Transiting Exoplanet Survey Satellite

Daryl SwadeSeptember 24, 2014

TESSDMS Management Meeting

Page 2: Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting

Agenda

TESS Archive Overview Contract Current Status Schedule

Deliverables Testing plan

Path to CDR

Page 3: Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting

Functional Architecture

Page 4: Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting

Archive Operations

Assumption: TESS data products will be similar to Kepler data products

TESS monthly processing (Kepler quarterly) Transferred from SPOC via hard drive

TESS archive data volume – 50 TB/year (to be refined) Total Kepler archive data volume – 19 TB (Q0-Q17)

• Does not consider reprocessed Kepler data

No proprietary period on data Availability depends primarily on SPOC processing time (<1 month)

Primary TESS web site hosted by MIT Links to MAST web site

Page 5: Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting

MAST Interfaces

SPOC

TSO

MAST

Target Pixel Data

Full Frame Images

Collateral Data

Light Curves

Focal Plane Characterization Models (from POC)

Cotrending Basis Vectors

TESS Objects of Interest Catalog

S/c Data (from POC)

Threshold Crossing Events

Data Validation Reports

Threshold Crossing Events

Data Validation Reports

TESS Input Catalog (fromPOC)

Follow-up Observation Data

Page 6: Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting

Archive System Enhancements for TESS

Page 7: Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting

TESS Contract - Cost

Sum of Total Cost Plus Fee FYWBS/Task Cost Element 2014 2015 2016 2017 2018 2019 2020 2021 Grand Total9.4.3 Data Archive Labor $33,085 $92,610 $110,228 $110,231 $346,155

Travel $2,909 $5,755 $3,282 $6,465 $18,412Materials & Equipment $29,703 $23,762 $53,465

9.4.3 Data Archive Total $35,994 $98,365 $143,213 $140,459 $418,0324.6 Data Archive Labor $23,849 $144,624 $84,648 $78,474 $4,493 $336,089

Materials & Equipment $11,881 $11,8814.6 Data Archive Total $23,849 $156,505 $84,648 $78,474 $4,493 $347,9704.2.4 Co-Investigator Science Labor $0 $74,994 $74,987 $74,997 $74,984 $74,983 $0 $0 $374,9444.2.4 Co-Investigator Science Total $0 $74,994 $74,987 $74,997 $74,984 $74,983 $0 $0 $374,944Grand Total $35,994 $173,359 $218,200 $239,305 $231,489 $159,631 $78,474 $4,493 $1,140,946

Total: $766K for Archive Development and Operations

Page 8: Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting

TESS Contract - LaborFY

WBS/Task Cost Element Description Job Family Data 2014 2015 2016 2017 2018 2019 2020 2021 Grand Total9.4.3 Data Archive Labor Project Management ASTMGR Sum of FY FTE 0.02 0.04 0.04 0.03 0.12

Sum of Hours 32 61 61 50 206Systems Engineering PROJ Sum of FY FTE 0.07 0.14 0.16 0.08 0.45

Sum of Hours 149 280 300 157 887Archive Database Engineer SW3 Sum of FY FTE 0.00 0.08 0.10 0.12 0.30

Sum of Hours 0 133 175 209 517Archive Software Engineer SW2 Sum of FY FTE 0.00 0.08 0.10 0.12 0.30

Sum of Hours 0 133 175 209 517Archive Scientist AST1 Sum of FY FTE 0.00 0.00 0.01 0.09 0.10

Sum of Hours 0 0 18 150 168Archive System Admin SYSAD2 Sum of FY FTE 0.00 0.00 0.00 0.01 0.01

Sum of Hours 0 0 5 10 15Program Management PM2 Sum of FY FTE 0.03 0.05 0.05 0.04 0.17

Sum of Hours 46 87 87 72 292Labor Sum of FY FTE 0.11 0.38 0.46 0.49 1.43Labor Sum of Hours 227 695 821 857 2,600

9.4.3 Data Archive Sum of FY FTE 0.11 0.38 0.46 0.49 1.439.4.3 Data Archive Sum of Hours 227 695 821 857 2,6004.6 Data Archive Labor Project Management ASTMGR Sum of FY FTE 0.01 0.04 0.04 0.04 0.00 0.11

Sum of Hours 11 61 61 61 3 199Systems Engineering PROJ Sum of FY FTE 0.00 0.00 0.00 0.00 0.00 0.00

Sum of Hours 0 0 0 0 0 0Archive Database Engineer SW3 Sum of FY FTE 0.03 0.20 0.09 0.09 0.01 0.42

Sum of Hours 63 349 157 157 9 734Archive Software Engineer SW2 Sum of FY FTE 0.03 0.20 0.09 0.09 0.01 0.42

Sum of Hours 63 349 157 157 9 734Archive Scientist AST1 Sum of FY FTE 0.03 0.15 0.08 0.05 0.00 0.31

Sum of Hours 47 262 145 87 5 545Archive System Admin SYSAD2 Sum of FY FTE 0.00 0.05 0.03 0.02 0.00 0.10

Sum of Hours 0 87 49 35 2 173Program Management PM2 Sum of FY FTE 0.01 0.05 0.05 0.05 0.00 0.16

Sum of Hours 16 87 87 87 5 282Labor Sum of FY FTE 0.11 0.69 0.38 0.34 0.03 1.53Labor Sum of Hours 199 1,196 657 585 33 2,668

4.6 Data Archive Sum of FY FTE 0.11 0.69 0.38 0.34 0.03 1.534.6 Data Archive Sum of Hours 199 1,196 657 585 33 2,6684.2.4 Co-Investigator Science Labor Graduate Student GRD Sum of FY FTE 0.00 1.03 1.00 0.97 0.94 0.92 0.00 0.00 4.87

Sum of Hours 0 1,806 1,752 1,699 1,649 1,600 0 0 8,506Labor Sum of FY FTE 0.00 1.03 1.00 0.97 0.94 0.92 0.00 0.00 4.87Labor Sum of Hours 0 1,806 1,752 1,699 1,649 1,600 0 0 8,506

4.2.4 Co-Investigator Science Sum of FY FTE 0.00 1.03 1.00 0.97 0.94 0.92 0.00 0.00 4.874.2.4 Co-Investigator Science Sum of Hours 0 1,806 1,752 1,699 1,649 1,600 0 0 8,506Total Sum of FY FTE 0.11 1.41 1.46 1.57 1.63 1.29 0.34 0.03 7.84Total Sum of Hours 227 2,501 2,573 2,755 2,845 2,257 585 33 13,775

Page 9: Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting

FY15 Effort

2015Oct* Nov* Dec* Jan* Feb* Mar* Apr* May* Jun* Jul* Aug* Sep*0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.0350.059 0.059 0.526 0.290 0.059 0.059 0.059 0.059 0.390 0.059 0.059 0.059

0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.1000.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100

0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.0500.144 0.144 0.611 0.575 0.344 0.344 0.344 0.344 0.675 0.344 0.344 0.344

WBS/Task Description9.4.3 Data Archive Project Management

Systems EngineeringArchive Database EngineerArchive Software EngineerArchive ScientistArchive System AdminProgram Management

9.4.3 Data Archive Total

Page 10: Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting

Status

Systems Engineering Drafted TESS Archive Operations Concept Drafted SPOC-MAST ICD Drafted TSO-MAST ICD

Archive Peer Review June 18, 2014 @ NASA/Ames 1 Archive RFA

Mission PDR September 9-2, 2014 @ MIT No known Archive issues

Page 11: Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting

Archive Peer Review RFA

Work with the TSO and the SPOC to find a meaningful way of presenting for public consumption the data products that MAST does not hold for Kepler. Threshold Crossing Events Data Validation Reports TESS Objects of Interest lists Follow-up Observation data

To be closed by CDR

Page 12: Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting

Archive Development Schedule

Phase B (April 1, 2014 – October 1, 2014 ) Continue developing TESS Archive Operations Concept Continue developing TESS-MAST ICD

• Work with SPOC to develop SPOC-MAST ICD section• Work with TSO to develop TSO-MAST ICD section

Continue to participate in Ground Segment Monthly Technical Reviews Participate in TESS Mission PDR (September 2014)

Phase C (October 2, 2014 – November 29, 2016) Develop TESS specific archive components based on Archive Operations

Concept and TESS-MAST ICD Participate in TESS Mission CDR Participate in Ground Segment testing

Phase D (November 30, 2016 – July 17, 2017) Develop TESS Archive User’s Guide

Page 13: Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting

MAST Deliverables

Deliverable Responsibility Phase Date of DeliveryTESS Archive Operations Concept Systems Engineer B PDRTESS-Archive ICD

SPOC-ArchiveTSO-Archive

Systems Engineer B/C PDR/CDR

Archive Architecture Systems Engineer C CDRArchive Catalog Design Specification Database Engineer C CDRArchive Software Design Software Engineer C CDRTESS Archive User Interface Software Engineer C/D CDR/GS TestArchive Test Procedures Systems Engineer D GS TestArchive Operations Procedures Archive Operator D LaunchTESS Archive User’s Guide Archive Scientist E Launch

Page 14: Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting

Testing Plan

MAST will work with the SPOC and TSO to develop test data. MAST will participate in Ground Segment end-to-end tests.

GSIT 1: July 2015 GSIT 2: June-July 2016 End-to-end Test: October-November 2016 GSIT 3: May 2017

Page 15: Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting

Path to CDR

Mission CDR currently scheduled for April 2015 Systems Engineering

Complete TESS Archive Architecture• Data Receipt and Ingest• Data Storage Options

Work with SPOC to complete SPOC-MAST section of TESS-MAST ICD Work with TSO to complete TSO-MAST section of TESS-MAST ICD

Archive Software Development Archive Catalog Schema Archive User Interface Prototype