training plan tile setting nc ii
TRANSCRIPT
-
7/28/2019 Training Plan Tile Setting Nc II
1/21
Training Materials, tools and equipments for Tile Setting NC II
TOOLS EQUIPMENT MATERIALS
QTY. ITEM QTY. ITEM QTY. ITEM
5 pcs. Notched trowel 2 pcs. Angle grinder 25 boxesGlazed wall tiles (20cm x 20 cm)
2 pcs. Tile cutter25sets
PPE 25 boxesVitrified floor tiles (20cm x 20 cm)
25 pcs. Pull- push Rule 150 pcs. Mosaic tiles (12 x12)
5 pcs. Tile Nipper 30 kilos Tile adhesive
15m Level Hose Cement
5 pcs. Plumb bob 1 bag Tile plastic spacer
5 pcs. Spirit level 1 pcs.
Sanding
Stone(Carburandum)
5 pcs. Tri-square (12) 25 pcsPencil
5 kilosTile grout (matchwith the tiles)
5 pcs. Rubber squeegee 25 pcs. Foam
-
7/28/2019 Training Plan Tile Setting Nc II
2/21
TRAINING PLANQualification: TILE SETTING NC II
Nominal Duration: 82hrsTrainees
TrainingRequirements
Training Activity/TaskMode ofTraining
Staff/PersonConcerned
Facilities/Tools and
EquipmentVenue
AssessmentMethod
Dateand
Time
BasicCompetency
18hrs
CommonCompetency
24hrs
CORE COMPETENCY40hrs
1. LAY AND REPAIR WALL AND FLOOR TILES32hrs
1.1 Plan andprepare for
work
1.1 Secured andinterpreted Work
instruction in linewith job requirements
Self-paceIndividualize
training methodGroupStructuredtraining method
Trainer (EfrenG. Gayanes)
Trainees
Module onblue print
reading;CBLM; PPT,Blue Print
Contextuallearning
area/Learning
resourcearea
Observationwith oral
Questioning
1.2 Identified Safetyand qualityrequirements in linewith OccupationalSafety and HealthStandards (OSHS) andcompany standardoperating procedures
Self-pace/IndustryimmersionIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
PPT,CBLM,otherreferencematerials/
ContextuallearningareaworkplaceOn site(construction site)
Observationwith oralquestioning/demonstration
-
7/28/2019 Training Plan Tile Setting Nc II
3/21
1.3 identified Materialtiles, tools andequipment inaccordance with job
requirements
Self-pace/IndustryimmersionIndividualize
training methodGroup
Structuredtraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM; PPT;otherreferencematerials/
actual toolsand
equipmentillustration
Contextuallearningarea
Observationwith oralquestioning/demonstration
1.2 Lay outtiling job
2.1 checked Area(s) to betiled in line with jobrequirements
Self-paceIndividualizetraining methodGroupStructuredtraining method
Trainer (EfrenG. Gayanes)
Trainees
Module onLay outingCBLM, PPT,Lay outing
Tools
Workplacearea/ Onsite
Demonstration/observationwith oralquestioning
2.2 Laid out Tiles in linewith specifications
DemonstrationSelf-paceIndividualizetraining methodGroupStructuredtraining method
Trainer (EfrenG. Gayanes)
Trainees
Module onTile layingprocedures,CBLM, PPT,
Tile layingTools
Workingarea/ Onsite
Demonstration/observationwith oralquestioning
1.3 Installwall tiles
3.1 Prepared Cement orcement based adhesiveaccording tomanufacturersinstructions orrecommendation then
applied to tile / wall
surface
Self-paceIndividualizetraining methodGroupStructuredtraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,Tools formixing
Workingarea/ Onsite
Demonstration/observationwith oralquestioning
3.2 Prepared andinstalled Tiles with
Self-paceIndividualize
Trainer (EfrenG. Gayanes)
CBLM, PPT,Video clip,
Workingarea / On
Demonstration/observation
-
7/28/2019 Training Plan Tile Setting Nc II
4/21
guide / batterboardset to level alignment
training methodGroupStructuredtraining method
Trainees Tools for tileinstallation
site with oralquestioning
3.3 Checked Horizontaljoint for straightnessand checked tile edgesand surface foralignment
Self-pace
Individualizetraining methodGroupStructuredtraining method
Trainer (Efren
G. Gayanes)Trainees
CBLM, PPT,
Video clip
Working
area/ Onsite
Demonstration
/observationwith oralquestioning
3.4 Fixed Tiles toalignment retainingdesigned pattern tospecifications
Self-paceIndividualizetraining methodGroupStructuredtraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ Onsite
Demonstration/observationwith oralquestioning
3.5 Shown evenmargins are aroundopenings, frames andfittings, whereapplicable
Self-paceIndividualizetraining methodGroupStructuredtraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ Onsite
Demonstration/observationwith oralquestioning
3.6 Installed Specialcut tile to create a
square corner in
accordance withdrawings andspecifications, whereapplicable
Self-paceIndividualize
training method
GroupStructuredtraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ On
site
Demonstration/observation
with oral
questioning
-
7/28/2019 Training Plan Tile Setting Nc II
5/21
3.7 Finished Verticaltiles according toplumbness andsquare corner
requirements
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ Onsite
Demonstration/observationwith oralquestioning
3.8 Maintained Alljoints straight anduniform in widthconsidering allowancefor tolerance of tile
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ Onsite
Demonstration/observationwith oralquestioning
3.9 MaintainedExpansion gapsfollowingspecifications
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ Onsite
Demonstration/observationwith oralquestioning
3.10 Polished andcleaned Tiled surfaceis to Specificationsand manufacturersrecommendations
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ Onsite
Demonstration/observationwith oralquestioning
1.4 Cut tiles 1.1 Cut Tiles accordingto required specifications
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,Cutting tools
Workingarea/ Onsite
Demonstration/observationwith oralquestioning
4.2 Cut Recess hole orcurve by hand ormachine is in requiredtolerance
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,Cutting tools
Workingarea/ Onsite
Demonstration/observationwith oralquestioning
4.3 Prepared Miter joints,retaining glazing on miter
Self-paceIndividualize
Trainer (EfrenG. Gayanes)
CBLM, PPT, Workingarea/ On
Demonstration/observation
-
7/28/2019 Training Plan Tile Setting Nc II
6/21
with no chips anduniform in size
training method Trainees site with oralquestioning
4.4 Prepared Special cuttile in accordance withdrawings and
specifications, whereapplicable
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,working plan
Workingarea/ Onsite
Demonstration/observationwith oral
questioning
4.5 Jolly-edged Tile to
form a miter to preventthe tile body from beingexposed at the joint
Self-pace
Individualizetraining method
Trainer (Efren
G. Gayanes)Trainees
CBLM, PPT,
Tile edgingtools
Working
area/ Onsite
Demonstration
/observationwith oralquestioning
4.6Applied Safetyprecautions in line withOccupational Safety and
Health Standards
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ Onsite
Demonstration/observationwith oral
questioning
1.5 Groutspace betweentiles
5.1 Cleaned andprepared Joints forgrouting followingmanufacturer'sspecifications
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,tile cleaningtools
Workingarea/ Onsite
Demonstration/observationwith oralquestioning
5.2 Mixed and appliedGrout according tomanufacturer's
specifications
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,grout mixingtools
Workingarea/ Onsite
Demonstration/observationwith oral
questioning
-
7/28/2019 Training Plan Tile Setting Nc II
7/21
5.3 Cleaned and polishedTiles to specifications,removing all dust fromsurface and joints
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ Onsite
Demonstration/observationwith oralquestioning
1.6 Install
vertical mosaicsheets
6.1 Fixed Paper-faced or
mesh-backed mosaics tobackground with tileadhesive
Self-pace
Individualizetraining method
Trainer (Efren
G. Gayanes)Trainees
CBLM, PPT, Working
area/ Onsite
Demonstration
/observationwith oralquestioning
6.2 Made Adjustments to
ensure spacing isuniformand pattern andalignment are maintained
Self-pace
Individualizetraining method
Trainer (Efren
G. Gayanes)Trainees
CBLM, PPT, Working
area/ Onsite
6.3 Finished area withmosaics level to line, if
applicable, surfacestraight and flat andgrout are finished tospecifications
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ On
site
Demonstration/observation
with oralquestioning
1.7 Lay floortiles
7.1 Selected Adhesivebased on specifications,tile type and climatic
condition
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ Onsite
Demonstration/observationwith oral
questioning
7.2 Cleaned Surface from
residue and protrusions
Self-pace
Individualizetraining method
Trainer (Efren
G. Gayanes)Trainees
CBLM, PPT, Working
area/ Onsite
Demonstration
/observationwith oralquestioning
-
7/28/2019 Training Plan Tile Setting Nc II
8/21
7.3 Mixed Adhesivefollowing manufacturer'sspecifications
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,mixing tools
Workingarea/ Onsite
Demonstration/observationwith oralquestioning
7.4 Laid Tiles tomanufacturer's
specifications andexpansion gapsmaintained betweenwalls and tiles
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,tile laying
tools
Workingarea/ On
site
Demonstration/observation
with oralquestioning
7.5 Mixed and appliedGrout to clean jointsand surface according tomanufacturer'sspecifications
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,groutapplicationtools
Workingarea/ Onsite
Demonstration/observationwith oralquestioning
7.6 Polished and cleanedFinished tile workaccording tospecifications andmanufacturerrecommendations
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,tile cleaningtools
Workingarea/ Onsite
Demonstration/observationwith oralquestioning
1.8 Tile treads,risers, steps
andthresholds
8.1 Calculated anddetermined Risers and
steps from concrete steps/ stairs
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ On
site
Demonstration/observation
with oralquestioning
8.2 Laid out Steps for
uniform rise and takeeven cut on both side
Self-pace
Individualizetraining method
Trainer (Efren
G. Gayanes)Trainees
CBLM, PPT, Working
area/ Onsite
Demonstration
/observationwith oralquestioning
-
7/28/2019 Training Plan Tile Setting Nc II
9/21
8.3 Placed Step riserpacking or rendersupport, wherenecessary, and installed
riser tiles according toalignment
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ Onsite
Demonstration/observationwith oralquestioning
8.4 Installed Treads inline with the top edge ofrisers within therequired tolerance
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ Onsite
Demonstration/observationwith oralquestioning
8.5 Applied Grout to wetjoints and finished flushwith tiles to a smoothfinish.
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ Onsite
Demonstration/observationwith oralquestioning
8.6 Cleaned and polishedfinished tile work andfree of pitted, chipped,cracked or scratched tileresultingfrom laying operation
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ Onsite
Demonstration/observationwith oralquestioning
8.7Polished and cleanedtiled surface is to
specifications and
manufacturersrecommendations.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ On
site
Demonstration/observation
with oral
questioning
-
7/28/2019 Training Plan Tile Setting Nc II
10/21
1.9 Repairdamaged tilework
9.1 Performed Damagedtiles removal procedurefollowing established /recommended practices
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,tile removaltools
Workingarea/ Onsite
Demonstration/observationwith oralquestioning
9.2 Old bedding is
cleaned and cleared forplacement ofreplacement tile
Self-pace
Individualizetraining method
Trainer (Efren
G. Gayanes)Trainees
CBLM, PPT, Working
area/ Onsite
Demonstration
/observationwith oralquestioning
9.3 Selected and cut
replacement tiles, ifnecessary, followingexisting pattern and facerecommendations.
Self-pace
Individualizetraining method
Trainer (Efren
G. Gayanes)Trainees
CBLM, PPT, Working
area/ Onsite
Demonstration
/observationwith oralquestioning
9.4 Fitted and installedTiles to maintain
alignment with joints foruniform spacing
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ On
site
Demonstration/observation
with oralquestioning
9.5 Performed groutingand cleaned tile facefrom dirt and otherresidues
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ Onsite
Demonstration/observationwith oralquestioning
9.6 Polished and cleanedTiled surface tospecifications and
manufacturers
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT, Workingarea/ Onsite
Demonstration/observationwith oral
questioning
-
7/28/2019 Training Plan Tile Setting Nc II
11/21
1.10 Clean up 10.1 Cleaned work areaas per OSHSrequirements
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,Workingarea/ Onsite
Demonstration/observationwith oralquestioning
10.2 Disposed waste and
unwanted materialsfollowing companystandard operatingprocedure and OSH andenvironmentalrequirements
Self-pace
Individualizetraining method
Trainer (Efren
G. Gayanes)Trainees
CBLM, PPT,Workingarea/ Onsite
Demonstration/observationwith oralquestioning
10.3 Stored / stackedunused materials areaccording to enterpriseprocedures
Self-paceIndividualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,Workingarea/ On
site
Demonstration/observation
with oralquestioning
10.4 Cleaned and
maintained tools andequipment are followingmanufacturer'sspecifications
Self-pace
Individualizetraining method
Trainer (Efren
G. Gayanes)Trainees
CBLM, PPT, Working
area/ Onsite
Demonstration
/observationwith oralquestioning
TraineesTraining
RequirementsTraining Activity/Task
Mode ofTraining
Staff/PersonConcerned
Facilities/Tools and
EquipmentVenue
AssessmentMethod
Dateand
Time
2. TILE CORNER 4hrs
2.1 Plan andprepare for
work
1.1Secured andinterpreted Work
instruction in line withjob requirements
Self-pace
Individualizetraining method
Trainer (EfrenG. Gayanes)
Trainees CBLM, PPT,
Working
area/ Onsite
Demonstration
/observationwith oral
questioning
-
7/28/2019 Training Plan Tile Setting Nc II
12/21
1.2.Identified Safety andquality requirements inline with OccupationalSafety and Health
Standards (OSHS) andcompany standard
operating procedures
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
1.3 Identified Materialtiles, tools andequipment inaccordance with jobrequirements
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
2.2Tileexternalcorners2.3 Tileinternal
corners
2.1 Checked set out tilesfor specified toleranceof + - 2 mm based onplumbness andlevelness.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oral
questioning
2.2 Checked externalcorners for flatness ofsurfaces andstraightness ofintersections.
Self-pace
Individualizetraining method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Working
area/ Onsite
Demonstration/observation
with oralquestioning
2.3 Installed tile trim tomaintain external
returns and tile trimis fitted to bothcorners.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration
/observationwith oral
questioning
-
7/28/2019 Training Plan Tile Setting Nc II
13/21
2.4 Installed tiles withoutvoids in tile bed andfully bedded tomaintain alignment
to specifications
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
2.5 Maintained cornerssquare and finishedto specifications.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
2.6 Polished and cleanedtiled surface tospecifications andmanufacturersrecommendations.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
3.1 Checked internal
corners for flatness ofsurfaces andstraightness ofintersections.
Self-paceIndividualize
training method
Trainer (Efren
G. Gayanes)Trainees
CBLM, PPT,Workingarea/ On
site
Demonstration/observation
with oralquestioning
3.2 Fitted and cut Tiles,where required and
installed to one wallmaintaining
alignment to set outand specifications.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,Workingarea/ On
site
Demonstration/observation
with oralquestioning
-
7/28/2019 Training Plan Tile Setting Nc II
14/21
3.3 Tiles are fitted andcut, where requiredand installedabutting adjacent
wall tiles to line, setout and
specifications.
Self-pace
Individualizetraining method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,
Working
area/ Onsite
Demonstration/observation
with oralquestioning
3.4 Made joints forabutting tiles inaccordance withdesigned margin forgrouting or forexpansion joint,where applicable tospecifications.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,Workingarea/ On
site
Demonstration/observation
with oralquestioning
3.5 Installed tiles to covetiles or trim andfinished to alignmentand specifications.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees CBLM, PPT,Workingarea/ On
site
Demonstration/observation
with oralquestioning
3.6 Polished and cleanedtiled surface tospecifications andmanufacturersrecommendations.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
2.4 Clean up 4.1 Cleaned work area asper OSHS requirements Self-pace
Individualizetraining method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
-
7/28/2019 Training Plan Tile Setting Nc II
15/21
4.2 Disposed waste andunwanted materials offollowing companystandard operating
procedure and OSHSrequirements
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
4.3 Stored / stackedunused materialsaccording to enterpriseprocedures
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
4.4Cleaned andmaintained tools andequipment followingmanufacturer'sspecifications
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,Workingarea/ On
site
Demonstration/observation
with oralquestioning
TraineesTraining
RequirementsTraining Activity/Task
Mode of
Training
Staff/Person
Concerned
Facilities/Tools and
EquipmentVenue
Assessment
Method
Dateand
Time
3. TILE CURVED SURFACES 4hrs
3.1 Plan andprepare for
work
1.1Secured andinterpreted Work
instruction in line withjob requirements
Self-pace
Individualizetraining method
Trainer (EfrenG. Gayanes)
Trainees CBLM, PPT,
Working
area/ Onsite
Demonstration/observation
with oralquestioning
-
7/28/2019 Training Plan Tile Setting Nc II
16/21
1.2.Identified Safety andquality requirements inline with OccupationalSafety and Health
Standards (OSHS) andcompany standard
operating procedures
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
1.3 Identified Materialtiles, tools andequipment inaccordance with jobrequirements
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
3.2 Tile curvedwall and floorsurfaces
2.1 Set out level linearound the wall byintermediate markingusing levelingequipment.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
2.2 Set out location oftiles to determinebalanced design andcutting requirements,if necessary.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
2.3 Made template to
form accurate curveline to tiled surface
around the wall.
Self-paceIndividualize
training method
Trainer (Efren
G. Gayanes)Trainees CBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
2.4 Determined methodfor installing tiles
Self-paceIndividualize
Trainer (EfrenG. Gayanes)
CBLM, PPT,Workingarea/ On
Demonstration/observation
-
7/28/2019 Training Plan Tile Setting Nc II
17/21
with identification oflocation of the firsttile.
training method Trainees site with oralquestioning
2.5 Prepared cement-based adhesivefollowing
manufacturer'sspecifications.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees CBLM, PPT,Workingarea/ On
site
Demonstration/observation
with oral
questioning
2.6 Installed guide boardto level set out andtemplate curve to
specifications.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees CBLM, PPT,Workingarea/ On
site
Demonstration/observation
with oralquestioning
2.7 Maintained minimumvoids in mortar tilebeds and tiles arefixed, plumb (wall),and flush.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
2.8 Laid floor tiles to setout grid withperimeter tilesmarked and cut to fitcurve wall.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
2.9 Mixed tile grout withwater and applied to
joints according tospecifications, toprovide flush andsmooth finish.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oral
questioning
-
7/28/2019 Training Plan Tile Setting Nc II
18/21
2.10 Polished andcleaned tiledsurface to specificationsand manufacturers
recommendations.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oral
questioning
3.3 Tilecircularvolume, walland arches
3.1 Set out, cut,positioned andchecked template tomaintain conformityto tile surface forcurve.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)Trainees
CBLM, PPT,Workingarea/ On
site
Demonstration/observation
with oralquestioning
3.2 Positioned andinstalled guide boardto line to maintainuniform spacing.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
3.3 Marked and cut tiles,where applicable,
installed into place tospecifications.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
3.4 Installed tiles onwalls and plumb,maintaining levelsand curvature of wallto specifications.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
3.5 Installed tiles toarchways,maintaining line andcurvature tospecifications.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
-
7/28/2019 Training Plan Tile Setting Nc II
19/21
3.6 Mixed tile grout withwater and applied to
joints of tiled surfacesand tiled surface is
finished tospecifications.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
3.7 Polished and cleanedtiled surface tospecifications and
manufacturersrecommendations.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
3.4 Installmosaic tiles ona circularcolumn
4.1 Checked Surfacefrom protrusions andfrom plasteringimperfections.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees CBLM, PPT,Workingarea/ On
site
Demonstration/observation
with oralquestioning
4.2 Prepared Templatefor column tilingdiameter tospecifications.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees CBLM, PPT,Workingarea/ On
site
Demonstration/observation
with oralquestioning
4.3 Applied mortar evenlyto the required tilingdiameter thickness
and finished to curvebased on prepared
templatespecifications.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees
CBLM, PPT,Workingarea/ On
site
Demonstration/observation
with oralquestioning
-
7/28/2019 Training Plan Tile Setting Nc II
20/21
4.4 Positioned andinstalled guide boardto maintain level line.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees CBLM, PPT,Workingarea/ On
site
Demonstration/observation
with oralquestioning
4.5 Mosaic tiles are
installed to columnmaintaining evenspacing and levelfinish tospecifications.
Self-paceIndividualize
training method
Trainer (Efren
G. Gayanes)Trainees
CBLM, PPT,Workingarea/ On
site
Demonstration/observation
with oralquestioning
4.6 Mixed tile grout withwater and applied totiled surface and tilesurface is finished tospecifications.
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
Trainees CBLM, PPT,Workingarea/ On
site
Demonstration/observation
with oralquestioning
4.7 Polished and cleanedtiled surface to
specifications andmanufacturersrecommendations
Self-pace
Individualizetraining method
Trainer (EfrenG. Gayanes)
Trainees CBLM, PPT,
Working
area/ Onsite
Demonstration/observation
with oralquestioning
3.5 Clean up 5.1 Cleaned work area asper OSHS requirements
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning
5.2 Disposed waste andunwanted materials offollowing companystandard operatingprocedure and OSHS
requirements
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oral
questioning
-
7/28/2019 Training Plan Tile Setting Nc II
21/21
Conformed:
EFREN G. GAYANESTraining Supervisor Trainer
5.3 Stored / stackedunused materialsaccording to enterpriseprocedures
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oral
questioning
5.4Cleaned andmaintained tools andequipment followingmanufacturer'sspecifications
Self-paceIndividualize
training method
Trainer (EfrenG. Gayanes)
TraineesCBLM, PPT,
Workingarea/ On
site
Demonstration/observation
with oralquestioning