trans-alaskan pipeline

31
Trans-Alaskan Pipeline Private Industry’s Most Expensive Undertaking

Upload: isi

Post on 22-Jan-2016

37 views

Category:

Documents


1 download

DESCRIPTION

Trans-Alaskan Pipeline. Private Industry’s Most Expensive Undertaking. Summary. History Original Proposals Political/Environmental Battles Final Design Economic Impact Future Pipelines. World History of Oil. Oil use documented for more than 5000 years - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Trans-Alaskan Pipeline

Trans-Alaskan Pipeline

Private Industry’s Most Expensive Undertaking

Page 2: Trans-Alaskan Pipeline

Summary History

Original Proposals

Political/Environmental

Battles

Final Design

Economic Impact

Future Pipelines

Page 3: Trans-Alaskan Pipeline

World History of Oil

Oil use documented for more than 5000 years

1859-First oil well drilled in Pennsylvania 1930s-Texas and Saudi Arabia Oil Fields 1946-Oil becomes world’s most popular

energy source 1960-OPEC formed

Page 4: Trans-Alaskan Pipeline

Oil in Alaska

1968-Announcement of Prudhoe Bay petroleum discoveries

Prudhoe Bay- largest oil field in the US, total production+reserves=10+ billion barrels

Took 10 years to bring to market, could have taken 4, costs of nearly $8 billion, almost twice as much when you add in costs of financing and developing oil field

Page 5: Trans-Alaskan Pipeline

Original Proposals

Submarine

Rail

Tanker Transport

Pipelines

Prudhoe Bay – Valdez

Prudhoe Bay – existing Canadian pipelines

Page 6: Trans-Alaskan Pipeline

Proposed Routes

Page 7: Trans-Alaskan Pipeline

Final Route

Page 8: Trans-Alaskan Pipeline

Political, Social and Environmental Battles 1970- National Environmental Policy Act Pipeline frozen within two months EIS for three years Legislation shaped by TAPS Trans-Alaska Pipeline Authorization Act of

1973 allowed the pipeline to proceed without more interference

Page 9: Trans-Alaskan Pipeline

Actual Pipeline Costsdescription of costs total amount time begin time end

  (million $) (month) (month)

exploration costs 40.8 1 24

archeological survey 2.4 25 48

land lease 900 13 24

access road 120 37 42

drill well 277 13 48

pipe & machine 1500 19 22

construction 6380 76 114

repairs to pipeline 240 114 ----

Total Present Worth of Costs: $5,500 million

Page 10: Trans-Alaskan Pipeline

Expected Revenue

1977

Oil shipped to West Coast: $17228

(2 million b/d)

Oil exported to Japan: $694

(100 thousand b/d)

Total Revenue: $17,922 million

1990

Oil shipped to West Coast: $6891

(800 thousand b/d)

Oil Exported to Japan: $1387

(200 thousand b/d)

Total Revenue: $8,278 million

PW(Revenue) – PW(Cost) = PW(Profits)

$8,300 - $5,500 = $2,800 million

Page 11: Trans-Alaskan Pipeline

Cost/Revenue Graph

-600

-400

-200

0

200

400

600

800

1000

1 10 19 28 37 46 55 64 73 82 91 100 109 118 127 136 145 154 163 172 181 190 199

Month

Co

st/

Re

ve

nu

e (

millio

n $

)

Page 12: Trans-Alaskan Pipeline

Sensitivity Analysis

    expected low price low yield low price&yield

  cost revenue revenue revenue revenue

base 5300 18000 13000 8600 6200

rapid construction 6000 18000 13000 8600 6200

delayed construction 4300 18000 13000 8600 6200

monthly repairs 5300 18000 13000 8600 6200

small yearly earthquakes 5500 18000 13000 8600 6200

large&small earthquakes 11000 18000 13000 8600 6200

rebuild 13000 18000 13000 8600 6200

rebuild&large earthquakes 22000 18000 13000 8600 6200

Page 13: Trans-Alaskan Pipeline

Environmental Considerations

Earthquakes

Permafrost

Animal Migration Patterns

Oil Spills

Page 14: Trans-Alaskan Pipeline

Vertical Support Members

Page 15: Trans-Alaskan Pipeline

Above: Staggered pattern of the pipeline allows the pipeline to withstand earthquakes without cracking the pipe.

Below: Pipeline dips down underground to allow for migrating animals to pass over it.

Page 16: Trans-Alaskan Pipeline

Refrigerated Buried Pipe Section

Page 17: Trans-Alaskan Pipeline

Impact on Alaskan Economy

More than 70,000 workers Population of the state increase 50%

between 1975 and 1980 State received 20% royalty, created problems

when project was delayed

Page 18: Trans-Alaskan Pipeline

Impact of Oil Industry Today

Industry spends $1.7 billion/year on goods and services=State of Alaska’s general fund spending

Indirectly impacts 25,000 jobs with $880 million in payroll

1999- $2.1 billion in spending, $3.1 billion total output with value added

$258 million in oil royalties $2000 yearly dividend

Page 19: Trans-Alaskan Pipeline

Impact on Payroll

Page 20: Trans-Alaskan Pipeline

North Slope Oil Delivered to West

Page 21: Trans-Alaskan Pipeline

Drilling in ANWR

Page 22: Trans-Alaskan Pipeline

Proposed Pipeline Route

Page 23: Trans-Alaskan Pipeline

TAPS Daily Throughput

Page 24: Trans-Alaskan Pipeline

Pump Station Locations

Page 25: Trans-Alaskan Pipeline

Drag Reducing Agent

Drag reducing agent (DRA) reduces the loss of energy due to friction as fluid travels through the pipeline. DRA allows higher throughput without additional pumps, and allows earlier rampdown of pump stations as throughput declines.

Page 26: Trans-Alaskan Pipeline

Winter Construction

Page 27: Trans-Alaskan Pipeline

Caribou Owl

Bears Calf

WildlifeCoexistsWith ThePipeline

Page 28: Trans-Alaskan Pipeline

Tanker Route Map

Page 29: Trans-Alaskan Pipeline

Evolution of a Drill site: 1970-present

Page 30: Trans-Alaskan Pipeline

Cash Flow Diagram

-2500

-2000

-1500

-1000

-500

0

500

1000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

year

cash

flow

($m

illion

s)

Page 31: Trans-Alaskan Pipeline

Conclusion

Economic viability does not seem to be a problem with pipelines (unless there is a dramatic change in the price of oil).

Social, environmental and economic impacts instead are what influence construction

We recommend further studies before drilling in ANWR