transition from rf to ato - belgium
TRANSCRIPT
Federale Overheidsdienst Mobiliteit en Vervoer
Service public fédérale Mobilité et Transport
11 December 2012
Pieter Dumont and Olivier Grisel – Training Department
Licencing Directorate
Transition from RF to ATO
Content
11/12/2012 Transition from RF to ATO 2
1. EU regulation 290/2012 – Transitional measures
2. Registration vs Approval certificate
3. PART-ORA (Annex 7 to EU 290/2012)
I. ORA.GEN.105 Competent authority
II. ORA.GEN.115/ORA.ATO.105 Application for an organisation certificate and fees
III. ORA.GEN.130 Changes to organisations
IV. ORA.GEN.150 Findings
V. ORA.GEN.160 Occurrence reporting
VI. ORA.GEN.200 Management system
VII. ORA.GEN.205 Contracted activities
VIII. ORA.GEN.210/ORA.ATO.110 Personnel requirements
IX. ORA.GEN.215 Facility requirements
X. ORA.GEN.220/ORA.ATO.120 Record-keeping
XI. ORA.ATO.125/130 Training programme and manuals
Content
11/12/2012 Transition from RF to ATO 3
3. PART-ORA (Annex 7 to EU 290/2012)
XII. ORA.GEN.135 Training A/C and FSTDs
XIII. ORA.ATO.140 Aerodromes and operating sites
XIV. ORA.ATO.145 Pre-requisites for training
XV. Distance Learning Course
1. EU regulation 290/2012 – Transitional measures
11/12/2012 Transition from RF to ATO 4
• Existing RFs are allowed to continue already approved training activities in accordance with Royal Decree 08/03/2008 (JAR-FCL 1 – Airplanes) and/or Royal Decree 21/06/2004 (JAR-FCL – Helicopters) even after 08/04/2013 up to 08/04/2015
• If a training according to JAR-FCL has began before 08/04/2015, the final skill test must be performed before 08/04/2016 according the Part-FCL requirements
• RFs may apply for an ATO certificate as from 08/04/2013
NO RUSH BUT FIRST IN FIRST OUT
08/04/2013 08/04/2015 08/04/2016
RF may apply for an ATO certificate RF should be approved as ATO to
continue training
All training in accordance with JAR-
FCL shall be completed
1. EU regulation 290/2012 – Transitional measures
11/12/2012 Transition from RF to ATO 5
AT0
08/04/2013 08/04/2015 08/04/2016
No conversion
provisions!
RF may apply
for an ATO
certificate
RF should be approved as ATO
to continue training
All training in
accordance
with JAR-FCL
shall be
completed
Training conform Jar-FCL Training conform Jar-FCL
Training conform Part-FCL
Credits
conform
creditreport
BCAA
2. Registered facility Vs Approved Training Organisation
11/12/2012 Transition from RF to ATO 6
• Registered facility :
� Registered trough an official reporting of the training activities to the BCAA
� Changes to the RF must be registered/reported to the BCAA
• Approved training organization :
� Means an organization qualified for the issue or continuation of an approval to provide training for pilot licenses and associated ratings and certificates.
� Approved by the competent authority (Certificate)
� May exercise training activities within the approved scope
� Changes to the organization or scope must be approved before implementation
Reason of the registered mail
2. Registered facility Vs Approved Training Organisation
11/12/2012 Transition from RF to ATO 7
There are no conversion provisions for an RF to become an ATO
An RF will not be converted automatically into an ATO
You must apply for an ATO certificate
3. PART-ORA (Annex 7 to EU 290/2012)I. ORA.GEN.105 Competent authority
11/12/2012 Transition from RF to ATO 8
• If principle place of business in Belgium
The competent authority is the BCAA
• If principle place of business within an EASA member state
The competent authority of that member state
• If principle place of business in third country
The EASA
• Contact informations :
[email protected] (yet operational!)
• BCAA ATO surveyors :
� Pieter Dumont – [email protected]
� Jelle Vanderhaeghe – [email protected]
� Olivier Grisel – [email protected]
3. PART-ORA (Annex 7 to EU 290/2012)II. ORA.GEN.115/ORA.ATO.105 Application for an organisation certificate and fees
11/12/2012 Transition from RF to ATO 9
• Application for an ATO certificate is made trough a dedicated BCAA procedure
Deliver an ATO certificate – LA/L-TRA/0101
• Within this main process, there are 5 sub processes in order to approve « items » of the ATO certificate
Approve a manual of an ATO – LA/L-TRA/0151
Approve a post holder of an ATO – LA/L-TRA/0152
Approve a FI/TKI of an ATO – LA/L-TRA/0153
Deliver an A/C user approval to an ATO – LA/L-TRA/0154
Deliver a FSTD user approval – LA/L-TRA/0155
• One process to audit the ATO
Perform an audit of an ATO – LA/L-TRA/0150
All BCAA procedures and support documents will be made available on our website
3. PART-ORA (Annex 7 to EU 290/2012)II. ORA.GEN.115/ORA.ATO.105 Application for an organisation certificate and fees
11/12/2012 Transition from RF to ATO 10
Deliver an ATO certificate – LA/L-TRA/0101
3. PART-ORA (Annex 7 to EU 290/2012)II. ORA.GEN.115/ORA.ATO.105 Application for an organisation certificateand fees
11/12/2012 Transition from RF to ATO 11
Deliver an ATO certificate – LA/L-TRA/0101
BCAA perform the initial Audit
Reduced scope, mainly facilities and training devices
3. PART-ORA (Annex 7 to EU 290/2012)II. ORA.GEN.115/ORA.ATO.105 Application for an organisation certificate and fees
11/12/2012 Transition from RF to ATO 12
Deliver an ATO certificate – LA/L-TRA/0101
If no findings or corrective action plan is approved
Issue o the • ATO approval certificate • Training course approval
3. PART-ORA (Annex 7 to EU 290/2012)II. ORA.GEN.115/ORA.ATO.105 Application for an organisation certificate and fees
11/12/2012 Transition from RF to ATO 13
Approve a manual of an ATO – LA/L-TRA/0151
• Three manuals to be approved :
� OMM : Organisation Management Manual
� OM : Operations Manual
� TM : Training Manual
• Manual Compliance Checklist and Findings (MCCF)
� Document to introduce a manual to the BCAA
� X-ref towards Part-ORA requirement
3. PART-ORA (Annex 7 to EU 290/2012)II. ORA.GEN.115/ORA.ATO.105 Application for an organisation certificate and fees
11/12/2012 Transition from RF to ATO 14
Approve a manual of an ATO – LA/L-TRA/0151
MCCF :
• MCCF must be introduced for the initial approval of the manual
AND for each subsequent revision
• It is a compliance statement made by the ATO and confirmed by the BCAA
• Work documents to communicate findings on the manual
3. PART-ORA (Annex 7 to EU 290/2012)II. ORA.GEN.115/ORA.ATO.105 Application for an organisation certificate and fees
11/12/2012 Transition from RF to ATO 15
Approve a post holder of an ATO – LA/L-TRA/0152
• Which positions in an ATO requires an approval ?
� Accountable manager
� Compliance Monitoring Manager
� Safety Manager
� Head of Training
� Chief Flight Instructor
� Chief Theoretical Instructor
• Combination of management position :
� AM/CMM and a SM
� AM and a CMM/SM
� Three post holders for non complex ATOs
Required for non-complex
Required for complex
3. PART-ORA (Annex 7 to EU 290/2012)II. ORA.GEN.115/ORA.ATO.105 Application for an organisation certificate and fees
11/12/2012 Transition from RF to ATO 16
Approve a post holder of an ATO – LA/L-TRA/0152
DOC-Letter of intention-Post holder approval-Standardized resume-Working agreement / contract
3. PART-ORA (Annex 7 to EU 290/2012)II. ORA.GEN.115/ORA.ATO.105 Application for an organisation certificate and fees
11/12/2012 Transition from RF to ATO 17
Approve a FI/TKI of an ATO – LA/L-TRA/0153
DOC-Letter of intention-New/updated FI/TKI list-Staff application form-Standardisation certificate-Working agreement/contract
3. PART-ORA (Annex 7 to EU 290/2012)II. ORA.GEN.115/ORA.ATO.105 Application for an organisation certificate and fees
11/12/2012 Transition from RF to ATO 18
Deliver an A/C user approval to an ATO – LA/L-TRA/0154
DOC-Letter of intention-A/C application form-Agreement/contract
3. PART-ORA (Annex 7 to EU 290/2012)II. ORA.GEN.115/ORA.ATO.105 Application for an organisation certificate and fees
11/12/2012 Transition from RF to ATO 19
Deliver a FSTD user approval – LA/L-TRA/0155
DOC-Letter of intention-FSTD application form-Agreement/contract
3. PART-ORA (Annex 7 to EU 290/2012)III. ORA.GEN.130 Changes to organisations
11/12/2012 Transition from RF to ATO 20
• Changes requiring prior approval from the competent authority
� Any change in the ATO approval (Manuals, locations, A/C, FSTDs, etc…)
At least 30 days before the date of the intended changes
� Any change in the ATO nominated staff
At least 10 days before the date of the proposed change
• Changes not requiring approval
� i.e. items not mentioned in GM1 ORA.GEN.130 (a)
� Must be covered by a proper internal procedure approved by the BCAA
• Unforeseen changes
� At earliest opportunity
3. PART-ORA (Annex 7 to EU 290/2012)IV. ORA.GEN.150 Findings
11/12/2012 Transition from RF to ATO 21
• Oversight of the ATO by the BCAA
� Audits – Performed by the L-TRA department
� Unannounced inspections – performed by the inspection department
• An ATO must be audited in full within 24 months
May be extended up to 48 months on special conditions ARA.GEN.305 (c), (d)
• Oversight program : AMC1 ARA.ATO.105
• ATO will be warn in advance
� The date of the audit (agreement with ATO)
� Scope of the audit
• After the audit the ATO will receive a report stating the finding and the time fame allowed to correct the non compliances
• If any findings, the ATO must provide to the BCAA
� Root cause analysis
� Corrective action plan
3. PART-ORA (Annex 7 to EU 290/2012)IV. ORA.GEN.150 Findings
11/12/2012 Transition from RF to ATO 22
• The corrective action plan must be submitted within 10 working days after the reception of the audit report by email
• The ATO must implement the corrective action plan in due time
• The ATO must provide the evidences of the implementation of the corrective actions in due time
If not, related findings raised to level 1!
Related training activities are stopped!
If not, related findings raised to level 1!
Related training activities are stopped!
3. PART-ORA (Annex 7 to EU 290/2012)V. ORA.GEN.160 Occurence reporting
11/12/2012 Transition from RF to ATO 23
• The organisation shall report to the BCAA
� Accidents & Serious incidents (CIR/INS01)
� Occurrences (CIR/INS01)
• The organisation shall report to the BCAA and to the A/C manufacturer
� incident
� Malfunctions
� Technical defect…
That would highlights problems with data established in accordance with Part-21
• Reporting of those shall be made on a form and manner established by the BCAA (CIR/INS01)
3. PART-ORA (Annex 7 to EU 290/2012)VI. ORA.GEN.200 Management system
11/12/2012 Transition from RF to ATO 24
• Two aspects in the management system
� Safety management system
� Compliance monitoring system
• Both systems will be described within the ATO OMM
Safety Management System :
• Developped and managed by the safety manager (SM)
• SMS is a system that ensures that the ATO is performing his activities in a safe manner by
� Hazard identification
� Risk analysis
� Mitigation of the risks
3. PART-ORA (Annex 7 to EU 290/2012)VI. ORA.GEN.200 Management system
11/12/2012 Transition from RF to ATO 25
What is the contain of the SMS:
• Safety policy :
� commitment to improve towards the highest safety standards
� Should be endorsed by the AM
� Just culture
• Emergency Response Plan (ERP) :
� Actions to be taken by the organization in an emergency
� Who coordinate the ERP and how?
• Responsibilities of hazard identification, risk assessment and mitigation
� Who do what, when and how?
• Assessment of the effectiveness of the mitigation by the SM
• Procedure to assess a safety risk related to a change (internal or external)
• Training and communication
• Safety audits plan
3. PART-ORA (Annex 7 to EU 290/2012)VI. ORA.GEN.200 Management system
11/12/2012 Transition from RF to ATO 26
Safety Management System, How to build such system? :
• Hazard identification
� Who may identify hazards :
It could be anyone active in the ATO (FIs, TKIs, candidates,…)
� How the hazard should be communicate to the ATO :
On an approved form or a hazard checklist
3. PART-ORA (Annex 7 to EU 290/2012)VI. ORA.GEN.200 Management system
11/12/2012 Transition from RF to ATO 27
Safety Management System, How to build such system? :
• Risk analysis/assessment
� Who will analyze the risks :
SM, AM, FIs, TKIs
� How :
A lot of different systems available
(risk assessment matrix, SPE model, GAR model)
• Risk mitigation
� Who defines the mitigation plan/method
� Safety audits to assess effectiveness of the mitigation plan
KEEP IT SIMPLE!
BCAA will provide further guidance
3. PART-ORA (Annex 7 to EU 290/2012)VI. ORA.GEN.200 Management system
11/12/2012 Transition from RF to ATO 28
Compliance Monitoring System :
• Developed and managed by the compliance monitoring manager (CMM)
• Goal of such system : to be certain that the ATO remains in compliance with applicable requirements
• How to build such system :
� Checklists to assess the compliance of the ATO
� Audit program
BCAA will provide checklist that will be in use during BCAA audits
3. PART-ORA (Annex 7 to EU 290/2012)VII. ORA.GEN.205 Contracted activities
11/12/2012 Transition from RF to ATO 29
• All activities within scope of approval performed by another organisation
(certified or not)
• Should conform to the applicable requirements
• A written agreement between both organisations
• Subject to hazard identification and risk management, occurrence
reporting and compliance monitoring,
• If certified:
• compliance montoring should check the scope of approval certificate and
the validity
• If not certified:
• working under the approval of contracting organisation
• Competent authority is given access to the contracted organisation to
determine continued compliance with applicable requirements
3. PART-ORA (Annex 7 to EU 290/2012)VIII. ORA.GEN.210/ORA.ATO.110 Personnel requirements
11/12/2012 Transition from RF to ATO 30
Accountable manager (AM) Compliance monitoring manager
Safety managerHead of training (HT)
Non-Complex organisation:
Flight instructorsTheoretical knowledge instructors Flight simulation training instructors
3. PART-ORA (Annex 7 to EU 290/2012)VIII. ORA.GEN.210/ORA.ATO.110 Personnel requirements
11/12/2012 Transition from RF to ATO 31
Accountable manager (AM):
Responsible for:
• Finances
• Management system
Head of training (HT):
• Extensive experience as an instructor
• Possesses sound managerial capability
Responsible for:
• Ensuring training in compliance with Part-FCL
• Satisfactory integration of flight training in a/c or FSTD and theoretical
knowledge instruction
• Supervising the progress of individual students
Shall be assisted by one or more deputy HT(s), if training courses for different a/c
categories are provided.
3. PART-ORA (Annex 7 to EU 290/2012)VIII. ORA.GEN.210/ORA.ATO.110 Personnel requirements
11/12/2012 Transition from RF to ATO 32
Compliance monitoring manager:
Responsible for:
• Organisation continues meet the requirements of this Part and other Parts
• Implementing of the compliance monitoring programme
Should:
• Have direct access to accountable manager
• Demonstrate relevant knowledge, background and appropriate experience
related to activities to the organisation, including knowledge and experience
in compliance monitoring
• Access to all parts of the organisation, and contracted organisations
• May be the AM
• Independent
Safety manager:
• Coordinating the SMS
• May be the AM
Compliance monitoring manager and safety manager may be combined for non-
complex organisations if they receive sufficient resources of AM
3. PART-ORA (Annex 7 to EU 290/2012)VIII. ORA.GEN.210/ORA.ATO.110 Personnel requirements
11/12/2012 Transition from RF to ATO 33
Theoretical knowledge instructors:
Shall have:
• Practical background in aviation in the areas relevant for the training provided
• Instructional techniques
or
• Previous experience in giving theoretical knowledge instruction
• Appropriate theoretical background
Should, before appointment, prove their competency by giving a test lecture
3. PART-ORA (Annex 7 to EU 290/2012)IX. ORA.GEN.215 Facility requirements
11/12/2012 Transition from RF to ATO 34
• Flight operations:
• Flight planning room
• Briefing room(s)/cubicles
• Office
• Rest areas
• Theoretical knowledge instruction:
• Classroom
• Demonstration equipment
• Office
• A single room may be sufficient
3. PART-ORA (Annex 7 to EU 290/2012)X. ORA.GEN.220/ORA.ATO.120 Record-keeping
11/12/2012 Transition from RF to ATO 35
• A system of record–keeping:
• all developed activities
• all the elements of the Management System
Who, When, Where & How ?
• Paper and/or Electronic format
• 3 years after completion of the training
• including:
• Details of ground, flight, and simulated flight training
• Progress reports
• Information on the licenses of the students
• Student’s progress card
3. PART-ORA (Annex 7 to EU 290/2012)XI. ORA.ATO.125/130 Training programmes and manuals
11/12/2012 Transition from RF to ATO 36
• Different ATO manuals :
� OMM : Organization management manual
Includes CMS and SMS
Provide all info regarding ATO general info (operating sites, staff, etc…)
� TM : Training manual
States standards, objectives and training goals for each phase of training
One per training course
Forms included in the TM must answer to the following questions :
� Which candidate
� Which FI/TKI
� When
� Where/which device or A/C
� Content of the lesson
� Grading (if applicable)
3. PART-ORA (Annex 7 to EU 290/2012)XI. ORA.ATO.125/130 Training programmes and manuals
11/12/2012 Transition from RF to ATO 37
• Different ATO manuals :
� OM : Operations manual
States how the ATO works to the persons active in the ATO (candidates, staff)
• Each manual has a MCCF
� If you can answer to each point of the MCCF, your manual is approvable
• Each manual is approved by a signed LEP
REMEMBER! Who, what, when and how
3. PART-ORA (Annex 7 to EU 290/2012)XI. ORA.ATO.125/130 Training programmes and manuals
11/12/2012 Transition from RF to ATO 38
Part-FCL PPL training programme
Theoretical Knowledge
• At least 100 hours of instruction
• Syllabus Part-FCL ~= Jar-FCL
Differences: Meteorology, Air law & ATC procedures, Navigation
Flight Instruction
• Before being accepted for training an applicant should be informed that the
appropriate medical certificate must be obtained before solo flying is permitted
• FI should ensure that an applicant can use R/T communication before solo nav
• Syllabus PPL(A): Part-FCL ~= Jar-FCL
Differences: Radio navigation: use of GNSS
• Syllabus PPL(H): Part-FCL ~= Jar-FCL
Differences: 30 ex: splitting of ex, DVE; Radio navigation: use of GNSS
3. PART-ORA (Annex 7 to EU 290/2012)XII. ORA.ATO.135 Training A/C and FSTDs
11/12/2012 Transition from RF to ATO 39
• Part-ORA Regulation not applicable for A/C referred in
Annex 2 of Basic Regulation (EC 216/2008)
i.e. PA-18/19, SV-4, tigermoth, …
3. PART-ORA (Annex 7 to EU 290/2012)XII. ORA.ATO.135 Training A/C and FSTDs
11/12/2012 Transition from RF to ATO 40
• Each training aircraft should be:
• Equipped as required in the training specifications concerning the course in
which it is used
• Fitted with primary flight controls that are instantly accessible by both the
student and the instructor (for example dual flight controls or a center
control stick).
• The fleet should include, as appropriate to the courses of training:
• Aircraft suitably equipped to simulate (IMC) and for the instrument flight
training required
• In the case of a non-complex ATO, one aircraft fulfilling all the required
characteristics for a training aircraft might be sufficient
3. PART-ORA (Annex 7 to EU 290/2012)XIII. ORA.ATO.140 Aerodromes and operating sites
11/12/2012 Transition from RF to ATO 41
• Use of aerodromes and operating sites with appropriate
facilities/characteristics taking into account the training provided and category
and type of A/C :
� For Aeroplane : most AIP aerodromes are suitable
� For Helicopter : Additional requirements
Confined area
Simulated engine off autorotation
Sloping ground operation
• Aerodromes and operating sites are approved trough the OMM
3. PART-ORA (Annex 7 to EU 290/2012)XIV. ORA.ATO.145 Pre-requisites for training
11/12/2012 Transition from RF to ATO 42
• The ATO shall ensure that the student meet all pre-requisites for training as established in Part-MED and Part-FCL
• The proofs of the pre-requisites attested before the training shall be stored in the candidate’s training folder
• If the pre-requisites were not compliant with applicable regulations, the license or rating will not be issued by the BCAA
• The ATO is responsible of the checking of the pre-requisites
3. PART-ORA (Annex 7 to EU 290/2012)XV. Distance Learning Course
11/12/2012 Transition from RF to ATO 43
ORA.ATO.300 DL – General :
• Distance learning is approved to conduct :
� Theoretical knowledge
� Class or type rating
ORA.ATO.305 DL – Classroom instruction :
• An element of classroom instruction shall be conducted in all subjects
• At least 10% of the total duration of the course shall be performed in class
ORA.ATO.310 DL – Instructors :
• All TKIs shall be fully familiar with the requirements of the DL course programme