transformer power factor test - engineering home pageengineering.richmondcc.edu/courses/eus...
TRANSCRIPT
![Page 1: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/1.jpg)
Transformer Power Factor Test
![Page 2: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/2.jpg)
Tests Performed in De-Energized State of Transformer : • Capacitance and Power Factor –Windings to ground and to each other –Oil –Bushings –Arresters
Transformer Testing
![Page 3: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/3.jpg)
Transformer Construction
![Page 4: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/4.jpg)
Transformer Insulation Model
CHL
CH
CL
Low
Voltage
Windings
High
Voltage
Windings
• For Overall tests, transformer insulation is sectioned into three groups:
– CH
– CL
– CHL
• Reasons – Better assessment of the
individual components.
– Reduces chance of a problem being masked by “averaging”
![Page 5: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/5.jpg)
High
Low
CH
CL
CHL
Tank and
Core
• CH - Insulation between High-Voltage conductors and grounded Tank & Core (H Bushings-Winding Insulation-Structural Insulating Members-Oil)
• CL - Insulation between Low-Voltage conductors and grounded Tank & Core (X Bushings - Winding Insulation-Structural Insulating Members-Oil)
• CHL - Insulation between High- and Low-Voltage Windings (Winding Insulation-Barriers-Oil)
Two-Winding Transformer
![Page 6: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/6.jpg)
• CH - Insulation between the High-Voltage Winding Conductors and the Grounded Tank & Core – High Voltage Bushings –Winding Insulation – Structural Insulating Members – DETC, LTC and Series-Parallel Switch Insulation – Insulating Fluid
Two-Winding Transformer Dielectric
Circuit
![Page 7: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/7.jpg)
• CL - Insulation Between the Low-Voltage Winding Conductors and Grounded Tank & Core – Low Voltage Bushings –Winding Insulation – Structural Insulating Members – DETC, LTC and Series-Parallel Switch Insulation – Insulating Fluid
Two-Winding Transformer Dielectric
Circuit
![Page 8: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/8.jpg)
• CHL - Insulation between the HV and LV Windings –Winding Insulation Barriers – Insulating Fluid
• Possibility of a Static Shield
Two-Winding Transformer Dielectric Circuit
![Page 9: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/9.jpg)
• Acceptance – Establish a baseline – Make sure you get what you paid for
• Routine – Establish Trend – Preventative Maintenance
• Troubleshoot – Disturbance on system, suspected fault – Isolate problem
• Assess Condition after relocation or repair
When to Do Test
![Page 10: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/10.jpg)
High Voltage Winding Setup
Guard
Low Voltage Lead
I & W Meter
Tank & Core
Ground
Lead
HV Cable
Test Set
Low High
![Page 11: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/11.jpg)
Measuring CH + CHL ICHL
Guard
Low Voltage Lead
I & W Meter
Tank & Core
Ground
Lead
HV Cable
Test Set
Low High
GST-Ground
ICH + ICHL
ICHL
ICH
ICH
![Page 12: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/12.jpg)
Measuring CH Guarding CHL
Guard
Low Voltage Lead
I & W Meter
Tank & Core
Ground
Lead
HV Cable
Test Set
Low High
GST-Guard
ICH
ICHL
ICH
ICH
ICHL
![Page 13: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/13.jpg)
Measuring CHL Guarding CH ICHL
Guard
Low Voltage Lead
I & W Meter
Tank & Core
Ground
Lead
HV Cable
Test Set
Low High
UST
ICHL
ICHL
ICH
ICH
ICH
![Page 14: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/14.jpg)
Verification of the HV Results
Line #1 Measures CH+CHL , Tank and LV Winding Grounded
Line #2 Measures CH only to Ground, LV Winding Guarded
Line #3 Measures CHL only using UST Lead
Line #4 Calculated from Lines 1 minus 2. Compare to Line #3
![Page 15: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/15.jpg)
Low Voltage Winding Setup
Low Voltage
Lead
I & W Meter
Tank & Core
Ground Lead
HV Cable
Test Set
Low High
Guard
![Page 16: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/16.jpg)
Measuring CL + CHL
Low Voltage
Lead
I & W Meter
Tank & Core
Ground Lead
HV Cable
Test Set
Low High
Guard
GST-Ground
ICL + ICHL
ICL
ICHL
![Page 17: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/17.jpg)
Measuring CL Guarding CHL
Low Voltage
Lead
I & W Meter
Tank & Core
Ground Lead
HV Cable
Test Set
Low High
Guard
GST-Guard
ICL
ICL
ICHL
![Page 18: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/18.jpg)
Measuring CHL Guarding CL
Low Voltage
Lead
Tank & Core
Ground Lead
Test Set
Low High
Guard
ICL
ICHL
ICHL
UST
HV Cable
![Page 19: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/19.jpg)
Verification of the LV Results
Line #5 Measures CL+CHL , Tank and HV Winding Grounded
Line #6 Measures CL only to Ground, HV Winding Guarded
Line #7 Measures CHL only using UST Lead
Line #8 Calculated from Lines 5 minus 6. Compare to Line #7
![Page 20: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/20.jpg)
Analysis of Test Result
• < 0.5% -- GOOD
• >0.5% but < 0.7% -- DETERIORATED
• >0.5% but <1.0% & increasing -- INVESTIGATE
• > 1.0% -- BAD
GENERAL GUIDELINES
Data Interpretation of Modern Oil-Filled Power Transformers (Temperature Corrected)
![Page 21: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/21.jpg)
Analysis of Test Result
• Change in Capacitance –Physical change has occurred
• 0-3% Good
• 3-5% Deteriorated
• 5-10% Investigate
• >10% Bad
![Page 22: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/22.jpg)
Capacitance change detects movement and deformation of transformer windings.
C = Ae
d
Significance of Measured Capacitance
![Page 23: Transformer Power Factor Test - Engineering Home Pageengineering.richmondcc.edu/Courses/EUS 215/Notes... · Tests Performed in De-Energized State of Transformer : •Capacitance and](https://reader034.vdocuments.net/reader034/viewer/2022042605/5a7009497f8b9a93538b97c8/html5/thumbnails/23.jpg)
• Evaluating Transformer Condition – Involves Many Methods – Some more sensitive to certain problems than others – Baseline Results Beneficial
• Power Factor – Sensitive to Physical Characteristics & Quality of Insulation – Segment Insulation into Small Pieces
Summary