Transport for LondonLondon Underground
Access Improvement
Train Master - Transmission Based Train Control Module
Issue 1
Effective 1st July 2013
MAYOR OF LONDON
Learning information booklet
1 Introduction 42 Rolesandresponsibilities 53 TransmissionBasedTrainControl overview 74 Planningpossessionworksitesand specifiedareas 125 SpecifiedareasonTBTClines 136 PossessionworksitesonTBTClines 167 Communications 188 Dealingwithincidentsandemergencies 209 References 21
ContentsSection page
4
sect
ion IntroductionIntroduction1 Roles and responsibilities
1 IntroductionThemodulewilltrainanindividualcertificatedasaTrainMaster(TM)in:
• thebasicunderstandingoftheTransmissionBasedTrainControl(TBTC)signallingsystem
• settingupandworkingwithinaSpecifiedArea(SA)onlinesfittedwiththeTBTCsignallingsystem
• liaisingwiththeVehicleControlCentre(VCC)operatorforroutelockingpoints
• theprocessofre-enteringontotheTBTCsignallingsystemwithinaSAandpossessionworksites
• givinguptheSAonlinesfittedwiththeTBTCsignallingsystem
• dealingwithunexpectedcomplicationswhenre-enteringontotheTBTCsignallingsystem.
IndividualswhomeettherequiredstandardwillbeawardedatracksafetycertificateendorsedTBTCmodule.
ThiscoursedoesnotcoverEngineer’sCurrentAreas.
Introduction
5
section2Roles and responsibilities
2 Roles and responsibilities
2.1 Train Master
Thetrainmasterisresponsiblefor:
supervisingandcontrollinganengineer’strain,testtrain,mechanisedvehicleandontrackplantworkingwithinapossessionworksiteorSA
thesafetyofpersonnelneedingtoworkonoraboutthetrackwithinapossessionworksiteorSA.
Allpersonnelworkingonoraboutthetrackwhentrainsandmechanisedvehiclesaremovingorifthetractioncurrentison,mustasaminimum,holdBasicTrackAwareness(BTA)orTrackAccustomed(TA)certification.
2.2 Engineer’s Train Operator
Aperson,certificatedbyLondonUnderground(LU),todriveanelectric,batteryordieseltrainorlocomotive.
Roles and responsibilitiesTransmission Based Train Control overview
6
sect
ion Roles and responsibilities2
2.3 Vehicle Control Centre Operator
2.4 Possession Master
ApersoncertificatedbyLUtotakecontrolofapossession.APossessionMaster(POM)canbeidentifiedwitha‘PossessionMaster’armbandwornontheleftarmabovetheelbow.
Monitors,controlsandmaintainstheVCC.
TheVCCoperatorisnotasignalleranddoesnotauthorisetrainmovements.
Roles and responsibilities
7
section3Transmission Based Train Control overview
3 Transmission Based Train Control overview
TBTCisacomputerbasedsignallingsystemthatisdifferenttothenormalconventionalsystemasitdoesnothave:
• fixedlinesidesignals
• associatedtrackcircuits.
TBTCisbasedonthemovingblockprinciple,allowingmoretrainstosafelyoccupythesameamountoftrack.
TheVCCcancalculatethebrakingdistancerequired,relativetothespeedofthetrainatanyspecifictime.Thisallowsafollowingtrainthatisslowingdown,toapproachandstopbehindthetraininfrontmoreclosely.
TheVCCsarecentralisedcomputers,locatedattheNeasdenServiceControlCentre(SCC)whichcommunicatewiththetrain’sonboardcomputerequipmentandkeepthetrainsasafedistanceapart.
Transmission Based Train Control overview
8
sect
ion Transmission Based Train Control overviewTransmission Based Train Control overview3
3.1 TBTC associated equipmentThereareseveraldifferentpiecesofequipmentonandaroundthetrackusedfortheTBTCsignallingsystem.
3.1.1 Induction loop
TransmitsinformationbetweenthetrainandtheVCC.
3.1.2 Remote loop box
TheinductiveloopsarefittedtotheremoteloopboxviaafeedindevicethattransmitsinformationbacktotheVCC.
Youmustnottouchordisturbtheinductionloop,anydamageorsuspecteddamagetotheloopmustbereportedimmediately.
Transmission Based Train Control overview
9
section3Transmission Based Train Control overview
3.1.3 Axle counter
Detectsthepassingofatrainusingacountinghead(detectionpoint)installedateachendofasection.Aseachaxlepassestheheadatthestartofthesection,acountercountsintheaxle.Adetectionpointcomprisesoftwoindependentsensors;thereforethedevicecandetectthedirectionofatrainbytheorderinwhichthesensorsarepassed.Whenthetrainpassesasimilarcountingheadattheendofthesection,theaxlesarecountedout.
3.1.4 Axle counter head communication
SendsinformationfromtheaxlecounterheadtotheVCC.
Transmission Based Train Control overview
10
sect
ion Transmission Based Train Control overviewTransmission Based Train Control overview3
3.2 TBTC track signs
ThefollowingaretypesofTBTCtracksignsthataTMwillseeoruseduringwork.
3.2.1 Entry Point (EP)
ThissignmarksthelocationoftheboundarybetweentwoTBTCloops.Trainsre–enteringtheTBTCsignallingsystemmustensurethattheirVehicleonBoardControllers(VOBC)areresetbeforepassingthissign.
3.2.2 Clearance Point (EPX)Thispointiswheretrainsmayre-entertheTBTCsignallingsystemafterbothVOBCshavepassedaloopboundary.Thispointislocatedafteranentrypoint,approximatelyonetrainlength(130metres)afteraloopboundary.Trainswillbeauthorisedtothissignwhenre-enteringtheTBTCsignallingsystem,thisissothatbothVOBCsareonthenewloop.
Transmission Based Train Control overview
11
section3Transmission Based Train Control overview
11
section
3.2.3 Restrictive Manual (RM) hold
ThesesignsindicatethelocationswheretrainsinRMmode(outsideofapossessionorSA)muststopandgainauthorisationtoproceed.RMholdsignsmaybeusedasadesignatedentrypointinplaceofEntryPointsigns.
Thesignwiththeyellowborderisarepeater.
Planning possession worksites and specified areasSpecified areas onTransmission Based Train Control lines
12
sect
ion Planning possession worksites and specified areas4
4 Planning possession worksites and specifiedareas
WhenplanningpossessionworksitesandSAsonTBTClinesthefollowingmustbetakenintoconsideration:
• platformsusedforre-couplingareofsufficientlengthtoaccommodatetheentiretrain
• thereareappropriateEntryPoints(EP)andClearancePoints(EPX)withinthepossessionworksiteorSA
• whereverpossibleaminimumoftwoentrypointsshouldbedesignedintothere-entrypathoftheengineer’strain(re-entrypathwillbewithinthelimitsofthepossession/SA)
• theengineer’strainwillruntositeinProtectedManual(PM)(thiswillmeanthetrainwilloperatetonormalsignalledmovesunderTrafficHoursconditions)
• thepossession/SAmustbepublishedintheNightlyEngineeringProtectionArrangementsandEngineeringNotice.
AtlocationswherepointscannotbesecuredusingtheTBTCroutelockingprocedure,theymustbesecuredusingascotchandclip.
Whenanengineer’strainisscheduledtouncoupleandbothportionsarescheduledtoworkindependently,thereisarequirementforbothportionstohaveaTM,oneforeachportion.
Planning possession worksites and specified areas
13
section5Specified areas onTransmission Based Train Control lines
5 SpecifiedareasonTBTClinesEngineer’strainswillberoutedtositeinaccordancewiththepublishedpath.
Whentheengineer’strainhasarrivedatthedesignatedplatformtheTMwill:
• bookonwiththeTrackAccessController(TAC)iftheyhavenotalreadydoneso
• telltheEngineersTrainOperator(ETO)toswitchtobatterypower(ifapplicable)
• contactthecontrollertorequestthattractioncurrentbeswitchedofffromtherelevantsection(s)andconfirmwithaCurrentRailIndicatorDeviceorPermanent–CurrentRailIndicatorDevice
• tellthelimitdefinerstodefinethelimitsoftheSAandconfirmwhenthisisdone
• telltheVCCoperatortosetandlockpointsaspertheTBTCroutelockingprocedureandreceiveconfirmation
• confirmandinformtheSitePersoninCharge(SPC)thattheSAhasbeendefined.
Iftheengineer’strainisnotscheduledtouncouplethentheVCCoperatordoesnotneedtobecontactedwhensettinguptheSA.HowevertheVCCoperatorwillneedtobetoldwhengivinguptheSA.
Specified areas onTransmission Based Train Control lines
14
sect
ion Specified areas on
Transmission Based Train Control linesSpecified areas onTransmission Based Train Control lines55.1 Commencing work
OncetheSAhasbeensetupandtheworkgrouphavebeenbriefed,theTMinformstheSPCthattheSAhasbeendefinedandworkcancommence.
TheTMtellstheETOtouncouplethetrainandconfirmwhenthisisdone.
Whenconfirmed,theTMtellstheSPCthatworkcanstart.
TheSPCtellstheTMtoworktheengineer’strainasrequired.
TheTMtellstheETOtomovetheengineer’strainasrequired.
5.2 On completion of the work
Oncompletionofthework,theSPCwilltelltheTMthattheworkiscompleteandtheSAcanbegivenup.
TMtellstheETOtomovebothportionsoftheengineer’straintothedesignatedstationplatform,tore-couplethetrainandconfirmwhendone.
TMconfirmswiththeVCCoperatorthatthetrainhasre-coupledandisreadytore-entertheTBTCsignallingsystemandcannowberoutedtothedesignatedexitplatform.
WhentherouteissetandareaclearedtheVCCoperatorwilltelltheTMthatthetraincanbemovedtothedesignatedEntryPoint(EP).
TMtellstheETOtomovethetraintothedesignatedEntryPointinRestrictedManualmode(RM).
ItistheresponsibilityoftheTMtoensurethatallprotectionarrangementsareinplacebeforethetrainstartsworking.
MovingatraininRMmodelimitsthespeedoftheengineer’strainat17.5kph.
Specified areas onTransmission Based Train Control lines
15
section5Specified areas onTransmission Based Train Control lines
Onarrivalatthedesignatedsign,theTMwilltelltheVCCoperatorandrequesttheclearanceofanyfurtherissuesandwaitforconfirmation.
TMtellstheETOtoresetbothVOBCs.
WhentheETOconfirms,telltheVCCoperatorthattheVOBCsareresetandthetrainisreadyforre-entry.
TMauthorisesETOtoproceedtodesignatedClearancePoint(EPX)andwaitforthesystemtostartcommunicating.
Onceconfirmed,theTMauthorisestheETOtoproceedtothedesignatedexitplatforminRM.
TMtellstheVCCoperatorthatthetrainhasfullyberthedatthedesignatedexitplatformandrequestsforanyotherissuestobeclearedup.
VCCoperatorconfirmsthatallremainingissueshavebeenresolved.
5.3 Givingupthespecifiedarea
Oncetheengineer’strainhasfullyre-enteredtheTBTCsignallingsystemandallissueshavebeenresolved,theSPCwillauthorisetheTMtogiveuptheSA.TheTMwill:
• requesttheVCCoperatortoremoveanyroutelockingonpointswithintheSA
• tellthelimitdefinerstoremovethelimitsoftheSAandconfirmwhendone
• bookoffwiththeTACfollowedbythelimitdefiners
• telltheETOtoproceedtobookedstablingpointwhentractioncurrentisswitchedon.
Possession worksites on Transmission Based Train Control lines
16
sect
ion Possession worksites on
Transmission Based Train Control linesPossession worksites on Transmission Based Train Control lines66 Possession worksites on TBTC lines
Oncethepossessionhasbeensetup,thePOMwilltelltheProtectionSupportManager(POSM)tosetuptheworksite(s)andgivetheSPCpermissiontocommencework.
TMwilltelltheETOtoswitchtobatterypowerbeforeanytrainmovements(onlyapplicableifbatterylocomotivesareused).
TMtellstheVCCoperatortosetandlockpointsaspertheTBTCroutelockingprocedureandreceiveconfirmation.
TMtellstheETOtouncouplethetrainandwhenconfirmed,theTMinformstheSPC.
6.1 Commencing work
Oncetheworksitehasbeensetupandtheworkgrouphavebeenbriefed,theSPCtellstheTMthattheworkcancommence.
TheTMtellstheETOtouncouplethetrainandconfirmwhenthisisdone.
Whenconfirmed,theTMtellstheSPCthatworkcanstart.
TheSPCtellstheTMtoworktheengineer’strainasrequired.
TheTMinstructstheETOtomovetheengineer’strainasrequired.
6.2 On completion of the workOncompletionoftheworktheSPCwilltelltheTMthattheworkiscomplete.
TMtellstheETOtomovebothportionsoftheengineer’straintothedesignatedstationplatformtore-couplethetrainandconfirmwhendone.
TMtellstheVCCoperatorthatthetrainhasre-coupledandisreadytore-entertheTBTCsignallingsystemandcannowberoutedtothedesignatedexitplatform.
Possession worksites on Transmission Based Train Control lines
17
section6Possession worksites on Transmission Based Train Control lines
Whentherouteissetandareacleared,theVCCoperatorwilltelltheTMthatthetraincanbemovedtothedesignatedEntryPoint(EP).
TMtellstheETOtomovethetraintothedesignatedEntryPointinRMmode.
Onarrivalatthedesignatedsign,theTMwilltelltheVCCoperatorandrequesttheclearanceofanyfurtherissuesandwaitsforconfirmation.
TMinstructstheETOtoresetbothVOBCs.
WhenconfirmedtelltheVCCoperatorthattheVOBCsareresetandthetrainisreadyforre-entry.
TMauthorisesETOtoproceedtodesignatedClearancePoint(EPX)andwaitsforthesystemtostartcommunicating.
Onceconfirmed,theTMauthorisestheETOtoproceedtothedesignatedexitplatforminRM.
TMtellstheVCCoperatorthatthetrainhasfullyberthedatthedesignatedexitplatformandrequestsforanyotherissuestobeclearedup.
VCCoperatorconfirmsthatallremainingissueshavebeenresolved.
Onceconfirmed,TMtellstheSPC,whogivesuptheworksitewiththePOSM.
6.3 Movements outside the possession worksiteAlltrainmovementsoutsideapossessionworksitemustbecontrolledbythePOSM.ThePOSMwillinstructtheETOsviatheconnectradiosystemtomovetheengineer’strain.
AsaTMyouarenotresponsibleforthemovementsoutsidethepossessionworksite.
Communications
18
sect
ion CommunicationsCommunications7
7 CommunicationsA Alpha Q QubecB Bravo R RomeoC Charlie S SierraD Delta T TangoE Echo K Kilo U UniformF Foxtrot L Lima V VictorG Golf M Mike W WhiskeyH Hotel N November X X-rayI India O Oscar Y YankeeJ Juliet P Papa Z Zulu
Communicationisavitalpartofrailsafety,andattheheartofwhatwealldoday-to-day.
Ourownsafety,andthatofthoseworkingwithus,willoftendependonknowingwhateachotherisdoing–where,whyandwhen.Manyofthesystemswehaveinplacearebasedonthisunderstanding.Andifsomethingdoesgowrongwithaprocedure,orthere’sanunforeseenhazard,yourteammayhavetorelyoncommunicationtopreventthedanger.
Thefollowingrulesmustbecarriedoutwhengivingorreceivingmessages.
Makesure:
• youaretalkingtotherightpersonandthatpersonknowswhoyouare
• yourmessageisclear,accurate,andtothepoint
• youunderstandtheinformationandanyactionthatisrequired
• thatyouknowhowtomakecontactagain(ifrequired)
• yourecorddetailsinthelogbookoryournotebook(whereapplicable).
Communications
19
section7Communications
Themessagemuststartby:
• statingwhoyouare
• askingwhoyouaretalkingto
• statingwhereyouare
• statingwhyyouarecalling.
Askdelegates:
• whattheyknowofsafetycriticalcommunications
• iftheyknowthephoneticalphabet
• toreadoutthenameofthepersonnexttothemphonetically
• toexplaintheuseofnumbers.
7.1 Using numbers
Ifyouareusingnumbers10andoverinyourmessage,youmustsaythemoneatatime.
Forexample,‘Train123’mustbespokenas‘Trainonetwothree’not‘Trainonehundredandtwentythree’.
Youmustalsosaythenumber‘0’as‘zero’.
Whensignals,points,traindescriptionsorlocationshavesimilarnamesornumbers(forexample,signalsA114andA314onadjacentlines),youmusttakegreatcarenottocauseconfusion.
Youdonotneedtoquotenumbersseparatelywhenyourefertotime,forexample,thetime13.17hoursshouldbestatedas‘thirteenseventeen’.
Dealing with incidents and emergenciesReferences
20
sect
ion Dealing with incidents and emergencies8
8 Dealing with incidents and emergenciesIftheengineer’straincannotre-entertheTBTCsignallingsystemwhilstwithinapossessionworksiteorSA,theTMmustatthefirstinstancetelltheVCCoperator.
8.1 What would you do if the VCC operator cannot clear all issues relating to the engineer’s train?
IftheVCCoperatorcannotclearallissuesrelatingtotheengineer’strainwhilstwithinaSAtheTMmusttelltheTACandcontroller.
IftheVCCoperatorcannotresolvetheissuesrelatingtotheengineer’strainwhilstwithinapossessionworksitetheTMmusttellthePOSM.
ItisnottheresponsibilityoftheTMtoresolveanyissuesrelatingtore-enteringtheTBTCsignallingsystem.TheyaretoactontheadvicegivenbytheVCCoperator.
Dealing with incidents and emergencies
21
section9References
9 References• RuleBook01Communications
• RuleBook03Tractioncurrentandhighvoltagesupply
• RuleBook16GoingonthetrackinEngineeringHours
• RuleBook18Engineer’strains,vehiclesandtrolleys
• JubileeLineAppendixtotheRuleBooks
• OSP–(TLL-J001-N395-HSE-PLN-00025)JubileeLineengineeringvehiclere-enteringaTBTCsystem–possession/specifiedareaarrangements.