traffic jam avoidance

33

Upload: medge-hebert

Post on 02-Jan-2016

24 views

Category:

Documents


3 download

DESCRIPTION

TRAFFIC JAM AVOIDANCE. Acknowledgement Project Idea. Requirements The Technology used and why it is used. The Main idea used The Algorithm used. Program used to implement it Output shape. Double Handover Technique ⇨ Idea ⇨ Equation: ⇨ Conclusion. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: TRAFFIC JAM AVOIDANCE
Page 2: TRAFFIC JAM AVOIDANCE

Acknowledgement

Project Idea

Page 3: TRAFFIC JAM AVOIDANCE

Requirements

The Technology used and why it is used

Page 4: TRAFFIC JAM AVOIDANCE

The Main idea used

The Algorithm used

Page 5: TRAFFIC JAM AVOIDANCE

Program used to implement it

Output shape

Page 6: TRAFFIC JAM AVOIDANCE

Double Handover Technique

⇨ Idea ⇨ Equation:

⇨ Conclusion

Page 7: TRAFFIC JAM AVOIDANCE

Drive Tests

Page 8: TRAFFIC JAM AVOIDANCE

TEMS

⇨ Usage

Page 9: TRAFFIC JAM AVOIDANCE

Drive Tests Benefits

⇨Distance Calculations

Page 10: TRAFFIC JAM AVOIDANCE

⇨Knowing cells sequence through road

Obstacle

Page 11: TRAFFIC JAM AVOIDANCE

Pattern

Page 12: TRAFFIC JAM AVOIDANCE

Major Cells

Project Advantage ⇨ DOH doesn’t have to be between successive

boundaries

Page 13: TRAFFIC JAM AVOIDANCE

Handover Data

Page 14: TRAFFIC JAM AVOIDANCE

Continue Of Handover Data

Page 15: TRAFFIC JAM AVOIDANCE

GSM Infrastructure ⇨GSM data Capture

◉ Air-Interface◉ A-bis-Interface◉ A-interface

Page 16: TRAFFIC JAM AVOIDANCE

⇨GSM Frequencies

◉ 900

◉ 1800

Page 17: TRAFFIC JAM AVOIDANCE

Massive Data

Number of mobiles per cell (Density)

Page 18: TRAFFIC JAM AVOIDANCE

Code Algorithm

Page 19: TRAFFIC JAM AVOIDANCE

Technical Problems that faced us:

⇨Live Massive Data

◉ INET

Page 20: TRAFFIC JAM AVOIDANCE

◉ Old Data Recovery

Page 21: TRAFFIC JAM AVOIDANCE

◉ Old Data Recovery

Page 22: TRAFFIC JAM AVOIDANCE

⇨ Velocity Database is too Large

Page 23: TRAFFIC JAM AVOIDANCE

⇨ 900 & 1800 Frequency Bands

◉ Important Point

Page 24: TRAFFIC JAM AVOIDANCE

⇨ Distance between cell boundaries seems Variable

◉ Cell “3386”: * Coverage distance of the cell =

[2.6+2.5+2.15+2.12+2.08]/5 = 2.29 Km

◉ Cell “3385”: * Coverage distance of the cell = [1.2+1+1.25+1.15]/4 = 1.15 Km

Page 25: TRAFFIC JAM AVOIDANCE

How Java Program Work:

⇨ Function used in the code:

◉ getFiles(folder, list)

◉ searchfile(fo,dlist)

Page 26: TRAFFIC JAM AVOIDANCE

◉getcelltime(dlist,celltime)

◉ getsequence(celltime,pntarr,pntarrlength, fr)

◉getspeed(pntarr,pntarrlength,sectionspeed,fr)

Page 27: TRAFFIC JAM AVOIDANCE

◉Getaveragevelocity(avb,avf)

◉ Deletefiles (flist)

◉Timer

Page 28: TRAFFIC JAM AVOIDANCE
Page 29: TRAFFIC JAM AVOIDANCE

Market Segments That Will Be Interested In The Product/Service

Charge On Market Segment

Page 30: TRAFFIC JAM AVOIDANCE

Actual Cost Of The Project

Financial Returns For Vodafone

Page 31: TRAFFIC JAM AVOIDANCE

Major Competitors

⇨Competitive Advantage

Statistics Of Your Market Study

Page 32: TRAFFIC JAM AVOIDANCE

Other Algorithms We Tried To Achieve The Project

⇨ Obstacles That Faced Us

Page 33: TRAFFIC JAM AVOIDANCE

Future work

⇨ Increase The Accuracy of the Calculated Distance Between Cell Boundaries

⇨ Implement It On Other Roads