transitioning science & technology programsengineering and manufacturing development, ......

25
1 Mr. Al Shaffer Director, Plans and Programs Office of the Director, Defense Research and Engineering 5 March 2003 Technology Readiness Assessments and the Revised DoD Acquisition Series Transitioning Science & Technology Programs

Upload: trinhnguyet

Post on 19-Apr-2018

239 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

1

Mr. Al ShafferDirector, Plans and Programs

Office of the Director, Defense Research and Engineering5 March 2003

Technology Readiness Assessments and the Revised DoD Acquisition Series

TransitioningScience & Technology

Programs

Page 2: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

2

Director, Defense Research &Engineering Priorities

l Focus & Integrate DoD S&T on“Transformation”

l Enhance Technology Transitionl Address National Security S&E Workforcel Expand Outreach to Combatant Commands

and Intelligence Communityl Accelerate Support to the War on Terrorism

Page 3: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

3

DDR&E PrioritiesExpanded

• Enhance Technology Transition Effortsl Enhanced Primary Transition Efforts under DUSD

(Advanced Systems and Concepts); Mrs. SuePayton

l Increase Investment in Technology TransitionEfforts (Quick Reaction Special Projects andAdvanced Concept Technology Demonstrations)

l Expanded Use of Technology ReadinessAssessments as Part of Defense Acquisition BoardMajor Program Reviews

Page 4: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

4

Under Secretary AT&LGoals*

• Theme: Accelerate Acquisition & Tech TransitionEfforts

l Revitalize Defense Acquisition Board at SeniorLevel

l Mandate Evolutionary, Spiral Development

l Implement Technology Readiness Assessments

l Mandate the Goal of S&T at 3%

l Exploite the Enormous Potential of ACTDs

l Accelerate the Flow of Technology to theWarfighter

* From Nov 2002 Speech at PEO/SYSCOM Conference

Page 5: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

5

Speeding Technology Transition “The Challenge”

RDT&E

6.3Adv Tech

Dev6.2

Applied Research

6.1 Basic

Research

Tech Base

S&T

Managed by Labs

6.4 Adv Comp Dev & Prototype

6.5Sys Dev &

Demo (SDD)

Managed by System Program Offices

“Perceptions” of the S&T Community• S&T’s job is complete at the tech

development stage• Implementation of the technology is the

customer’s responsibility• The role of S&T is “tech push”— If it’s

good technology — they will come!• Development cycle for S&T is too long for

most Acquisition and Warfightercustomers

• Focus on the technology and not on thebusiness rationale for implementation

Technology Transition “Seam”

Key Impedimentsl Budget: Lack of Transition

Fundsl Transition Process Lacks

Definition & Visibilityl Culture: Different Goals &

Timelines between S&T andAcquisition Managers

l Lack of Incentives

Valle

y of

Dea

th

6.7Op System

Dev

Page 6: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

6

Some Tech Transition Dimensions

l Rate of Technology Change Increasing

l Capabilities-based Planning ChangesRequirements/Needs Process

l Acquisition Excellence/Spiral Insertion

l Availability of Commercial Technology

l Demos (Try Before Buy)

Multiple Dimensions Mean Multiple Solutions Needed

Page 7: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

7

The Challenge:Pace of Technology

“Moore’s Law” Computing doubles every 18 months

“Fiber Law” Communication capacity doubles every 9 months

“Disk Law” Storage doubles every 12 months

Technology growth is non-linear…Acquisition path has been linear

Defense Acquisition Pace

F-22 Milestone I: Oct 86 IOC: Dec 05*

Commanche Milestone I: Jun 89 IOC: Sep 09

* Computers at IOC are 512 X faster, hold 65,000 X bits ofinformation than they did at MS I

Page 8: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

8

DoD 5000-Series:S&T Role in Evolutionary Acquisition

As of April 2002

l DoDD 5000.1, The Defense Acquisition Systeml Rapid & Effective Transition From S&T to Productsl Emphasis on Cost & Affordability in Program Development

l DoDD 5000.2, Operation of the Defense Acq. Systeml Identify S&T Solutions in Pre-Systems Acquisitionl Reduce Technology Risks Before the Acquisition Processl Use Mechanisms with User & Acq. Customer to Ensure Transition

> ATDs, ACTDs, Service & Joint Experiments

l DoD 5000.2-R, Procedures for Acquisition Programsl Establish Technology Readiness Levels (TRLs) for Critical Technologies

Documents Available at http://www.acq.osd.mil/ara/

Technology and Defense Acquisition

Page 9: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

9

Why? “To create an acquisition policyenvironment that fosters efficiency,flexibility, creativity, and innovation”

l DoDD 5000.1, The Defense Acquisition Systeml Rapid & Effective Transition From S&T to Productsl Emphasis on Cost & Affordability in Program Development

l DoDD 5000.2, Operation of the Defense Acq. Systeml Identify S&T Solutions in Pre-Systems Acquisitionl Reduce Technology Risks Before the Acquisition Processl Use Mechanisms with User & Acq. Customer to Ensure Transition

> ATDs, ACTDs, Service & Joint Experiments

l DoD 5000.2-R, Procedures for Acquisition Programsl Establish Technology Readiness Levels (TRLs) for Critical Technologies

Changes to Defense Acquisition Regulation

Page 10: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

10

Additional DepSecDef Guidance30 Oct 2002

• DepSecDef Issued Interim Guidance (~40 Pages):• Reaffirmed the Importance of Technology Transition• Reaffirmed Evolutionary Acquisition• Reaffirmed Technology Development as a Continual Process• Directed Continuation of Technology Readiness Assessments and Independent Technology Assessments (Milestones B/C)

DEPSECDF Intent: Streamline Acquisition,with increased flexibility for technologyinsertion

Page 11: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

11

IOCBA

Single Step orEvolution

Concept &Technology

DevelopmentSystem Development

& Demonstration

Production &Deployment

Pre-SystemsAcquisition

Systems Acquisition(Engineering and Manufacturing

Development, Demonstration, LRIP &Production)

Operations &

Support

C

Technology Opportunities &User Needs

Sustainment

l Process entry atMilestones A, B, or C (orwithin phases)

l “Entrance criteria” metbefore entering phase

Relationship to Requirements Process

ICDAll validated byRequirements

Authority

FRPDecisionReview

Increment 2

Increment 3

FOC

IOT&E

CDD CPD

Page 12: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

12

Changes to Requirements Process

• Warfighter “owns” the Requirements Process• Moving to Top-Down “Joint Capabilities Integration”• Key Documents:

• Joint Integrating Architecture (JIA) (Pre MS-A)• Initial Capabilities Document (ICD) (Pre MS-A)• Capability Development Document (CDD) (MS-B)• Capability Production Document (CPD) (MS-C)• Capstone Requirement Document (CRD)

Page 13: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

13

Possible Future Requirements /Acquisition Process

Ongoing Mission Area Analysis

DOTMLPF

Approved

Enterprise Architecture

ICD

MS A

Analysisof

CapabilitySolution

Sets Demo

Demo Increment 1

Demo

Demo

Demo

Demo

Increment 2

Increment 3

MS B

MS C

MS B MS C

MS B MS C

Refinement ofSolution Sets

CDD

CPD

Concept & TechnologyDevelopment

LRIP

LRIP

LRIP

SDD

Oversight

RequirementsAcquisitionIntegrated Decision Making

MDARA

MDARA

MDARA

FRP

FRP

FRP

Process from Interim Guidance

Requirements

Acquisition

Page 14: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

14

Multi-Mission Area Analysis

D

O

T

M

L

P

F

• JWCAs

• Services, Agencies, OSD

• Combatant Commanders

• Laboratories

• Industry

• Considers DOTMLPF

Develop Range of Solutions

Analysis ofCapability Solution

Sets

Approved• Phase I, II, III BDA• MEA• Target nominations• Special Studies

• Maritime CTL• Phase I, II BDA

• Propose targets• Track JFLCC Targets• Phase I, II BDA• MEA

• Target study• Point mensuration• No strike lists• Target materials• Phase I, II, III BDA

• Phase II BDA;Combat Assessment

• CDL, JNFL, Pre-planned JTL

• Target materials• Target nomination

• Phase I, II BDA; MEA• Tgt. Folders;weaponeering• ATO, JTl

JFC(JOC/JIC)

JFLCC(ACE)

WOCMAW

JFMCC

F2C2

DCCC

DIA

NMJIC

JFSOCC

JFACC(AOC) • Phase I BDA

• Phase I BDA

• Coalition Coordination

Caveats:• Extract fromUSCENTCOM Objective Architecture Concerning Targeting – November 1997 Draft• Nodes; info. exchanges; functions shown do not represent a complete set

MIDBChanges

TargetNominations

BDA Reports(imagery/text)

• BDA Reports (imagery/text)

• Collection Requirements

• BDA Reports (imagery/text)

• Target materials/analysis• BDA Reports (imagery/text)

CollectionRequirements

• Weapon System Video• MISREPs• Combat Reports• Munitions Effects• Target nominations• Target material requests

• Target materials/analysis• BDA Reports (imagery/text)

• BDA Reports (imagery/text)

• Enemy Force Effectiveness• Collection Requirements• Target Nominations • BDA Reports

(imagery/text)

• Weapon System Video• MISREPs• Combat Reports• Munitions Effects• Target nominations• Target material requests• Collection Requirements

A1 A2 A3

A1.2 A3.1 A3.2A1.1

A3.2.1 A3.2.2

A0

ActivityHierarchy

ActivityDiagram

A1

A2

A3

EVENTS/TIME

NODES

NODE 1 NODE 2 NODE 3

EVENT 1

EVENT 2

EVENT 3

EVENT 4 EVENT 5

EVENT 6

EVENT 7 EVENT 8

time 1

time 2

time 3

time 3'

{formula relatingtime 3 to time 3'}

time n

{formula relatingtime 1 to time 2}SATCOM Interface

NODE A

NODE B

NODE C

SYSTEM2

SYSTEM1

SYSTEM1

SYSTEM3

SYSTEM

4

EXTERNALCONNECTION

SYSTEM1

COMMS Interface

COMMS Interfa

ce

SYSTEM2

COMMS InterfaceOne-way SATCOM Interface

F/A-18A/BF/A-18A/B

Navy Tankers4

E-2CE-2C

F-14DF-14D

F-14A, BF-14A, B

Tactical SurveilP-3C S-3BSH-60 UAVsetc.

Tactical SurveilP-3C S-3BSH-60 UAVsetc.

EA-6BEA-6B

ARC

C2WC3

ASUWC

ASWC

F/A-18 C/D, E/F

JFACCJFACCJFMCCJFMCC

JFLCC JFSOCCJFSOCCNATO Allies

Coalition Allies

JFCJOCJIC

JFCJOCJIC

CWCCWC ACAACAAADCAADC

SWC

A J M

A JM

A J M

A JM

A JM

A J M

A JM

A J M

A JM

A JM

Joint ElementsNational Theater

DSP SOF OTHR HFDF ASW ArraysFOSICs/FOSIFsetc

E-31 U-2RRC-

135V2 EP-3ES-3AUAVsTankers4

Ships6

Subs6 etc

Joint ElementsNational Theater

DSP SOF OTHR HFDF ASW ArraysFOSICs/FOSIFsetc

E-31 U-2RRC-

135V2 EP-3ES-3AUAVsTankers4

Ships6

Subs6 etc

AAWC

AEGIS Cruiser: CG-47 Class*(Alternate, CV)

CICAAWC

AEGIS Cruiser: CG-47 Class*(Alternate, CV)

CIC

A JM

A C J

NM R

A J N M Z

A J NM Z

A J NM

ZA J N M Z A M

A J N

M Z

A C J M Z

C J

A C M

C

C J

A J N M Z

A J N M Z

A J N M Z

A J N M Z

A C J NM

A C JM Z

A J N M Z

C

M

A JM

A C J

NM R

A J N M Z

A J NM Z

A J NM

ZA J N M Z A M

A J N

M Z

A C J M Z

C J

A C M

C

C J

A J N M Z

A J N M Z

A J N M Z

A J N M Z

A C J NM

A C JM Z

A J N M Z

C

M

USAFControlE-3 1 CRCCRE

WeaponsF-1 5 F-16

ForceAOC

USAFControlE-3 1 CRCCRE

WeaponsF-1 5 F-16

ForceAOC

ControlE-3 1 CRCCRE

WeaponsF-1 5 F-16

ForceAOC

AEGISDestroyers

DDG-51

AEGISCruisers

CG-47

AircraftCarriers

CV

Other AAWShips

CGN -36/38, DDG-993

Other AAWShipsFFG-7

OtherShips

AEGISDestroyers

DDG-51

AEGISCruisers

CG-47

AircraftCarriers

CV

Other AAWShips

CGN -36/38, DDG-993

Other AAWShipsFFG-7

OtherShips

ForceAAMDC FPTOC

Control WeaponsArmy

ForceAAMDC FPTOC

Control WeaponsForceAAMDC FPTOC

Control WeaponsArmy

USMCForceTACC

ControlTAOC / SAAWC /

EWC

WeaponsF/A-18AV-8BHAWK TMDD

USMCForceTACC

ControlTAOC / SAAWC /

EWC

WeaponsF/A-18AV-8BHAWK TMDD

Near Term Operations as of 2003 -- Major Regional Conflict --Theater Air and Missile Defense functions Sources: Ref J6, J13, J62, J84, J94, J97, N3, N10, N11, N14, N16, N27, F1, B17, R8, R16, S11, S14-S24 Notes for Navy Charts1 AWACS 2 RIVET JOINT 3 Formerly EWC 4 Aerial Refueling Aircraft 5 May be indirect via Fleet gateway6 “Ships” & “Subs” refers to vessels, which although not an integral part of the Joint Force, are tasked to provide surveillance

Integrated Architectures

• Captures the capabilityshortfall in terms ofthe integratedarchitecture(s)

• Critical capabilities tosatisfy the requirement

• “Best” Joint solution

• Service Sponsor

• DOTMLPF

Initial Capabilities Document

Enterprise Architecture

Initial Requirements Process

Sets Baseline for Technology Development

Strategy

Page 15: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

15

Evolutionary Acquisition and SpiralDevelopment

100% of Design Concept

A

MNS

Concept Development

SystemDesign Concept

CapabilitySummary

Spiral Development

Operational Assessments Capability-Based T&E

Demo

Demo

Demo

Demo

Demo

Demo

Increment I

B C

CPD

Increment 2

B C

Increment N

B C

“Use and Learn”Feedback

Technology Insertion Points

Every Spiral Should Enhance Capability

CDD

CPDCDD

CPDCDD

Page 16: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

16

Best Practices

All Services are evolving their acquisition processes

S&T Acq

Operational Requirements(Warfighter)

Enhanced Contact; Fewer Surprises

FROM

TO S&T Acq

Page 17: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

17

Navy Science & Technology (S&T)Problem / Solution

$

t

Critical Mass

But weneed this...

Programs below critical mass were never ready for transition

This

meansthis...

Circa 1999

Page 18: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

18

Navy FNC IPT Approach

l Industry Board of Directors Model

l Principal Members:l Chair -- Requirements community -- Office of Chief of Naval

Operations (OPNAV)/Marine Corp Combat Development Center(MCCDC)/Fleet/Force rep.

l Transition Lead -- Acquisition community -- Systems Command(SYSCOM)/Program Executive Officer (PEO) rep.

l Execution Manager/Technical Working Group Leader -- S&Tcommunity rep.

l Executive Secretary -- S&T Resource Sponsor Rep.

Page 19: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

19

Air ForceApplied Technology Council (ATC)

l Tech transition process should be a 3-legged stooll Air Force Research Lab, Product Centers, and Users

l Recurring participation at senior levelsl MAJCOM/CVs, Product Center/CCs, and AFRL/CC

l Funding commitments for both S&T and transitionl For Advanced Technology Demonstration (ATD)

Programs

Page 20: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

20

Army ATD Management PlansAccelerating Transition

• Coordinated and Documentedpartnership between WarfightingCustomer, Technology Developerand Acquisition Buyer

• Proposed by Technologists andTacticians

• Approved by GO/SES– HQ TRADOC Combat Developer– HQDA Chief Scientist– HQDA, G8 Force Development– PEO/PM

ATD Management Plan

Commitments to Transition needed Technology as Fast as Possible

Page 21: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

21

Measuring Technology Maturity

Technology Readiness Levels

Actual system “flight proven” through successfulmission operations

Actual system completed and “flight qualified” throughtest and demonstration

System prototype demonstration in a operationalenvironment

System/subsystem model or prototype demonstrationin a relevant environment

Component and/or breadboard validation in relevantenvironment

Component and/or breadboard validation in laboratoryenvironment

Analytical and experimental critical function and/orcharacteristic proof-of-concept

Technology concept and/or application formulated

Basic principles observed and reported

System Test, Launch& Operations

System/SubsystemDevelopment

TechnologyDemonstration

TechnologyDevelopment

Research to ProveFeasibility

Basic TechnologyResearch

TRL 9

TRL 8

TRL 7

TRL 6

TRL 5

TRL 4

TRL 3

TRL 2

TRL 1

As Defined in 5000.2-R

Page 22: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

22

TRL=6ProgrammedManeuverNLOSMETRIC:• Smart Cargo-10to 20m CEPto Max Range - Ambient Temp

functionality

TRL=4SeekerAcquisition Demo

METRICS:• Pacq/Enc to 8km viaTERM CFT Demo

TRL=4 ETC Propellant Demo

METRICS:Sub-scale firings of AdvPropellant (Gen II)Model to validate launchvelocity.Full Scale Firing WithJA2.

TRL=4Recoil MitigationDemoMETRICS:• 40% reducedrecoil forcew/Fire-out-of-battery modifiedM35 cannonw/ETC ignition

TRL=5Seeker/G&C High-gDemoMETRIC:• MP-ERM: 18k g’sair gun test• Cargo: 20k g’s airgun test

FCS Multi-Role Armament & Ammunition ATD(III.WP.1999.01 )

FY01 FY02 FY03 FY04 FY05 FY06 FY07

TRL=5Multi-ModeWHDMETRIC:• Shaped ChargeL/D=1 (vs 1.7)• EFP 25%increase in armorpenetration

TRL=6Multi-ModeWHD

METRIC:•Warhead demoof 3 lethalitymodes

TRL=6BLOSProgramedManeuver (G&C)

METRIC:• Maneuvercapability

TRL=6In Flight UpdateNLOS

METRIC:• Pacq/Enc viaInteg ProjectileGuide to Hit gunlaunch to MaxRange

TRL=6+IntegratedArmament Demoon VehicleMETRICS:• < 85K lbs forceon surrogatevehicle• < 3000lb cannon

TRL=4+Recoil MitigationVariable FIBModelingMETRICS:• Manage 6659Lb-Sec Impulse•Trunnion Force <100k Lbs

TRL=6Turret onHardstand DemoMETRICS:Slew Rate/400mpsGun Elevation –10, + 55 degreesAutoloader FeedRate of 15 rpm

TRL=6ETC IntegratedDemo Over TempRangeMETRICS:Fire Full ScaleCase TelescopedAmmo

TRL=6BLOS Seeker/G&CMETRIC:• Pacq/Enc via IntegProjectile Guide toHit gun launch to10km

TRL=5RecoilMitigationDemoMETRICS:• < 90K lbsforce hardstandfiring of KEslugs•3500lb cannon

TRL=5ETC PropulsionDemo

METRICS:Fire Full ScaleCaseTelescopedAmmo

Page 23: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

23

In FY03 President’s Budget Request New ProgramQuick Reaction Special Projects – 3 Projects

•Defense Acquisition Challenge ProgramProvides opportunities for inserting innovative and cost-saving technology intoacquisition programsFunds used only for review and evaluation of proposals, not implementation

• Quick Reaction FundProvides flexibility to respond to emergent DoD needs within budget cycleTakes advantage of technology breakthroughs in rapidly evolving technologiesCompletion of projects within a 6-12 month period

• Technology Transition InitiativeEstablishes a Technology Transition CouncilJump starts selected components/subsystems into systems

SPEED OF TECHNOLOGY CHANGE

Page 24: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

24

Summary

• Tech Transition is critical to maintaining capability edge• Need Reaffirmed at Highest Levels• DoD Implementing New Projects and Processes to Effect Transition• Effective Tech Transition remains a Contact Sport

Page 25: Transitioning Science & Technology ProgramsEngineering and Manufacturing Development, ... Solution Sets Demo Demo Increment 1 Demo Demo Demo ... • Target materials • Phase I, II,

25

Continuum of Tech Transition

Quick Reaction Projects

ATDs and ACTDs

Formal Acquisition Programs

Technology Transition Opportunities

Challenge Program

•Thermobaric weapon•Thermobaric Hellfire•Anthrax Kill Curve

•Predator•Blue Force Tracking

•JSF•FCS

6 mos 1 yr 3 yrs 5 yrs

Technology Transition Initiative

Co

mp

lexi

ty o

f E

ffo

rtComplementary Approaches to Meet Warfighter Needs