GRE); Rodney Hendricksen, MET
G3.3 OPTIMIZING POWER PLANT PERFORMANCE THROUGH COAL BENEFICIATIONMark Ness, Principal Engineer, Great River Energy; Nenad Sarunac, UNC Charlotte; Una Nowling, Black & Veatch Corp.; Sandra Broekema, Great River Energy
G3.4 ENGINEERING SOLUTIONS TO ENVIRO. NOISE PROBLEMS ON POWER PROJECTSJeff Szymanski, Acoustical Consulting Services Manager, Black & Veatch
G4. EHS & EMISG4.1 REDUCING ENVIRO. COMPLIANCE RISK: LESSONS LEARNED & GOALS ACHIEVEDCo-Chair - Carrie Young, Managing Director, Sphera Solutions; Jeffrey West, Xcel Energy
G4.2 SO2 & NOX ALLOWANCE POSITION & PORTFOLIO MGMT AT A LARGE UTILITYCo-Chair - David Gloski, CEO, xOverTime
G4.3 ISO 14001:2015 ENVIRONMENTAL MANAGEMENT SYSTEMS FOR UTILITIESEmily McKeon, Senior Consultant, Trinity Consultants
G4.4 MOVING BEYOND THE SAFETY PERFORMANCE PLATEAUDuncan Kerr, Management Consultant, The Engine Room; Milan Trpin
G4.5 SELECTION, USE, CARE AND MAINTENANCE OF ARC RATED CLOTHINGDerek Sang, Technical Training Manager, Bulwark Protective Apparel
G5. PROJECT FINANCE, RISK MGMT & EMISG5.1 INVESTING IN AMERICAN ENERGY: DOE’S LOAN PROGRAMS OFFICECo-Chair - Kerri Neary, Project Manager, U.S. DOE; Sydney Schneir & Michael Reed
G5.2 USE OF LIABILITY TRANSFER PROCESS FOR RETIRED STATION REPURPOSINGAlex Cates, Partner, ERM
G5.3 ADDRESSING THE EFFECTS OF INDUCED SEISMICITY ON PLANT OPERATIONSSession Sponsor & Co-Chair - Eddie Guerra, Director of Structural Engineering, RIZZO Associates; Richard Quittmeyer & Michael Rosenmeier
G5.4 REPORT: LARGE UTILITY AIR DATA MANAGEMENT USING EXCEL & XOVERTIMEDavid Gloski, CEO, xOverTime; Tyler Gloski
G5.5 NETDMR-READY NPDES SOLUTIONSKate Candillo, Services Operations Manager, Enviance; Aaron Rapp & Jamie Blevens
G5.6 WILDFIRE RISK ASSESSMENT OF TRANSMISSION SYSTEMSBen McKinsey, Transmission Project Manager, HDR
G6. OPERATIONS & OPTIMIZATIONG6.1 THE INTERNET OF THINGS AND ITS IMPACT ON THE WATER TREATMENT INDUSTRYMichael Henk, Director of Automation & Service, U.S. Water
G6.2 THE SYNERGY OF ENERGY EFFICIENCY AND WATER CONSERVATIONCo-Chair - Kevin Hwang, Director Product Mgmt., Smart Utility Systems; Ken Roberts
G6.3 WHY IS EARNED VALUE BASED PROJECT MANAGEMENT DIFFICULT TO IMPLEMENT?Robert Prowant, Partner, UnitsPro; Brett Houghton
G6.4 THE UTILITY DIRECTOR LEVEL LEADERSHIP CHALLENGEDuncan Kerr, Management Consultant, The Engine Room; Milan Trpin
G6.5 UNDERSTANDING ELECTROSTATIC WATER TREATMENT, USING SIDE STREAM PRECIPITATIONGeorge Wagner II, CEO, ElectroCell Systems; Dan Wheatly & Paul Q. McLain
G6.6 A RISK-BASED APPROACH TO PRIORITIZING UTILITY SYSTEM INVESTMENTSSession Sponsor & Co-Chair - Aaron Fishman, Consultant, Propeller
ROOM 7B ROOM 7BWednesday | February 8 | 1PM - 3PM
Thursday | February 9 | 7:30AM - 9:30AM
Wednesday | February 8 | 3:30PM - 5:30PM
Thursday | February 9 | 3:30PM - 5:30PM
Thursday | February 9 | 10AM - 12PM
Thursday | February 9 | 1PM - 3PM
30 31 ©
TRACK | G |O&M, DDD, EHS
G7. HEALTH & SAFETYG7.1 CHANGES IN 1910.269 AND THE SELECTION OF ARC RATED CLOTHINGSession Sponsor & Co-Chair - Derek Sang, Technical Training Manager, Bulwark
G7.2 ENVIRONMENTAL HEALTH AFFECTING HUMAN HEALTH: CAREGIVER’S PROSPECTIVEBapaniah Penugonda, Associate Professor, NYU Dentistry; Katie Baron
G7.3 JOURNEY TO SAFETY EXCELLENCE: CULTIVATING SAFETY LEADERSHIP CULTUREDr. Wes Scott, Director - Consulting Services/Safety Mgmt., National Safety Council
G7.4 HOW TO MANAGE & DEPLOY AN AUTOMATED EXTERNAL DEFIBRILLATOR PROGRAMCo-Chair - Brian Leonard, President, Cardio Partner Resources
G7.5 RADIATION POLLUTION & THE IMPACTS ON HUMAN HEALTH & THE ENVIRONMENTKatie Baron, Dental Student, NYU Dentistry; Dr. Bapaniah Penugonda
G7.6 SAFETY LEADERSHIP: BE THE CHANGE THAT YOU WANT TO SEECassandra Dillon, Principal Consultant, Compliance Solutions
G8. OPERATIONS & MANAGEMENTG8.1 UNLOCKING THE POWER OF YOUR INFORMATION ASSETSCo-Chair - Sloane Whiteley, Expert Practitioner, North Highland
G8.2 TRANSFORMER COOLING SYSTEMS MAINTENANCEKevin Riley, Product Development Manager, Trantech Radiator Products
G8.3 IMPROVING TECHNICAL COMPETENCY IN POWER PLANTSCo-Chair - Matthew Zuehls, Power Section Manager, HDR; Robert Moss, Synterprise, LLC
INTERPRETING RESULTS FROM INFRARED TECHNOLOGYSteven Driver Ph.D., Global Energy Program Manager, Sanofi Genzyme
ROOM 7B Friday | February 10 | 7:30AM - 9:30AM
POSTER
Friday | February 10 | 10AM - 12PM
This new era of continuous disruption needs a new brand of management consulting that is laser-focused
on helping large organizations nimbly negotiate an increasingly volatile business landscape.
We chose the name
PROPELLERbecause we are a
firm that is always moving toward the future and helping clients do the same.
WWW.PROPELLERCONSULTING.COM
26 27 ©
TRACK | G |OPERATIONS & MANAGEMENTTRACK | G |OPERATIONS & MANAGEMENT
G1. DECOMMISSIONING OF POWER PLANTSG1.1 DECOMMISSIONING, DEMOLITION & DECONTAMINATION (DDD) PROCESS Co-chair - Jeffery Pope, Decommissioning & Demolition Services Mgr., Burns & McDonnell
G1.2 HOW TO MAXIMIZE SCRAP VALUES AS PART OF DECOMMISSIONING PROCESSGreg Menen, Director - Demolition Scrap Management, Rocky Mountain Recycling
G1.3 NUCLEAR WASTE STORAGE OPPORTUNITIES FOR DECOMMISSIONED POWER PLANTSEmily Lewis, AAAS Fellow, U.S. DOE, Office of Energy Policy & Sys. Analysis; Lara Pierpoint
G1.4 DECOMMISSIONING SCALABILITYCo-chair - Richard Cheatham, Scientist 5, CB&I; Daniel Davis, Ken Beard & Andrew Schaaf
G1.5 POWER PLANT RETIREMENT - GOALS AND STRATEGY’SChristopher Dowdell, Decommissioning and Demolition Manager, HDR Engineering
G1. 6 RECLAIMING AND RECYCLING COAL FLY ASH FOR BENEFICIAL REUSEBill Fedorka, Director, Engineering, The SEFA Group
G2. COMPLIANCE STRATEGIES & PLANT CONVERSIONSG2.1 FORMER MANUFACTURED GAS PLANTS (MGP): LEGACIES FROM LAST TWO CENTURIESKevin White, Environmental Engineer, Burns & McDonnell Engineering Company, Inc.
G2.2 BIOCONVERSION OF COAL & GAS FIRED POWER STATIONSPreben Messerschmidt, Project Director, Ramboll Environ
G2.3 REPURPOSING POWER PLANT CHIMNEYS FOR CLEAN RENEWABLE ENERGYThomas Farber, Division Manager, Commonwealth Dynamics, Inc.; Jose Franco
G2.4 ENVIRONMENTAL MANAGEMENT SYSTEMS & ISO-14001 CERT. FOR SMALL UTILITIESCo-chair - Erik Haas, Principal, HMH Consulting LLC; Tom Chappel
G2.5 CCR & ELG: DEVELOPING A SIMULTANEOUS COMPLIANCE STRATEGYCo-chair - Jonathan Shimko, Director, Power & Water Solutions, Tetra Tech, Inc.
G2.6 EASE OF COMPLIANCE THROUGH DOCUMENT MANAGEMENTMark Buckley, President & CEO, Requordit Inc.
G3. POWER PLANT & BOILER OPTIMIZATIONG3.1 POWER PLANT FUEL TREATMENT TECHNOLOGIESCo-chair - Chris Wedig, Senior Technology Specialist - AQCS, CB&I
G3.2 ENGINEERING ANALYSIS PATENTED MULTISTAGE EVAPORATIVE COOLING SYSTEM Co-chair - Dr. Darrell Richardson, CEO, R4 Ventures LLC; Mike Reytblat
G3.3 OPTIMISING FUEL FLOW IN PULVERISED COAL & BIOMASS-FIRED BOILERSMalgorzata (Maggie) Wiatros-Motyka, Analyst & Author, IEA Clean Coal Centre
G3.4 NEW SIDE STREAM FILTRATION TECHNOLOGY WILL REVOLUTIONIZE THE INDUSTRYGeorge Wagner II, Partner, ElectroCell Systems; Paul McLaine & Dan Wheatley, ElectroCell Systems; Loraine Huchler, MarTech Systems, Inc.
G4. EHS & EMISG4.1 “FIXING” HUMAN ERRORCo-chair - Peter Bridle, Executive Director, Pegasus Risk Management
G4.2 INTEGRATING DAS WITH EMIS - KEY CONCEPTS AND CONSIDERATIONSGreg Gasperecz, Sr VP, EHS, Enviance, Inc.; Philip Black, Wood Group Mustang, Inc.
G4.3 MOBILE-ENABLED ENV. HEALTH & SAFETY MANAGEMENT INFORMATION SYSTEMCo-chair - Anne Heinrich, Client Manager, E2 ManageTech; Ian Cohen, NextEra
G4.4 INTEGRATING ENMS & EHS MGMT SYSTEM TO ACHIEVE A COHERENT SYSTEMNitin Shahani, Green Services Associate Program Manager, Intertek
G4.5 COMBINING COMPLIANCE & ENV. MGMT. FOR A 360 0 VIEW OF EHS PERFORMANCEJames Miller, Account Executive, Dakota Software; Jeff Cross
G4.6 THE ART OF EVERGREENING COMPLIANCE MANAGEMENT SYSTEMSMargery Moore, Director, Bloomberg BNA; David Kleen, regAction
G5. EHS & RISK MANAGEMENTG5.1 ARC FLASH RISK ASSESSMENT – WHAT DOES IT MEAN?Dennis Neitzel, Director Emeritus, AVO Training Institute, Inc.
G5.2 DRIVING OPERATIONAL EXCELLENCE BY AUTOMATING RISK MANAGEMENTCo-chair - Doug Hatler, VP, EHS, Energy & Utilities, 360factors, Inc.
G5.3 5 REASONS WHY MOBILE APPS ARE CHANGING HOW EHS WORKSCo-chair - John Niemoller, President, Perillon Software Inc.
G5.4 OFFICE OF ENV. HEALTH & HAZARD ASSESSMENT GUIDELINES & CHALLENGESEverest Yan, Senior Engineer, PCR Services Corporation; Heidi Rous & Alan Sako
G5.5 EHS OF AUTOMATED BIRD CONTROL TECHNOLOGY FOR THE UTILITY INDUSTRYJim Beaumont, National Account Manager, BirdBuffer, LLC; Walt Beals & Gary Crawford
G5.6 UTILITY CEMS AND EMISSION INVENTORY DATA IN THE CLOUDDon Ahearn, Director of Sales, xOverTime Inc.; David Gloski
G6. OPERATIONS & OPTIMIZATIONG6.1 SAFETY MANAGEMENT LEADERSHIP: YOUR ROLE IN ACHIEVING SAFETY EXCELLENCEDr. Wes Scott, Director, Consulting Services, National Safety Council
G6.2 PUMPING SYSTEMS EVOLUTIONCo-chair - Jessica Morrison, Business Development Manager, Grundfos; Stephen Putnam
G6.3 CONTINUOUS PERFORMANCE ASSURANCE AT BUDGET CONSTRAINED POWER PLANTSRodrigo Camargos, Process Optimization Engineer, Primex Process Specialists; S. Nicholson
G6.4 AN INTERNATIONAL APPROACH TO SUSTAINABILITYSteven Driver Ph.D., Global Energy Program Manager, Sanofi Genzyme
G6.5 CAP AND TRADE POSITION MANAGEMENT WITH COMPLIANCEDavid Gloski, President, xOverTime Inc.; Don Ahearn
G6.6 VIGILANCE: BUILDING A CULTURE OF HIGH RELIABILITYCo-chair - Bob Newhouse, President, Newhouse Consultants
ROOM 8 ROOM 8
Thursday | February 4 | 3:30PM - 5:30PM
Thursday | February 4 | 10AM - 12PM
Thursday | February 4 | 1PM - 3PM
Wednesday | February 3 | 1PM - 3PM
Thursday | February 4 | 7:30AM - 9:30AM
Wednesday | February 3 | 3:30PM - 5:30PM
28 29 ©
TRACK | H |CLIMATE, ELG, CCS & CCRTRACK | G |OPERATIONS & MANAGEMENT
G7. OPERATIONS & MANAGEMENTG7.1 INTERNET OF FACILITIES - SMART CAMPUS INITIATIVE AT ARGONNE NATIONAL LABDejan Ristic, Energy/Pressure Systems Engineer, Gr. Leader, Argonne National Laboratory
G7.2 CHANGE CULTURE & ACHIEVE ENERGY MANAGEMENT SUCCESS IN HEALTHCARECo-chair - Kim Hughes, Senior Initiative Manager, Northwest Energy Efficiency Alliance
G7.3 INTERNET OF THINGS: CONVERGENCE OF BIG DATACo-chair - Phil Carroll, Vice President, Finley Engineering Company, Inc.
G7.4 PORTFOLIO O&M: ONE PLANT, FLEET BENEFITSDouglas Machon, Director - Business Development, NAES Corporation
G7.5 STAKEHOLDER OUTREACH AND THE ROLE IT PLAYSLoren Locher,Director of Public Affairs, TRC Companies, Inc.
G8. O&MG8.1 CULTIVATING THE UTILITY WORKING ENVIRONMENTKevin Smith, Senior Consultant, Ephektiv
G8.2 SITUATION AWARENESS & HIGH PERFORMANCE HMI CONCEPTS IN POWER SYSTEMSRicardo Olsen, Electronics Engineer, CEEE-GT
G8.3 ELECTRIC UTILITY RATE STUDIES WITH PUBLIC INVOLVEMENTCo-chair - Chris Deffenbaugh, Public Involvement Specialist, Burns & McDonnell; Ted Kelly
G8.4 POSITIVE ENERGY: ACQUIRING & RETAINING CUSTOMERS THE RIGHT WAYCo-chair - Derek Dressler, Senior Vice President of Sales, Virtual Incentives
H1. CLIMATE CHANGE & GHGH1.1 ADDRESSING CLIMATE CHANGE UNDER THE NEW CEQ GUIDELINESCo-chair - Bruce Macdonald, Principal Scientist, SLR International Corporation
H1.2 BIRDS, CLIMATE CHANGE AND POWERLINESDavid Lee, Senior Biologist, Davey Resource Group
H1.3 FUNDING AFRICAN POWER INFRASTRUCTURE, CLIMATE CHANGE & US CARBON TAXCo-chair - Stephen Sewalk Burns School of Real Estate & Construction; Lydia Patton
H1.4 ELECTRIC POWER GENERATION GHG MEASUREMENT PROTOCOL REVISIONColin High, Co-Founder and Principal Consultant, RSG
H2. POST COP21 & INVENTORIES H2.1 SUSTAINABLE PATENT STRATEGIESCo-chair - Michael Messinger, Director, Sterne Kessler
H2.2 CARBON EMISSIONS REPORTING: IMPACTE FOLLOWING CPP & COP21Co-chair - Hari Gupta, Director, Coriolis Enterprises, Inc.
H2.3 PRIVATE SECTOR OPPORTUNITIES & PARTICIPATION UNDER THE PARIS AGREEMENTDouglas Marett, Head of Energy & Environment, Grue + Hornstrup
H2.4 ENERGY, ENVIRONMENT, AND COMMUNITIES: LOCAL V. GLOBAL CLIMATE GOALS Deidre Sanders, Environmental Justice Manager, Pacific Gas & Electric Company
H3. ELG - UTILITY PERSPECTIVEH3.1 ELG COMPLIANCE STRATEGIES FOR UTILITIESPatricia Scroggin, Sr. Water/Wastewater Treatment Consultant , Burns & McDonnell
H3.2 IMPLEMENTATION OF THE ELG RULEJared Morrison, Manager - Water & Wastewater Programs, Westar Energy
H3.3 COMPLIANCE ISSUES ASSOCIATED WITH IMPLEMENTATION OF THE ELG RULEGerald Butcher, Sr. Environmental Coordinator , Western Farmers Electric Cooperative
H3.4 ELG & OTHER RULES EFFECT ON THE GENERATION FLEETBlock Andrews, Director of Strategic Environmental Solutions, Burns & McDonnell
H3.5 COMPLIANCE ISSUES ASSOCIATED WITH IMPLEMENTATION OF THE ELG RULEJerry Purvis, Environmental Affairs Manager, East Kentucky Power Cooperative
H3.6 COMPLIANCE ISSUES ASSOCIATED WITH IMPLEMENTATION OF THE ELG RULEMaggie Skelton, Chemical Engineer - Boswell Station, Minnesota Power
Coriolis Enterprises
ROOM 9ROOM 8 Friday | February 5 | 7:30AM - 9:30AM
Friday | February 5 | 10AM - 12PM
Thursday | February 4 | 7:30AM - 9:30AM
Wednesday | February 3 | 1PM - 3PM
Wednesday | February 3 | 3:30PM - 5:30PM