SUMMARY 1

A summary of the transit state of good repair targets adopted by the MPO (or by the State, for rural projects or projects in an urbanized area covered by TxDOT’s group TAM plan);

CORPUS CHRISTI METROPOLITAN PLANNING ORGANIZATION

SUMMARY 2

A summary of how transit projects selected for inclusion in the TIP are reviewed and prioritized utilizing the adopted regional targets; and

CORPUS CHRISTI REGIONAL TRANSPORTATION AUTHORITY

Corpus Christi Regional Transportation Authority - Project Selection Process Procedures

January 19, 2019

Project Selection Process

Project selection begins with capital needs assessment/identification which then leads to the development of projects within the Corpus Christi Regional Transportation Authority’s (CCRTA’s) annual Capital Improvement Program This work is then supplemented by various age and condition assessment and safety needs Some of these considerations are incorporated into system performance requirements identified within the FAST Act (Section 1.7). Transit projects are prioritized based on an estimation of need, age, condition and future demand for each proposed service or project. These priorities determine which projects may proceed with respect to environmental and engineering studies and right of way acquisition, if necessary. Projects are then proposed for inclusion within the TIP based on the completion of any necessary studies, the acquisition of any necessary right of way and a formal commitment of necessary funds.

Transit projects generally include all federal operating funds allocated to Corpus Christi Regional Transportation Authority during the 4-year scope of the TIP. In addition, all capital purchases are included, based on need and a commitment of necessary funds. Other transit projects are evaluated in conjunction with the Transit 20/20 a separate transit route study, the results of which are incorporated into the MTP. Similar to highway projects, these projects are proposed for inclusion based on the completion of necessary studies, the availability of necessary funds and system performance requirements identified within the FAST Act (Section 1.7).

Priority within the TIP is determined by the year in which the project is programmed. Projects programmed for FY 2019 are considered to be the highest priority and may be implemented as soon as plans are complete and funds are available. Projects programmed for FY 2020 are considered a secondary priority and projects programmed for FY 2021 and 2022 are considered a tertiary priority.

Fiscal Constraint

Each identified phase of work within the TIP must have a formal commitment of funding prior to consideration. Projects lacking this commitment for a significant portion of the project cost cannot be programmed into the TIP.

Regional Performance Targets and Relationship to TIP Priorities

Transportation Performance Management (TPM) is federally required through the Fixing America’s Surface Transportation (FAST) Act. It is a strategic approach that uses goals, measures and data to make better informed decisions about how to invest transportation funding resulting in a better performing national transportation system with greater public benefit. Emphasis is placed on efficient delivery of goods and safe reliable journeys to work, school, shopping and community activities. Funding is intended to be targeted toward projects aimed at achieving national performance goals for improving the safety, reliability and condition of roadway facilities that are a part of the National Highway System (NHS) and regional transit systems.

CORPUS CHRISTI REGIONAL TRANSPORTATION AUTHORITY

Future long range transportation plans and short range implementation programs (MTPs and TIPs) developed by the CCRTA are required to demonstrate a performance based decision process that ties back to performance targets.. Performance measures focus on transportation system safety, and transit safety and asset condition.

The Transit Asset Condition performance rule (TAM) establishes national performance requirements to assess the condition of regional transit networks relative to a U.S. Department of Transportation (USDOT) definition of State of Good Repair (SGR). SGR is the condition in which a capital asset is able to operate at a full level of performance. The premise of the rule is condition of assets should guide funding prioritization in order to meet the national goal of strategically and systematically maintaining the nation’s transit networks in good condition.

Transit Asset Management

Every year in coordination with the Corpus Christi MPO, the CCRTA sets asset condition targets for three federally required transit asset performance measures for the regional transportation system. These measures focus on assessing the condition of rolling stock (e.g., buses and passenger vans), the condition of equipment (e.g., maintenance vehicles) and the condition of transit facilities (transit stations, maintenance shops).

CORPUS CHRISTI METROPOLITAN PLANNING ORGANIZATION

SUMMARY 3

A summary of the MPO’s (or State’s) expected results in terms of achieving the adopted targets through implementation of the projects selected. It may be, based on the nature, type of magnitude of those transit projects, that the expected result will be minimal, none, or unknown, and that is acceptable.

CORPUS CHRISTI METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION POLICY COMMITTEE (TPC) MINUTES

December 6, 2018

1. Call to Order and Quorum Determination

Judge Simpsoncalled the meeting to order at 2:00 p.m. at the City of Corpus Christi Council Chambers.

Present: Judge Simpson, San Patricio County; Mr. Zahn, Port of Corpus Christi (PCC);Mayor Skurow, City of Portland;Mr. Olivarez, P.E., Texas Department of Transportation – Corpus Christi District (TxDOT-CRP); Mr. Martinez, Corpus Christi Regional Transportation Authority (RTA, 2:04 p.m.)

Ms. Melissa Vela, Assistant Chief of Administration, Nueces County

Staff present: Daniel Carrizales, Victor Mendieta, and Yoshiko Boulan

2. Introduction of Visiting Agency Officials

San Patricio Judge Elect David Krebs, Ms. Sharon Montez, Ms. Christina Perez (RTA) and all in attendance were welcomed.

3. Public Comments

Judge Simpson called for public comment on TPC agenda items; none were offered.

4. Approval of the November 1, 2018 TPC Special Meeting Minutes

Mr. Zahn made a motion to approve the November 1, 2018 TPC Meeting Minutes. Mayor Skurow seconded; motion passed unanimously.

5. Presentation, Discussion and Possible Action

A. Corpus Christi Regional Transportation Authority (RTA) Transit Asset Management (TAM) Plan. Presenter: Sharon Montez, Managing Director of Capital Programs.

Federal Transit Administration (FTA) requires all transit agencies who provide public transportation and receive federal financial assistance to develop a TAM Plan. Ms. Montez presented RTA’s TAM Plan that aims to achieve and maintain a State of Good Repair (SGR) condition for RTA’s assets to deliver the performance-based service. Current RTA’s assets, non-revenue vehicles, rolling stock/buses, and facilities satisfied the FTA’s useful life benchmark and are considered in good condition. RTA uses the useful life, asset age, and vehicle mileage/age for their asset condition assessment and is using several strategies such as risk management, maintenance, overhaul, disposal, and acquisition and renewal, to prioritize investment and prepare five-year capital replacements and comply with the FTA’s SGR requirement.

Judge Simpson made a motion to adopt the RTA’s TAM Plan. Mayor Skurow seconded; motion passed unanimously.

B. RTA Transit Projects Amendment to the FY 2019-2022 Transportation Improvement Program (TIP) and 2015-2040 Metropolitan Transportation Plan (MTP). Presenter: Christina Perez, DBE/EEO Compliance Officer.

Ms. Perez presented the proposed amendment to the FY 2019-2022 TIP based on the Capital Investment Plan and routine purchase/maintenance of assets. Most projects are routine in nature, such as replacement of vehicles, shelter amenities and improvements, and this amendment is for specifying the projects and their cost. Three major facility projects: Port/Ayers Station renovation, Del Mar South Campus Transfer Station, and Bear Lane Bus Parking Lot Improvement are programmed in FY 2020. Westside Station near Del Mar College is programmed in FY 2022. Port/Ayers Station Renovation project is expected to complete within 18 months and Del Mar South Campus Transfer Station is expected to complete within 12 months in two phases. The first phase would be the turn-off drive, sidewalks, shelter

pad, 50% of the overall covered shelter, and related infrastructure construction. The second phase would be another shelter pad, and the rest of the overall covered shelter and related infrastructure construction. Westside Station near Del Mar College is still under the concept development at this point and more detail will be provided after the concept is finalized.

Judge Simpson asked if the Del Mar South Campus Transfer Station’s two phases are both in FY 2020. Ms. Montez responded that the two phases are planned to be in FY 2020.

Judge Simpson made a motion to approve the requested TIP and MTP amendments. Mr. Zahn seconded; motion passed unanimously.

C. Discussion and possible action to select a third-party recruiting agency to recruit for the position of the MPO Director.

Mayor Skurow briefed the current status of recruitment efforts for the MPO Director. The job opening was advertised via Nueces County Human Resources webpage and other resources such as caller.com and indeed.com for two weeks and received two applicants. The opening period was extended for another two weeks and we received another two applicants. The ad-hoc committee will meet and review these four applications. Meanwhile, MPO sent 27 Request for Qualification (RFQ) to the recruitment agencies with the help of City of Corpus Christi and Nueces County Human Resources Office and received two RFQs from Renee’s Narloch & Associates and GovHRUSA. Renee’s Narloch& Associates is a Texas-based, boutique-style agency and GovHRUSA is a Florida-based, relatively large agency and both are considered qualified firms. Mayor Skurow recommended Renee’s Narloch & Associate as the recruiting agency for the MPO Director search. Mayor Skurow also informed that Nueces County Human Resources agreed to advertise the Director’s salary range as “negotiable,” and the ad-hoc committee would make a recommendation based on the candidate’s qualification upon reviewing the application and submit it to the TPC.

Mr. Martinez inquired that the hiring of the agency would be simultaneously done with the reviewing of potential applicants. Mayor Skurow answered that the execution of contract with Renee’s Narlock & Associate would be after the ad-hoc committee’s review and recommendations for the potential candidates.

Mr. Zahn made a motion to approve the recommendation to hire Renee’s Narlock & Associate. Judge Simpson seconded; motion passed unanimously.

6. Director’s Report

A. 2017 Federal Certification Review draft report

The MPO received a draft report of 2017 Federal Certification Review from Federal Highway Administration (FHWA) on November 8, 2018. MPO provided the response to FHWA in accordance with TxDOT-CRP and RTA on November 27, 2018. The approved letter was issued on November 30, 2018 and the final report was electronically delivered on December 4, 2018.

B. Ms. Buentello, MPO Transportation Planner departure

Ms. Buentello, MPO Transportation Planner resigned effective on November 30, 2018. She has been working for the MPO for four years and was an integral part of the MPO.

D. Next Transportation Policy Committee Meeting: February 7, 2019

The January TPC meeting has been cancelled and the next TPC meeting will be held on February 7, 2019. Mr. Carrizales will send the 2019 meeting calendar to all TPC members.

7. Future Agenda Items

A. Discussion and action to elect officials for the Transportation Policy Committee for the 2019 calendar year. MPO by-laws indicate that the Transportation Policy Committee shall elect a Chair and Vice Chair from among its voting members during the first meeting of each calendar year. Such election shall be by a majority vote of the voting membership.

B. Discussion and action on Performance Targets. Staff will seek action from TAC in the form of a recommendation to the Transportation Policy Committee (TPC) to assume the state’s new 2019 performance targets for Safety Performance Measure Final Rule (PM1) to meet the February deadline.

8. Adjourn

The meeting adjourned at 2:26 p.m.

All Figures in Year of Expenditure (YOE) Dollars

FY 2019 FY 2020 FY 2021

Federal Match Total Federal Match Total Federal Match Total

1 Sec. 5307 - Urbanized Formula >200K 1,937,580 484,395 2,421,975 5,721,344 1,068,472 6,789,816 836,000 209,000 1,045,0002 Sec. 5307 - Urbanized Formula <200K 0 0 03 Sec. 5309 - Fixed Guideway Capital Improvement 0 0 04 Sec. 5310 - Seniors and Individuals with Disabilities >200k 115,618 28,904 144,522 320,000 80,000 400,000 320,000 80,000 400,0005 Sec. 5310 - Seniors and Individuals with Disabilities <200k 0 0 06 Sec. 5310 - Seniors and Individuals with Disabilities Nonurbanized 0 0 07 Sec. 5311 - Nonurbanized Formula 0 0 08 Sec. 5337 - State of Good Repair 0 0 09 Sec. 5339 - Bus and Bus Facilities >200k 508,081 127,020 635,101 686,750 152,000 838,750 678,702 169,675 848,37710 Sec. 5339 - Bus and Bus Facilities <200k 0 0 011 Sec. 5339 - Bus and Bus Facilities Nonurbanized 0 0 012 Other FTA/US DOT (e.g. TIGER or BUILD) 0 0 0 6,597,943 1,649,485 8,247,428 0 0 013 Regionally Significant or Other (incl FHWA transfers) 0 0 0

$2,561,279 $640,319 $3,201,598 $13,326,037 $2,949,957 $16,275,994 $1,834,702 $458,675 $2,293,377

Requested 0 0 0 Awarded 0 0 0

FY 2022 Total

Federal Match Total Federal Match Total

1 Sec. 5307 - Urbanized Formula >200K 4,080,000 1,020,000 5,100,000 12,574,924 2,781,867 15,356,7912 Sec. 5307 - Urbanized Formula <200K 0 0 0 03 Sec. 5309 - Fixed Guideway Capital Improvement 0 0 0 04 Sec. 5310 - Seniors and Individuals with Disabilities >200k 320,000 80,000 400,000 1,075,618 268,904 1,344,5225 Sec. 5310 - Seniors and Individuals with Disabilities <200k 0 0 0 06 Sec. 5310 - Seniors and Individuals with Disabilities Nonurbanized 0 0 0 07 Sec. 5311 - Nonurbanized Formula 0 0 0 08 Sec. 5337 - State of Good Repair 0 0 0 09 Sec. 5339 - Bus and Bus Facilities >200k 690,116 172,529 862,645 2,563,649 621,224 3,184,87310 Sec. 5339 - Bus and Bus Facilities <200k 0 0 0 011 Sec. 5339 - Bus and Bus Facilities Nonurbanized 0 0 0 012 Other FTA/US DOT (e.g. TIGER or BUILD) 0 0 0 6,597,943 1,649,485 8,247,42813 Regionally Significant or Other (incl FHWA transfers) 0 0 0 0

$5,090,116 $1,272,529 $6,362,645 $22,812,134 $5,321,480 $28,133,614

Requested 0 0 Awarded 0 0

Transportation Development Credits

Transit Financial SummaryCorpus Christi MPO

FY 2019 - 2022 Transportation Improvement Program

Transit Program

Total Funds

Total Funds

Transportation Development Credits

All Figures in Year of Expenditure (YOE) Dollars

Transit Program

Statewide TransportationImprovement Program

Statewide TransportationImprovement ProgramCorpus Christi MPOTransit Projects

WEDNESDAY, JANUARY 23, 2019 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 3 OF 10

14:32:40 PM CORPUS CHRISTI MPO - TRANSIT PROJECTS

FY 2019

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER:

MTP REFERENCE:APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Bus Stop Amenities

AMENDMENT DATE: 2018AMENDMENT REQUEST: 2/2019, Removed from STIP

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5307FEDERAL (FTA) FUNDS: $ 0

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 0FISCAL YEAR COST (YOE): $ 0

TOTAL PROJECT COST: $ 0TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER:

MTP REFERENCE:APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Bus Stop Improvements

AMENDMENT DATE: 2018AMENDMENT REQUEST: 2/2019, Removed from STIP

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5307FEDERAL (FTA) FUNDS: $ 0

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 0FISCAL YEAR COST (YOE): $ 0

TOTAL PROJECT COST: $ 0TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER:

MTP REFERENCE:APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Engine Overhaul

AMENDMENT DATE: 2018AMENDMENT REQUEST: 2/2019, Removed from STIP

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5307FEDERAL (FTA) FUNDS: $ 0

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 0FISCAL YEAR COST (YOE): $ 0

TOTAL PROJECT COST: $ 0TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-101-18A

MTP REFERENCE:APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Mobile Bus Lift

AMENDMENT DATE: 2018AMENDMENT REQUEST: 2/2019, Cost change.

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5339FEDERAL (FTA) FUNDS: $ 64,000

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 16,000FISCAL YEAR COST (YOE): $ 80,000

TOTAL PROJECT COST: $ 80,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

WEDNESDAY, JANUARY 23, 2019 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 4 OF 10

14:32:40 PM CORPUS CHRISTI MPO - TRANSIT PROJECTS

FY 2019

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-106-18A

MTP REFERENCE:APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Section 5310-Seniors and People with Disabilities

AMENDMENT DATE: 2018AMENDMENT REQUEST: 2/2019, cost change

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5310FEDERAL (FTA) FUNDS: $ 115,618

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 28,904FISCAL YEAR COST (YOE): $ 144,522

TOTAL PROJECT COST: $ 144,522TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-113-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Bus DVR Camera Replacement

AMENDMENT DATE: 2018AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5307FEDERAL (FTA) FUNDS: $ 258,424

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 64,606FISCAL YEAR COST (YOE): $ 323,030

TOTAL PROJECT COST: $ 323,030TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-114-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Two (2) Hybrid SUV Replacement

AMENDMENT DATE: 2018AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5307FEDERAL (FTA) FUNDS: $ 59,928

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 14,982FISCAL YEAR COST (YOE): $ 74,910

TOTAL PROJECT COST: $ 74,910TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-115-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Port A Fleet Replacement

AMENDMENT DATE: 2018AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5307FEDERAL (FTA) FUNDS: $ 68,000

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 17,000FISCAL YEAR COST (YOE): $ 85,000

TOTAL PROJECT COST: $ 85,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

WEDNESDAY, JANUARY 23, 2019 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 5 OF 10

14:32:40 PM CORPUS CHRISTI MPO - TRANSIT PROJECTS

FY 2019

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-116-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Paratransit Fleet Replacement

AMENDMENT DATE: 2018AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5307FEDERAL (FTA) FUNDS: $ 1,408,000

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 352,000FISCAL YEAR COST (YOE): $ 1,760,000

TOTAL PROJECT COST: $ 1,760,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-117-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Two (2) VPG Support Vehicles Replacement

AMENDMENT DATE: 2018AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5307FEDERAL (FTA) FUNDS: $ 54,400

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 13,600FISCAL YEAR COST (YOE): $ 68,000

TOTAL PROJECT COST: $ 68,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-118-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Bear Lane Fencing Replacement

AMENDMENT DATE: 2018AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5307FEDERAL (FTA) FUNDS: $ 24,828

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 6,207FISCAL YEAR COST (YOE): $ 31,035

TOTAL PROJECT COST: $ 31,035TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-119-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Concrete Improvement for Bus Pads

AMENDMENT DATE: 2018AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5339FEDERAL (FTA) FUNDS: $ 280,000

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 70,000FISCAL YEAR COST (YOE): $ 350,000

TOTAL PROJECT COST: $ 350,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

WEDNESDAY, JANUARY 23, 2019 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 6 OF 10

14:32:40 PM CORPUS CHRISTI MPO - TRANSIT PROJECTS

FY 2019

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-120-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Fluid Storage Tanks

AMENDMENT DATE: 2018AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5339FEDERAL (FTA) FUNDS: $ 22,000

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 5,500FISCAL YEAR COST (YOE): $ 27,500

TOTAL PROJECT COST: $ 27,500TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-121-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Coin Sorter

AMENDMENT DATE: 2018AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5339FEDERAL (FTA) FUNDS: $ 8,800

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 2,200FISCAL YEAR COST (YOE): $ 11,000

TOTAL PROJECT COST: $ 11,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-122-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Shelves for Maintenance Dept.

AMENDMENT DATE: 2018AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5339FEDERAL (FTA) FUNDS: $ 40,000

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 10,000FISCAL YEAR COST (YOE): $ 50,000

TOTAL PROJECT COST: $ 50,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-123-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Bus Automatic Passenger Counting Solution

AMENDMENT DATE: 2018AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2019

FEDERAL FUNDING CATEGORY: 5339FEDERAL (FTA) FUNDS: $ 157,281

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 39,320FISCAL YEAR COST (YOE): $ 196,601

TOTAL PROJECT COST: $ 196,601TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

WEDNESDAY, JANUARY 23, 2019 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 7 OF 10

14:32:40 PM CORPUS CHRISTI MPO - TRANSIT PROJECTS

FY 2020

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-102-18A

MTP REFERENCE:APPORTIONMENT YEAR: 2018

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Port/Ayers Renovation

AMENDMENT DATE: 2018AMENDMENT REQUEST: 2/2019, cost change

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2020

FEDERAL FUNDING CATEGORY:FEDERAL (FTA) FUNDS: $ 3,951,713

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 987,928FISCAL YEAR COST (YOE): $ 4,939,641

TOTAL PROJECT COST: $ 4,939,641TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-107-18A

MTP REFERENCE:APPORTIONMENT YEAR: 2019

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Mobile Bus Lift

AMENDMENT DATE: 2019AMENDMENT REQUEST: 2/2019, cost change

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2020

FEDERAL FUNDING CATEGORY: 5339FEDERAL (FTA) FUNDS: $ 34,000

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 6,000FISCAL YEAR COST (YOE): $ 40,000

TOTAL PROJECT COST: $ 40,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-108-18A

MTP REFERENCE:APPORTIONMENT YEAR: 2019

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Del Mar South Campus Transfer Station

AMENDMENT DATE: 2019AMENDMENT REQUEST: 2/2019, cost change

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2020

FEDERAL FUNDING CATEGORY:FEDERAL (FTA) FUNDS: $ 1,946,230

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 486,557FISCAL YEAR COST (YOE): $ 2,432,787

TOTAL PROJECT COST: $ 2,432,787TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-110-18A

MTP REFERENCE:APPORTIONMENT YEAR: 2019

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Bus Stop Shelters Amenities

AMENDMENT DATE: 2019AMENDMENT REQUEST: 2/2019, cost change

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2020

FEDERAL FUNDING CATEGORY: 5307FEDERAL (FTA) FUNDS: $ 419,000

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 104,750FISCAL YEAR COST (YOE): $ 523,750

TOTAL PROJECT COST: $ 523,750TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

WEDNESDAY, JANUARY 23, 2019 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 8 OF 10

14:32:40 PM CORPUS CHRISTI MPO - TRANSIT PROJECTS

FY 2020

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-112-18A

MTP REFERENCE:APPORTIONMENT YEAR: 2019

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Section 5310 - Seniors and People with Disabilities

AMENDMENT DATE: 2019AMENDMENT REQUEST: 2/2019, cost change

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2020

FEDERAL FUNDING CATEGORY: 5310FEDERAL (FTA) FUNDS: $ 320,000

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 80,000FISCAL YEAR COST (YOE): $ 400,000

TOTAL PROJECT COST: $ 400,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-124-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2019

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Bear Lane Bus Parking Lot

AMENDMENT DATE: 2019AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2020

FEDERAL FUNDING CATEGORY:FEDERAL (FTA) FUNDS: $ 700,000

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 175,000FISCAL YEAR COST (YOE): $ 875,000

TOTAL PROJECT COST: $ 875,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-125-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2019

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Supervisor Vans (7)

AMENDMENT DATE: 2019AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2020

FEDERAL FUNDING CATEGORY: 5339FEDERAL (FTA) FUNDS: $ 267,750

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 47,250FISCAL YEAR COST (YOE): $ 315,000

TOTAL PROJECT COST: $ 315,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

WEDNESDAY, JANUARY 23, 2019 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 9 OF 10

14:32:40 PM CORPUS CHRISTI MPO - TRANSIT PROJECTS

FY 2021

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-126-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2020

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Bus Stop Shelter Amenities

AMENDMENT DATE: 2020AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2021

FEDERAL FUNDING CATEGORY: 5339FEDERAL (FTA) FUNDS: $ 678,702

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 169,675FISCAL YEAR COST (YOE): $ 848,377

TOTAL PROJECT COST: $ 848,377TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-127-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2020

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Bus Stop Improvements

AMENDMENT DATE: 2020AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2021

FEDERAL FUNDING CATEGORY: 5307FEDERAL (FTA) FUNDS: $ 800,000

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 200,000FISCAL YEAR COST (YOE): $ 1,000,000

TOTAL PROJECT COST: $ 1,000,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-128-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2020

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Mobile Bus Lift

AMENDMENT DATE: 2020AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2021

FEDERAL FUNDING CATEGORY: 5307FEDERAL (FTA) FUNDS: $ 36,000

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 9,000FISCAL YEAR COST (YOE): $ 45,000

TOTAL PROJECT COST: $ 45,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-129-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2020

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Section 5310 Sub-recipients

AMENDMENT DATE: 2020AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2021

FEDERAL FUNDING CATEGORY: 5310FEDERAL (FTA) FUNDS: $ 320,000

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 80,000FISCAL YEAR COST (YOE): $ 400,000

TOTAL PROJECT COST: $ 400,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

WEDNESDAY, JANUARY 23, 2019 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 10 OF 10

14:32:40 PM CORPUS CHRISTI MPO - TRANSIT PROJECTS

FY 2022

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-130-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2021

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Section 5310 Sub-recipients

AMENDMENT DATE: 2021AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2022

FEDERAL FUNDING CATEGORY: 5310FEDERAL (FTA) FUNDS: $ 320,000

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 80,000FISCAL YEAR COST (YOE): $ 400,000

TOTAL PROJECT COST: $ 400,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-131-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2021

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Westside Station near Del Mar College West Campus

AMENDMENT DATE: 2021AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2022

FEDERAL FUNDING CATEGORY: 5307FEDERAL (FTA) FUNDS: $ 4,080,000

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 1,020,000FISCAL YEAR COST (YOE): $ 5,100,000

TOTAL PROJECT COST: $ 5,100,000TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

GENERAL PROJECT INFORMATION

PROJECT SPONSOR: Corpus Christi RTAMPO PROJECT NUMBER: T-132-19

MTP REFERENCE: FEB-2019APPORTIONMENT YEAR: 2021

PROJECT TYPE: CAPITALPROJECT DESCRIPTION: Bus Stop Shelter Amenities

AMENDMENT DATE: 2021AMENDMENT REQUEST: Add Project

REMARKS:

FUNDING INFORMATION

URBANIZED AREA: CORPUS CHRISTIFISCAL YEAR: 2022

FEDERAL FUNDING CATEGORY: 5339FEDERAL (FTA) FUNDS: $ 690,116

STATE FUNDS: $ 0OTHER STATE FUNDS: $ 0

OTHER SOURCE FUNDS: $ 172,529FISCAL YEAR COST (YOE): $ 862,645

TOTAL PROJECT COST: $ 862,645TRANS. DEV. CREDS REQUESTED: $ 0

TRANS. DEV. CREDS AWARDED: $ 0T. DEV. CREDS AWARD DATE: None

1

Corpus Christi MPO

From: Victor E. Vourcos <[email protected]>Sent: Thursday, January 17, 2019 4:58 PMTo: Corpus Christi MPOCc: Daniel Carrizales; Paula Sales-EvansSubject: RE: Corpus Christi MPO February 2019 TIP amendment - Transit Projects

The Corpus Christi District has reviewed the documents submitted for the February TIP amendment and has no objection to their submittal with the following revision.

The CCMPO Transit Financial Summary Table shows “Corpus Christi District” in the title. Please revise this to “Corpus Christi MPO”.

If you have any questions, please contact me. Thank you. Victor E. Vourcos, P.E. Advance Project Development Engineer TxDOT - Corpus Christi District 1701 S. Padre Island Drive Corpus Christi TX 78416 (361) 808-2378 From: Corpus Christi MPO [mailto:[email protected]] Sent: Thursday, January 17, 2019 2:01 PM To: Victor E. Vourcos Cc: Paula Sales-Evans; Daniel Carrizales Subject: Corpus Christi MPO February 2019 TIP amendment - Transit Projects Importance: High

This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.

Good afternoon Victor, Please find attached the following documents:

1. TPP Checklist for February TIP amendments 2. CCMPO Requirement Summaries 3. TPC Approval Minutes 4. CCMPO Transit Financial Summary Table 5. CCMPO Transit Individually listed projects

Please review and confirm that the TxDOT Corpus Christi District review the documents for February TIP amendment. Thank you very much.

2

CORPUS CHRISTI METROPOLITAN PLANNING ORGANIZATION

602 N. Staples Street, Suite 300 Corpus Christi, TX 78401

Direct: 361.884.0687 www.corpuschristi-mpo.org

To help protect your privacy, Micro so ft Office prevented auto matic download of this pictu re from the In ternet.A Texas Department