Training Catalog
Contents
1. INTRODUCTION 1
WHY SELMERS TRAINING COURSES? ................................... 2 WHO SHOULD ATTEND SELMERS TRAINING COURSES?...... 2 OBJECTIVES OF THE TRAINING COURSES ............................ 3 LOCATION ............................................................................ 3 LANGUAGE ........................................................................... 3 COSTS ................................................................................... 4 CONTACT ............................................................................. 4
2. MULTI-LAYER PIPE COATING PROCESS 5
EXTERNAL FBE OR MULTI-LAYER PIPE COATING PLANT ...... 7 PIPE HANDLING EQUIPMENT............................................... 9 GAS-FIRED HEATING SYSTEM ............................................ 11 INDUCTION HEATING SYSTEM ........................................... 13 EXTERNAL BLASTING SYSTEM ............................................ 15 ACID WASH SYSTEM .......................................................... 17 NEUTRALIZATION UNIT ...................................................... 19 CHROMATE APPLICATION SYSTEM .................................... 21 FBE APPLICATION SYSTEM AND SPRAY GUN SETTINGS .... 23
INTEGRATED SPRAY GUN CONTROL SYSTEM .................... 25 COATING EXTRUDERS ........................................................ 27 COOLING TOWERS ............................................................. 29 PIPE END PEELING SYSTEM ................................................ 31 PIPE END CLEANING SYSTEM ............................................. 33
3. INTERNAL PIPE COATING PROCESS 35
INTERNAL PIPE COATING PLANT........................................ 37 INTERNAL PIPE WASH SYSTEM .......................................... 39 INTERNAL HEATING SYSTEM ............................................. 41 INTERNAL BLASTING SYSTEM ............................................ 43 INTERNAL LIQUID COATING SYSTEM ................................. 45 CURING SYSTEM ................................................................ 47
4. QC EQUIPMENT 49
SOLUBLE SALT DETERMINATION MEASUREMENT ............ 50 ABRASIVE SCREEN ANALYSIS ............................................. 51 ADHESION TESTING ASTM D3359-A .................................. 53 SELMERS CATHODIC DISBONDING TESTER ........................ 55 WA CLEANLINESS TESTER .................................................. 57 DCCT HOLIDAY DETECTOR ................................................. 59 DUST TESTER...................................................................... 61 IMPACT RESISTANCE TESTER ............................................. 62 SELMERS PEELING RESISTANCE TESTER ............................ 63
INDENTATION HARDNESS TESTER ..................................... 65 PH TESTER .......................................................................... 66 WET FILM THICKNESS MEASUREMENT ............................. 67 ROUGHNESS SURFACE PROFILE MEASUREMENT .............. 69
5. COMMUNICATION 70
EFFECTIVE COMMUNICATION ........................................... 71 GIVING FEEDBACK ............................................................. 72
6. HEALTH, SAFETY AND ENVIRONMENT (HSE) 73
WORKING SAFELY AT HEIGHT ............................................ 74 SAFETY GUIDELINES ........................................................... 75
1
1. Introduction
Selmers Global Services can provide training assistance for the period prior to, during and after the erectioning and commissioning of the plant or equipment. The Selmers Academy program provides additional background and in-depth information of the operation systems of the plant, logistics, maintenance, and so on. This has shown to be very useful to pipe blasting, coating and handling plant crew members, particularly for new employees. They will learn quickly and more easily to understand the machinery and the periphery surrounding it. In turn, this enables them to operate the coating plant to its full capabilities in an efficient manner, which obviously is beneficial for the plant owner.
Figure 1 Attentive Audience
2
Why Selmers Training courses?
Our custom-made training programs has shown to be very useful and effective to all crew members in all layers of a pipe blasting, coating and handling orientated organization. Especially our operator training teaches operators how to optimize the blasting and coating process, which will results in a significant improvement of the blasting and coating performance. Besides comprehensive operator training, Selmers Global Services offers more training programs like maintenance, logistic, general or programs on request. For Example: a complete operator team of a pipe blasting, coating and handling plant were trained by one of our experienced trainers. The training has resulted in more educated and dedicated operators, which additionally saved the coating plant over 15% less consumption of epoxy powder.
Who should attend Selmers Training Courses?
Personnel who will operate or maintain the equipment or personnel designated to oversee operation or maintenance of the equipment should attend Selmers training courses.
3
Objectives of the Training Courses
Describe the equipment, its usage, and its interactions
Know how to locate useful and necessary information in the user manual and associated documentation
Explain the main systems of the product (mechanical, hydraulic, electric, and control systems)
Explain the subsystems of the product (structural, hydraulic, and control systems)
Explain safety issues related to the equipment
Explain how to operate the equipment safely
Explain the necessary screens on the human machine interface (HMI)
Understand how to run sequences and operation modes
Explain safety issues related to operating and the maintenance of the equipment
Explain the maintenance that operators perform
Explain the maintenance that maintainers perform
Location
The training can be held at your facility or at Selmers in Beverwijk, the Netherlands.
Language
The Selmers training courses are offered in English.
4
Costs
Price per training session depends on the equipment that is present in your plant and the number of participants. For details please contact Selmers Global Services.
Contact
Selmers Biesland 3 1948 RJ BEVERWIJK The Netherlands Phone +31 251 211999 Website www.selmers.com General [email protected] Enquiries [email protected] Selmers Global Services [email protected]
5
2. Multi-Layer Pipe Coating Process
In the multi-layer pipe coating process, pipes are blast cleaned and covered with a compound coating of three or more individual layers.
Generally the first layer is a fusion bonded epoxy coating of 100 – 200 microns thickness, which is the actual anti-corrosion layer. On top of the epoxy, an adhesive layer of 250 – 350 microns is applied which is the actual anti-corrosion layer. On top of the epoxy, an adhesive layer of 250 – 350 microns is applied which acts as the bond layer between the epoxy and the top layer(s).
The top layer usually consists of 2 – 4 mm PE or PP and provides mechanical protection for the pipe. In some cases, foamed PP or syntactic PP is added in extra intermediate layer(s) as an insulation coating for heated transport lines.
The two main types of coating application are side extrusion and crosshead extrusion (also known as sleeve extrusion). In side extrusion, pipes rotate while top coating is wrapped around the pipe.
In crosshead extrusion, the pipe does not rotate and coating is ‘pulled’ as a sleeve around the pipe.
6
Figure 2 Multi-Layer Pipe Coating
7
External FBE or Multi-Layer Pipe Coating Plant
Description In the multilayer coating process, pipes are blast cleaned and covered with a coating of three or more individual layers. Generally the first layer is a fusion bonded epoxy coating. On top of the epoxy, an adhesive layer applied which acts as the bond layer between the epoxy and the top layer(s). The top layer usually consists of PE or PP and provides mechanical protection for the pipe. Goals and objectives This training gives a comprehensive overview of the equipment used in an external pipe coating including adjusting, operating and maintenance. Main training topics
Safety
Pipe handling and conveying
Pipe heating
Pipe blasting
Pipe washing
Pipe coating, FBE / multilayer
Quenching
Holiday detection
Pipe end cleaning Duration Depending on the number of participants and the equipment that is present in your plant the training will take approximately 10 days.
8
Figure 3 Training
9
Pipe Handling Equipment
Description To handle and transport a pipe through an internal or external pipe coating plant as well as a spoolbase facility pipe handling equipment is needed. Goals and objectives This training gives a comprehensive overview of pipe handling equipment including adjusting, operating and maintenance. Main training topics
Safety
Pipe indexer systems
Chain conveyors
Hempel racks
Linear (endo) roller conveyors
Wheel conveyors
Walking beams
Rotation units
Tilting racks
Hempel racks
Wheel conveyors
Line up systems Duration Depending on the number of participants and the equipment that is present in your plant the training will take approximately 1 day.
10
Figure 4 Wheel Conveyor
11
Gas-Fired Heating System
Description One of the pre-treatment steps before blasting a pipe is pre-heating to remove moist from the pipe and to elevate the pipe temperature. A pre-treatment step before the immediate application of a coating layer is also to heat up a pipe. A gas-fired oven or induction heater may be used to heat up pipes. Goals and objectives This training gives a comprehensive overview of the gas oven including adjusting, operating and maintenance. Main training topics
Safety
Components
Adjusting Duration Depending on the number of participants the training will take approximately ½ day.
12
Figure 5 Gas-fired oven
13
Induction Heating System
Description Induction heating is a contactless heating method of bodies, which absorb energy from an alternating magnetic field generated by induction coil (inductor) and could be used to elevate the pipe temperature before blasting or immediately before the application of FBE. Goals and objectives This training gives a basic overview of induction heating. Main training topics
Safety
Features of induction heating
Advantages of induction heating
Eddy current and hysteresis
Principle of induction heating
Electrodynamic forces
Coils Duration Depending on the number of participants the training will take approximately 1 day.
14
Figure 6 Induction Heating
15
External Blasting System
Description Surface preparation is conducted to the relevant standards by blasting clean the outer pipe surface ensuring the desired cleaned steel surface and anchor profile for the coating application. To do the job an external pipe blaster is used. Goals and objectives This training gives a comprehensive overview of an external pipe blaster including adjusting, operating and maintenance. Main training topics
Safety
Blast wheels
Hotspot
Reclaim system
Optimizing Duration Depending on the number of participants the training will take approximately 1 day.
16
Figure 7 External Pipe Blasting
17
Acid Wash System
Description Surface preparation is conducted to the relevant standards by blasting clean the inner or outer pipe surface ensuring the desired cleaned steel surface and anchor profile for the coating application. In certain cases the pipes may require a phosphoric acid wash to remove chlorides, sulfates, salts etcetera. The acid wash system could be a component in your external pipe coating plant. Goals and objectives This training gives a comprehensive overview of the acid wash system including adjusting, operating and maintenance. Main training topics
Safety
pH
Acid mixture
Rinsing
Drying
Nozzles
Pressure Duration Depending on the number of participants the training will take approximately 1 day.
18
Figure 8 Acid Wash
19
Neutralization Unit
Description The waste water of the acid wash system contains acid and heavy metals, a neutralization unit provides in a proper and environmental friendly discharge of these products.
Goals and objectives This training gives a comprehensive overview of a neutralization unit including adjusting, operating and maintenance. Main training topics
Safety
pH
Neutralizing
Polymers
Caustic Duration Depending on the number of participants the training will take approximately ½ day.
20
Figure 9 Neutralization Unit
21
Chromate Application System
Description Additional coating performance enhancement can be achieved by treating the clean pipe surface with a chromate solution prior to the final preheat. Goals and objectives This training gives a comprehensive overview of chromate application including adjusting, operating and maintenance. Main training topics
Safety
Chromate
Mixture
Application Duration Depending on the number of participants the training will take approximately ½ day.
22
Figure 10 Chromate wash
23
FBE Application System and Spray Gun Settings
Description To apply an epoxy coating on a pipe an epoxy system and spray guns are used. To apply a coating within the specs it is important to know how epoxy is applied and how to deal with variables. Goals and objectives This training overviews an epoxy system and spray guns including, operating adjusting and maintenance. Main training topics
Safety
Corona effect
Cabin ventilation
Dust filters
Virgin and reclaimed powder
Hoppers
Fluid bed
Flow air
Atomizing air
Spray guns Duration Depending on the number of participants the training will take approximately 1 day.
24
Figure 11 FBE Layer Application
25
Integrated Spray Gun Control System
Description For controlling powder spray guns an Integrated Control System is used. This system incorporates closed-loop digital flow for consistent, repeatable coating performance on your powder line. It integrates all powder control functions into a single, easy-to-operate system. Goals and objectives This training gives a comprehensive overview of an integrated powder spray gun control system including operating adjusting and maintenance. Main training topics
Safety
System build up
Programming
Flow air
Atomizing air
Charging Duration Depending on the number of participants the training will take approximately ½ day.
26
Figure 12 Plant Overview
27
Coating Extruders
Description A multi-layer coating is often regarded as the most dependable of external coating methods for pipes, which unite excellent corrosion protection properties with high resistance against mechanical damage. An extruder applies the mechanical resistance layer like PE and PP.
Goals and objectives This training overviews an extruder and granulate handling system including, operating adjusting and maintenance. Main training topics
Safety
Extrusion process
Adhesive extruder
PE\PP extruder
Granulate handling system
Extrusion dies
Screen changer
Cooling system
Duration Depending on the number of participants the training will take approximately 1 day.
28
Figure 13 Extrusion
29
Cooling Towers
Description A cooling tower is a heat rejection device which rejects waste heat to the atmosphere through the cooling of a water stream to a lower temperature. Cooling towers may either use the evaporation of water to remove process heat and cool the working fluid to near the wet-bulb air temperature or, in the case of closed circuit dry cooling towers, rely solely on air to cool the working fluid to near the dry-bulb air temperature. Goals and objectives This training gives a comprehensive overview of cooling towers. Main training topics
Safety
Cooling tower designs
Cooling tower components
Water control Duration The duration of the training will be approximately ½ day.
30
Figure 14 Quenching
31
Pipe End Peeling System
Description After the pipe coating process the applied PE or PP coating needs to be removed from the pipe ends. A pipe end peeling station removes in a quick, easy and sufficient way the coating. Goals and objectives This training gives a comprehensive overview of pipe end cleaning and pipe end peeling equipment including adjusting, operating and maintenance. Main training topics
Safety
Rotation units
Heating
Knives
Dust filter Duration Depending on the number of participants the training will take approximately ½ day.
32
Figure 15 Pipe End Peeling
33
Pipe End Cleaning System
Description After the pipe coating process the applied PE or PP and FBE coating needs to be removed from the pipe ends. A pipe end cleaning station brushes in a quick, easy and sufficient way the coating off. Goals and objectives This training gives a comprehensive overview of pipe end cleaning and pipe end peeling equipment including adjusting, operating and maintenance. Main training topics
Safety
Rotation units
Brushes
Dust filter Duration Depending on the number of participants the training will take approximately ½ day.
34
Figure 16 Pipe End Cleaning
35
3. Internal Pipe Coating Process
Flow-efficiency lining The transmission of dry gas, sour gas, potable water, sewage, or oil often requires the application of either a flow-efficiency lining or an anti-corrosion lining inside the pipe. Typical of internal lining plants is that pipes are processed in a one-by-one sequence in separate stations, of which the abrasive (grit/shot) blasting and lining station are the core of the process.
36
Figure 17 Internal Coated Pipes
37
Internal Pipe Coating Plant
Description Internal coating or lining of pipes is a common technology to protect steel pipelines against corrosion or to reduce flow friction. It is widely used in (long distance) transport lines for oil, gas fuel, condensate, chemicals, potable-or industrial water, sewage, outfall pipes and drilling pipes. Goals and objectives This training gives a comprehensive overview of a complete internal pipe coating plant including adjusting, operating and maintenance. Main training topics
Safety
Pipe handling and conveying
Internal Pipe Wash System
Internal Heating System
Internal Blasting System
Internal Liquid Coating System
Curing System
Holiday detection Duration Depending on the number of participants and the equipment that is present in your plant the training will take approximately 7 days.
38
Figure 18 Internal Coated Pipes
39
Internal Pipe Wash System
Description The possible requirement of pipe treatment stations is usually determined by specifications, local conditions or requirements of the plant owner and may contain pre-treatment, post-treatment and inspection. A pre-treatment station is the internal wash station. The internal wash station removes surface contamination. For instance by solvent cleaning or water washing, with or without detergents. Goals and objectives This training gives a comprehensive overview of an internal pipe wash station including adjusting, operating and maintenance. Main training topics
Safety
Wash process Duration Depending on the number of participants the training will take approximately ½ day.
40
Figure 19 Internal Pipe Wash
41
Internal Heating System
Description The possible requirement of pipe treatment stations is usually determined by specifications, local conditions or requirements of the plant owner and may contain pre-treatment, post-treatment and inspection. A pre-treatment station is the internal pipe heating station. The internal pipe heating station removes moist from the pipe and elevates the pipe temperature. Goals and objectives This training gives a comprehensive overview of an internal pipe heating station including adjusting, operating and maintenance. Main training topics
Safety
Settings Duration Depending on the number of participants the training will take approximately ½ day.
42
Figure 20 Internal Pipe Heating
43
Internal Blasting System
Description The possible requirement of pipe treatment stations is usually determined by specifications, local conditions or requirements of the plant owner and may contain pre-treatment, post-treatment and inspection. A pre-treatment station is the internal blaster. The blaster is the core equipment in any internal pipe coating plant Goals and objectives This training gives a comprehensive overview of an internal blaster including adjusting, operating and maintenance. Main training topics
Safety
Blast wheel
Hotspot
Lances
Reclaim system
Dust filters Duration Depending on the number of participants the training will take approximately 3 days.
44
Figure 21 Internal Pipe Blasting
45
Internal Liquid Coating System
Description Internal coating or lining of pipes is a common technology to protect steel pipelines against corrosion or to reduce flow friction. It is widely used in (long distance) transport lines for oil, gas fuel, condensate, chemicals, potable-or industrial water, sewage, outfall pipes and drilling pipes. The liquid coating in single or plural component are applied by airless spray guns. Goals and objectives This training gives a comprehensive overview of internal pipe coating including adjusting, operating and maintenance. Main training topics
Safety
Ventilation
Lining boom
Mixture Duration Depending on the number of participants the training will take approximately ½ day.
46
Figure 22 Internal Liquid Coating
47
Curing System
Description Internal coating or lining of pipes is a common technology to protect steel pipelines against corrosion or to reduce flow friction. It is widely used in (long distance) transport lines for oil, gas fuel, condensate, chemicals, potable-or industrial water, sewage, outfall pipes and drilling pipes. To speed up the curing of the lining or to initiate final curing a curing station is used. Goals and objectives This training gives a comprehensive overview of curing stations including adjusting, operating and maintenance. Main training topics
Safety
Conveying system
Heater Duration Depending on the number of participants the training will take approximately ½ day.
48
Figure 23 Curing
49
4. QC Equipment
We care about our partners and their high quality pipe blasting, coating and handling equipment and process lines. To keep up the high standards Selmers provides a wide scope of QC equipment.
Soluble Salt Determination Measurement
Abrasive Screen Analysis
Adhesion Testing ASTM D3359-A
Selmers Cathodic Disbonding Tester
WA Cleanliness Tester
DCCT Holiday Detector
Dust Tester
Impact Resistance Tester
Selmers Peeling Resistance Tester
Indentation Hardness Tester
pH Tester
Wet Film Thickness Measurement
Roughness Surface Profile Measurement
50
Soluble Salt Determination Measurement
Description Prior to coating a pipe it is important to check if there is any soluble salt present. To determine the amount of soluble salts a test kit is used. Goals and objectives This training gives a comprehensive overview of a soluble salt test kit including adjusting, operating and maintenance. Main training topics
Safety
Purpose
Soluble Salt Determination Kit Duration Depending on the number of participants the training will take approximately 2 hours.
51
Abrasive Screen Analysis
Description A sieve analysis is a procedure used to assess the particle size distribution of blast grit. The size distribution is of critical importance to the way the material performs in use. Goals and objectives This training gives a comprehensive overview of abrasive screen analyzing. Main training topics
Purpose
Analyse Duration Depending on the number of participants the training will take approximately 2 hours.
52
Figure 24 Abrasive Screen Analysis
53
Adhesion Testing ASTM D3359-A
Description For determine the adhesion strength of an epoxy coating a meter is used. The adhesion test is according to:
STM D 4541
AS/NZS 1580.408.5
EN 13144
ISO 4624 supersedes EN 24624 & NF T30-062
ISO 16276-1
JIS K 5600-5-7 & NF T30-606 Goals and objectives This training gives a comprehensive overview how to determine the adhesion strength of an epoxy coating. Main training topics
Safety
Purpose
Analyse Duration Depending on the number of participants the training will take approximately 2 hours.
54
Figure 25 Adhesion Test Kit
55
Selmers Cathodic Disbonding Tester
Description The Selmers Cathodic Disbonding Tester is designed to test the resistance of the coating against disbonding, whilst the coating is subjected to electrical stress in a highly conductive, alkaline electrolyte. The tests are according to most standards like:
NACE RP0394
DIN 30671
ASTM G8
ASTM G42
ASTM G95 Goals and objectives This training gives a comprehensive overview of a cathodic disbonding tester including adjusting, operating and maintenance. Main training topics
Safety
Purpose
Settings
Calibrating
Analyse Duration Depending on the number of participants the training will take approximately ½ day.
56
Figure 26 Selmers Cathodic Disbonding Tester
57
WA Cleanliness Tester
Description The WA Clean is the first and only handheld patented technology that provides a fast and objective manner to measure and communicate the cleanliness degree of a blasted surface. This device does not replace the ISO 8501-1 standard but enables a better qualitative and quantitative control of the blasting process after a proper calibration according the norm mentioned above. Goals and objectives This training explains how to determine the cleanliness of a surface with the WA clean according to ISO 8501-1. Main training topics
Purpose
Operating
ISO-8501-1
Calibrating
Analyse Duration Depending on the number of participants the training will take approximately 2 hours.
58
Figure 27 WA Clean
59
DCCT Holiday Detector
Description Holiday testing is a non-destructive test method applied on protective coatings to detect unacceptable discontinuities such as pinholes and voids. Goals and objectives This training gives a comprehensive overview of a DCCT holiday detector including adjusting, operating and maintenance. Main training topics
Safety
Purpose
calibration Duration Depending on the number of participants the training will take approximately 2 hours.
60
Figure 28 Holiday Tester
61
Dust Tester
Description Prior to coating a pipe it is important to check if the dust level on the blasted pipe is within limits. To determine the dust level test tape is used. Goals and objectives This training gives a comprehensive overview of determine the dust level on a pipe surface. Main training topics
Purpose
Dust test kit Duration Depending on the number of participants the training will take approximately 2 hours.
62
Impact Resistance Tester
Description To the test the resistance of the coating against the impact of a punch load the impact resistance tester is used. The impact resistance tester is designed to test according to:
DIN 30670
DIN 30678 Goals and objectives This training overviews the impact resistance tester including operating adjusting and maintenance. Main training topics
Safety
Purpose
Settings
Operating
Maintenance Duration Depending on the number of participants the training will take approximately 2 hours.
63
Selmers Peeling Resistance Tester
Description Essential in your QC equipment is the latest Selmers Peeling Resistance Tester. The S-PRT-2500 is used to perform the peel strength test. More specifically, it tests the bond between the adhesive/PE (or PP) top coat layers and the FBE layer. The peel strength test measures the force required to peel the top coating from the pipe at a constant pull rate. Goals and objectives This training gives a comprehensive overview of the Selmers Peeling Resistance Tester including adjusting, operating and maintenance. Main training topics
Safety
Purpose
Settings Duration Depending on the number of participants the training will take approximately 2 hours.
64
Figure 29 Selmers Peeling Resistance Tester
65
Indentation Hardness Tester
Description According to DIN 30670 and DIN 30678 the resistance of an applied coating needs to be tested. The indentation hardness tester is designed for testing the resistance of the coating to the indentation of an indenter. Goals and objectives This training gives a comprehensive overview of the indentation hardness tester including, adjusting, operating and maintenance. Main training topics
Safety
Purpose
Settings Duration Depending on the number of participants the training will take approximately 2 hours.
66
pH Tester
Description To get an indication of the pH you can use a pH tester. Goals and objectives This training gives a comprehensive overview of a pH tester including calibrating, operating and maintenance. Main training topics
Safety
Purpose
Calibrating Duration Depending on the number of participants the training will take approximately 2 hours.
67
Wet Film Thickness Measurement
Description Measuring wet film thickness is necessary to identify the amount of material that needs to be applied to achieve a particular dry film thickness that will give the best protection against damage, wear and corrosion. Goals and objectives This training gives a comprehensive overview of how to measure the thickness of fresh applied paint. Main training topics
Purpose
Wet film comb
Wet film wheel
Maintenance Duration Depending on the number of participants the training will take approximately 2 hours.
68
Figure 30 Wet Film Thickness Tool
69
Roughness Surface Profile Measurement
Description To determine the surface roughness profile of a blasted pipe replica tape or a roughness surface profile meter can be used. Goals and objectives This training explains how to determine the surface profile with replica tape and a roughness surface profile meter. Main training topics
Safety
Purpose
Settings Duration Depending on the number of participants the training will take approximately 2 hours.
70
5. Communication
We care about our partners and their employees. To keep the plant safe and efficient, it’s very important that people understand each other in all circumstances and communicate in the right way. Training courses:
Effective communication
Giving feedback
71
Effective communication
Description With a personality profile you get insight into your own way of communicating and insight into the behavioral preferences of others. This helps you to stay constructively connected with your colleagues. Goals and objectives This training shows in a playful way how you can easily keep talking with each other in a simple way, resulting in a lasting cooperation. Main training topics
Communication skills
Insight behavior Duration Depending on the number of participants the training will take approximately one day.
72
Giving Feedback
Description This training ensures that employees learn to give feedback to each other in a constructive way and learn from their mistakes so they don’t make them a second time. Goals and objectives It helps you to realize careful improvement within the organization, a team and on an individual level. Main training topics
Your communication is more effective by giving and receiving good feedback
In conversations you can express appropriately what you think and experience
You can express your message clearly and respectfully
Your feedback is accepted by others
You can influence others in conversations Duration Depending on the number of participants the training will take approximately one day.
73
6. Health, Safety and Environment (HSE)
We care about our partners and their employees. To keep the plant safe, it’s very important that people understand and behave according safety guidelines. Dedicated HSE policy is not only beneficial for the employees, but also for plant owners. Training courses:
Safe working at height
Safety guidelines
74
Working safely at height
Description This training ensures that you know what measures you need to take to work safely at height. Goals and objectives You will learn how to use the right means to work at height so that the risk of accidents is minimized. Main training topics
Legislation and regulations regarding climbing and working at heights
Explanation about the operation and usage of various personal fall protection equipment
Inspection and maintenance of fall protection
Attract and hang in a harness
Temporary ladder, cage ladder and aerial work platforms
Unsafe work situations Duration Depending on the number of participants the training will take approximately one day.
75
Safety guidelines
Description In this training you learn how to work according to the safety rules on location according to the European standard. Goals and objectives You will learn what safety guidelines there are and how to apply them in a pipe coating plant. Main training topics
Risks of accidents
Hazardous substances
Fire hazards
Explosion hazards
Working in closed rooms
Working safely in general
Working safely with electricity
Working safely with tools
Working safely with hoisting equipment and forklift trucks
Working safely at height
Lifting, stumbling, slipping and falling
Personal protective equipment
Duration Depending on the number of participants the training will take approximately one day.
76
Figure 1 Attentive Audience .......................................................................... 1 Figure 2 Multi-Layer Pipe Coating .................................................................. 6 Figure 3 Training ............................................................................................ 8 Figure 4 Wheel Conveyor ............................................................................. 10 Figure 5 Gas-fired oven ................................................................................ 12 Figure 6 Induction Heating........................................................................... 14 Figure 7 External Pipe Blasting ..................................................................... 16 Figure 8 Acid Wash ...................................................................................... 18 Figure 9 Neutralization Unit ......................................................................... 20 Figure 10 Chromate wash ............................................................................ 22 Figure 11 FBE Layer Application ................................................................... 24 Figure 12 Plant Overview ............................................................................. 26 Figure 13 Extrusion ...................................................................................... 28 Figure 14 Quenching .................................................................................... 30 Figure 15 Pipe End Peeling ........................................................................... 32 Figure 16 Pipe End Cleaning......................................................................... 34 Figure 17 Internal Coated Pipes ................................................................... 36 Figure 18 Internal Coated Pipes ................................................................... 38 Figure 19 Internal Pipe Wash ....................................................................... 40 Figure 20 Internal Pipe Heating ................................................................... 42 Figure 21 Internal Pipe Blasting ................................................................... 44 Figure 22 Internal Liquid Coating ................................................................. 46 Figure 23 Curing ........................................................................................... 48 Figure 24 Abrasive Screen Analysis .............................................................. 52 Figure 25 Adhesion Test Kit ......................................................................... 54 Figure 26 Selmers Cathodic Disbonding Tester ............................................ 56 Figure 27 WA Clean...................................................................................... 58 Figure 28 Holiday Tester .............................................................................. 60 Figure 29 Selmers Peeling Resistance Tester ............................................... 64 Figure 29 Wet Film Thickness Tool .............................................................. 68