transfer switching with breakers ... in less than 2 cycles

2
Phone: 1.866.551.8362 (604.540.6600) Website: www.tavrida-na.com Office: 1105 Cliveden Ave, Delta, British Columbia, Canada ISM_Shell Series Breakers and Fast Transfer A good transfer switch is able to transfer the load from an alternave source with zero or minimal loss of power. So far this can be achieved with stac transfer switches, but the investment costs are substanal and there are technical limits due to the drasc short circuit constraints. For these reasons convenonal medium voltage circuit breakers are sll installed widely in power generaon plants and ulies. However due to the relavely slow opening and closing mes of convenonal circuit breakers, power is typically interrupted for more than 5 cycles, and even interrupons of 8 or more cycles are not uncommon. For industrial applicaons this can result in significant slowing down of motors, which produces a phase angle between the “lost source” and the alternave source. If the interrupon is too long, the motor can be severely damaged. Thus many industrial systems actually do not perform “live transfer” in order to migate risks of losing expensive investments. At the same me any down-me of industrial processes or customer outages leads to significant costs or penales. Tavrida Electric has revoluonized circuit breaker design by developing a new generaon of circuit breakers and controls with exceponally fast opening, closing and response mes. This enables transfer mes as fast as 2 cycles with the SEL 451 in a closed transion (“make before break”) and less than 3 cycles for an open transion (“break before make”). Transfer switching with breakers....in less than 2 cycles PT PT Breaker Control Breaker Control SEL-451 Breaker #1 Normally Closed Breaker #2 Normally Open Main Source Backup Source Motor Loads M M FAULT Transfer to Backup Source <2 Cycles Complete power transfer in less than two cycles Overcurrent protecon for main source and backup Implementaon of breaker failure logic for both circuit breakers Tracking of average and last circuit breaker oper- ang me Seng of alarm or protect against system fre- quency voltage and frequency excursions using built-in voltages and frequency elements

Upload: arjay-automation

Post on 16-Jan-2017

143 views

Category:

Engineering


0 download

TRANSCRIPT

Page 1: Transfer Switching with Breakers ... In Less Than 2 Cycles

Phone: 1.866.551.8362 (604.540.6600) Website: www.tavrida-na.com

Office: 1105 Cliveden Ave, Delta, British Columbia, Canada

ISM_Shell Series Breakers and Fast Transfer

A good transfer switch is able to transfer the load from an alternative source with zero or minimal loss of power. So far this can be achieved with static transfer switches, but the investment costs are substantial and there are technical limits due to the drastic short circuit constraints. For these reasons conventional medium voltage circuit breakers are still installed widely in power generation plants and utilities.

However due to the relatively slow opening and closing times of conventional circuit breakers, power is typically interrupted for more than 5 cycles, and even interruptions of 8 or more cycles are not uncommon. For industrial applications this can result in significant slowing down of motors, which produces a phase angle between the “lost source” and the alternative source. If the interruption is too long, the motor can be severely damaged. Thus many industrial systems actually do not perform “live transfer” in order to mitigate risks of losing expensive investments. At the same time any down-time of industrial processes or customer outages leads to significant costs or penalties.

Tavrida Electric has revolutionized circuit breaker design by developing a new generation of circuit breakers and controls with exceptionally fast opening, closing and response times. This enables transfer times as fast as 2 cycles with the SEL 451 in a closed transition (“make before break”) and less than 3 cycles for an open transition (“break before make”).

Transfer switching with breakers....in less than 2 cycles

PT PT

Breaker Control Breaker Control

SEL-451

Breaker #1Normally Closed

Breaker #2Normally Open

Main Source Backup Source

Motor Loads

M M

FAULT

Transfer to Backup Source<2 Cycles • Complete power transfer in less than two cycles

• Overcurrent protection for main source and backup

• Implementation of breaker failure logic for both circuit breakers

• Tracking of average and last circuit breaker oper-ating time

• Setting of alarm or protect against system fre-quency voltage and frequency excursions using built-in voltages and frequency elements

Page 2: Transfer Switching with Breakers ... In Less Than 2 Cycles

Phone: 1.866.551.8362 (604.540.6600) Website: www.tavrida-na.com

Office: 1105 Cliveden Ave, Delta, British Columbia, Canada

ISM_Shell Series Breakers and Fast Transfer

Fast Transfer Switch PackageComponent DescriptionISM15_Shell_2(FT) Shell type breaker, rated 15kV - 2000A - 25kA - 95kV BILCM_1501_01(4) Breaker control module, 85 - 265 VAC / VDC input with 4 ms reaction timeSEL-451® Schweitzer Engineering transfer switch relay assembly + options

Timing DetailsProduct Parameters Designation Response timeTavrida SHELL CB opening time (including fast control module response time)

Topen 8 ms (<1/2 cycle)

Tavrida SHELL CB interrupting time (including fast control module response time)

Tinterrupt 16.3 ms (<1 cycle)

Tavrida SHELL breaker closing time (including fast control module response time)

Tclose 22 ms (1.32 cycles)

SEL-451 Open Phase Detection Logic trip time TSEL451 10 ms (0.6 cycles)

Transfer switch time closed transition “make-before-break” with SEL-451 Open Phase Detection Logic

TSEL451+ Tclose 32 ms (<2 cycles)

Transfer switch time open transition “break-before-make” with SEL-451 Open Phase Detection Logic

TSEL451+ Tclose + Topen 40 ms (<2.5 cycles)