  • 7/28/2019 Training NBE 400V AC System R0

    1/39

    NEWBONGESCAPE

    400VAC

    Switchgear

    (3.6)

    Oct.2012

    TRAININGMANUAL

    Vol.III:BALANCEofPLANT

  • 7/28/2019 Training NBE 400V AC System R0

    2/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearContents

    1.General Introduction2.Major TechnicalData3.Design

    4.Outline DrawingandInstallation5.Operation

    6.Inspection andMaintenance

  • 7/28/2019 Training NBE 400V AC System R0

    3/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgear

    Notes:

    Whileoperatingelectricaldevicestherearesomepartsundercurrent.Onlystaffwho

    hasreceivedrelevanttrainingandwhichisfamiliarwiththesafelydefinitionof

    electricaldevicescanexecutesuchworkasinstallation,trying,maintainsand

    modification

    .

  • 7/28/2019 Training NBE 400V AC System R0

    4/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgear

    1. General Introduction

  • 7/28/2019 Training NBE 400V AC System R0

    5/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearGeneral

    Introduction

    The400VACstationsupplysystemshallbeprovidedwith400VACdistributionboardssuppliedfrom4

    (four)setsof11kVgeneratorswitchgearthrough2(two)setsof

    11000/400Vdrytypeauxiliary

    transformerseach

    of

    1600kVA

    as

    per

    the

    load

    calculation

    of

    the

    plant.

    The

    system

    shall

    also

    be

    supplied

    fromonesetofdieselgeneratorofsufficientcapacityincaseofblackoutandblackstart.

    Thesystemshallbemadeofnonessentialbusandessentialbusconnectedbyabustiebreaker.The

    nonessential

    bus

    with

    main

    bus

    1shall

    supply

    to

    non

    essential

    loads

    and

    unit

    auxiliary

    loads,

    while

    the

    essentialbuswithmainbus2shallsupplytoessentialloadsandunitauxiliaryloadsasbackuptomain

    bus1.

    Themain400VACdistributionboardsshallbeinstalledindoorin theauxiliaryelectricalroomatelevation245mondownstreamsideofthepowerhouse.

  • 7/28/2019 Training NBE 400V AC System R0

    6/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearStructure

    TheframeisconsistsofsquaresteelstubeswithYsectionconnectedbyrivets.

  • 7/28/2019 Training NBE 400V AC System R0

    7/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearStructure

    Theframebaseoflowvoltagecabinetisconsistsoffoursquaresteeltubes.Itcaninstallonthetrough

    directly.Thecabinetisassembledwithparts,suchasdoors,rearplates,sideplates,partitions,supports,

    busbars,functionalunit.Thedimensionsofpartsandpartitions

    aremodular.

  • 7/28/2019 Training NBE 400V AC System R0

    8/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearStructure

    Therespartitionbetweeneverypanelormainbusbarandunits.Passagewaysofcablesaresealed.The

    equipmentscanensurethatforfaultsineverycircuit,changethebreakersandcomponents,inspectand

    repairthecableswithoutswitchingoffmainbusbar.

  • 7/28/2019 Training NBE 400V AC System R0

    9/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearStructure

    Forthecabinet,thecablescancomeinfromtoporbottom.Insidethecabinet,thereshorizontalcable

    ductandverticalcableduct.Theyarecompletelyseparatedwith

    horizontalbusbar.Theverticalcable

    ductisfromhorizontalcableductontoptothehorizontalcableductonbottom.

  • 7/28/2019 Training NBE 400V AC System R0

    10/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearStructure

    ThematerialofmainplugincontactsisBe

    Cualloy.Theyaremadeofmultiplesprungsilverlamination

    andconnectwithCdropperbars.Be

    Cualloyhastheabilitiesofresistpressureandflexibility.Multiple

    sprungsilverlaminationhasconductivity.Andtheyaugmenttheinterfacebetweencontactsand

    dropperbar.

    The

    problem

    for

    the

    life

    of

    contact:

    the

    main

    plug

    in

    contacts,

    which

    are

    made

    of

    Be

    Cu

    alloyandmultiplesprungsilverlamination,arealwayspressed.

    Insomecompressingdistance,thelifeof

    maincontactscanbeincreased.

  • 7/28/2019 Training NBE 400V AC System R0

    11/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearStructure

    Inthelowvoltagecabinet,themainbusbaranddropperbarareCcopper.

  • 7/28/2019 Training NBE 400V AC System R0

    12/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgear400V

    AC

    Switchgear

    Pictures

    PhysicalPicture

  • 7/28/2019 Training NBE 400V AC System R0

    13/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgear

    2. Major Technical Data

  • 7/28/2019 Training NBE 400V AC System R0

    14/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearSystem

    Parameter:

    Detail information refer to the specif ication NBE-207-02-001_R1

  • 7/28/2019 Training NBE 400V AC System R0

    15/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgear

    3. Design

  • 7/28/2019 Training NBE 400V AC System R0

    16/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearDesign

    The400Vlowvoltagedistributionboardsshallbedesigned,manufacturedandtestedinaccordancewithIEC

    60439andIEC60529.

    Thedevicesprovidedwiththeswitchgearassembliesshallincludelowvoltagepoweraircircuitbreakers,

    molded

    case

    circuit

    breakers,

    busbar,

    current

    transformers,

    voltage

    transformers,

    meters,

    indication

    lamps,

    relays,controlelementsandassociatedwiringandtestblocks.

    Lowvoltagepoweraircircuitbreakersshallbe3poleelectricallyandmechanicallytripfreedrawouttype

    andshallbecompletedwithinterpolebarriersforeliminatingallfaultcommunication,arcquenchers,

    manualand

    electrical

    stored

    energy

    operating

    mechanism,

    mechanical

    position

    indicator,

    and

    shall

    be

    mountedonadrawoutmechanisminthebreakercompartment.

    Allmolded

    casecircuitbreakersshallbelocalmanualoperatedfixedtype

    andshallhavethermaland

    magnetictrippingdevices.

    Theremoteelectricallyoperatedcircuitbreakersshallbeequippedwithpushbuttonsforlocalcontrol,andaLocal

    Remote

    selectorswitch.Allelectricallyoperatedcircuitbreakersshallbeprovidedwithsufficient

    numberofauxiliarycontactsforoperation,control,interlockingandlocal/remoteindication.

  • 7/28/2019 Training NBE 400V AC System R0

    17/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearDesign

  • 7/28/2019 Training NBE 400V AC System R0

    18/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgear

    4. Outline Drawing and Installation

  • 7/28/2019 Training NBE 400V AC System R0

    19/39

    N B E B l f Pl

  • 7/28/2019 Training NBE 400V AC System R0

    20/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearGeneral

    Installation

    Requirement:

    Regulatethefirstcabinets/transportationunit.

    Installthenextcabinetaccordingtothearrangeorder,andconnecttheframeofcabinettillthe

    arrangementis

    ended.

    Cleantheconnectionareaofmaincircuitandconnectthemaincircuitandaux.circuit.

    Installcablestofeedcabinets(payattentiontotorque).

    Connectearthingpointofcabinetstooverallearthingsystem.

    Duringthe

    above

    process

    be

    sure

    that

    connections

    points

    of

    main circuits/transportationisolatedpointsmustreachthetightentorque.

    Eachblockof400VACcabinetshallbeearthedatleastwith2points

    Afterinstallationfinished,cleanthelocationandthematerialswhichareinsidethecabinets.Alsocleanthe

    partswhich

    are

    irrelevant

    for

    the

    running

    of

    the

    cabinets

    such

    as

    tools,

    packing

    material,

    conductions.

    Lockthedoor

    N B E B l f Pl t

  • 7/28/2019 Training NBE 400V AC System R0

    21/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearGeneralInstallationMethodontheGround(recommend)

    Whentheincomingunitisfrombottom,thecableslotisrequiredontheground.

    Cabinetsshould

    be

    installed

    on

    the

    pedestal

    which

    is

    embedded

    in

    the

    concrete

    ground.

    The

    horizontal

    error

    of

    the pedestalis1mm/permeter.

    Cabinetsshouldbeconnectedwiththepedestal(withweldingorscrews).Thegroundingisreliable.

    Thelengthofweldinglineinfrontandbackofeverycabinetis

    20mm.Allweldinglineshouldbecoatedwith

    antisepsis.Whenfixingcabinetsonthepedestal(withweldingorscrews),Thehorizontalerrorofthepedestalis

    1mm/permeter.Thegroundingisreliable.Allweldinglinesarecoatedwithantisepsis.Toensurethe

    bendingradiusofcablesandenoughspace,suggesttheminheightofcablechannelis500mm.

    New Bong Escape Balance of Plant

  • 7/28/2019 Training NBE 400V AC System R0

    22/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearThe

    Sketch

    Map

    for

    Installing

    BLTS

    New Bong Escape Balance of Plant

  • 7/28/2019 Training NBE 400V AC System R0

    23/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearThe

    Sketch

    Map

    for

    Connection

    Between

    Cabinets

    New Bong Escape Balance of Plant

  • 7/28/2019 Training NBE 400V AC System R0

    24/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearThe

    Sketch

    Map

    for

    Connecting

    Busbar

    Between

    Cabinets

    New Bong Escape Balance of Plant

  • 7/28/2019 Training NBE 400V AC System R0

    25/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearCable

    Connection

    The sketch map of connection for control

    busbar between cabinets

    New Bong Escape Balance of Plant

  • 7/28/2019 Training NBE 400V AC System R0

    26/39

    NewBongEscape

    BalanceofPlant

    400VACSwitchgearCable

    Connection

    The sketch map of di rect connection for

    breakers and loading components

    The sketch map for connection without

    holes between cables and C-copper

  • 7/28/2019 Training NBE 400V AC System R0

    27/39

  • 7/28/2019 Training NBE 400V AC System R0

    28/39

    NewBongEscape BalanceofPlant

  • 7/28/2019 Training NBE 400V AC System R0

    29/39

    g p

    400VACSwitchgearInspect

    in

    Incoming

    Unit

    Inspect the type of breakers. Copper connection of breaker.

    Inspect whether degree of protection (distance between phases, creepage,distance, arc distance) meets

    requirements.

    Inspect the action property of breaker (switch on and off 5 times).

    Inspect whether mechanical interlock system is reliable.

    Inspect whether control circuit.

    InspectinFeederUnit

    Inspect whether components meet requirements.

    Internal interlock of mechanical and electrical parts whether is reliable.

    Inspect whether panel can be operated normally (including contacting property of insert parts).

    Inspect whether electrical and mechanical interlock are reliable.

    Inspect action property in control circuit and main components (switch on and off 5 times).

  • 7/28/2019 Training NBE 400V AC System R0

    30/39

    NewBongEscape BalanceofPlant

  • 7/28/2019 Training NBE 400V AC System R0

    31/39

    g p

    400VACSwitchgearEliminate

    the

    general

    faults

    Whenhavingfaults,youmusttaketheemergencystepatthefirsttimeonsite.Recordthephenomenon.

    Thegeneralfaultscanbeeliminatedasfollowingsteps:

    No. Fault Possible reason Solution

    1Main circuit breaker can not switch on

    There is no control voltage. Switch on control power breaker.

    Voltage inspector does not work.Adjust or replace the voltage inspector

    Under voltage release has not been energized/ damaged. Check the wiring or replace the coil.

    2Feeder circuit breaker is tripping.

    The setting value of overload/short is too low. Reset the overload/short setting value

    Load or its wiring has mistake. Eliminate loading faults.

    The breakers capacity is too small. Increase the switchs capacity

    3 Theres fog/ taste. Connection area of conductor didnt tighten. Stop the power supply and tighten the connection points.

    4 Capacitor unit cabinet does not work.No load and the current is too small.

    See manuals of components for other faults.Use again when having more loading.

    5 Faults of other components See manuals of components

    NewBongEscape BalanceofPlant

  • 7/28/2019 Training NBE 400V AC System R0

    32/39

    400VACSwitchgearEnergizingLoadBreakers

    ACB in Fixed Uni t Cabinets

    Infixedunitcabinet,energizingmethodofACBisthesamewith

    incomingunitcabinet.Butbefore

    energizing,

    inspect

    the

    isolation

    for

    loading

    cables.

    If

    the

    isolation

    of

    cables

    is

    no

    problem,

    operate

    the

    breakeraccordingtoabovementionedsteps.

    NewBongEscape BalanceofPlant

  • 7/28/2019 Training NBE 400V AC System R0

    33/39

    400VACSwitchgear

    Adjust the Protective Value of BreakerNZM2

    NZM2

    PKZ2

    NewBongEscape BalanceofPlant

  • 7/28/2019 Training NBE 400V AC System R0

    34/39

    400VACSwitchgear Give Operating PowerControl operating power is the main factor to start up circuits. Therefore, before energizing, give

    working power in time for all loads in loading circuit.

    State of Normal Running

    When normal running, it should be light for the white indicator lights of control bar. When normal running, all doors

    of cabinets should be closed and each panel are in connection position. Operating handle of panel is in I.

    NewBongEscape BalanceofPlant

  • 7/28/2019 Training NBE 400V AC System R0

    35/39

    400VACSwitchgear

    Monitoring Item of Normal Running

    Voltageofthreephaseswhetherisnormalbyobservingvoltagemeter.Ifthererecurrentmetersinthe

    circuit,pleaseinspectthecurrentduringrunning.Ifitsnecessary,pleaseinstallthetongtestammeterto

    inspectthebalanceofthreephases. Ifitsdigitalfunctionalmeter,onlyoperatefunctionalkeystolook

    the

    current,voltage,powerandsoon

    Monitoring Item of Equipments for Stopping Running

    Whenstoppingrunning,theindicatorlightOFF

    ison.The

    handleofbreakerisino

    position.Switchoff

    thebreaker.

    NewBongEscape BalanceofPlant

  • 7/28/2019 Training NBE 400V AC System R0

    36/39

    400VACSwitchgear6.Maintenance

    MaintenanceinRunning

    Iftheequipmentshaveproblemsduringrunning,ortermmaintenanceandinspection,cutpowerfor

    runningequipment.Afterfinishingmaintenance,givepoweragain.

    The following points should be attended.

    Inspectthoroughlyforthismaintenance.Theinspectionwhetherperfectreally.

    Inspectthesiteofmaintenance,mainincomingcircuitbreakermustinconnectionposition.Powerstorageof

    breakeris

    ok.

    Beforestartinguprunningagain,itmustbeensuredthatallbreakerloadhasntfaults.Theisolationofcables

    is10M.Energizingbreakeriscorrespondingwithcableload.

    Resumetostartupreferringtotherequirementsinfirsttime.

    MaintenancePeriod

    Suggest:newrunningequipmentsaremaintainedoneyear.Later,maintainonceevery2to5years.(Depend

    onenvironmentoraskmanufacture.)

    NewBongEscape BalanceofPlant

  • 7/28/2019 Training NBE 400V AC System R0

    37/39

    400VACSwitchgear StepsforMaintenance1.Maintenancepersonshouldbetheprofessionalelectricianwhoistrained.Faultsshouldberecorded.

    2.Checkindicatorlightswithpower.

    3.Switchoffmainpower(includinghighvoltagepart),auxiliarypowerandcontrolpower,checkitandsure

    thereis

    no

    power

    and

    connect

    main

    circuit

    to

    ground

    4.Openallcabinetdoorsandcheckmaincircuitconnection

    points

    torque,meanwhilecheckwhetherthere

    isbreakdowncausedbyoverload

    5.Carbonizationhasappearedcheckandmaintenancetherelevantpartsandchangethedamagedparts.

    If

    the

    color

    has

    changed

    but

    it

    still

    has

    gloss

    tighten

    the

    torque.

    6.Checkwhetherthereisuncommonphenomenon,ifthereispleasechecktherelevantconductorofmain

    plugandchangedamagedpartsAttention:mainplugofwithdrawablecomponentsandcannotattach

    object,plugscanbeusedagainaftertheywerecleanedandpaintedVaseline)

    7.Cleantheinsideofcabinetwithbrushandcloth(ifthereiscontrolwiringdropped,tightenitagain)

    Cleantheoutsideofcabinets(solventisnotpermitted)

    NewBongEscape BalanceofPlant

  • 7/28/2019 Training NBE 400V AC System R0

    38/39

    400VACSwitchgear

    Itemsbefore/aftermaintenance

    Before Maintenance

    MaintenanceworkcannotdowithpowerON.

    Mainand

    auxiliary

    power

    relevant

    wirings

    must

    be

    switch

    OFF.

    WithdrawablepartsandcomponentsmustbesettoOFF

    position.

    Verifythereisnopower.

    Shortandgroundconnectionprotectionmustbedone.

    After Maintenance

    Toolscannotleaveincabinets.

    Disconnectprotectiveactions

    Check

    isolation

    and

    make

    a

    record.

    Takeawaylockingdevices

    Placewithdrawablepartstoconnectionposition

    Supplythepower

    NewBongEscape BalanceofPlant

  • 7/28/2019 Training NBE 400V AC System R0

    39/39

    400VACSwitchgear

    THANKYOUFORATTENTION!