TRANSCRIPT

  • Traction Power SCADA Functional & Performance Specification - Train System

    Rail Commissioner

    TP2-DOC-002253

  • Traction Power SCADA Functional & Performance Specification - Train System

    Document Number: TP2-DOC-002253 Knet No (PDF): 15851618

    Version Number: 1 Knet No (Word): 14066852

    Document Owner: Electrical Engineering Issue Date: 10-August-2020 UNCONTROLLED WHEN PRINTED Page 2 of 33

    DOCUMENT CONTROL

  • Traction Power SCADA Functional & Performance Specification - Train System

    Document Number: TP2-DOC-002253 Knet No (PDF): 15851618

    Version Number: 1 Knet No (Word): 14066852

    Document Owner: Electrical Engineering Issue Date: 10-August-2020 UNCONTROLLED WHEN PRINTED Page 3 of 33

    TABLE OF CONTENTS

    1. Introduction ................................................................................................................... 5

    2. Purpose ......................................................................................................................... 5

    3. Scope ............................................................................................................................. 5

    4. Related Documents ....................................................................................................... 5

    5. References..................................................................................................................... 6

    6. Acronyms ...................................................................................................................... 7

    7. Definitions ..................................................................................................................... 8

    8. Overview - Existing & Future Configurations............................................................ 11

    8.1. Overview – Existing 25kV TPSS Configuration .................................................. 11

    8.2. Overview - Future Expansion ............................................................................. 13

    8.3. Future Expansion – Miscellaneous Notes .......................................................... 14

    9. Traction Power SCADA Functions ............................................................................. 15

    9.1. Primary Functions .............................................................................................. 15

    9.2. Support Functions .............................................................................................. 15

    10. Systemic Functional Requirements ........................................................................... 16

    10.1. Overview............................................................................................................ 16

    10.2. Equipment Interface Requirements .................................................................... 16

    10.3. Data Acquisition & Processing Functional Requirements ................................... 17

    10.4. RTU Functional Requirements ........................................................................... 18

    10.5. Data Transmission Functional Requirements ..................................................... 19

    10.6. Server Functional Requirements ........................................................................ 19

    10.7. Workstation Functional Requirements ............................................................... 21

    10.8. HMI Functional Requirements ............................................................................ 22

    10.9. Auxiliary LV Power Supplies .............................................................................. 24

    10.10. Equipment Enclosures ....................................................................................... 24

    11. Operational Performance Requirements ................................................................... 25

    11.1. Operational Availability Target ........................................................................... 25

    11.2. Operational Reliability ........................................................................................ 25

    11.3. Maintainability .................................................................................................... 26

    11.4. Expandability ..................................................................................................... 26

    11.5. Security ............................................................................................................. 27

    11.6. Control integrity.................................................................................................. 27

    11.7. Data Integrity ..................................................................................................... 27

    11.8. Timing Precision ................................................................................................ 27

    11.9. Response Times ................................................................................................ 27

    11.10. Equipment Service Life ...................................................................................... 28

  • Traction Power SCADA Functional & Performance Specification - Train System

    Document Number: TP2-DOC-002253 Knet No (PDF): 15851618

    Version Number: 1 Knet No (Word): 14066852

    Document Owner: Electrical Engineering Issue Date: 10-August-2020 UNCONTROLLED WHEN PRINTED Page 4 of 33

    11.11. Software Service Life ......................................................................................... 28

    11.12. Environmental Performance............................................................................... 28

    12. General – Design Requirements ................................................................................ 30

    13. General - Testing and Commissioning Requirements .............................................. 31

    13.1. Factory Acceptance Testing............................................................................... 31

    13.2. Site Acceptance Testing .................................................................................... 31

    13.3. Commissioning Testing ...................................................................................... 32

    13.4. System Integration Testing ................................................................................ 32

  • Traction Power SCADA Functional & Performance Specification - Train System

    Document Number: TP2-DOC-002253 Knet No (PDF): 15851618

    Version Number: 1 Knet No (Word): 14066852

    Document Owner: Electrical Engineering Issue Date: 10-August-2020 UNCONTROLLED WHEN PRINTED Page 5 of 33

    1. Introduction

    The Department of Planning, Transport and Infrastructure (DPTI) operates and maintains the Adelaide Metropolitan Passenger Rail Network (AMPRN) under the Rail Accreditation assigned to the Rail Commissioner. This specification stipulates the minimum performance and functional requirements for traction power Supervisory Control and Data Acquisition (SCADA) system works required to remotely monitor and control the electrified portions of the rail network.

    2. Purpose

    This specification forms part of the engineering management system (EMS) and is intended to ensure that the traction power SCADA system (TPSS) serving the Adelaide Metropolitan train network is not subject to any risks not deemed to meet the So Far As Is Reasonably Practicable (SFAIRP) principles under Rail Safety National Law (RSNL).

    3. Scope

    This specification shall be applied to the design, procurement, construction, installation, testing and commissioning of all new traction power SCADA systems works to serve the AMPRN. The intended audience for this specification includes:

     DPTI Rail Maintenance functional areas,

     DPTI Rail Operations functional areas;

     DPTI Rail Projects; and

     DPTI Rail contractors to the extent specified in their contract.

     The SCADA system shall be of highest reliability and based on the state-of-the art technology. It shall be capable of monitoring and controlling traction power supply from a remote location called ROC (Rail Operation Centre). The system should be capable of collecting, storing, displaying and analyzing data as stipulated in the specification

     Interpretation of any technical meanings of the specifications and sorting out technical disputes regarding this specification shall be decided by Unit Manager, Electrical Engineering, whose decision shall be final and binding.

     The tenderers/project proponents shall familiarize themselves with site conditions before quoting against tenders based on this specification. Conditions particular to individual sites, including availability of communication and spare channels, conditions & space at ROC, switching posts, proximity to Road/Rail, sequence in which RTUs sites will be offered by railways for taking up work, and any special conditions concerning erection and commissioning of SCADA system shall be got clarified in a pre-bid meeting to be arranged by the purchaser with the tenderers.

    4. Related Documents

    DOCUMENT NAME DOCUMENT NUMBER

    Traction Power System Principles and Practices TP1-DOC-001097

    (KN