training and operations facility
DESCRIPTION
TRAINING AND OPERATIONS FACILITY. “TRAINING THE AIRCREWS OF TOMORROW----TONIGHT”. ADMINISTRATIVE. FIRE EXITS FIRE EXTINGUISHERS FOOD / BEVERAGES TOBACCO BREAK / SMOKE AREA LATRINE. NVG / NIGHT MISSION PLANNING. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/1.jpg)
TRAINING ANDTRAINING ANDOPERATIONS FACILITYOPERATIONS FACILITY
“TRAINING THE AIRCREWS OF TOMORROW----TONIGHT”
![Page 2: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/2.jpg)
Army Aviation Warfighting Center2
ADMINISTRATIVEADMINISTRATIVE• FIRE EXITSFIRE EXITS
• FIRE EXTINGUISHERSFIRE EXTINGUISHERS
• FOOD / BEVERAGESFOOD / BEVERAGES
• TOBACCOTOBACCO
• BREAK / SMOKE AREABREAK / SMOKE AREA
• LATRINELATRINE
![Page 3: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/3.jpg)
Army Aviation Warfighting Center3
NVG / NIGHTNVG / NIGHTMISSION MISSION
PLANNINGPLANNING
![Page 4: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/4.jpg)
Army Aviation Warfighting Center4
TERMINAL LEARNING TERMINAL LEARNING OBJECTIVEOBJECTIVE
WHILE SERVING AS AN AIRCREW WHILE SERVING AS AN AIRCREW MEMBER, THE STUDENT WILL MEMBER, THE STUDENT WILL CONDUCT NVG / NIGHT MISSION CONDUCT NVG / NIGHT MISSION PLANNING IN ACCORDANCE WITH PLANNING IN ACCORDANCE WITH TC 1-204.TC 1-204.
![Page 5: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/5.jpg)
Army Aviation Warfighting Center5
SAFETY SAFETY
NOTESNOTES CAUTIONSCAUTIONS WARNINGSWARNINGS
![Page 6: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/6.jpg)
Army Aviation Warfighting Center6
RISK ASSESSMENT LEVELRISK ASSESSMENT LEVEL
LOWLOW
![Page 7: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/7.jpg)
Army Aviation Warfighting Center7
ENVIRONMENTAL ENVIRONMENTAL CONSIDERATIONSCONSIDERATIONS
NONENONE
![Page 8: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/8.jpg)
Army Aviation Warfighting Center8
EVALUATIONEVALUATION
![Page 9: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/9.jpg)
Army Aviation Warfighting Center9
![Page 10: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/10.jpg)
Army Aviation Warfighting Center10
ENABLING LEARNING ENABLING LEARNING OBJECTIVE # 1OBJECTIVE # 1
FROM A LIST, SELECT THE NVG / FROM A LIST, SELECT THE NVG / NIGHT MISSION PLANNING NIGHT MISSION PLANNING CONSIDERATIONS IAW TC 1-204.CONSIDERATIONS IAW TC 1-204.
![Page 11: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/11.jpg)
Army Aviation Warfighting Center11
MISSION PLANNING MISSION PLANNING CONSIDERATIONS / GUIDELINESCONSIDERATIONS / GUIDELINES
GENERAL CONSIDERATIONSGENERAL CONSIDERATIONS COMMAND CONSIDERATIONSCOMMAND CONSIDERATIONS PLANNING CELL CONSIDERATIONSPLANNING CELL CONSIDERATIONS MAP PREPARATIONMAP PREPARATION ROUTE / CP CONSIDERATIONSROUTE / CP CONSIDERATIONS BRIEFING CONSIDERATIONSBRIEFING CONSIDERATIONS
![Page 12: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/12.jpg)
Army Aviation Warfighting Center12
GENERAL GENERAL CONSIDERATIONSCONSIDERATIONS
STRESSSTRESS• PsychologicalPsychological• PhysiologicalPhysiological
NAVIGATIONNAVIGATION COMMOCOMMO BATTLEFIELD LIGHT SOURCESBATTLEFIELD LIGHT SOURCES
![Page 13: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/13.jpg)
Army Aviation Warfighting Center13
GENERAL GENERAL CONSIDERATIONS CONSIDERATIONS (Con’t)(Con’t)
OBSTRUCTIONSOBSTRUCTIONS• Man madeMan made• NaturalNatural
TERRAINTERRAIN ENROUTE DATAENROUTE DATA ALTITUDE CHANGESALTITUDE CHANGES METEOROLOGYMETEOROLOGY
![Page 14: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/14.jpg)
Army Aviation Warfighting Center14
COMMAND COMMAND CONSIDERATIONSCONSIDERATIONS
CREW ENDURANCECREW ENDURANCE AIRCRAFT MAINTENANCEAIRCRAFT MAINTENANCE SAFETYSAFETY ENVIRONMENTENVIRONMENT
![Page 15: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/15.jpg)
Army Aviation Warfighting Center15
PLANNING CELL PLANNING CELL CONSIDERATIONSCONSIDERATIONS
COMMANDER FORMS CELLCOMMANDER FORMS CELL• NO OTHER DUTIESNO OTHER DUTIES• CELL DUTIES SPECIFIEDCELL DUTIES SPECIFIED
PLAN WORST CASE PROFILEPLAN WORST CASE PROFILE
![Page 16: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/16.jpg)
Army Aviation Warfighting Center16
MAP PREPARATION MAP PREPARATION CONSIDERATIONSCONSIDERATIONS MAP TYPESMAP TYPES• 1:250,000 (JOG)1:250,000 (JOG)
• 1:500,000 (VFR SECTIONAL)1:500,000 (VFR SECTIONAL)
• 1:50,000 (TACTICAL)1:50,000 (TACTICAL)
• AERIAL PHOTOSAERIAL PHOTOS
![Page 17: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/17.jpg)
Army Aviation Warfighting Center17
MAP PREPARATION MAP PREPARATION CONSIDERATIONS CONSIDERATIONS (CON’T)(CON’T)
ADDITIONAL NVG CONSIDERATIONSADDITIONAL NVG CONSIDERATIONS• HIGHLIGHT ROUTEsHIGHLIGHT ROUTEs
• PLOT ROUTEs AND ACPs FIRSTPLOT ROUTEs AND ACPs FIRST
• PLAN 10-15 KILOMETERS EITHER SIDEPLAN 10-15 KILOMETERS EITHER SIDE
• MARK TOWERS, BEACONS, CITIES, ETC. MARK TOWERS, BEACONS, CITIES, ETC.
![Page 18: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/18.jpg)
Army Aviation Warfighting Center18
ADDITIONAL NVG ADDITIONAL NVG CONSIDERATIONS CONSIDERATIONS (CON’T)(CON’T)
• AVOID OVER-PREPARATIONAVOID OVER-PREPARATION
• TRANSFER KEY FEATURES FROM OTHER TRANSFER KEY FEATURES FROM OTHER SOURCESSOURCES
• AVOID EXAGGERATIONAVOID EXAGGERATION
• ORIENT NOTES IN DIRECTION OF FLIGHT ORIENT NOTES IN DIRECTION OF FLIGHT
![Page 19: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/19.jpg)
Army Aviation Warfighting Center19
ROUTE / CHECKPOINT ROUTE / CHECKPOINT CONSIDERATIONSCONSIDERATIONS
ROUTE PLANNINGROUTE PLANNING ACP/CP PLANNINGACP/CP PLANNING
![Page 20: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/20.jpg)
Army Aviation Warfighting Center20
ROUTE PLANNINGROUTE PLANNING AVOID BRIGHTLY LIT AREASAVOID BRIGHTLY LIT AREAS AVOID AIRFIELDSAVOID AIRFIELDS AVOID LOW CONTRAST AREASAVOID LOW CONTRAST AREAS NEGOTIATE VALLEYSNEGOTIATE VALLEYS AVOID RISING / SETTING MOONAVOID RISING / SETTING MOON AVOID > 60° HEADING CHANGESAVOID > 60° HEADING CHANGES SELECT AMPLE REFERENCE POINTSSELECT AMPLE REFERENCE POINTS
![Page 21: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/21.jpg)
Army Aviation Warfighting Center21
ROUTE PLANNING ROUTE PLANNING (CON’T)(CON’T)
CROSS ROADs AND R/Rs 90° CROSS ROADs AND R/Rs 90° MINIMIZE EXPOSURE TIME MINIMIZE EXPOSURE TIME T / D / H TO PROMINENT FEATUREST / D / H TO PROMINENT FEATURES PLOT CROSSING TIMES ON MAPPLOT CROSSING TIMES ON MAP ANTICIPATE WIRESANTICIPATE WIRES
![Page 22: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/22.jpg)
Army Aviation Warfighting Center22
ROUTE PLANNING ROUTE PLANNING (CON’T)(CON’T)
PLAN ALTERNATE ROUTEsPLAN ALTERNATE ROUTEs MINIMIZE CHANGES DURING MINIMIZE CHANGES DURING
MULTI-HELICOPTER OPERATIONSMULTI-HELICOPTER OPERATIONS DETERMINE SAFE ENROUTE DETERMINE SAFE ENROUTE
ALTITUDES ALTITUDES CONTINGIENCY PLANSCONTINGIENCY PLANS
![Page 23: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/23.jpg)
Army Aviation Warfighting Center23
ACP/CP PLANNINGACP/CP PLANNING
SELECT CPs:SELECT CPs: THAT HAVE UNIQUE FEATURESTHAT HAVE UNIQUE FEATURES THAT CONTRASTTHAT CONTRAST AWAY FROM TOWNSAWAY FROM TOWNS AWAY FROM BRIGHT LIGHTSAWAY FROM BRIGHT LIGHTS PROMINENT ADJACENT FEATURESPROMINENT ADJACENT FEATURES
![Page 24: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/24.jpg)
Army Aviation Warfighting Center24
ACP/CP PLANNING ACP/CP PLANNING (CON’T)(CON’T)
5 - 20 KILOMETERS APART 5 - 20 KILOMETERS APART ENSURE PROMINENT BARRIERS ENSURE PROMINENT BARRIERS
NEARBY NEARBY SP AND RP 3 TO 5 KILOMETERSSP AND RP 3 TO 5 KILOMETERS NOTE MSL ALTITUDE OF CPsNOTE MSL ALTITUDE OF CPs ADVERSE ENVIRONMENTAL ADVERSE ENVIRONMENTAL
CONDITIONSCONDITIONS AVOID CPs IN SHADOWSAVOID CPs IN SHADOWS
![Page 25: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/25.jpg)
Army Aviation Warfighting Center25
BRIEFING BRIEFING CONSIDERATIONSCONSIDERATIONS
TIME TO RESOLVE PROBLEMSTIME TO RESOLVE PROBLEMS DETAILED FORMAL BRIEFDETAILED FORMAL BRIEF EQUIPMENT CHECKEQUIPMENT CHECK FINAL BRIEFFINAL BRIEF
![Page 26: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/26.jpg)
Army Aviation Warfighting Center26
MISSION PLANNING CONSIDERATIONSMISSION PLANNING CONSIDERATIONS
![Page 27: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/27.jpg)
Army Aviation Warfighting Center27
ENABLING LEARNING ENABLING LEARNING OBJECTIVE # 2OBJECTIVE # 2
FROM A LIST, SELECT THEFROM A LIST, SELECT THE CHARACTERISTICS OF THE NVGCHARACTERISTICS OF THE NVG MODES OF TERRAIN FLIGHT IAW MODES OF TERRAIN FLIGHT IAW
TC 1-204. TC 1-204.
![Page 28: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/28.jpg)
Army Aviation Warfighting Center28
METT-TMETT-T TERRAIN FLIGHTTERRAIN FLIGHT
LOW LEVELLOW LEVEL CONTOURCONTOUR NOENOE
COMPUTE T / D / HCOMPUTE T / D / H DISORIENTATIONDISORIENTATION
NVG TERRAIN FLIGHT NVG TERRAIN FLIGHT MODE SELECTIONMODE SELECTION
![Page 29: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/29.jpg)
Army Aviation Warfighting Center29
MODES OF TERRAIN FLIGHTMODES OF TERRAIN FLIGHT
![Page 30: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/30.jpg)
Army Aviation Warfighting Center30
ENABLING LEARNING ENABLING LEARNING OBJECTIVE # 3OBJECTIVE # 3
FROM A LIST, SELECT THE FROM A LIST, SELECT THE CHARACTERISTICS OF ROUTE CHARACTERISTICS OF ROUTE PLANNING CARDS IAW TC 1-204. PLANNING CARDS IAW TC 1-204.
![Page 31: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/31.jpg)
Army Aviation Warfighting Center31
NAVIGATION CARDNAVIGATION CARD ENROUTE CARDENROUTE CARD LANDING ZONE / OBJECTIVE CARDLANDING ZONE / OBJECTIVE CARD
ROUTE PLANNING CARDSROUTE PLANNING CARDS
![Page 32: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/32.jpg)
Army Aviation Warfighting Center32
NAVIGATION CARDNAVIGATION CARD
![Page 33: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/33.jpg)
Army Aviation Warfighting Center33
ENROUTE CARDENROUTE CARD
![Page 34: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/34.jpg)
Army Aviation Warfighting Center34
LANDING ZONE / OBJECTIVE LANDING ZONE / OBJECTIVE CARDCARD
![Page 35: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/35.jpg)
Army Aviation Warfighting Center35
ROUTE PLANNING CARDSROUTE PLANNING CARDS
![Page 36: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/36.jpg)
Army Aviation Warfighting Center36
ENABLING LEARNING ENABLING LEARNING OBJECTIVE # 4OBJECTIVE # 4
FROM A LIST, SELECT THEFROM A LIST, SELECT THE NIGHT TACTICAL LIGHTINGNIGHT TACTICAL LIGHTING CONSIDERATIONS IAW TC 1-204. CONSIDERATIONS IAW TC 1-204.
![Page 37: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/37.jpg)
Army Aviation Warfighting Center37
AIRCRAFT LIGHTINGAIRCRAFT LIGHTING LZ / PZ TACTICAL LIGHTINGLZ / PZ TACTICAL LIGHTING SUPPLEMENTAL LIGHTINGSUPPLEMENTAL LIGHTING
TACTICAL LIGHTINGTACTICAL LIGHTING
![Page 38: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/38.jpg)
Army Aviation Warfighting Center38
AIRCRAFT LIGHTINGAIRCRAFT LIGHTING COCKPIT LIGHTINGCOCKPIT LIGHTING EXTERNAL LIGHTINGEXTERNAL LIGHTING
![Page 39: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/39.jpg)
Army Aviation Warfighting Center39
LZ / PZ TACTICAL LZ / PZ TACTICAL LIGHTINGLIGHTING
![Page 40: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/40.jpg)
Army Aviation Warfighting Center40
INVERTED “Y”INVERTED “Y”
![Page 41: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/41.jpg)
Army Aviation Warfighting Center41
““T”T”
![Page 42: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/42.jpg)
Army Aviation Warfighting Center42
![Page 43: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/43.jpg)
Army Aviation Warfighting Center43
NOTENOTE
WHEN ONLY TWO LIGHT SOURCES WHEN ONLY TWO LIGHT SOURCES ARE AVAILABLE TO MARK THE LZ, ARE AVAILABLE TO MARK THE LZ, THE MINIMUM DISTANCE BETWEEN THE MINIMUM DISTANCE BETWEEN THE LIGHTS IS 15 FEET. THE LIGHTS IS 15 FEET.
![Page 44: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/44.jpg)
Army Aviation Warfighting Center44
SUPPLEMENTAL SUPPLEMENTAL LIGHTINGLIGHTING
![Page 45: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/45.jpg)
Army Aviation Warfighting Center45
SUPPLEMENTALSUPPLEMENTAL
![Page 46: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/46.jpg)
Army Aviation Warfighting Center46
TACTICAL LIGHTING CONSIDERATIONSTACTICAL LIGHTING CONSIDERATIONS
![Page 47: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/47.jpg)
Army Aviation Warfighting Center47
MISSION PLANNING CONSIDERATIONS MISSION PLANNING CONSIDERATIONS MISSION PLANNING ACTIONS MISSION PLANNING ACTIONS ROUTE SELECTION GUIDELINESROUTE SELECTION GUIDELINES CHARACTERISTICS OF ACPS /CHECKPOINTSCHARACTERISTICS OF ACPS /CHECKPOINTS MODES OF TERRAIN FLIGHTMODES OF TERRAIN FLIGHT ROUTE PLANNING CARDSROUTE PLANNING CARDS TACTICAL LIGHTING CONSIDERATIONSTACTICAL LIGHTING CONSIDERATIONS
![Page 48: TRAINING AND OPERATIONS FACILITY](https://reader035.vdocuments.net/reader035/viewer/2022070420/56815dea550346895dcc1201/html5/thumbnails/48.jpg)
Army Aviation Warfighting Center48