trane c.d.s. elearning - ashrae standard 62.1 and … · 3/31/2015 1 ashrae standard 62.1 trace™...

16
3/31/2015 1 ASHRAE Standard 62.1 TRACE 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) Prescribes quantity of outdoor air delivered to each zone based How to calculate outdoor air flow needed at the system intake Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700 ©2015 Trane. All rights reserved.

Upload: doanduong

Post on 04-Jun-2018

265 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

1

ASHRAE Standard 62.1

TRACE 700™

ASHRAE 62.1: Section 6.2Ventilation Rate Procedure (VRP)

• Prescribes quantity of outdoor air delivered to each zone based

• How to calculate outdoor air flow needed at the system intake

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.

Page 2: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

2

Learning objectives

• Describe the multi-zone calculation process

• Show how TRACE™ determines system level

• Common questions

Example: Two zone officeCalculate required outdoor air intake VAV reheat system

Block airflow : 2560 cfm

VAV diversity factor:0.8 1600 cfm

25% min stop

exhaustunconditioned outdoor air

sup

ply

air

retu

rn a

ir

VAV

VAV

1600 cfm 25% min stop

zone 1

zone 2

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.

Page 3: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

3

exhaust

ASHRAE Standard 62.1 Variables

Vpz = 1600 cfmVpz-min = 400 cfm

Vpz = 1600 cfmVpz-min = 400 cfm

outdoor airsu

pp

ly a

ir

retu

rn a

ir

VAV

VAV

Block airflow : Vps = 2560 cfm

Zone Airflow Rates

1. Define Zone Level Parametersa. Define zone airflow rates and distribution effectiveness

a. Ra = Outdoor airflow rate per unit area (Table 6-1)b. Rp = Outdoor airflow rate per person (Table 6-1)c. Ez = Define zone air distribution effectiveness (Table 6-2)

1

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.

Page 4: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

4

Zone Airflow Rates

1. Define Zone Level Parametersa. Define zone airflow rates and distribution effectiveness

a. Ra = Outdoor airflow rate per unit area (Table 6-1)b. Rp = Outdoor airflow rate per person (Table 6-1)c. Ez = Define zone air distribution effectiveness (Table 6-2)

2. Calculate Breathing Zone Outdoor Airflow (Vbz)a. Vbz= (Rp x Pz) + (Ra x Az),

where Pz is the number of people and Az is the zone area

1

2

Zone Airflow Rates

1. Define Zone Level Parametersa. Define zone airflow rates and distribution effectiveness

a. Ra = Outdoor airflow rate per unit area (Table 6-1)b. Rp = Outdoor airflow rate per person (Table 6-1)c. Ez = Define zone air distribution effectiveness (Table 6-2)

2. Calculate Breathing Zone Outdoor Airflow (Vbz)a. Vbz= (Rp x Pz) + (Ra x Az),

where Pz is the number of people and Az is the zone area

3. Calculate Zone Outdoor Airflow (Voz)a. Voz = Vbz/Ez

1

2

3

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.

Page 5: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

5

Zone Airflow Rates

Zone 2:• Rp = 5 cfm/p• Ra = 0.06 cfm/ft2

• Pz = 10 people• Az = 500 ft2

• Ez = 1.0 (cooling)

Calculate Vbz and Voz:Zone 1:• Rp = 5 cfm/p• Ra = 0.06 cfm/ft2

• Pz = 30 people• Az = 1500 ft2

• Ez = 1.0 (cooling)

exhaust

OA 

sup

ply

air

retu

rn a

ir

VAV

VAV

zone 1

zone 2

Voz = 240 cfm 

Voz = 80 cfm

ASHRAE Standard 62.1/TRACE demonstration

1. Area and occupancy ventilation rates: OA required to remove contaminants from people and building materials

2. Zone level efficiency: Effectiveness of zone level outdoor airflow to dilute indoor contaminants

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.

Page 6: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

6

3. Area and occupancy ventilation rates: Select an appropriate standard 62.1 calculation

ASHRAE Standard 62.1/TRACE demonstration

TRACE™ ASHRAE Standard 62.1 report

Ventilation Parameters

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.

Page 7: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

7

4. Determine Zone Primary OA Fraction (Zp) for each zone

exhaust

Vpz = 1600 cfmVpz-min = 400 cfm

Vpz = 1600 cfmVpz-min = 400 cfm

sup

ply

air

retu

rn a

ir

VAV

VAV

Zp = Voz/Vpz-min

WhereVozVpz-min

= zone outdoor airflow= minimum expected

zone primary airflow at the design condition analyzed

4

OA 

4. Determine critical zone (zone with maximum Zd)5

exhaust

Zd = 0.6

Zd = 0.2

sup

ply

air

retu

rn a

ir

VAV

VAV

critical zone

OA 

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.

Page 8: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

8

*

TRACE™ ASHRAE Standard 62.1 report

Ventilation Calculation for Cooling Design

Vou = D Σall zones Rp Pz + Σall zones Ra Az, where D represents the occupancy diversity within the system

Assume D =1 Vou = 320 cfm

4. Determine uncorrected OA intake (Vou)6

exhaust

Vbz = 240 cfm

Vbz = 80 cfm

sup

ply

air

retu

rn a

ir

VAV

VAV

OA 

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.

Page 9: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

9

TRACE™ ASHRAE Standard 62.1 report

System Ventilation Requirements

Xs = Vou/Vpswhere Vps is system primary airflow (VAV block airflow)

4. Determine Average Outdoor Air Fraction (Xs)7

exhaust

sup

ply

air

retu

rn a

ir

VAV

VAV

OA 

Vou = 320 cfmVps = 2560 cfm (fan block)Xs= 0.125

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.

Page 10: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

10

TRACE™ ASHRAE Standard 62.1 report

System Ventilation Requirements

Ev = 1+Xs‐Zd‐max = 1+0.125‐0.6 = 0.525

4. Determine system ventilation efficiency (Ev): Table 6‐3 or App. A

8

exhaust

Vbz = 240 cfm

Vbz = 80 cfm

sup

ply

air

retu

rn a

ir

VAV

VAV

OA 

Equation A‐1

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.

Page 11: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

11

Vot = Vou/Ev = 320/0.525 = 610 cfm 23.8% OA at cooling design (610 cfm/2560  cfm)

Vot = 610 cfm 

4. Find outdoor intake flow (Vot): 9

exhaust

sup

ply

air

retu

rn a

ir

VAV

VAV

OA 

TRACE™ ASHRAE Standard 62.1 report

System Ventilation Requirements

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.

Page 12: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

12

TRACE and ASHRAE Standard 62.1

Common Questions

• Why is my system 100% OA?

• Why does my ASHRAE multi-zone spreadsheet does not match the TRACE 700 output?

• Why does TRACE calculate Zd using Vpz-min?

Resolving 100% OA • Set Max Vent Allowed (Max Zd) in Create Systems>Advanced• Increase VAV min in critical zone in Create Rooms>Airflows

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.

Page 13: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

13

ASHRAE Standard 62.1Lesson 2: Program Methodology100% OA

Max Zd = 75%

Pros

Reduce OA cfm• Reduced outdoor air

cfm

• Reduced ventilation load

Cons

Increased airflows• Increased minimum stop

• Increased fan power

• Increased reheat loads

Max Zd

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.

Page 14: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

14

Note: These values are for the 2 zone example

Impact of Zd-max on Vot and Vpz-min

TRACE and ASHRAE Standard 62.1

Common Questions

• Why is my system 100% OA?

• Why does my ASHRAE multi-zone spreadsheet does not match the TRACE 700 output?

• Why does TRACE calculate Zd using Vpz-min?

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.

Page 15: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

15

TRACE and ASHRAE Standard 62.1

Common Questions

• Why is my system 100% OA?

• Why does my ASHRAE multi-zone spreadsheet does not match the TRACE 700 output?

• Why does TRACE calculate Zd using Vpz-min?

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.

Page 16: Trane C.D.S. eLearning - ASHRAE Standard 62.1 and … · 3/31/2015 1 ASHRAE Standard 62.1 TRACE™ 700 ASHRAE 62.1: Section 6.2 Ventilation Rate Procedure (VRP) • Prescribes quantity

3/31/2015

16

Additional resources

• TRACE™ 700 User’s Manual

• TRACE online (F1) help

• Trane.com/EN

• Trane.com/ContinuingEducation

phone I 608.787.3926

fax I 608.787.3005

email I [email protected]

Web  I www.tranecds.com

contact us

Trane C.D.S. eLearning Tutorial ASHRAE Standard 62.1 and TRACE™ 700

©2015 Trane. All rights reserved.