CARM CBSA Assessment and
Revenue Management
Trade Chain Partner Working Group (TCP WG) Monthly Call
September 5, 2018
CARM CBSA Assessment and
Revenue Management2
Agenda
Topic Timing Speaker
Introduction 4:00-4:05pm Lisa Anawati
Action Items Log 4:05-4:15pm Kevin Horseman
Question & Answer Document 4:15-4:20pm Kevin Horseman
Summary of Consultation and Deep-Dive Session Output
4:20-4:35pm Daniel Melkin
Survey Results from August Consultation and Deep Dive Sessions
4:35-4:50pm Kevin Horseman
Roundtable 4:50-5:25pm TCP WG
Conclusion 5:25-5:30pm Lisa Anawati
t
CARM CBSA Assessment and
Revenue Management
Action Items Log
CARM CBSA Assessment and
Revenue Management
Action Item Log
4
• The table below outlines the key actions that have recently been completed, along with upcoming actions to be completed.
ACTION OWNER TIMING PROGRESS COMMENTSProvide a comprehensive list of programs available for the TCP WG Leads to review in advance of the deep-dive sessions.
CBSA 8/1/2018 In Progress
Send email to remind TCP WG members to consent to having their contact information displayed on the CBSA website.
CBSA 8/3/2018 In ProgressAn email was sent to ask for consent on August 7th.
Inform TCP Leads on the parameters around who they can allow on to GCcollab.
CBSA 8/22/2018 Completed
Set up demo with Dina and Tracy to see how their current bond portal operates.
CBSA 8/29/2018 Completed Demo held on September 4th.
Send the LVS presentation (shown during the C/C/FF/W deep-dive session) to the CARM team.
TCP WG 9/5/2018 Completed
Confirm what the ‘Request for in land release and authorization to move’ means, since it is not a requirement today.
CBSA 9/18/2018 In Progress
Confirm processes and authorities regarding the issuance of BN9 to non-resident importers.
CBSA 9/5/2018 CompletedCRA provided CARM with an answer to this question.
Consult with other Carrier working group members to find statistics on how many casual importers do self-accounting.
TCP WG 9/26/2018 Not Started
Check with declaration filers to see if the potential extra data elements being asked at time of release (i.e. the accounting data or current B3 data) will cause an increase of shipments being stopped, due to their internal system performance issues.
TCP WG 9/26/2018 Not Started
Provide the CBSA with statistics regarding percentages of transactions that contain all data elements at time of release.
TCP WG 9/26/2018 Not Started
Provide statistics on how many transactions currently require corrections between the initial filing and the final B3, as well as what specifically changed.
TCP WG 9/26/2018 Not Started
CARM CBSA Assessment and
Revenue Management
Action Item Log (cont.)
5
ACTION OWNER TIMING PROGRESS COMMENTSSend regular and peak volume data, specific to LVS program, to Richard Lavoie.
TCP WG 9/26/2018 Not Started
Organize a Low Value Shipment (LVS) ad-hoc session. CBSA 9/26/2018 Not StartedCARM to conduct internal sessions on LVS before holding this ad-hoc session.
CARM Innovation team is exploring creation of an early mock-up/pilot of a bond portal.
CBSA 9/26/2018 In Progress
Explore the possibility of making mass-editing only available through the portal.
CBSA 9/26/2018 Not Started
Find out how many people are currently using the eManifest portal. CBSA 9/26/2018 In Progress
Organize discussion with gas sub-working group companies on Continuous Transmission Commodities (CTC).
CBSA 9/26/2018 In ProgressCARM to conduct internal sessions on CTC before having this discussion.
Reach out to clients to see why they don't currently pay electronically. TCP WG 9/26/2018 Not Started
t
CARM CBSA Assessment and
Revenue Management
Question & Answer Document
CARM CBSA Assessment and
Revenue Management
CARM TCP Question & Answer Document
• The CARM TCP WG Q&A document will be updated regularly on GCcollab.
• Questions raised by the TCP WG will be provided in this document, with answers from CARM.
• Q&As from this document will be potentially included as Frequently Asked Questions for the broader TCP community, based on input from the TCP WG.
7
t
CARM CBSA Assessment and
Revenue Management
Summary of Consultation and Deep-Dive Session Output
CARM CBSA Assessment and
Revenue Management
Key Takeaways from August 1st/2nd Deep-Dive Sessions
9
There were no major areas of misalignment between the sub-working groups, and deep-dive discussions were generally representative of what was said during the Consultation Sessions. The key themes from the deep-dive output documents were as follows:
Implications of accounting date = release date need to be fully understood and clarified by the project.
CARM Portal needs to facilitate interaction with non-resident importers, and importers with multiple BN numbers.
LVS and e-Commerce remain prominent challenges that CARM needs to keep in mind.
Management of permissions and authority in the portal will be critical to CARM’s success.
Notification capabilities will be key to ensuring TCPs have the required visibility around account activity.
Real-time monitoring of security bonds will be beneficial, but the Agency’s position on liability needs to be established.
CARM CBSA Assessment and
Revenue Management
Potential billing process raised concerns on how corrections made towards the end of billing cycle, audit assessments, and recourse results would be reconciled and handled in CARM.
Highlights from August Consultation & August 23rd
Deep-Dives
10
Potential offsetting process raised concern around how to reconcile debit/credits with multiple third parties. TCPs would like to be able to pick offsetting options, if they are in good standing with the CBSA.
There was a clear indication that TCPs want liability to be at the importer level.
Moving away from cash and cheque payments was generally well received, as long as the transition to electronic-only is gradual and carefully monitored.
Notifications and sufficient visibility will be required to properly inform TCPs of relevant changes to their transactions, and enable accurate reconciliation of their records.
t
CARM CBSA Assessment and
Revenue Management
Survey Results from August Consultation & Deep Dives
CARM CBSA Assessment and
Revenue Management
Mentimeter Results from August Consultation
9
CARM CBSA Assessment and
Revenue Management
Mentimeter Results from August 23rd Deep-Dives
9
3.96
4.06
3.425
3 3.2 3.4 3.6 3.8 4 4.2
Session objectives were met/Lesobjectifs de la session ont été atteints
The deep-dive session materials werewell organized/Les matériaux de
consultation étaient bien organisés
Duration of the session wasadequate/La durée de la session était
adéquate
Session Feedback The session used relevant examples to describe the future state design
Strongly Agree / Très en accord Agree / En accord
Disagree / En désacord
This session helped you better understand how CARM will affect your line of business
Strongly Agree / Très en accord Agree / En accord
Disagree / En désacord
Really felt session was rushed and too short
t
CARM CBSA Assessment and
Revenue Management
Roundtable
t
CARM CBSA Assessment and
Revenue Management
Conclusion
CARM CBSA Assessment and
Revenue Management
Upcoming Activities
DATE ACTIVITY OWNER
September 19 Consultation Session CARM Project
September (TBD) Deep Dive Sessions TCP Leads
October 3 Monthly Call CARM Project
October 17 Consultation Session CARM Project
October (TBD) Deep Dive Sessions TCP Leads
November 7 Monthly Call CARM Project
CARM CBSA Assessment and
Revenue Management
What you should do
Participating in the next consultation session
Action – Book your travel arrangements and participate in the next consultation session, which will be held on September 19th in
Ottawa.
Publishing TCP Contact Information on the CBSA Website
Action – If you accept having your name displayed as a member of the working group on the CBSA website, let us know by emailing
the CARM Governance Mailbox.
Provide CARM with SWG Deep Dive Session Output Documents*
Action – Provide CARM with your output documents from the August 23rd Deep Dive Sessions by September 6th.
Preparing for next Deep-Dive session*
Action – Prepare your next TCP Sub-Working Group Deep-Dive session (Dates TBD). Connect with the CBSA if you require any logistical
support.
Immediate Actions
17
Change Management is not a spectator sport. Leaders are the center of successful change.
*for TCP Leads only
CARM CBSA Assessment and
Revenue Management
Thank You
18
CARM CBSA Assessment and
Revenue Management
Appendix A – TCP Working Group Representative List
Full Name TCP Type Email Title Location
Janice McBride (Lead) Brokers [email protected] Vice President Ottawa (HQ)
Candace Sider Brokers [email protected] President, Regulatory Affairs North America
Toronto (GTA)
Melanie Bedard Brokers [email protected], Canada Customs Operations
Montreal (QC)
Renate Jalbert Carr/Cour/FF/WH [email protected] Chair Mississauga (GTA)
Susan Foster (Lead) Carr/Cour/FF/WH [email protected] Manager Mississauga (GTA)
Lak Shoan Carr/Cour/FF/WH [email protected], Policy and Industry Awareness Programs
Toronto (GTA)
Michael Tamilia Carr/Cour/FF/WH [email protected] Manager, Customs and Transborder Ops (CN)
Winnipeg (PRA)
Ruth Snowden Carr/Cour/FF/WH [email protected] Executive Director Toronto (GTA)
Tara Forristal Carr/Cour/FF/WH [email protected] General Manager London (SOR)
James (Jim) Sutton (Lead) Importers [email protected] Vice President, Advocacy Toronto (GTA)
Corinne Pohlmann Importers [email protected] Senior Policy Analyst Ottawa (HQ)
Debbie Price Importers [email protected] Manager, Trade Compliance
Mississauga (GTA)
Karin Muller Importers [email protected] Board of DirectorsBrampton (GTA)
Emil Fiorantis Service Provider [email protected] Vice President, Operations Toronto (GTA)
Oryst Dydynsky Service Provider [email protected] Vice President Ottawa (HQ)
Ray Fischer Service Provider [email protected] Manager, Global Trade Management
Toronto (GTA)
Vikram Patil Service Provider [email protected] Senior Product Manager Toronto (GTA)
19