Traffic Engineering Assessment
Proposed Residential Development
at
855 Ferntree Gully Road, Wheelers Hill
Traffic Engineering Assessment 855 Ferntree Gully Road, Wheelers Hill: Proposed Residential Development
24503R#1
Traffic Engineering Assessment
Proposed Residential Development at 855 Ferntree Gully Road, Wheelers Hill
Document Control
Issue No. Type Date Prepared By Approved By
A Draft 12/06/2018 M. Huynh /
M. O’Shea
M. O’Shea
B FINAL 18/06/2018 M. Huynh /
M. O’Shea
M. O’Shea
Traffix Template Version 1.0 – May, 2015
Our Reference: 24503R#1
COPYRIGHT: The ideas and material contained in this document are the property of Traffix Group (Traffix Group Pty Ltd – ABN 32 100 481 570, Traffix
Survey Pty Ltd – ABN 57 120 461 510, Traffix Design Pty Ltd – ABN 41 060 899 443). Use or copying of this document in whole or in part without the
written permission of Traffix Group constitutes an infringement of copyright.
LIMITATION: This report has been prepared on behalf of and for the exclusive use of Traffix Group’s client, and is subject to and issued in connection
with the provisions of the agreement between Traffix Group and its client. Traffix Group accepts no liability or responsibility whatsoever for or in
respect of any use of or reliance upon this report by any third party.
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 2
Table of Contents
1 Introduction .......................................................................................................................... 4
2 Proposal ................................................................................................................................ 4
3 Existing Conditions ................................................................................................................ 6
3.1 Subject Site ................................................................................................................................... 6
3.2 Road Network ............................................................................................................................... 9
3.3 Car Parking Conditions .................................................................................................................. 9
3.4 Existing Traffic Conditions ............................................................................................................. 9
3.5 Public Transport .......................................................................................................................... 11
4 Traffic Engineering Assessment ............................................................................................ 12
4.1 Statutory Car Parking Assessment .............................................................................................. 12
4.2 Car Parking Layout Assessment .................................................................................................. 14
4.3 Bicycle Parking Assessment ........................................................................................................ 16
4.4 Traffic Generation and Impacts .................................................................................................. 16
4.4.1 Traffic Generation ....................................................................................................................... 16
4.4.2 Traffic Distribution ...................................................................................................................... 16
4.5 Traffic Impact Assessment .......................................................................................................... 18
4.5.1 Impacts at Jells Road and Site Access ......................................................................................... 19
4.5.2 Access to Jells Road Considerations ............................................................................................ 20
5 Loading & Waste Collection ................................................................................................. 21
5.1 Loading & Emergency Access ...................................................................................................... 21
5.2 Waste Collection ......................................................................................................................... 21
6 Conclusions .......................................................................................................................... 22
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 3
List of Figures
Figure 1: Locality Plan ............................................................................................................................. 7
Figure 2: Aerial Photograph ................................................................................................................... 7
Figure 3: Land Use Zoning Map .............................................................................................................. 8
Figure 4: Jells Road – view north ............................................................................................................ 9
Figure 5: Jells Road – view south ............................................................................................................ 9
Figure 6: Existing Traffic Conditions during AM/PM Peak Hours ......................................................... 10
Figure 7: Public Transport Map ............................................................................................................ 11
Figure 8: Existing traffic distribution at Strathconnan Place ................................................................. 17
Figure 9: AM (PM) Peak Hour Additional Traffic Generated by Proposed Development .................... 18
List of Tables
Table 1: Development Summary ............................................................................................................ 4
Table 2: Public Transport Services ........................................................................................................ 11
Table 3: Statutory Car Parking Assessment – Clause 52.06 ................................................................. 12
Table 4: Adopted Gap Acceptance ........................................................................................................ 19
Table 5: Peak Hour Traffic conditions at site access to Jells Road ....................................................... 20
List of Appendices
Appendix A: Development Plans
Appendix B: Car Parking and Vehicle Access Swept Paths
Appendix C: Waste Collection and Loading Swept Paths
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 4
1 Introduction
Traffix Group has been engaged by Madison Quay to prepare a traffic impact assessment report
associated with the proposed residential development of 855 Ferntree Gully Road, Wheelers Hill.
This report provides a detailed traffic engineering assessment of the parking and traffic issues
associated with the proposed development.
2 Proposal
The proposal is for a residential development comprising a total of 80 dwellings. The development will
include a series of attached townhouses and stand along townhouses within individual lots.
Car parking is proposed within private garages attached to each dwelling (resident car parking) and at
grade car parking along a private accessway that will serve the development and within under cover
car parking areas (visitor car parking areas).
A development summary that identifies the dwelling breakdown and car parking provisions is provided
as follows.
Table 1: Development Summary
Use Number Car Paring Allocation Car Parking Rate
Three‐bedroom Dwelling 61 122 2 car spaces per dwelling
Four‐bedroom Dwelling 19 38 2 car spaces per dwelling
Visitor Car Parking 80 dwellings 18 0.23 car spaces per dwelling
Total Car Parking 178
Car Parking
The car parking for each of the dwellings is provided in the form of attached garages. The garages are
either standard double garage or a tandem double garage. In both cases all resident car spaces will be
enclosed and secure.
The visitor car parking includes 10 car spaces located at grade along the private access road that will
extend through the site. A further 4 visitor car spaces are provided within the end of each semi‐
basement car parking area.
Use of Tandem Car Parking
The use of tandem car parking widely accepted by the industry and by the market/end users as an
innovative way to accommodate the required car parking. This arrangement is not dissimilar from a
single garage and adjacent driveway car parking that is provided for standard dwellings. Residents can
conveniently manage this style of car parking and the rotation of car parking (if required) will not
require cars to exit the basement.
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 5
Narrow terraced housing such as the townhouses proposed lends itself to tandem car parking
arrangement. Specifically, double garages would complicate future subdivisions with basement
misaligned with floors above.
Vehicle Access Arrangement
Vehicle access to the development from adjacent road network is to occur via the existing opening and
vehicle crossover to Jells Road. At this stage no modifications to this crossover are anticipated within
the road reserve with amendments to the alignment of the internal access road only expected.
The existing vehicle access from the site to Ferntree Gully Road will be removed with kerb and channel
reinstated to the satisfaction of the Responsible Authority.
The internal access road will remain under private ownership of Owners Corporation of the proposed
development.
Pedestrian Access
Pedestrian links through the site will be achieved via a footpath along one side of the private internal
access road. Given the low traffic volumes, the north‐south access road could operate as a shared
zone.
Connections to Ferntree Gully Road will also be provided.
A copy of the development plans prepared by CHT Architects is attached to the report at Appendix A.
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 6
3 Existing Conditions
3.1 Subject Site
The subject site is located on the north side of Ferntree Gully Road, at the intersection between
Ferntree Gully Road and Jells Road. A locality plan and aerial photograph of the site are presented in
Figure 1 and Figure 2, respectively.
The site is irregular in shape with a total area of approximately 15,870m2 and has frontages to Ferntree
Gully Road and Jells Street of approx. 112m and 106m respectively.
Formal vehicle access to the site is currently unavailable but existing crossovers connect to Ferntree
Gully Road and Jells Road of approximately 112m and 103m, respectively.
The site is located primarily within a General Residential Zone (Schedule 2). A land use zoning map is
provided at Figure 3. Land use in the vicinity of the site is typically residential.
Significant nearby land uses are detailed below:
Monash Gallery Reserve, located 100m south‐east of the site.
Wheelers Hill Library, located 100m southeast of the site.
Wheelers Hill Shopping Centre, located 450m south of the site,
Caulfield Grammar School, located 750m north of the site, and
Wheelers Hill High School, located 1.15km southwest of the site.
Site Previous Use
The buildings and associated car parking on the site was historically used for the purpose of a fitness
centre that included an indoor pool and training gym use.
The site includes a large at grade car parking area accommodating in the order of 225 car parking
spaces. Vehicle access to the on‐site car parking occurs via intersection with Jells Road (all movements
permitted) and intersection with Ferntree Gully Road (access limited to left‐in/left‐out only).
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 7
Figure 1: Locality Plan
Figure 2: Aerial Photograph
Reproduced with Permission of Melways Publishing Pty Ltd
Subject Site
Source: Nearmap
Subject Site
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 8
Figure 3: Land Use Zoning Map
Source: Planning Schemes Online
Subject Site
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 9
3.2 Road Network
Ferntree Gully Road is a VicRoads declared arterial road and a Road Zone Category 1 under the
Planning Scheme, aligned in an east‐west direction. In the vicinity of the site, it provides six lanes of
two way traffic separated by a centre median. A slip lane is generally provided for either deceleration
lanes or channelized right turning lanes.
Adjacent to the site, a bus lane is also provided which provides access for buses to the Vermont South
terminal.
A posted speed limit of 80km/h applies to Ferntree Gully Road
Jells Road is also a VicRoads declared arterial road and a Road Zone Category 1 under the Planning
Scheme, aligned in a north‐south direction.
Typically, the configuration of Jells Road consists of a through lane in each direction with kerbside
parking along the western side. Further in the north, a service road is available on the eastern side.
In the vicinity of the intersection with Ferntree Gully Road, a centre median is constructed which
extends for 60m.
A posted speed limit of 60km/h applies to Jells Road.
Photographs of Jells Road near the site access are provided below.
Figure 4: Jells Road – view north Figure 5: Jells Road – view south
3.3 Car Parking Conditions
In the vicinity of the site, Ferntree Gully Road does not provide any kerbside on‐street parking. At the
eastern side of Jells Road, on‐street parking is provided on the service road.
During our site inspections during peak commute hours the occupancy of the car parking areas along
Jells Road were low.
3.4 Existing Traffic Conditions
Traffix Group has undertaken traffic surveys in combination with collected SCATS data to determine
the existing traffic conditions of the surrounding road network including along Jells Road adjacent to
the site access and intersection of Jells Road and Ferntree Gully Road.
Turning movement counts were undertaken on Thursday 15th March, 2018 between 7:30am‐9:30am
and 4:30pm‐6:30pm to establish the commuter peak hours at the intersection between Ferntree Gully
Road & Jells Road.
The results from the turning movement counts and SCATS data are summarised in Figure 6.
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 10
Figure 6: Existing Traffic Conditions during AM/PM Peak Hours
Subject Site
LEGEND 8am‐9am (5pm‐6pm) [veh/hr
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 11
3.5 Public Transport
The site served by a number of bus services. The available public transport services within close
proximity of the site are shown in Figure 7 and detailed in Table 2.
Figure 7: Public Transport Map
Table 2: Public Transport Services
Service Between Via
Ferntree Gully Rd/Jells Rd Bus Stop – approx. 50m south of the site
Bus Route 753 Belgrave & Oakleigh Ferntree Gully & Brandon Park
Bus Route 693 Glen Waverly & Bayswater Wheelers Hill, Knoxfield & Boronia
Jells Rd/Ajax Dr Bus Stop – approx. 80m north of the site
Bus Route 754 Rowville & Glen Waverly Caulfield Grammar & Wheelers Hill
Source: Public Transport Victoria ptv vic gov au
Subject Site
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 12
4 Traffic Engineering Assessment
4.1 Statutory Car Parking Assessment
The proposed development falls under the following land‐use category of ‘dwelling’ under Clause 74
of the Planning Scheme.
The Planning Scheme sets out the parking requirements for new developments under Clause 52.06.
The purpose of Clause 52.06 is:
To ensure that car parking is provided in accordance with the State Planning Policy Framework
and Local Planning Policy Framework.
To ensure the provision of an appropriate number of car parking spaces having regard to the
demand likely to be generated, the activities on the land and the nature of the locality.
To support sustainable transport alternatives to the motor car.
To promote the efficient use of car parking spaces through the consolidation of car parking
facilities.
To ensure that car parking does not adversely affect the amenity of the locality.
To ensure that the design and location of car parking is of a high standard, creates a safe
environment for users and enables easy and efficient use.
The car parking requirement for the development is set out under Clause 52.06 at the car parking table
at Clause 52.06‐5 of the Planning Scheme.
Table 3: Statutory Car Parking Assessment – Clause 52.06
Use Size/No. Statutory Parking Rate Car Parking Requirement
(Note 1)
Car Parking Provision
Shortfall(‐)/ Surplus(+)
Three‐bedroom Dwelling
64 2 spaces per three or more
bedroom dwelling
128 128 0
Four‐bedroom Dwelling
16 32 32 0
Residential visitors
80 dwellings
1 car space per 5 dwellings, for developments of 5 or
more dwellings 16 18 +2
TOTAL 176 178 +2
Note 1: Clause 52.06‐5 specifies that where a car parking calculation results in a requirement that is not a whole number, the number of spaces should be rounded down to the nearest whole number.
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 13
The development has a statutory parking requirement under Clause 52.06‐5 of 176 car spaces,
including 160 resident spaces and 16 visitor spaces. The provision and allocation of car spaces for
dwellings and shared car parking for visitors accords with the minimum statutory requirements of
Clause 52.06‐5.
Accordingly, a car parking reduction is not required under Clause 52.06‐7.
Clause 56 Requirements
Under Clause 52.06‐10 of the Planning Scheme, the Responsible Authority is required to consider:
The relevant standards of Clauses 56.06‐2, 56.06‐4, 56.06‐5, 56.06‐7 and 56.06‐8 for
residential developments with accessways longer than 60 metres or serving 16 or more
dwellings.
Clause 56.06 typically requires that on‐street parking for visitors is available at ‘1 hard standing verge
parking space per 2 lots’. Based on the 173 dwellings provided, this requirement equates to 86 car
parking spaces.
We are of the opinion that the actual visitor car parking demands for this development will be closer
to the requirements under Clause 52.06‐7 as the attached townhouses are more akin to apartment
style dwellings.
Overall, we are satisfied that adequate car parking is provided for the development.
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 14
4.2 Car Parking Layout Assessment
Traffix Group has provided design advice to the project architect to achieve a satisfactory carpark
layout. The proposed parking layout and vehicle access arrangements have been assessed under the
following guidelines:
Clause 52.06‐9 of the Planning Scheme (Design standards for car parking), and
AS2890.1‐2004 – Part 1: Off‐Street car parking.
Key elements of the design include:
Design Standard 1 – Accessways
The vehicle accessways with accommodate two‐way passing as required.
A minimum headroom clearance of 2.2m is provided along the ramps, which exceeds the
headroom requirement of Clause 52.06‐9 and accords with AS2890.1‐2004.
Vehicles will be able to enter and exit the site in a forwards direction in accordance with Clause
52.06‐9.
Pedestrian sight triangles will be available at the interface of the primary driveway with Jells Road
and between the interface of basement garage driveways and internal footpaths.
Design Standard 2 – Car spaces
Garages are generally provided in accordance with the minimum requirements of Clause 52.06‐9
or AS2890.1‐2004, with discussion as follows:
o Double garages provided at 5.5m wide x 6.0m long with minimum garage door of 4.8m in
accordance with Clause 520.6‐9.
o As a result of the lot widths and requirement for stairs the tandem garages are provided with
a clear width of 3.2m and length of 11.1m. Whilst the width of 3.2m is less than Clause 52.06‐
9 specifies for a single garage (3.5m) the width accords with the requirements of AS2890.1‐
2004 (min. 3m) and requirements of Clause 52.06‐9 where a car space is confined by walls
along both sides (3.2m).
We are satisfied that these dimensions are acceptable as separate storage areas are available
within the garages (i.e. under stairs and within initial entry areas where width of 4.3m
provided).
o Some of the tandem garages are shown at 8.6m long. These garages should be increas3ed
in length to a minimum of 10.9m (6m plus 4.9m). This requirement should be included as a
condition of permit.
Visitors car spaces within the basement are provided with dimensions that accord with the
requirements of Clause 52.06‐9 (2.6m wide x 4.9m long).
The open visitors car spaces provided along the internal access road have been provided with
dimensions that accord with AS2890.1‐2004. Specifically, car spaces are provided with clear
length of 6.3m and width of 2.3m. The variation from Clause 52.06‐9 is acceptable in this instance
as the external car parking areas are more akin to on‐street car parking and the use of shorter
bays allows for greater efficiency to maximise landscaping opportunities.
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 15
Access to all critical car spaces has been tested for the B85 design car from AS2890.1‐2004 and
found to be satisfactory.
Design Standard 3 – Gradients
The ramp grades accord with Clause 52.06‐9 including changes in grades and maximum gradients.
Due to the natural fall of the land some areas of open visitor car parking will include grades greater
than 1:20. We are satisfied that this arrangement is acceptable and not dissimilar from a number
of the local roads within the nearby area.
Grade changes of no more than 12.5% are provided along ramps.
Other Considerations
Clause 52.06‐9 specifies that before deciding on an application, the Responsible Authority must also
consider:
The relevant standards of Clauses 56.06‐2, 56.06‐4, 56.06‐5, 56.06‐5, 56.06‐7 and 56.06‐8 for
residential developments with accessways longer than 60m or serving 16 or more dwellings.
Accordingly, this development requires consideration of these Clauses.
A response to each of these requirements is set out in the following table.
Table 6: Response to Clause 56.06 Requirements
Planning Scheme Requirement Development Response
Clause 56.06‐2 – Walking and
Cycling Network Objectives
Clause 56.06‐5 – Walking and Cycling Network Detail Objectives
Main access road will include a separate footpath along one side that
ensures adequate separation between pedestrians and traffic.
Accordingly, we are satisfied that the development meets the objectives of
the Planning Scheme in regards to pedestrian and bicycle access.
Clause 56.06‐4 – Neighbourhood
and Street Network Objective
Clause 56.06‐7 – Neighbourhood Street Network Detail Objective
The internal accessway will accommodate all required movements
associated with all vehicles which can be reasonably expected to access the
site, including emergency vehicles and service vehicles (noting that waste
collection will occur within the basements via a private contractor utilising
a 6.4m mini waste truck) to the extent necessary.
Based on the expected traffic volumes and lot access arrangements, the
internal accessways can be assessed as an ‘Access Place’ under Table C1.
An ‘Access Place’ is identified as “A minor street providing local residential
access with shared traffic, pedestrian and recreation use, but with
pedestrian priority”. Under Table C1 an Access Place is required to be
designed with a 5.5m wide carriageway, which is achieved by the main
entrance driveways to the site.
The 5.5m wide Access Road is expected to accommodate on‐street parking,
and this will occur along the north‐south leg with indented car parking
provided along the east‐west leg.
We are satisfied that the development meets the objectives of the Planning Scheme in regards to neighbourhood street network objectives.
Clause 56.06‐8 – Lot Access
Objective
Vehicle access to each garage and visitor spaces has been reviewed and is
satisfactory.
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 16
Based on the above, we are satisfied the proposed layout of car parking and vehicles access is
satisfactory and that the access arrangements for the site will provide for safe and efficient movements
to and from the surrounding road network.
4.3 Bicycle Parking Assessment
Clause 52.34 of the Planning Scheme specifies bicycle parking requirements for new developments and
changes in use. Based on the height of the buildings proposed there is no requirements for bicycle
parking under Clause 52.34.
Notwithstanding, we are satisfied that bicycle parking for each of the dwellings can be accommodated
within the attached private garage provided to each (bikes available for use by residents and visitors
as required). This arrangement is similar to standard dwellings.
Based on the above, we are satisfied with the provision of bicycle parking in this development.
4.4 Traffic Generation and Impacts
4.4.1 Traffic Generation
The RTA Guide to Traffic Generating Developments (2002) (RTA Guide) sets out traffic generation rates
for a range of land uses. This guide is referred to in the AustRoads Guide which is used by VicRoads
and is generally regarded as the standard for metropolitan development characteristics.
The RTA Guide sets out the following relevant traffic generation rates for medium density residential
development:
Larger Units (three or more bedrooms)
Daily vehicle trips = 5 – 6.5 per dwelling per day
Weekday peak hour vehicle trips = 0.5 – 0.65 per dwelling per day
For the purpose of undertaking a conservative analysis, we have adopted the upper end of the range
for all of the proposed three and four‐bedroom dwellings (6.5 daily vehicle trips per dwelling per day)
Accordingly, a conservative assessment of the 80 dwellings are anticipated to generate in the order of
520 vehicle trip‐ends per day, including 52 vehicle trip‐ends during each of the road network peak
hours.
4.4.2 Traffic Distribution
All traffic from the development will be distributed to the wider road network via the existing access
to Jells Road.
The following traffic distribution assumptions have been adopted:
AM Peak Hour: 80% exiting and 20% entering.
PM Peak Hour: 30% exiting and 70% entering
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 17
The surrounding arterial road network comprises of Ferntree Gully Road to the south and Jells Road to
the east providing access inbound via the Eastlink to the east or the Monash Freeway to the west of
the site.
Distribution of the additional traffic generated by the proposed development exiting and entering the
site has adopted those at the intersection between Strathconnan Place and Jells Road. This is
intersection represents a closed catchment in similar location with residential uses only.
Turning movement counts of this intersection were undertaken during the same period as the surveys
to determine the existing conditions.
The traffic distribution results from the turning movement counts at the intersection are summarised
in Figure 8.
Figure 8: Existing traffic distribution at Strathconnan Place
Based on our opinion, and the locality of the site, the following traffic distribution assumptions have
been adopted at the intersection between Ferntree Gully Road and Jells Road for both AM and PM
peak hours:
To/from Springvale Road (westbound): 40%
To/from Eastlink (eastbound): 40%
To/from Wellington Road (southbound): 20%
Based on the preceding assumptions, Figure 9 below shows the additional traffic on the surrounding
road network during the AM and PM peak hours as a result of the proposed development.
Jells Rd
To Ferntree
Gully Road
(South)
To Waverly
Road
(North)
Strathconnan
Pl
40% (67%)
60% (33%)
50% (33%) 50% (67%)
LEGEND
Entering Movement
Exiting Movement
AM (PM) [veh/hr]
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 18
Figure 9: AM (PM) Peak Hour Additional Traffic Generated by Proposed Development
4.5 Traffic Impact Assessment
Comparison to Historical Conditions
The site accommodates existing buildings associated with a fitness centre and a total of approximately
230 at grade car parking spaces.
Allowing for 60% of car parking spaces to generate a traffic movement during the peak hour equates
to historical traffic impacts of 138 vehicle trip ends. Of these trips it would be reasonable to assume
that 50% occurred via the access to Jells Road, that is, 69 vehicle trip ends per hour.
Based on the above, we are satisfied that the traffic generation onto Jells Road associated with the
current development scheme would be no greater than the traffic historically generated at this site.
Comparison to Previous Application
A previous residential application over the site included 133 dwellings. Access to this development
was proposed to occur at similar location to Jells Road with some access to Ferntree Gully Road also
provided.
The current scheme represents a significant reduction in the number of dwellings accommodated at
the site and traffic generation respectively (approximately 40% reduction in number of dwellings).
Subject Site
LEGEND AM (PM) [veh/hr]
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 19
4.5.1 Impacts at Jells Road and Site Access
Figure 9 shows that the increase in traffic generated on the surrounding road network as a result of
the proposed development equates to 52 additional vehicle movements either entering or exiting via
Jells Road.
The assessment identifies that the peak impacts on the operation of Jells Road would occur during the
PM peak hour when a higher proportion of entry movement are expected. The entry movements will
consist of:
24 left‐in movements – equating to an average of 1 movements every 2.5 minutes, and
12 right‐in movements ‐equating to an average of 1 movement every 5 minutes.
This level of traffic is minor and unlikely to have any impact on the operation of Jells Road.
In particular the signalised intersection of Ferntree Gully Road 94m south of the site will provide
regular large gaps in traffic to enable right‐in movements to occur without any significant level of delay
or impacts to the through southbound traffic along Jells Road.
Gap Analysis Capacity Assessment
A gap acceptance analysis has been undertaken for the critical AM Peak Period 8am‐9am and PM Peak
Period 5pm‐6pm to assess the capacity of the site access to Jells Road to accommodate the post
development traffic movements.
Gap acceptance analysis is preferential to a SIDRA based analysis for an unsignalised intersection as it
records actual gaps in traffic rather than using theoretical gaps based on certain flow assumptions.
This is particularly the case where gaps in traffic can be significantly influenced by nearby traffic signals
or queues.
The gap acceptance parameters adopted in this assessment, are generally in accordance with
AustrRoads, Guide to Road Design: Part 4A: Unsignalised Intersections (2017) as detailed in Table 4.
Table 4: Adopted Gap Acceptance
Movement Commuter Peak
Critical Gap (s) Follow‐up Headway (s)
Right‐Turn IN 4 2
Right‐Turn OUT 5 3
The results of the assessment are summarised in Table 5.
This assessment is based on the actual recorded gaps available for each movement in the existing
traffic stream and taking into account any vehicle queues along Jells Road. The assessment identifies
traffic from the development will be readily accommodated with minimal delays and queuing.
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 20
Table 5: Peak Hour Traffic conditions at site access to Jells Road
Movement Critical / Follow‐up Gap
Total Movement Capacity (1)
Generated Volume
Utilisation of Total Cap.
Post‐Dev. Spare
Capacity
98th Percentile Queue Length
(3)
AM PEAK HOUR
Right Turn Out 5 / 3 sec 304 25 8.2% 279 1
Right Turn In 4 / 2 sec 545 5 0.9% 540 1
Left Turn Out 5 / 3 sec 554 17 3.1% 537 1
PM PEAK HOUR
Right Turn Out 5 / 3 sec 171 (2) 5 2.9% 157 1
Right Turn In 4 / 2 sec 219 (2) 12 5.5% 207 1
Left Turn Out 5 / 3 sec 522 (2) 11 2.1% 494 1
Notes:
1) The total movement capacity has been taken as 80% of the actual recorded movement capacities in order to undertake a conservative assessment
2) Conservatively excludes any capacity for right‐turn exit movements during those periods where queueing in southbound lane of Jells Road was recorded. In practice some additional courtesy gaps could be accommodated during these periods.
3) 98th Percentile queue lengths in accordance to Figure 6.5 ‐ AustRoads Guide to Traffic Management Part 3: Traffic Studies and Analysis
Impacts at Intersection between Jells Road and Ferntree Gully Road
In regard to impacts on specific movements at the intersection between Ferntree Gully Road and Jells
Road, we are satisfied that the peak hour traffic impacts of the development can be accommodated
and represent a reduction in the impacts at this location in comparison to the historical use of the site
as fitness centre and approved development scheme for approx. 130 dwellings.
4.5.2 Access to Jells Road Considerations
The access from the proposed to development to Jells Road is to occur via an existing vehicle crossover.
We are satisfied that this arrangement is acceptable on the basis of the following:
Right‐in movements into the site from Jells Road are low at a maximum of 12 movements during
the peak hours. This level of traffic represents an average of 1 movements every 5 minutes and
these movements will have negligible impact on the operation of Jells Road.
Noted that most local road intersections along Jells Road north of the site do not include separate
provision for right‐turn lanes (i.e. Strathconnan Place and Ajax Drive).
Left‐in movements will typically be staggered associated with those periods when traffic signals
to the site allow northbound movements to occur. The majority of left‐in movements are
expected to consist of movements originating from the east or west with only 20% of movements
expected to originate from Jells Road south of the Ferntree Gully Road intersection (no more than
4 left‐in movements from this origin).
The configuration of Jells Road adjacent to the site is such that two through lanes are available for
north‐bound traffic which merge north of the site access. At those times when left‐in movements
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 21
originate from the east of west (peak of 10 movements from either direction), the traffic stream
would consist of a single lane only and as such the two through lanes will enable any through
traffic to pass turning traffic safely and without any delay.
Based on the above, we are satisfied that the provision of left‐turn deceleration lane is not
required for the site access from Jells Road.
Overall, we are satisfied that the existing intersection treatment providing access to the site from Jells
Road is acceptable in its current form and appropriate for the proposed 80 dwelling development.
5 Loading & Waste Collection
5.1 Loading & Emergency Access
Loading
Clause 65 of the Planning Scheme specifies that:
Before deciding on an application or approval of a plan, the responsible authority must consider, as
appropriate:
o The adequacy of loading and unloading facilities and any associated amenity, traffic flow and
road safety impacts.
Loading demand for the dwellings would typically be associated with move‐in/move‐out activities and
delivery of various goods. Based on the level of at grade car parking provided, we are satisfied that
these demands can be accommodated on‐site as required.
The internal road network can accommodate turn‐around manoeuvres associated with the 8.8m long
Medium Rigid Vehicle (MRV) presented at AS2890.2‐2002. Swept paths demonstrating this movement
are attached at Appendix C.
Emergency Access
As detailed above the at grade internal road network can accommodate access movements associated
with the 8.8m long Medium Rigid Vehicle (MRV) presented at AS2890.2‐2002. Accordingly, we are
satisfied that suitable access through the site is available for emergency vehicles (fire/ambulance).
5.2 Waste Collection
Waste bins for those external townhouses are to be stored within garages or private open spaces
attached to each dwelling. For the attached townhouses centralised waste collection bin storage areas
are proposed within the shared basements.
Waste will be collected via private contractor using a 6.4m long waste collection vehicle with an
operation height of height of 2.1m. The waste collection vehicle will be able to enter and exit the site
and individual townhouse basements in a forwards direction.
Swept path diagrams have been prepared for the waste collection vehicle and are attached at
Appendix C.
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1 Page 22
Based on the above, we are satisfied that waste collection is not a significant issue for this development
and can occur on‐site via private contractor as required. A waste management plan would typically
prepared as a condition of permit.
6 Conclusions
Having undertaken a detailed assessment of the proposed residential development at 855 Ferntree
Gully, Wheelers Hill, we are satisfied that:
a) car parking is provided on‐site for residents and visitors at rates that accord with the requirements
of Clause 52.06‐5 of the Planning Scheme and no reduction in car parking is required in association
with this development,
b) adequate car parking for visitors will be available and all visitor demands can be accommodated
on‐site,
c) the internal vehicle and pedestrian access arrangements are acceptable in accordance with the
relevant requirements of Clause 52.06‐9 of the Planning Scheme,
d) the design of the car parking spaces and private garages accords with the requirements of Clause
52.06‐9, subject to:
i) tandem garages provided at minimum clear internal length of 10.9m, with this requirement
included as a condition of permit,
e) the configuration of the existing vehicle access arrangements to Jells Road is acceptable for the
proposed development, represents safe and efficient access and upgrades or amendments are
not warranted,
f) traffic predicted to be generated by the proposed development will easily be accommodated on
the surrounding road network and intersections without any adverse impacts and mitigation
works to the external road network are not required,
g) loading and waste collection vehicles will be accommodated on‐site as required, and
h) there are no traffic engineering reasons why the proposed residential development at 855
Ferntree Gully Road, Wheelers Hill should not be approved, subject to appropriate conditions.
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1
Appendix A: Development Plans
UP
UP
117.69
118.44
118.70
128.12
128.10
127.97
127.91
127.81
127.60
127.38
127.10
126.83126.74
126.31
125.74 124.97 124.09123.14
122.22
121.21
120.18
120.18 119.55
119.16
118.76117.46
117.17116.32
115.73
115.59 114.39
113.95
SE
TO
UT
PO
INT
TYPE DTYPE D TYPE D
TYPE C
TYPE C
TYPE A
TYPE CTYPE C
TYPE B
TYPE B
10 METER SET BACK LINE
7 METER HEIGHT LIMIT
10.5 METER HEIGHT LIMIT
12 METER HEIGHT LIMIT
visi
tor
car
pa
rks
ATP3.00
ATP3.00
BTP3.00
BTP3.00
S.P.O.S.60m298.5m²
15.5m²
24.5m²
7m²7m²7m²16.5m²7m²7m²7m²
3.5m²
88.5m²
97.5m²
97.5m²
TYPE A
97.5m²
8.5m²
BIN
S S
TO
RA
GE
S.P.O.S.60m2
S.P.O.S.98.5m2
S.P.O.S.78.5m2
S.P.O.S.57m2
S.P.O.S.60m2
164.5m²
UPPER BASEMENT
LOWER BASEMENT
visitor car park
visitor car park
visitor car park
visitor car park
visitor car park
visitor car park
Visitor car park subject to 'NO PARKING' during waste collection
visitor car park
3m²
3m²
3.5m² 3.5m² 3.5m² 3.5m²3.5m²
SETBACK LEGEND:
MAIN ROADS (Ferntree Gully - Jells Road)0-10 m along main roads - no buildable area10-18 m set back o/a 10.5 meters height18+ m set back o/a 11-12 meters height
REMAINING SITE BOUNDARIES00-03 m set back landscape buffer03-12 m set back max o/a h 7.0 m12-18 m set back max o/a h 10.5 m18+ m set back max o/a h 11-12 m
RL 120.30
RL 122.50
RL 120.49
RL 119.89
RL 118.50 RL 118.40
5m² 5m²RL 120.45RL 121.12
RL 120.27 RL 119.16RL 120.96 RL 119.53RL 119.90
RL 121.40 RL 120.73
RL 122.35
RL 122.20
RL 123.00
RL 122.07
RL 121.65
RL 120.91
RL 123.66
RL 123.00
RL 123.00
RL 123.00
1:20
1TP2.00
10750
BIN
S S
TO
RA
GE
RL 123.66RL 123.66
RL 123.66 RL 123.66
RL 123.00
RL 120.96RL 120.96 RL 120.52
RL 120.30
RL 120.96 RL 120.30RL 120.961:20
13200
1200
0
RL 120.62
1:20
G.I SHED
G.I
SH
ED
TH
ICK
TR
EE
S &
BU
SH
ES
SWIMMING POOL
(APPROX. POSITION)
TH
ICK
TR
EE
S &
BU
SH
ES
No. 137/4 DOUBLE STOREY BRICK &
RENDERED DWELLING
No. 137/5 DOUBLE STOREY BRICK &
RENDERED DWELLING
No. 137/6 DOUBLE STOREY BRICK &
RENDERED DWELLING
No. 137/7 DOUBLE STOREY BRICK &
RENDERED DWELLING
No. 139 DOUBLE STOREY BRICK
DWELLING No. 137/1 DOUBLE STOREY BRICK &
RENDERED DWELLING
No. 135 DOUBLE STOREY BRICK
DWELLING (APPROX. POSITION
ONLY)
JELLS ROAD
FE
RN
TR
EE
GU
LL
Y
RO
AD
PA
LIN
GS
2
m H
IGH
PA
LIN
GS
2
m H
IGH
96.5m²
123m²
10m²
visi
tor
car
park
visi
tor
car
park
visi
tor
car
park
visi
tor
car
park
visi
tor
car
park
visi
tor
car
park
No. 14 SINGLE STOREY BRICK
DWELLING
No. 13 SINGLE STOREY BRICK
DWELLING
No. 12 SINGLE STOREY BRICK
DWELLING
No. 11 SINGLE STOREY BRICK
DWELLING
No. 10 DOUBLE STOREY BRICK & W/B DWELLING
No. 9 DOUBLE STOREY BRICK & W/B DWELLING
No. 851/2 SINGLE STOREY BRICK
DWELLING
1TP2.01
4TP2.01
1TP2.02
2TP2.03
3TP2.00
3TP2.03
TH01
TH02
TH03
TH04
TH05
TH06
TH07
TH08
TH12TH13TH14TH15TH16TH17TH18
TH19
TH20TH21TH22TH23
TH24TH25
TH26TH27TH28TH29TH30TH31TH32TH33
TH34TH35
TH36 TH37 TH38 TH39 TH40 TH41 TH42 TH43 TH44 TH45 TH46 TH47 TH48 TH49 TH50 TH51
TH52TH53TH 54TH55TH56TH57TH58TH59TH60TH61TH62TH63TH64TH65TH66
TH80
TH79
TH78 TH77
TH76 TH75TH74 TH73
TH72 TH71
TH70 TH69 TH68 TH67
1:55
1:19
DASHED OUTLINE SHOWINGUNDERGROUND RAINWATER TANK
DASHED OUTLINE SHOWINGUNDERGROUND RAINWATER TANK
DA
SH
ED
OU
TL
INE
SH
OW
ING
UN
DE
RG
RO
UN
DD
ET
EN
TIO
N W
AT
ER
TA
NK
outline of relocatedsubstation reserve6400x6400
outline of relocatedsubstation reserve6400x6400
GMBGMB
GMB
AWMC
AWMC
AW
MC
AW
MC
RFE
RFE DHWP
DC
WB
T
DCWP
DHWP
2TP2.01
2TP2.02
4TP2.02
4TP2.03
1:26 RA
MP
1:10
S.P.O.S.91.5m2
S.P.O.S.73m2
3682
1704
3172
S.P.O.S.164.5m2
RL 121.49
TH09 TH10
TH11
5500
3000
visitor car park 3800
2600
2600
BIN
S S
TO
RA
GE
BIN
S S
TO
RA
GE
1200
0
2979m²
344.5m²
42.5m²
97.5m²
RL 122.67 RL 120.81
RL 120.81RL 120.44 RL 120.07
RL 121.15
RL 122.67 RL 122.28 RL 121.89 RL 121.50 RL 120.07 RL 119.70RL 120.81 RL 120.44
13200
RL 121.95
RL 121.55
RL 119.00
RL 119.25
RL 119.55
RL 120.75
RL 121.12 RL 120.45
RL 121.40 RL 121.18 RL 120.96 RL 120.96RL 120.74 RL 120.74 RL 120.52
RL 120.30RL 120.30
RL 120.30 RL 120.30RL 120.96RL 121.18RL 121.40
RL 121.62
RL 124.32
RL 124.32
RL 124.32
RL 124.10 RL 123.88 RL 123.22
RL 123.22 RL 123.22 RL 123.00RL 123.88RL 124.10RL 124.10
RL 120.96
RL 121.40RL 121.62
RL 121.62
RL 121.40 RL 121.18 RL 120.74
RL 119.70 RL 119.30
13200
TYPE D
LEGEND ABBREVIATIONS:
HYDRAULICAWMC: Authority Water Meter CabinetsDCWP: Domestic Cold Water PumpDHWP: Domestic Hot Water PumpDCWBT: Domestic Cold Water Break Tank
FIRE SERVICEFHRC: Fire Hose Real CupboardFE: Fire ExtinguisherSCV: Sprinkler Control ValveFBC: Fire Booster Cabinet
ELECTRICAL EMS: Electrical Main SwitchboardGMB: Group Meter Box
FE
& F
HR
FE
& F
HR
FE
& F
HR
FE
& F
HR
Town Houses Legend Type:
ABCD
01010101
0202
02 03 04RL 120.00
visitor car parkRWT
RWT
RWT
RWT
RWT
RWT
RWT
4000
5000
310050
00
1200
0
7000
7000
7000
7000 visitor car park
RWT
RW
T
RW
T
RW
T
RW
T
RW
T
RW
T
1:20
RL 123.44
EA
ST
-WE
ST
RO
AD
SOUTH-NORD ROAD
OUTLINE GAS METER ENCLOSURE
OUTLINE VOID ABOVE
OUTLINE VOID ABOVE
OUTLINE VOID ABOVE
OUTLINE VOID ABOVE
OUTLINE VOID ABOVE
OUTLINE VOID ABOVE
OUTLINE VOID ABOVE
OUTLINE VOID ABOVE
OUTLINE VOID ABOVE
OUTLINE VOID ABOVE
OUTLINE VOID ABOVE
BINS COLLECTIONA AREA
RL 122.67
7998
3130
6000
1342
6
3013
6000
TH08
TH07
TH06
TH05
TH04
TH03
TH02
TH01
AmendmentsProject Title Sheet No. Revision
PRELIMINARY
No. Date Notes
Client Sheet Scale
DateCHT Architects Pty LtdABN 29 108 008 519
ArchitectureInterior DesignUrban Design
CHT Architects Pty Ltd44 Oxford StreetCollingwood VIC 3066Post Office Box 1352Collingwood VIC 3066
Telephone 03 9417 1944Facsimile 03 9415 1847
Copyright © CHT Architects Pty Ltd.
The drawings, designs, and specifications and copyright therin are the property of CHT Architects Pty Ltd, and must not be used, copied, or reproduced wholly or in part without the express written permission of CHT Architects Pty Ltd.
Do not scale drawings. Use given dimensions only.
Any discrepency in drawings or specifications shall be referred to CHT Architects Pty Ltd.
TOWN PLANNING ISSUE
1 : 250@A1
15-J
un-1
8 6 :
21:2
4 PM
TOWN HOUSES DEVELOPMENT855-869 Ferntree Gully Rd, Wheelers Hill
MADISON QUAY PTY LTD
BASEMENT FLOOR MASTER PLAN TP1.01
1716
7
NOT FOR CONSTRUCTION
1716
7--
Drawn by:AuthorChecked by:Checker
SCALE 1 : 250
2 MP - TH01-08 BASEMENT
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1
Appendix B: Car Parking and Vehicle Access
Swept Paths
Traffic Impact Assessment: 855 Ferntree Gully Road, Wheelers Hill Traffic Engineering Assessment: Proposed Residential Development
24503R#1
Appendix C: Waste Collection and Loading
Swept Paths