TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR EVACUATION OFPOWER FROM THE GENERATION PROJECTS 2018-19
31-December-2018
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Adhunik Power TPP (Mahadev Prasad TPP) (2x270 MW), PS,Jhk, APCL.U1-11/12(C),U2-3/13 (C)
Commissioned. 7/12ADHUNIK JUL-12D/C1 1400 1Adhunik - Jamshedupur (PG)(Padampur)
JUL-12
Remark:
Agartala (AGTP) (4x21 MW), PS NEEPCO, Tripura,ST-I, 08/16 (C),ST-2,3/15(C)
TSECL S/C1 132AGTP - Kumarghat line
TSECL D/C2 132AGTP - Agartala line
Remark: Agrartala Gas Turbine Combinedd Cycle Extension Plant Stg-1 (25.5MW) commissioned on 23.08.2015.
Akaltara(Naiyara) TPP (6x600 MW), Chg, KSK, U1-8/13(c),U2-8/14(c),U3-12/17,U4-3/18,U5-9/18,U6-12/18
Commissioned 04/15. (Interim)118 APR-152xD/C1 11811871400 71LILO of both ckt, of Raigarh -Raipur at Akaltara TPP
APR-15
Ready for Commissioning 06/15.164 JUN-152xD/C2 164164105400 105KSK Mahanadi (Warda Power) -Champa Pooling Station
JUN-15
Remark:
Alaknanda HEP (6x50 MW), PS, UK, Badrinath, Project dropped
GMR D/C1 220Alaknanda HEP - Joshimath
Remark: Generation project has been dropped.
Amravati, TPS,(5x270+5x270), Phase-II-uncertain
Commissioned 10/12.IBPL 22 OCT-12D/C1 222214400 14LILO of Koradi -Akola atAmravati
OCT-12
Commissioned 03/15.IBPL 279 MAR-15D/C2 279279207400 207Amravati - Akola (Bableshwar) -I
MAR-15
Remark:
Anpara C (2X600 MW),PS,UP,LANCO,U1&2-11/11(C)
Commissioned 3/12.UPPTCL 6 MAR-12S/C1 661765 1Shifting of Anpara B-Unnaotermination point from Anpara Bto Anpara C sw. yard.
MAR-12
Work completed. 6/10.LEPP JUN-10D/C2 400Extn. of Bus from Anpara B toAnpara C.
JUN-10
Line charged at 400 kV Oct'11UPPTCL 3 OCT-11S/C3 331765 1Shiffting of 765 kV Anpara-Unnao at Unnao
OCT-11
Commissioned 3/12.UPPTCL 100 MAR-124 1001001000765/400 100Unnao MAR-12
Remark:
Anpara-D TPP (2x500 MW),SS,UP,UPRVUNL, U6-6/15 (C),U7-3/16 (C)
Physical verification of stores completed.Necessary help from districtadministration/ local police authorities isbeing provided to the new working agency.Matter being constantly pursued.
UPPTCL 1198 MAR-19S/C1 JAN-1211111225416765 346Anpara D - Unnao
TL: Total Location 50Page 1 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 03/16.UPPTCL 23 MAR-16D/C2 23235400 5Anpara B-Anpara D (Ckt-I) MAR-16
Commissioned 06/14.UPPTCL 11 JUN-14S/C3 JAN-1211113765 3Anpara C - Anpara D JUN-14
Commissioned 06/14.UPPTCL 100 JUN-144 1001001000765/400 100Anpara D. S/S JUN-14
Remark:
Anuppur TPP Ph-I, (2x600 MW),PS,MP,Moser Baer Power MP, U1-4/15 (C),U2-2/15 (C)
Commissioned 11/12.MPPTCL 18 NOV-12D/C1 181816220 16LILO of Amarkantak - Korba atAnooppur
NOV-12
Commissioned in Dec'13.PGCIL 45 DEC-13D/C2 454531400 31Jabalpur Pooling Station -Jabalpur (High Capacity) line
DEC-13
Commissioned 08/14.PGCIL 600 AUG-14D/C3 600600492400 492Anuppur (Moser Baer) - JabalpurPooling Station
AUG-14
Remark:
Avantha Bhandar TPS, (2x600 MW), PS,Chhattisgarh,Korba West Power Comany Limited U1-3/14(C),
Interim arrangement.KWPCL 22 DEC-13D/C1 222210400 10LILO of on Ckt of Raigarh -Raipur at Avantha Bhandar(Korba west ) TPS
Commissioned 05/2016 (Late Reported)KWPCL 64 DEC-16D/C2 646437400 37Avantha Bhandar TPS (KorbaWest) - Raigarh (Kotra)
DEC-16
Remark:
Avantha (Jhabua Power) (2x600 MW), PS,Seoni,MP, BHEL, U1-03/14 (C)
Commissioned 05/15.JHAPL 207 MAY-15D/C1 207207131400 131Jhabua Power TPS - JabalpurPooling Station.
MAY-15
Remark:
Babandh - (Dhenkanal) TPS , (2x660 MW), PS Orissa, Lanco Infratech U1-7/18,U2-1/19
Work yet to start.LEPP 0 DEC-16D/C1 07248400 0Babandh TPP - Angul PoolingStation
Remark:
Baghliar-II HEP (3x150MW) SS,J&K, JKPDC, U1-9/15 (C),U2-9/15(C),U3- 10/15 (C)
Ready for Commissioning 05/18.JKPDD 16 MAY-18D/C1 16168400 8LILO of one ckt. of Kishanpur -New wanpoh at Baglihar HEP
MAY-18
Remark:
Bajoli Holi HEP(3x60=180 MW), HP, GMR-BHHPPL, U1,2-06/19
Work in ProgressHPPTCL 0 JUN-19D/C1 OCT-1606136220Bajoli Holi HEP - Lahal GISS
Work in ProgressHPPTCL 0 APR-19D/C2 OCT-180070400Lahal-Chamera
HPPTCL 35 JUL-193 JAN-1845100630400/220 10Lahal S/S
Remark:
Balco TPS PS,Chg,Sterlite,U1-6/15 (C),U2-3/16 (C),U3-2/14,(4x300 MW, 4x67.5 (CPP) ) 4x67.5 (C)
Commissioned 06/2016 (Late Reported).BALCO 72 DEC-16D/C1 707246400 46Balco - Dharamjaygar PoolingStation
DEC-16
commissioned 3/12 (Interim)BALCO JUN-12D/C2 35400 35LILO of one ckt of Korba -Birsinghpur at Balco
MAR-12
Remark:
Bandakhar TPP, (300 MW), PS,Chg, MCC&PL, U1-6/15 (C)
TL: Total Location 50Page 2 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 06/14.MCCPL 14 JUN-14D/C1 14146400 6LILO of ACBIL-Baraari (Bilaspur)PS at Bandakhar (Maruti CleanCoal)
JUN-14
Remark:
Banswara and Pratpgarh Wind Project
Commissioned 06/2017.RVPNL 421 JUL-17D/C1 421421181220 181Nimbahera - Pratapgarh (Part ofPratapgarh -Chittorgarh line)
JUN-17
Commissioned 06/2017.RVPNL 100 JUN-172 10010060220/132 100Pratapgarh (Upgradation)(160-100)
JUN-17
Remark:
Banswara Super Critical TPS (2x660 MW), SS,Raj, U1 & U2 -2016/2017
Commissioned 11/14.RVPNL 100 NOV-141 100100315400/220 100Chitorgarh S/S NOV-14
Commissioned 10/18.RVPNL 100 OCT-182 100100315400/220 100Jodhpur s/s (New) OCT-18
Remark:
Baradarha TPP (2x600 MW), PS,D.B.P.C.L, Dist.. Jangir Champa ,Chhattisgarh,U1-8/13, U2-2/14
Commissioned 08/14.DBPCL 54 AUG-14D/C1 545436400 36DB Power (Baradarha) - Raigarh(Kotra) Pooling Station
AUG-14
Line completed. (Interim)DBPCL 44 MAY-13D/C2 444430400 30LILO of Raigarh - Raipur (3rdCkt) at Baradhara TPP ( Interimarrangement)
Remark:
Bara TPP (3x660MW),PS,UP,PPGCL,U1-12/15(C),U2-9/16(C),U3-9/15 (C)
Ready for commissioning 12/2016SEUPPTC 899 DEC-16S/C1 899899377765 377Mainpuri - Bara Ckt-II DEC-16
Ckt-I commissioned 12/2016 and Ckt-IIReady for commissioning 12/2016
SEUPPTC 219 DEC-16D/C2 219219186400 186Mainpuri - Aligarh DEC-16
Ready for commissioning 12/2016SEUPPTC 135 DEC-172xD/C3 13513593400 93LILO of Orai - Mainpuri line atMainpuri
DEC-16
Commissioned 03/15.UPPTCL 2 MAR-15D/C4 221400 1LILO of Panki - Obra at RewaRoad
MAR-15
The project is at stand still pending of atime extension requested to UPPTCL inJune 2015
SEUPPTC 613 JUN-17S/C5 346889375765 0Mainpuri - Bara Ckt-I
Karchana gantry not finalised. The projectis at stand still pending of a time extensionrequested to UPPTCL in June 2015
SEUPPTC 0 JUN-16D/C6 012480400 0Bara - Karchana
Remark: Unit - II (660MW) commissioned on 06.09.2016.
Barauni TPS Extn (2x250, Bihar, BSPGCL,U8-12/17,U9-3/18(C)
Commissioned 06/18.BSPTCL 403 JUN-18D/C1 JUN-16403403214220 214Barauni TPS Exte. - Hazipur JUN-18
Commissioned 10/2017 (Late Reported).BSPTCL 9 DEC-17D/C2 994220 4LILO of Both ckt. of Biharsharif -Begusarai at BTPS Extn.
DEC-17
yet to be commissionedBSPTCL 90 APR-183 90100300220/132 90Barauni (TPS ) (ICT)
Remark:
Barh STPP -Stage-I (3x660 MW), Stage-2 (2x660 MW), CS, Bihar, U4,5-11/13(C),U1-3/18,U2-09/18,U3-3/19
Commissioned 05/15.PGCIL 944 MAY-15D/C1 AUG-14944944698400 698Barh-II - Gorakhpur MAY-15
TL: Total Location 50Page 3 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 06/10.PGCIL 645 JUN-10D/C2 SEP-09645645488400 488Barh-Balia (Quad) JUN-10
Commissioned 6/12PGCIL 100 JUN-123 1001001250500 100Balia & Bhiwadi convertor Stn.(Pole-II)
JUN-12
Remark:
Barkhera TPP (2x45 MW), PS,UP, Bajaj,
Line energised on 13.09.2017.UPPTCL 203D/C1 203203132 129Barkhera (Bajaj) - Dohna
Remark:
Bela TPP (1x270 MW),PS,Maha,IEPL,U1-3/13(C)
Completed (Interim)IEPL 2 NOV-12D/C1 220400 0LILO of Mouda - Wardha at Bela
Commissioned 12/15. (Only LILO Portion2x24.3 Ckm has been taken).
MSETCL 75 DEC-15D/C2 757549400 49LILO of Koradi II- Wardh(PG) atBela TPP
DEC-15
Remark:
Bellary TPP (3X500 MW),SS,KAR,KPCL,U1-12/07(C),U2-6/14,U3-3/16 (C)
Commissioned 6/08KPTCL 3 JUN-08D/C1 332400 2LILO of RTPS - Guttur at BTPS. JUN-08
Commissioned 3/12KPTCL 440 MAR-12D/C2 DEC-08440440313400 313BTPS- Hiriyur MAR-12
Remark:
Bhadradri TPP (Manuguru) (4x270 MW),TSGENCO, U1-12/17,U2-2/18,U3-5/18,U4-8/18
Commissioned 12/2017(Late Reported)TSTRANS 306 OCT-17D/C1 MAR-17306306219400 219Julurupadu (QM) - Suryapet S/s JAN-18
Work completed on 28.10.2018 .TSTRANS 313 OCT-17D/C2 MAR-17313313222400 225Julurupadu SS - Manuguru TPP
TSTRANS3 0400400kV Suryapet Bay Extensions
Commissioned 07/18.TSTRANS 100 AUG-184 100100630400/220 100Julurupadu S/S JUL-18
Remark:
Bhasmey HEP (2x25.5 MW),PS,Sikkim,Gati Infra,U1,2&3-3/19
Work yet to be awarded.GISL MAY-182xS/C1 10220LILO of one circuit of Chujachen- Rangpo line at Bhasmay
Remark: Generation Projects stopped since Dec-16
Bhavanagar Padva (2x250MW),SS,Guj,BHEL,U1-6/16,U2-9/16
Commissioned 06/13.GETCO 97 JUN-13D/C1 979756220 56LILO of Savarkundla - Vartej atBECL (Padva)
JUN-13
Commissioned 03/14.GETCO 139 MAR-14D/C2 13913983220 83BECL (Padva)- Sagapara line MAR-14
Tender on website and last date is10.12.2018. (Risk & cost for Balance work).
GETCO 182 MAR-19D/C3 142292188220 34BECL (Padva) - Botad line
Remark:
Bhavanapaddu TPP, (2x660MW),PS, AP,East cost Energy, U1-12/17,U2-05/18
XYZ D/C1 44400Bhavanapaddu TPP - Srikakulam(PS)
Remark:
Bhawani Barrage HEP -II & III (4x15 MW), SS,TN, TANGEDCO, BB-II (U1-8/13 (C ),U2-9/13(C), BB-III (U1-12/12 (C),U2-9/13(C)
Energised on 23.08.12.TANTRAN 30 AUG-12D/C1 303015110 15BKB-II - Common Point line AUG-12
TL: Total Location 50Page 4 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 09/13.TANTRAN 12 SEP-13D/C2 12124110 4LILO of Mettupalayam -Irumborai line at BKB-II
SEP-12
Energised on 06/11TANTRAN 10 JUN-11D/C3 10105110 5LILO of BKB-I - SP Budur at BKB-II line
JUN-11
Energised on 13.08.12.TANTRAN 36 AUG-12S/C4 363610110 10BKB-III Common point - Nallurline
AUG-12
Energised on 13.08.12.TANTRAN 13 AUG-12D/C5 13136110 6BKB-III - Common point line. AUG-12
Energised 6/12TANTRAN 69 JUN-12S/C6 696922110 22BKB-III Common point - BKB-IIline
JUN-12
Energised on 23.08.12.TANTRAN 40 AUG-12S/C7 40409110 9BKB-II Common point -Thirucengode line
AUG-12
Energised on 23.08.12.TANTRAN 7 AUG-12S/C8 772110 2BKB-II Common point -Pallipalayam line
AUG-12
Remark:
Bhusaval TPS (2x500 MW),SS,MAHA,MSPGCL,U4-3/12 (C),U5-3/12 (C)
Commissioned 12/11.MSTRANS 283 DEC-11D/C1 283283185400 185Bhusaval - II - Aurangabad DEC-11
Commissioed 11/11MSETCL 331 NOV-11D/C2 331331197220 197Bhusaval - II - Amalner NOV-11
Commissioned 4/10.MSETCL 26 APR-10D/C3 DEC-09262615400 15Bhusaval - II - existing Khadka APR-10
Commissioned 8/11.MSETCL 100 AUG-114 100100500400/220 100Bhusaval (ICT-I) S/S AUG-11
Commissioned 9/11.MSETCL 100 SEP-115 100100500400/220 100Bhusaval (ICT -II) S/S SEP-11
Remark:
Bijora Ghanmukh TPP (2x300MW), Maharashtra ,JPGPL, Uncertain
Not in STU Plan.MSETCL 0D/C1 000400JPGPL TPS Switchyard - WaroraPS (JPGPL-TBCB)
Remark:
Bina TPS (2x250 MW),PS,MP,Bina power,U1-8/12(C),U2-3/13(c )
Commissioned 01/15.JV(PG&JP JAN-15D/C1 40400 40Bina TPS - Suitable location(along Bina (PG) - Bina(MPPTCL)
JAN-15
Commissioned.JV(PG&JP JAN-15D/C2 400Termination of Ckt of above atBina (PG) & otuer ckt at Bina(MPTCL)
JAN-15
Remark:
Binjkote TPP (4x300 MW),PS,Chg,SKS Power, U1-4/17(c),U2-3/18(c), U3,4-unknown
Commissioned 05/15.SKS 93 MAY-15D/C1 939355400 55Binjkote - Raigarh (Kotra)Pooling Station
MAY-15
Remark:
Bokaro TPS
Commissioned 12/14.PGCIL 276 DEC-14D/C1 AUG-12276276200400 200Bokaro TPS Extn.- Koderma TPS DEC-14
Remark:
Bongaigaon TPS (3x250 MW),CS, Assam, NTPC, U1-6/15 (C),U2-3/17(C),U3-12/17
TL: Total Location 50Page 5 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
1. All normal Foundations have beencompleted, 2.Two (2) nos. of TowerErection are remaining on completed PileFoundation. 3. 186.445 ckm of line are idlecharged.
AEGCL 517 DEC-18D/C1 JAN-13515517326220 279Bongaigaon TPS - Rangia(Salakati)
Kokrajhar to Bilashipara charged on24.06.16 and Bilashipara to Gauripurcharged on 14.06.2016
AEGCL 203 JUN-16S/C onD/C
2 SEP-1320320363132 63Kokrajhar - Bilashipara -Gauripur
Line charged on 30.06.2016AEGCL 39 JAN-16S/C onD/C
3 DEC-13393910132 10BTPS - Kokrajhar line
commissioned 9/14AEGCL 195 SEP-14S/C4 19519565220 65BTPS-Agia-Sarusajai (2ndCircuit, Balance portion)
SEP-14
Commissioned 12/12.PGCIL 11 DEC-12D/C5 11116400 6Bongaigaon TPS - Bongaigaon DEC-12
Remark:
Budhil HEP (2x35 MW), PS, H.P., LANCO Green, U1-5/12(C),U2-5/12.(C)
Commissioned 3/12LEPP 62 MAR-12S/C onD/C
1 626240220 40Budhil -Chamera III MAR-12
Remark:
Butibori (2x300 MW) TPS Phase -II,PS,Maha,RPL,U1-8/12(C),U2-11/12
Commissioned 12/11.MSETCL DEC-11D/C1 1220 1Buttibori TPS -Buttibori-III DEC-11
Commissioned on 26.03.2013MSETCL 90 MAR-132 100100100220/132 90butibori III MAR-13
Remark:
Chamera-II HEP,CS,HP,
Commissioned 3/11.PGCIL 3 MAR-11S/C1 APR-10331400 1Chamera-II HEP (Part-I)-Chamera Pooling Station
MAR-11
Remark:
Chamera-III HEP (3x77 MW), CS,H.P.,NHPC, U1-6/12,( C) U2-6/12(C), U3-6/12 (C )
Commissioned 8/11PGCIL 46 AUG-11D/C1 464630220 30Chamera-III - Pooling StationNear Chamera-II HEP
AUG-11
Commissioned 03/13.PGCIL 444 MAR-13D/C2 444444324400 324Chamera-II HEP - Jullandur line MAR-13
Commisiioned 8/11.PGCIL 100 AUG-113 100100630400/220 100GIS Pooling Station nearChamera-II HEP
AUG-11
Remark:
Chandrapur TPS, (2x500 MW), SS, Maha, MSPGCL, U1 to 7 (C) U8-3/15 (C), U9-3/16 (C)
Commissioned 06/13.MSETCL 138 JUN-13D/C1 13713891400 91Chandrapur-II - Warora JUN-13
Commissioned 4/13.MSETCL 11 SEP-13D/C2 11113400 3LILO of Chandrapur - Parli atChandrapur II
APR-13
Commissioned 03/14.MSETCL 11 MAR-14S/C3 11114400 4Chandrapur switching Stn. -Chandrapur II S/S
MAR-14
Commissioned 01/13.MSETCL 223 JAN-13S/C4 22322376400 76Warora-Wardha(2nd Ckt) JAN-13
TL: Total Location 50Page 6 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Priority Bay 410, 426, 408 (Tie Bay) and409 ,411, 412, 428, 429, 404, 405commissioned from 30.12.2013 to13.3.2014. In 400KV Switchyard- erectionof ICT-2 is balance. ICT-I (500 MVA)commissioned on 31-03-2018.
MSETCL 97 AUG-175 96100500400/220 85Chandrapur-II (Addl.) MAR-18
Remark:
Chango Yangthang (140 MW), PS, Spiti,HP, MPCL, Project dropped
MPCL D/C1 220Chango Yangthang - Ka DogriPooling Station
MPCL D/C2 400Ka Dogri - Jangi Pooling Station
Remark: Project has been dropped from generation program.
Chanju-I HEP (3x12 MW) on Ravi river, SS HPPTCL, IA Energy, U1,2-2/17(C), U3-9/17
Completed.HPPTCL 1D/C1 111132 1LILO of one ckt Kurthala - Bathriat Nakrot Pooling Station
MAR-17
commissioned.HPPTCL 29 MAY-16D/C2 273012132 10Chanju - Nakrot line
Remark:
Chhabra TPP Extn. (2x250 MW) SS,Raj, RRVUNL, U3-9/13(C),U4-6/14 (C)
Commissioned 4/10RVPNL 803 APR-10S/C1 803803342400 342Chhabra TPS -Hindaun APR-10
Commissioned 8/11.RVPNL 329 AUG-11S/C2 329329101220 101Chhabra TPS - Jhalawar AUG-11
Remark:
Chhabra TPS-II(2x660),SS,RRVUNL,Rajasthan, U5-4/17(c),U6-12/18
Commissioned 01/15.RVPNL 244 JAN-15D/C1 244244179400 179Chhabra TPS - Anta (Baran) JAN-15
Remark:
Chitrangi TPP Ph-I (6x660 MW), Ph-II (3x660 MW),SS,MP,Ph-I,U1-9/13,U2-12/13,U3-3/14,U4-6/14,U5-9/14,U6-12/14, Ph-II,U1-3/15,U2-6/15,U3-9/19
XYZ D/C1 765Chitrangi TPS - VindhyachalPooling Station
Remark:
Chujachen HEP (2x49.5 MW)PS,Sikkim,GIL,U1-4/13(C),U2-4/13 (C).
Line commissioned.GISL D/C1 132Chujachen HEP - Rangpo PS MAR-17
Commissioned 04/13. (Interimarrangement)
GISL 91 APR-13D/C2 919147132 47LILO of Melli - Gantok atChuzachen (LILO point atnamthang)
MAR-17
Remark:
Chutak-HEP (4x11 MW), CS, J&K, NHPC, U1-11/12( C), U2- 11/12( C), U3- 11/12(C), U4-1/13(C)
Commissioned.JKPDD 124 SEP-14S/C1 1241242866 28Mulbek-II - Kargil -I MAR-17
Commissioned.JKPDD 29 SEP-12S/C2 2929566 5Chutak HEP-Gramthong -II MAR-17
Commissioned.JKPDD 55 OCT-12S/C3 55551066 10Chutak HEP-Kargil-I MAR-17
Commissioned.JKPDD 154 SEP-14S/C4 1541542766 27Gramthong -II - Sankoo MAR-17
CommissionedJKPDD 117 SEP-14S/C5 1171172366 23Khangral - Mulbek -II MAR-17
Commissioned.JKPDD 100 SEP-146 1001006066/11 100Sankoo S/S
TL: Total Location 50Page 7 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned.JKPDD 100 SEP-147 1001006066/11 100Khangral (Bodhkharbu)
Commissioned.JKPDD 100 SEP-128 1001006066/11 100Kargil S/S
Commissioned.JKPDD 100 SEP-129 1001006066/11 100Gramthong S/S
Commissioned.JKPDD 100 SEP-1510 1001006066/11 100Mulbeck
Remark:
Common System Associated with Costal Energen Private Ltd and Ind-Barath Power Ltd. (LTOA) Gen. Proj. in Tuticorin area Part - B..
Ready for commissioning 08/15.PGCIL 165 AUG-15D/C1 SEP-14165165120400 120Salem Pooling Station - Salem AUG-15
Commissioned 10/18.PGCIL 644 OCT-18S/C2 SEP-14644644243765 243Salem PS - Madhugiri PS line OCT-18
Commissioned 11/2016.PGCIL 1000 NOV-16D/C3 SEP-1410001000731765 731Tuticorin Pooling Station -Salem Pooling Station
NOV-16
Remark:
Cosmos Sponge TPS, (1x350 MW), PS,Chh,CSPL,U1-6/13
XYZ D/C1 400CSPL TPS - Raigarh PoolingStation (Near Kotra)
Remark:
Cuddalore TPP (2x600 MW), PVT, IL&FS, SS, Tamil Nadu, U1-9/15 (C) U2-05/16
Commissioned 01/15. (Late reported.)ITPCL 138 JAN-15D/C1 13813895400 95Cuddalore - Naggapattinam AUG-16
Remark:
Dada Dhuni wale TPP, Khandwa (2x800 MW) SS,MP, U1-7/15,1U2-12/16
MPPTCL D/C1 80400Dada Dhuniwale TPP - MoondiPooling Point
Work under progress.MPPTCL 1002 MAR-1983100630400/220 67Badnawar (2x315)
MPPTCL 03 00630400/220 0Handia S/S
Remark:
Dahanu Solar (40 MW), PS,Tehsil Pokaran, Distt, Jaisalmer,Raj,M/s Dahanu Solar Power Pvt. Ltd.
RVPNL 0D/C1 00132 0Dahanu - Degchu GSS
Remark:
Damaracherla TPP (2*600+4*800), TSGenco, Telangana
TSTRANS D/C1 SEP-18310400Damaracherla TPP - Jangaon
TSTRANS D/C2 SEP-18310400Damaracherla TPP -Maheswaram (TS)
TSTRANS D/C3 SEP-18300400Damacherla TPP - Choutuppal
TSTRANS D/C4 SEP-18280400Damacherla TPP - Dindi
Remark:
Damodaram Sanjeevaiah(Krishnapatnam) TPP, (2x800MW) SS,AP, APPDCL, U1-9/14 (C), U2-3/15 (C)
Commissioned 02/15.APTRANS 281 FEB-15D/C1 281281196400 196Bonapally - Chittoor (Quad) FEB-15
Commissioned 07/15.APTRANS JUL-15D/C2 180400 180Krishnapatnam TPS- Chittoor(Balance)
JUL-15
Commissioned 11/12.APTRANS 112 NOV-12D/C3 11211272400 72Krishnapatnam TPS - Nellore. NOV-12
TL: Total Location 50Page 8 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:
Darlipalli TPS(2x800), Odissa, NTPC, U1-02/18, U2-08/18
Ready for Commissioning 04/2017PGCIL 61 APR-17D/C1 616141765 41Darlipalli TPS - Jharsuguda(Sundergarh) PS line
APR-17
Remark:
Derang TPP (2x600MW) PS, Orissa, JIPL, U1-5/14 (C), U2-1/15 (C)
Commissioned 08/14.JPL 231 AUG-14MC+D/C
1 231231154400 154Derang - Angul Pooling Station AUG-14
Remark:
DGEN TPS (3x400MW), Torrent Power Ltd, Gujarat
TOR. D/C1 400DGEN TPS - Bharuch/DahejPooling Station
Work awarded to M/s Instalaciones.Inabemsa. Spian on May 2014. Routechanged after survey observations.
TOR. D/C2 220Navseri - Bhasten (DGEN TL -TBCB)
Work awarded to M/s Instalaciones.Inabemsa. Spian on May 2014. Routechanged after survey observations.
TOR. D/C3 400DGEN - Vadodara (DGEN TL -TBCB)
TOR. 04 001500765/400 0Bharuch/Dahej
Remark:
Dhariwal TPS (2x300 MW), PS, Maharashtra, DIPL, U1-11/13(C),U2-5/14 (C)
Commissioned 08/14.DIPL 51 AUG-14D/C1 515131400 31LILO of one ckt of Bhadravati(PG) - Parli at Dhariwal
AUG-14
Commissioned 09/13.DIPL 29 SEP-13S/C2 292910400 10Dhariwal TPS -Channdrapur II(1st Ckt)
SEP-13
Remark:
Dharmpura TPP (4x300 MW), Jain Energy, P.S,
JAIN ETL MAR-17D/C1 400Jain Energy TPS -Dharamjaygarh Korba Poolingstation
Remark:
Dikchu HEP (2x48MW)PS,Sikkim,SKPPL,U1,U2-4/17(C)
PGCONSU JUN-19D/C1 DEC-1846220(Sikkim) Dikchu Pool - Singhik
Yet to awardSIKKIM 0D/C2 00132Dikchu HEP - Dikchu Pool
Completed.SIKKIM 2 FEB-17D/C3 1221400 1LILO of Teesta III - Rangpo 400kv line at Dikchu (Interimconnectivity)
PGCONSU MAR-19D/C4 DEC-189642132(Sikkim) Dikchu Pool - Parbingline
PGCONSU SEP-18D/C5 DEC-1850220(Sikkim) Dikchu Pool - Rangpo(Samardong) (twin)
PGCONSU 0 MAY-196 DEC-180100132/33/11 0(Sikkim) Dikchu pool (new) S/S
Remark:
Durgapur (DPL) Extn. (250 MW), SS,WB, U8-3/14 (C)
TL: Total Location 50Page 9 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Existing line.DPL D/C1 400DPL - Bidhan nagar MAR-12
Remark:
Durgapur TPS (2x500 MW),CS,WB,DVC,U1-7/11(C),U2-3/1 (C)
Commissioned 4/12.PGCIL 469 APR-12D/C1 451519276400 276Durgapur-Jamshedpur (PartLine)
APR-12
Commissioned 07/13.DVC 208 JUL-13D/C2 MAY-10208208138400 138Durgapur STPS - Raghunathpur JUL-13
Commissioned 3/11.DVC 14 MAR-11D/C3 MAY-0914147400 7LILO of Durgapur-Jamshedpur(PG) at Durgapur STPS
JAN-11
Remark:
Dwarkesh Energy Ltd TPP (2x660 MW) PS, Khandwa, MP,
XYZ D/C1 765Dwarkesh Energy TPP - Indore
Remark:
EMCO Warora TPP (2x300 MW), PS,Maha,GMR, U1-2/13 (C),U2-8/13(C)
Commissioned 01/13.GMR 96 JAN-13D/C1 969680400 80EMCO - Bhadrawathi (PG) JAN-13
Remark:
Ennore TPP, Ennore Exp, N Chennai-III(2X660, 660, 800),TG,TANGENDCO,U1-3/20,U2-4/19;U1-9/21;U1-9/18
Work awarded to Transrail on 13.08.18.Check Survey in Progress. Excavation onenumber under progress.
TANTRAN 0 MAR-19D/C1 SEP-18010824400ETPS exp. - North ChennaiPooling Station
Work awarded to Transrail on 13.08.18 and2 loc excavation is under progress. one locconcrete under process.. Check Survey inProgress. Excavation one number underprogress.
TANTRAN 0 MAR-19D/C2 SEP-18010824400 0Ennore SEZ - North ChennaiPooling Station
Work awarded to Transrail on 13.08.18 2loc excavation is under progress. One locconcrete under process. Check Survey inProgress. Excavation one number underprogress.
TANTRAN 0D/C3 APR-19010824400ETPS exp.- Ennore SEZ
Work awarded and under progress. Sitegrading under progress. Piling forcompound wall and retaining wall isprogress. Casting of pile for 765 KV GISbuilding in progress.
TANTRAN 20 MAR-204 SEP-18003000765/400 0North Chennai PS (GIS)
Remark:
Gadarwara STPS-I (2x800 MW), NTPC, U1-1/18,U2-07/18
Commissioned 05/17.PGCIL 271 MAY-17D/C1 NOV-17271271187765 187Gadarwara - Jabalpor Pool line(Balance Portion from LILO ofSeoni - Bina to Jabalpur) (PWTL-TBCB)
MAY-17
commissioned 11/2016 (Late Reported)PGCIL 43 JAN-17D/C2 434316765 16LILO of existing Seoni-Bina atGadarwara STPP
JAN-17
Ready for Commissioning 06/18.PGCIL 837 JUN-18D/C3 NOV-17837837627765 616Gadarwara - Warora PS (PWTL-TBCB)
JUN-18
Commissioned 05/18.PGCIL 269 MAY-18D/C4 NOV-17269269196400 196LILO of Wardha - Parli at WaroraPS (PWTL-TBCB)
MAY-18
TL: Total Location 50Page 10 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 06/18.PGCIL 100 JUN-185 NOV-171001003000765/400 100Warora PS (PWTL-TBCB) JUN-18
Remark: SPV/BPC - Powergrid Warora Transmission Ltd / REC
Gadarwara STPS-II (2x800 MW), NTPC (Part-B) (TBCB)
Commissioned 04/18.PGCIL 311 APR-18D/C1 JAN-18311311236765 236Parli - Solapur (PPTL - TBCB) APR-18
Ready for Commissioning 2/11.PGCIL 15 FEB-11D/C2 JUL-10151510400 10Parli (MSETCL) - Parli (PG) FEB-11
Commissioned 06/18.PGCIL 920 JUN-18D/C3 JAN-18920920694765 694Warora PS - Parli (PPTL-TBCB) JUN-18
Commissioned 04/18.PGCIL 100 APR-184 JAN-181001003000765/400 100Parli (New) S/s (PPTL -TBCB) APR-18
Remark: SPV/BPC - Powergrid Parli Transmission Ltd / REC
GAMA CCPP (225 MW), M/s GAMA Infraprojects Ltd., UK, Module-1:4/16(C)
XYZ D/C1 3220LILO of Mahuakheraganj-Kashipur line at GAMA CCPP
Remark:
GEPL Ph -1 (2x60 MW ), U1-60 MW,9/12 (C) & Ph-2 (2x270 MW) TPS,PS,Maha,GEPL,U2-4/12(C)
Commissioned 9/14GEPL SEP-14D/C1 20220 20GEPL -MIDC S/S SEP-14
GEPL D/C2 400LILO of one ckt of Bhadrawati -Parli at GEPL TPS
Remark:
Ghazipur (2x660 MW), PS, UP, BEL Spun,
Commissioned 09/14.UPPTCL 186 SEP-14S/C1 FEB-1118618659220 59Ghazipur - Rasra SEP-14
Remark:
Goindwal Sahib (2x270MW), PS,Punjab,GVK, U1-2/16(C),U2-3/16 (C)
Ready for Commissioning 12/15.PSTCL 92 DEC-15D/C1 929255220 55Goindwal Sahib - Chola Sahib DEC-15
Ready for Commissioning 09/18(Commissioning held up due to treecutting).
PSTCL 203 SEP-18D/C2 203203129220 129Goindwal Sahib - Bottianwala SEP-18
Commissioned 8/12PSTCL 60 AUG-12D/C3 606038220 38Goindwal Sahib - SultanpurLodhi
AUG-12
Remark:
Gongri HEP (2x72 MW), PS, Arp, Dirang Energy, U1&U2-03/20
DEPL D/C1 220Gongri - Dinchang PoolingStation
Remark:
Gorgi TPP (2x660MW), MP, DB Power Ltd. , Uncertain
MPPTCL D/C1 0400DBTPS - Vindhyachal PS (Quad)line
Remark:
Green Energy Corridor - I Intrastate
WIP.GETCO 2 JUL-191 1100320220/132 0Wankaner S/S (Dist. Rajkot)(GEC-I)
Remark:
Haldia TPP (2x300 MW) SS, WB, IPC(H)L. U1 - 07/16, U2 - 11/16
TL: Total Location 50Page 11 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 03/17 (Late Reported).IPCHL 15 MAY-17D/C1 15155220 5Haldia TPP (IPCL) - New Haldia(WBSETCL)
MAY-17
Under planning stage by WBSETCL.ISPAT D/C2 180220Haldia TPP - Egra
Remark:
Harduaganj TPS (2x250 MW),SS,UP,UPRVUNL,U8-9/11(C),U9-5/12(C)
Commissioned 11/14.UPPTCL 151 NOV-14D/C1 AUG-0915115199220 99Harduaganj - Jahangirabad NOV-14
Remark:
Harduaganj TPS Exp-II (1x660MW), UP, UPRVUNL , U-6/19
Foundation & erection work in progress.UPPTCL 72 MAR-19D/C1 568450400 0LILO of one Ckt Aligarh-Sikandrabad at Harduaganj TPSLine
UPRVUNL SCOPEUPPTCL 02 00630400/220 0ICT at Harduaganj Extn
Remark:
Hazaira CCPP (351 MW),SS,GUJ,GSECL,,GT+ST-2/12(c )
Commissioned 9/11.GETCO 211 SEP-11D/C1 APR-11211211125220 125Hazaira (GSEC)-Kosamba SEP-11
Inter connection of Utran-Kosamba chargedunder stop gap arrangement (Kosamba-Mota & Utran-Mota) on 16.06.2018 as persystem requirement.
GETCO 111 JUN-19D/C2 96182111220 42Hazaira (GSEC) - Mota
Remark:
Hindustan Electricity GCL TPP (1x350+3x379 MW), PS, Maha, U1-3/14, U2, & U3
XYZ D/C1 400LILO of Lonikhand - Kalwa atHEGCL TPP
XYZ D/C2 110400HEGCL TPP - Pune (AIS) (PG)
Remark:
Ind Barath TPP (Utkal)(2x350MW),PS,Orissa,Barath, U1-2/16(C), U2-11/17
Commissioned 06/2017 (Late Reported).IBPIL 125 OCT-17D/C1 125125124400 124Ind - Barath (Power Plant(Shahjbahal) - Jharsuguda(Sundargarh)line
OCT-17
IBPIL 72 JUN-15D/C2 727247400 47LILO of Rouekila - Raigarh at IndBarath
Remark:
Jal Churk (4x60 MW), PS,UP, M/S Jal ,
Commissioned 01/14.UPPTCL JAN-14D/C1 13220 13Churk - Robertsganj JAN-14
Remark:
Jallipa-Kapurdi TPP(8x135MW),PS,RAJ, RW Power, U1 to U8: Comm from 10/09(c) to 2/13(c)
Commissioned 8/10RVPNL 10 AUG-08D/C1 10105220 5LILO of Giral - Barmer Ckt 1 atRaj West LTPS.
AUG-08
Commisisoned 3/12RVPNL 283 MAR-12S/C2 28328383220 83Raj West-Dhorimana MAR-12
1 ckt Commissioned 5/10RVPNL 44 MAY-10D/C3 APR-10444430400 30Rajwest- Barmer MAY-10
Commissioned 5/10RVPNL 560 MAY-10D/C4 APR-09560560417400 417Rajwest- Jodhpur MAY-10
Remark:
TL: Total Location 50Page 12 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Jawaharpur TPP, (3x660 MW), Uttar Pradesh, JVUNL, 2020-21
UPPTCL MAR-18D/C1 80400Jawahapur TPS-Firozabad Line
JAWAHAR D/C2 400Jawaharpur TPP - yet to bedecided
To be constructed in TBCB mode.UPPTCL 0 MAR-21D/C3 0020400LILO Agra(South)-Fahtehabad(Agra) at Firozabad
UPPTCL S/C4 30765LILO of Mainpuri - G Noida atJawaharpur TPS
Work in progress.UPPTCL 49 JAN-19S/C5 484915220 17LILO of Mainpuri- Sikandrarao atJawarharpur TPS
Remark:
Jegurupadu extesion project (Phase II) GVK Group) 220 MW U (C)
Commissioned in FY 2008-09.GVKP&IL MAR-09D/C1 14400 14Jegurupadu - Vemagiri line MAR-09
Remark:
Jhajjar Mahatama Gandhi (CLP) (2x660 MW), PS, U1-1/12(C),U2-4/12(C)
Commissioned 05/13.HVPNL 95 MAY-13D/C1 959525220 25Deepalpur-Barhi MAY-13
Commissioned 2/12.HVPNL 64 FEB-12D/C2 646440400 64Jhajjar -Dhanonda FEB-12
Commissioned 10/11.HVPNL 23 OCT-11D/C3 232310400 10LILO of Jhajjar (APCPL) -Daultabad line at MG Jhajjar(CLP)
OCT-11
Commissioned 2/12.HVPNL 95 FEB-12D/C4 959570400 95Jhajjar - Kabulpur FEB-12
Commissioned 09/13HVPNL 97 SEP-13D/C5 979746220 46Kabalpur - Badhan SEP-13
commissioned 2/12.HVPNL 3 FEB-12D/C6 332400 2LILO of abdullapur-Bawana atdeepalpur
FEB-12
Commissoned 2/12.HVPNL FEB-12D/C7 133400Kabulpur-Deepalpur FEB-12
Commissioned 11/13.HVPNL 94 NOV-13D/C8 949447220 47LLIO of Bahadurgarh- Rohtak atKabulpur
NOV-13
Ready for commissioning 02/2016 (LateReported)
HVPNL 101 DEC-16M/C9 MAY-1310110141220 41Deepalpur-Sonepat HSIIDC Rai (terminated at Rajiv Gandhi s/s)
DEC-16
Commissioned 2/12.HVPNL 100 FEB-1210 100100200220/132 100Kabulpur S/S FEB-12
Commissioned 2/12.HVPNL 100 FEB-1211 100100630400/220 0Deepalpur S/S FEB-12
Commissioned 2/12.HVPNL 100 FEB-1212 100100630400/220 100Kabulpur S/S FEB-12
Commissioned 2/12.HVPNL 100 FEB-1213 100100200220/132 100Deepalpur S/S FEB-12
Remark:
Jhajjar TPS (Indira Gandhi ) TPS (3x500 MW),CS,HR,ACPCL,U1- (C),U2-(C),U3-12/12
Commissioned 2/12.HVPNL 175 FEB-12D/C1 175175136400 136Jhajjar - Daultabad FEB-12
1st cket commissioned 9/10 & 2nd ckt in11/10.
APCPL 186 NOV-10D/C2 MAR-10186186132400 132Jhajjar - Mundka NOV-10
Commissioned 9/12.DTL 100 SEP-123 100100160220/66 100Mundka (2nd ICT) SEP-12
Commissioned 12/10HVPNL 0 DEC-104 00945400/220Daultabad S/S DEC-10
Commissioned 3/11.DTL 100 MAR-115 100100160220/66Mundka (1st ICT) MAR-11
TL: Total Location 50Page 13 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
1st Trans. Commissioned 9/10. 2nd trf3/11.
DTL 0 MAR-116 00630400/220Mundka (2x315) S/S MAR-11
Remark:
Jharsuguda (Sterlite TPP),PS, Ori,Sterlite, U1-12/10(C), U2-10/10(C),U3-8/11(C),U4-6/12 (c)
Transmission work not started yet. SEL willapproach CEA for approval of continuingthe LILO-II.
SEL 0D/C1 NOV-160040400Sterlite TPP - Jharsuguda (LILO-IIto Jharsuguda)
Commissioned 2/11. (Interimarrangement).
SEL 85 FEB-11D/C2 858549400 49LILO of Rourkela - Raigarh atSterlite TPP (Existing line)
FEB-10
Ist ckt commissioned, 2nd cktcommissioned 8/10.
SEL AUG-102xD/C3 9220 9Sterlite TPP - Sterlite captiveplant D/C
AUG-10
Commissioned 10/2017SEL 64 OCT-17D/C4 NOV-16646441400 47Sterlite TPP (Vedanta)-Jharsuguda (Sundergarh)(Balance portion from LILO-Ipoint to Jharsuguda)
OCT-17
Commissioned 03/14. (Interimarrangement).
SEL 92 MAR-14D/C5 929260400 60LILO of Rourkela - Raigarh atSterlite TPP ( 2nd LILO)
MAR-14
Remark:
Jorethang Loop HEP (2x48MW)PS,Sikkim,DANS,U1-9/15 (C), U2-9/15 (C).
Commissioned 11/2016.(Interim connectionremoved- LILO on one ckt of New Melli -Rangpo D/C tr. Line at Jorethang ).
DEPL 35 NOV-16D/C1 353520220 20Jorethang HEP - New Melli NOV-16
Remark:
JSW Ratnagiri TPP (4x300 MW) ,PS,MAHA,JSW Energy ,U1-8/10(C),U2-12/10(C),U3-5/11(C),U4-10/11(C)
Commissioned 10/11.JSWEL 300 OCT-11D/C1 300300219400 218Jaigad - karad. SEP-11
Ckt 1 commissioned 7/10 & ckt 2commissioned 8/10.
JSWEL 160 AUG-10D/C2 MAY-10160160110400 110Jaigad - New Koyna AUG-10
Remark:
Kaiga APP (220 MW),CS,KAR,NPCIL,U4-11/10(C)
Ready for Commissioning 09/15.PGCIL 614 SEP-15D/C1 DEC-07614614420400 420Mysore - Kozhikode SEP-15
Commissioned 03/08PGCIL 422 MAR-08D/C2 422422310400 310Narendra - Davangere MAR-08
Commissioned 03/08PGCIL 100 MAR-083 100100315400/220 100Hirriyur (Extn.) S/S MAR-08
Commissioned 10/15.PGCIL 100 OCT-154 DEC-07100100630400/220 100Kozhikode S/Stn. (2x315) OCT-15
Remark:
Kakatiya TPP Extn (2x600 MW) SS,TCTL, APGENCO, U1-5/10 (C),U2-12/15 (C)
Commissioned 09/13.APTRANS 363 SEP-13D/C1 363363262400 262Bhoopalapally (Kakatiya) -Gajwel
SEP-13
Remark:
Kalisindh TPS (2x600 MW), SS,Raj,RRVUNL, U1-5/14 (C),U2-6/15 (C)
Commissioned 03/18.RVPNL 284 MAR-18D/C1 SEP-12284284106400 106Phagi (Jaipur south-765 kV)-Ajmer (Ckt. - I)
MAR-18
Commissioned 11/2016 (Reported Late)RVPNL 126 DEC-16D/C2 SEP-12126126104400 104Phagi GSS (Jaipur) - Heerpuraline
DEC-16
Commissioned 03/14.RVPNL 220 MAR-14D/C3 220220159400 159Kalisndh TPS - Anta (Baran)Pooling Station (Quad)
MAR-14
TL: Total Location 50Page 14 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 4/12.RVPNL 35 APR-12D/C4 353519220 19Kalisindh-Jhalawar line APR-12
Charged at 400 kV 01/14.RVPNL 570 JAN-14S/C5 570570214765 214Anta - Phagi (Jaipur South Ckt-2)(Charged at 400 kV)
JAN-14
Commissioned 03/14.RVPNL 586 MAR-14S/C6 586586212765 212Anta - Phagi (Jaipur South Ckt-1) MAR-14
Commissioned 02/15.RVPNL 100 FEB-157 1001003000765/400 100Phagi (jaipur South ) (2x1500 )S/S
FEB-15
Commissioned 01/16.RVPNL 100 JAN-168 100100315400/220 100Ajmer S/S JAN-16
Commissioned 02/15.RVPNL 100 FEB-159 1001003000765/400 100Anta (Distt. Banra) PoolingStation
FEB-15
Remark:
Kalpakkam PFBR (Bhavini) (500 MW)
Commissioned 3/12.PGCIL MAR-12D/C1 213230 213Kalpakkam - Arni MAR-12
Commissioned 8/12.PGCIL 306 AUG-12D/C2 306306160230 160Kalpakkam PFBR-Kanchepurram AUG-12
Line commissioned in Nov'11PGCIL 140 NOV-11D/C3 14014072230 72Kalpakkam PFBR-Sirucheri NOV-11
Remark:
Kamalanga TPP (3x350MW),PS,GMR, Orissa, U1-3/13(C),U2-9/13(C),U3-9/13
For start up power,work completed 5/12.GMR 3 MAY-12D/C1 331400 1LILO of Talchar -Meramundli atKamalanga TPP
Commissioned 12/14.GMR 103 DEC-14D/C2 10310360400 60Kamalanga (GMR) - Angulpooling station
DEC-14
Remark:
Kameng HEP,(4x150 MW) SS,ArP, NEEPCO,U-12/18
Commissioned 03/18.PGCIL 151 MAR-18D/C1 AUG-13151151114400 114Kameng - Balipara line MAR-18
Remark:
Karcham Wangtoo HEP ( 4x250 MW)PS, HP, JKHCL, U1-5/11(C), U2-6/11( C), U3-9/11 (C), U4,9/11 (C).
Commissioned. 7/12JV(PG&JP 518 JUL-12D/C1 518518432400 432Karcham Wangtoo-Abdullapur JUL-12
Commissioned 3/11.PGCIL 395 MAR-11D/C2 SEP-11385403291400 230Abdullapur - Sonepat MAR-11
Remark:
Kasaipalli TPP (2x135 MW),PS,Cha,ACB,U1- 12/11(C),U2-6/12(C)
Commissioned. 7/12ACB 181 JUL-12D/C1 181181112400 112Kasaipalli TPP -Bharai (Sipat)Pooling station
JUL-12
Commissioned 11/11.ACB NOV-11D/C2 6400 6LILO of Korba - Bhatapara atKasaipalli
NOV-11
Remark:
Kashang-I,II & III HEP (1x65+2x65MW) on Satluj river,SS,HP,U1 -10/16 (C),U2-8/16 (C),U1-01/17 (C)
Commissioned 04/16.HPPTCL 100 APR-16D/C1 OCT-1510010039220 39Kashang - Bhaba (2nd Ckt) APR-16
power of kashang and other generatingprojects in vicinity was planned to bepooled at Jangi pooling station, since othergenerating projects have withdrawn LTAtherefore the construction of Jangi poolingstation has been dropped for the timebeing.
HPPTCL 0D/C2 00220Kashang - Jangi Pooling Station
TL: Total Location 50Page 15 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:
Kashipur CCPP (225+225 MW) (Gas),SEPL, UK, Mod-1:11/16(C)
PTCUL SEP-14D/C1 34220Kashipur - Mahuakheraganj JUL-14
Remark:
Kawai Super Critical TPS (2x660 MW),Raj, PS,Adani , Unit 1-5/13 (C),U2-12/13 (C)
Commissioned 12/12.RVPNL 46 DEC-12S/C1 464616400 16Chhabra TPS-Kawai SCTPS DEC-12
Commissioned 01/14.RVPNL 136 JAN-14D/C2 136136101400 101Kawai - Anta (Baran) JAN-14
Commissioned 09/2016 (Late Reported)RVPNL 100 APR-173 1001001500765/400 100Anta GSS (ICT-3) APR-17
Remark:
Khaperkheda (500 MW),SS,MAHA,MSPGCL,U1-8/11(C)
Commissioned 3/12.MSETCL 19 MAR-122xD/C1 191912220 12Khaperkheda TPS -Khaperkheda (Existing)
MAR-12
Commissioned 11/9MSETCL 8 NOV-09D/C2 883400 3LILO of Koradi - Chandrapur atKhaperkheda TPS.
NOV-09
Commissioned 12/11.MSETCL 100 DEC-113 1001001000400/220 100Khaperkheda S/S (2x500) DEC-11
Remark:
Khargone Super Critical TPP(2x660 MW),CS,MP,NTPC,U1-3/19,U2-9/19 (TBCB)
Commissioned 02/2018.SGL 21 FEB-18D/C1 FEB-18212114400 14LILO of one ckt. of Khandwa -Rajgarh at Khargone TPP (KTL -TBCB)
FEB-18
1. Introduction of new guidelines fordetermination of Land & Corridorcompensation in the state of MadhyaPradesh which has led to the increase incost of the project. Notices served to LTTCs 2. NH-3 Crossing Approval is pending withNHAI
SGL 242 FEB-19D/C2 JUL-19240243179765 132Khandwa Pool - Indore (KTL -TBCB)
Introduction of new guidelines fordetermination of Land & Corridorcompensation in the state of MadhyaPradesh and Maharashtra which has led tothe increase in cost of the project. Noticesserved to LTTCs
SGL 468 FEB-19D/C3 JUL-19453486378765 264Khandwa Pool - Dhule (KTL -TBCB)
Introduction of new guidelines fordetermination of Land & Corridorcompensation in the state of MadhyaPradesh which has led to the increase incost of the project. Notices served to LTTCs
SGL 35 JUL-19D/C4 JUL-1967049400 0Khargone TPP - Khandwa Pool(Q) (KTL - TBCB)
Agitation from farmers for landacquisituion Change in Law- Introductionof GST in place of Service Tax and it hasbeen increased from 15% (Service Tax) to18% (GST) w.e.f. 01st July 2017, same hasbeen intimated to all LTTCs
SGL 54 JUL-195 JUL-19871003000765/400 2Khandwa PS (KTL - TBCB)
Remark: Khargone Transmission Limited (SGL)
TL: Total Location 50Page 16 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Kishanganga HEP (3x110MW) CS, J&K, NHPC, U1-3/18(C),2 & 3-03/18(C)
Commissioned 02/2018.PGCIL 150 FEB-18D/C1 JUL-1715015085220 85Kishanganga - Amargarh line FEB-18
Progress affected due to ROWcompensation issue. Fdn. at 01 loc. & 1 Kmstringing stretch were held up due tosevere ROW/ Court case, now beingresolved.
PGCIL 251 FEB-19D/C2 MAR-18251252228220 226Kishanganga - Wagoora
Remark:
Koderma TPS 2x500 MW,CS,JHA,DVC,U1-7/11 (C),U2-2/13 (C)
Commissioned 8/10DVC 66 AUG-10D/C1 666632132 32LILO of Barhi-Koderma atKoderma S/S
AUG-10
Commissioned 5/11.PGCIL 294 MAY-11D/C2 APR-10294294222400 222Koderma-Biharshariff (Quad) MAY-11
Remark:
Koldam HEP (4x200 MW),CS,HP,NTPC, U3-4/15 (C), U4-6/15 (C)
Commissioned 09/14.PKTCL 423 SEP-14D/C1 SEP-08423423301400 301Koldam - Ludhinana (JV Portion) SEP-14
Commissioned 03/10.PGCIL 127 MAR-10D/C2 12712793400 93Koldam - Nalagarh MAR-10
Remark:
Koradi TPP Expn. (3x660 MW), SS,Maha, MSPGCL, U8-3/15 (C) ,U9-3/16 (C),U10-6/16
Commissioned 03/16.MSETCL 72 MAR-16D/C1 DEC-13727228220 28Koradi TPS-New Khaparhkeda MAR-16
Commissioned 01/16.. (97 Ckm hadalready been taken as commissioned inMay 2015.)
MSETCL 336 JAN-16D/C2 APR-11336336144400 144Koradi TPS - Wardha JAN-16
Commissioned 12/2016MSETCL 111 DEC-16D/C3 11111138400 38Koradi-II - Koradi-III (Ckt-I) DEC-16
Remark:
Korba (E) (2x250 MW), SS, Chg, U2-7/12 (C)
Commissioned 08/14.CSPTCL 505 AUG-14S/C1 MAR-12505505153220 153Korba -Vishrampur AUG-14
Remark:
Korba (W) (1x500 MW),SS,Cha,CSEB,U5-3/13(C)
Commissioned 9/12.CSPTCL 70 SEP-12D/C1 MAR-10707047400 47LILO Korba (West)-Bhilai atRaipur (CSPTCL)
SEP-12
Commissioned 12/12.CSPTCL 640 DEC-12D/C2 640640447400 447Korba (W)-Bhilai (khedamara) DEC-12
Commissioned 03/13 & 03/14. (ReportedLate)
CSPTCL 100 MAR-143 100100630400/220 100Raipur S/S (ICT I & II.) MAR-16
Remark:
Koteshwar HEP (4x100 MW),CS,UK, THDC,U3-1/12,U4-3/12.
Commissioned 3/11.PGCIL 9 MAR-11D/C1 JUN-08995400 5Koteshwar -Tehri Pooling Point APR-11
Commissioned 6/11.PGCIL 59 JUN-112xD/C2 JUN-08595913765 13LILO of Tehri - Meerut at TehriPooling Point (to be charged at400 KV)
JUN-11
Remark:
Kothagudem TPS St-VII (1x800), TPGenco, U12-07/18
works are U/P.TSTRANS 487 JAN-19D/C1 SEP-18481489349400 275Julurupadu - Jangaon
TL: Total Location 50Page 17 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Ready for Commissioning 02/18.TSTRANS 119 FEB-18D/C2 MAR-1711911978400 78Julurupadu - KTPS (Stage-VII) FEB-18
Equipment erection WORKS Under progress.
TSTRANS 553 AUG-1860100500400 70Jangaon
TSTRANS4 SEP-170400Julurupadu 2nos 400kV bay
Remark:
Koyna Left Bank PSS (2x40MW), Maharashtra, WRD Maharashtra, 2019-20
Commissioned 02/2017MSETCL 170 FEB-17S/C onD/C
1 17017044220 44Koyna PSS - Karad(Loc. 8 - 144)line
FEB-17
Remark:
Kudgi TPS-I (3x800), NTPC Ltd., U1-12/16(C),U2-3/17(C),U3-11/17
Work is under progress.KPTCL 224 FEB-19D/C1 FEB-17141267159220 4Kudgi UMPP(NTPC) - Vajramatti220kV s/s(Bagalkot Distt.)
Commissioned 12/2017.KPTCL 99 DEC-17M/C2 JUN-17999980220 80LILO of B.Bagewadi - Bijapurline at Kudgi 400kV STPP
DEC-17
Commissioned 08/16.KTCL 256 AUG-16D/C3 DEC-15256256185400 185Madhugiri - Bidadi (KTL - TBCB) AUG-16
Ready for Commissioning 09/16.KTCL 867 SEP-16D/C4 DEC-15867867758765 758Narendra (New) - Madhugiri(KTL - TBCB)
SEP-16
Ready for Commissioning 08/15.KTCL 46 AUG-152xD/C5 FEB-15464636400 36Kudgi STPS - Narendra (KTL -TBCB)
AUG-15
Remark: Transmission System required for evacuation of power from Kudgi TPS (3x800 MW in Phase-I) of NTPC Ltd. (TBCB) SPV/BPC - Kudgi Transmission Company Ltd. / REC
Kundankulam - APP Transmission System - PGCIL
Severe ROW problem (long pending).Problem being addressed progressively asper revised G.O. of 30.07.15 .
PGCIL 428 MAR-19D/C1 NOV-08404447296400 174Edamon (KSEB) - Muvattupuzha(PG)
Commissioned 03/09.PGCIL 213 MAR-09D/C2 213213160400 160Kudankulam-Tirunelveli (Quad)2nd.
MAR-09
Commissioned 03/09.PGCIL 199 MAR-09D/C3 199199145400 145Kudankulam-Tirunelveli (Quad)1st.
MAR-09
Commissioned 03/09.PGCIL 730 MAR-09D/C4 730730533400 533Tirunelveli - Udumaplet MAR-09
Commissioned 03/10.PGCIL 235 MAR-10M/C5 235235327400 327Tirunelveli - Edamon MAR-10
Line commissioned in Nov'11.PGCIL 224 NOV-11D/C6 224224157400 157Muvattupuzha (PG) - NorthTrichur (PG)
NOV-11
Commissioned 4/08.PGCIL 300 APR-08D/C7 300300213400 213LILO of Madurai - Trivandrum atTirunelveli 2 X D/C
APR-08
ICT-II commissioned in Nov'11.PGCIL 100 NOV-118 100100315400/220 100Muvattapuzha s/s (2 nd ICT) NOV-11
ICT-I Commissioned 4/08, ICT-IICommissioned 11/08.
PGCIL 100 APR-089 100100630400/220 100Tirunelveli S/S NOV-08
Commissioned 6/09.PGCIL 100 JUN-0910 100100315400/220 100Trivandrum JUN-09
Commissioned 3/09PGCIL 100 MAR-0911 100100315400/200 100Udumalpet (PG) Ext. MAR-09
Remark:
Lakhwar (300 MW) Yamuna river,UK,UJVNL - 2018-19
TL: Total Location 50Page 18 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Route Survey has been completed. Towerschedule and profile of line has beenapproved. Principal approval obtained fromMOEF on dated 11/09/2017. Proposal fortransfer of land (73.36 Hect.) forcompensatory afforestation was submittedto DM, Dehradun on dated 14/09/2017.SDM directed to Tehsildar on 03/10/2017for further necessary action. Total Progress12%
PTCUL 0 DEC-20D/C1 0060220Lakhwar- Dehradun
NHPC D/C2 JAN-17220LILO of Lakhwar HEP-Muzaffarnagar at Vyasi HEP
Remark:
Lalitpur Ph-I (3x660MW), Ph-II (3x660 MW )PS,UP,BHL, U1-03/16 (C),U2-1/16(C),U3-04/16(C)
Ready for commissioning 09/16.UPPTCL 955 SEP-16S/C1 AUG-16955955337765 337Lalitpur TPS - Agra (UP) Ckt-I SEP-16
Commissioned 04/2017UPPTCL 382 APR-17S/C2 AUG-16382382142400 142Fatehabad (Agra (UP)) - Maath (Mathura) line
APR-17
Ready for commissioning 06/2017.UPPTCL 203 JUL-17D/C3 AUG-16203203139400 139Agra(UP) - Agra (South) JUN-17
Commissioned 09/16.UPPTCL 219 SEP-16D/C4 AUG-16219219156400 156LILO of 400 kV Agra (UP) -Muradnagar 400 kV S/C line atAgra (UP) 765/400 kV S/S
SEP-16
Commissioned 06/2017.UPPTCL 88 JUL-17D/C5 AUG-16888864400 64LILO of Agra - Muradnagar atMathura
JUN-17
Commissioned 04/2017UPPTCL 119 APR-17D/C6 11911968220 68Maath (Mathura) -Chhata line APR-17
Ready for Commissioning 09/16.UPPTCL 100 SEP-16D/C7 AUG-1610010073400 73LILO of one ckt of 400 kV Agra(UP) - Agra (PG) 400 kV D/C lineat Agra (UP) 765/400 kV S/S
SEP-16
Commissioned 04/2017UPPTCL 902 APR-17S/C8 AUG-16902902335765 335Lalitpur TPS - Fatehabad (Agra(UP)) Ckt-II
APR-17
Commissioned 05/2017.UPPTCL 100 MAY-179 100100315400/220 100Maath Mathura (New) (ICT-II) MAY-17
Commissioned 04/2017UPPTCL 100 APR-1710 AUG-16100100315400/220 100Maath (Mathura) s/s (ICT-1) APR-17
Commissioned 02/2017UPPTCL 100 FEB-1711 1001001500765/400 100Agra (UP) S/S (ICT-II)(Fatehabad)
FEB-17
Commissioned 09/16.UPPTCL 100 SEP-1612 AUG-161001001500765/400 100Agra (UP) S/S (ICT-I)(Fatehabad)
SEP-16
3x200 MVA, 400/132 KV ICTs energised on10/07/2017
UPPTCL 10013 AUG-16100100600400/132 100Agra (South) S/S JUN-17
Remark:
Lanco Amarkantak TPS -II, (2x660 MW), PS,Chg,LPT, U3 -11/18,U4-2/18
LEPP 96 JUN-16D/C1 1215895400 0Lanco Amarkantak - ChampaPooling Station
Remark:
Lanco Vidarbha (Dhenkanal )TPS (2x660 MW), PS,LIL, U1-12/18,U2-3/19
LEPP MAR-17D/C1 1615765LILO of Seoni - Wardha at LancoVidarbha TPS
Remark:
TL: Total Location 50Page 19 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Lara STPP-I (2x800 MW), CS, Chh, NTPC, U1-3/18(c), U2-6/18
Ready for commissioning 06/17PGCIL 306 JUL-17D/C1 APR-17306306224400 224Lara STPS - Champa PoolingStation line (Q)
JUN-17
Commissioned 04/16.PGCIL 50 APR-16D/C2 APR-17505036400 36Lara STPS - Raigarh (Kotra) line APR-16
Remark:
Lata Tapovan (3x57 MW),CS,UK,NTPC- 2021-22
Contract has been terminated on23.01.2017 as per the stay order of Honble Supreme Court for Construction ofHydro electric project of Lata Tapovan HEP(171MW) after June 2013 Natural Disasterin Uttrakhand State and also nonavailability of Land at Joshimath forconstruction of 220 KV Substation.
PTCUL 0 DEC-17D/C1 03624220 0Lata Tapovan- Joshimath
Contract has been terminated on23.01.2017 as per the stay order of Honble Supreme Court for Construction ofHydro electric project of Lata Tapovan HEP(171MW) after June 2013 Natural Disasterin Uttrakhand State and also nonavailability of Land at Pipalkoti forconstruction of 400KV Substation and hugeagitation of local public on prposed land.
PTCUL 0 DEC-20D/C2 0040220Joshimath - Kunwari Pass(Pipalkoti)
Remark: Contract has been terminated on 23.01.2017 as per the stay order of hon'ble Supreme Court for construction of HEP of Lata Tapovan after June 2013 natural disaster in Uttarakhand.Currently work is stalled
Loharinagpala (NTPC),CS,UK,NTPC,Unit-14/15.
The work at Loharinagpala HEP stopped asper GOI order.
PTCUL 0D/C1 00180400 0Loharinagpala-Koteshwar line
The work at Pala Maneri HEP stopped asper GOI order.
PTCUL 0D/C2 0010400 0LILO of Loharinagpala -Koteshwar at Pala - Maneri
Remark:
Lower Jurala HEP (6x40MW) SS,TCTL,TSGENCO,U1-10/15(C),U2-9/15(C),U3-1/16 (C),U4-11/15,U5-8/16 (C),U6-9/16(C).
Commissioned 05/16. (Late Reported).TSTRANS 36 MAY-16D/C1 363621220 21Lower Jurala HEP - Upper Jurala AUG-16
Commissioned 12/13.APTRANS 17 DEC-13D/C2 17179220 9LILO of Veltoor -Jurala at LowerJurala HEP
DEC-13
Remark:
Lower Kalnai (2x24MW),J&K, JKSPDC, 2020-21
JKPDD D/C1 6132Lower Kalnai - Thathri S/s(existing) line
Remark:
Mahan TPP Ph-1(2x600 MW),PS, MP,ESSAR Power TCL, U1-2/13 (C), U2-9/17
Commissioned 09/18.EPTCL 942 SEP-18D/C1 942942673400 673Mahan -Sipat SEP-18
Commissioned 3/13.EPTCL 287 MAR-13D/C2 287287208400 208Gandhar-Hazira MAR-13
Commissioned 3/12. (Interim)EPTCL 67 MAR-12D/C3 676744400 44LILO of Viindhyachal -Korba lineat Mahan S/S
MAR-13
commissioned in March 2013. Reported inJuly 2015.
EPTCL 100 JUL-154 1001001000400/220 100Hazira S/S JUL-15
TL: Total Location 50Page 20 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:
Maheshwar HEP (10x40 MW),PS,MP,SMHPCL,U1 to U10-2018-19
Commissioned 5/10.MPPTCL 90 MAY-10D/C1 APR-09909054220 54Maheshwar - Nimrani MAY-10
Commissioned 2/12.MPPTCL 195 FEB-12D/C2 195195115220 115Maheshwar - Pithampur FEB-12
Remark:
Maithon RBTPP (2x525 MW),PS,JHA,DVC-JV TATA ,U1-6/11(C),U2-3/12 (C)
Commissioned 12/11.PGCIL 534 DEC-11D/C1 534534376400 376Maithon (RB) - Ranchi DEC-11
Commissioned 09/10PGCIL 94 SEP-10D/C2 APR-10949462400 62Maithon RB - Maithon (PG) SEP-10
Remark:
Malana - II HEP (2x50 MW)PS,HP,EPPL,U1-8/11(C),U2-8/11(C),
Commissioned 9/11.EPCL 51 SEP-11D/C1 515136132 36Malana - II HEP - Chhaur. SEP-11
Commissioned 9/11.EPCL 4 SEP-11D/C2 SEP-09442220 2LILO of Allain Duhangan-Nalagarh at Chhaur
SEP-11
Commissioned 9/11EPCL 0 SEP-113 0170230/132 0Chhaur SEP-11
Remark:
Malibrahmini (2x525MW),PS,Orissa, MPL,U1-3/18,U2-3/18
MPCL 100 JUL-16D/C1 8010862400 20Malibrahmani - Angul
Remark:
Malwa TPP(Shree Singaji), (2x600+2x660), SS,MP,MPPGCL, U1-11/13,U2-10/14,U3-07/18,U411/18
Commissioned 09/13.MPPTCL 9 SEP-13D/C1 996220 5LILO of both ckts of Nimrani-Julwania at Julwania
SEP-13
Commissioned 03/14.MPPTCL 193 MAR-14D/C2 193193128400 128Pithampur-Indore MAR-14
Work Under ProgressMPPTCL 203 SEP-18D/C3 203203140400 135Pithampur - Badnawar DCDS
Work Under ProgressMPPTCL 383 SEP-18D/C4 381383284400 251MalwaTPP(Stage-II)-Pithampur
Commissioned 11/13.MPPTCL 397 NOV-13D/C5 397397272400 268Malwa TPP - Pithampur NOV-13
Commisioned 3/12MPPTCL 160 MAR-12D/C6 16016095220 95Malwa TPP - Chhegaon MAR-12
Commissioned 02/13MPPTCL 158 FEB-13D/C7 158158105400 105Malwa TPP - Chhegaon FEB-13
Commissioned 11/14.MPPTCL 340 NOV-14D/C8 340340225400 225Chhegaon - Julwania NOV-14
Commissioned 11/14.MPPTCL 100 NOV-149 100100630400/220 100Julwania S/S NOV-14
Commissioned 4/13.MPPTCL 100 APR-1310 100100630400/220 100Pithampur S/S APR-13
Commissioned 12/12.MPPTCL 100 DEC-1211 100100315400/220 100Chhegaon S/S DEC-12
Remark:
Mangaon CCPP(338 MW), PS, MH, PGPL, U1-2/13(C)
commissioned 03/16MSETCL 0D/C1 004220Mangaon CCPP(Vile)- Bhagad
Remark:
Marwa TPP (2x500 MW) SS,Chg,CSPGCL U1-3/14 (C), U2 -6/16
Commissioned 1/13. (Loc 39 to 51 chargedon 7.11.12)
CSPTCL 55 JAN-13D/C1 555528220 28Marwa - Banari (Start up power) JAN-13
TL: Total Location 50Page 21 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 06/13.CSPTCL 379 JUN-13D/C2 379379281400 281Marwa - Raipur (Raitha) JUN-13
Commissioned 05/15.CSPTCL 161 MAY-15D/C3 MAR-13161161116400 116LILO of One ckt of Korba (W) -Khedamara at Marwa
MAY-15
Remark:
Matrishri Usha TPP (Corporate Power) (4x270MW), U1-3/18,U2-3/19,U3,4-uncertain
CPL 293 AUG-16D/C1 274320216400 132Latehar - Namkum
CPL AUG-16D/C2 116400Corporate TPP - JharkhandPooling Station
Remark:
Mauda TPS (500 MW),Phase-II (2x660 MW) CS, Maha, NTPC, U1-4/12 (C), U2-3/13(C),U3-7/16,U4-03/17 (C)
Commisisoned 05/12PGCIL MAY-12S/C1 124400Mauda - Wardha (2nd Ckt) MAY-12
Commissioned 3/12.PGCIL 345 MAR-12S/C2 345345124400 124Mauda - Wardha line (Quad)(Ckt-1)
MAR-12
Remark:
Meja TPP Ph-I (2x660 MW)(UPPCL & NTPC), U1-3/18(C),U2-1/19
Commissioned 03/15.UPPTCL 91 MAR-15D/C1 919168400 68Rewa Road - Meza line MAR-15
Commissioned 03/15.UPPTCL 83 MAR-15D/C2 838365400 65Bara - Meza line MAR-15
Ready for Commissioning 08/16.PGCIL 81 AUG-16D/C3 JUL-15818156400 56Meja - Allahabad line AUG-16
Remark:
Mettur TPS Stage III (600 MW), SS,TN,U1-10/12(C)
Commissioned 3/12TANTRAN 8 MAR-12S/C1 883230 3MTPS Stage-III - Gobi MAR-12
Commissioned 01/13.TANTRAN 325 JAN-13D/C2 325325220400 220MTPS St.III - Arasur JAN-13
MTPS III- Malco energised 2/11 for start uppower.
TANTRAN 9 FEB-11D/C3 993230 3LILO of MTPS -Malco at MTPSStage III
FEB-11
Remark:
Monarchak CCPP (101 MW), CS,Tripura, NEEPCO, GT - 3/15 (C), ST - 1/16(C).
Completed 9/13TSECL 13 SEP-13D/C1 13133132 3Surajmani Nagar - Rabindranagar
MAR-17
RoW issues. TSECL has connected a portionof the said D/C line splitting the existingRokhia - Udaipur 132 KV S/C line nearMelaghar (12.178 Km distance fromMonarchak) thereby connecting Monarchakwith Rokhia and Udaipur sub-stations. Thesaid arrangement has already beencommissioned and is in operation w.e.fJanuary 2015 for evacuation of MonarchakPower.
TSECL 133 DEC-18D/C2 9215242132 24Monarchak - Surajmani Nagar
Remark:
Moti Khavdi (500 MW), PS,Guj,RPL,U1
RPTL D/C1 400Moti Khavdi TPP - Jam Nagar
Remark:
M/s Sembcorp Gayatri Power Ltd. (SGPL) (Formerly NCC Power Project Ltd.) Super-critical TPP (2x660 MW),PS,AP,Nellore, U1-11/16 (C), U2-11/16
TL: Total Location 50Page 22 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 03/16.PGCIL 101 MAR-16D/C1 FEB-1710110166400 66NCC gen Sw Yd. - Nellore PS line(Q)
MAR-16
Remark:
Mundra TPP & Mundra UMPP (3x660&5x800),PS,Guj, Adani & TATA, both project commissioned by 03/13(c)
Commissioned. 7/12APL 139 JUL-12D/C1 APR-11139139100400 100Mohindergarh HVDC - Bhiwani JUL-12
Commissioned. 7/12APL 15 JUL-12D/C2 APR-11151510400 10Mohindergarh HVDC-Mohindergarh HVPNl(Dhanonda)
JUL-12
Commissioned 3/12APL 2693 MAR-12BIPOLE3 269326931980500 1980+/- 500 kV Mundra - BipoleMohindergarh
MAR-12
Commissioned 1/13.HVPNL 219 JAN-13D/C4 219219146400 146Daultabad -Dhanonda JAN-13
Commissioned 4/12HVPNL 100 APR-125 100100315400/220 100Dhanoda (Mohindergarh) APR-12
Remark:
Mundra TPP Ph.II (2x660 MW) ,PS,GUJ,Adani ,U1-12/10(C),U2-7/11(C)
Commissioned 02/16. (One Circuit is viavarsana.)
GETCO 956 FEB-16D/C1 956956671400 671Mundra (Adani) - Zerda line 2 FEB-16
W I P / Severe RoW problemsGETCO 453 JUN-19D/C2 275997640400 0Mundra (Adani) - Zerda line 1
Remark:
Mundra UMPP WR system Strengething
Commissioned 04/14.PGCIL APR-14D/C1 OCT-12118400 118Aurangabad (PG)-Aurangabad(MSETCL)
APR-14
Commissioned 5/12.GETCO 315 MAY-12D/C2 315315217220 217LILO of Halvad-Morbi I atBhachau
MAY-12
Commissioned 12/2016. (Remainingportion was taken as commissioned asVapi-Navsari line in Mar'13)
PGCIL 567 DEC-16D/C3 OCT-12567567161400 161Navsari - Boisor line (Balanceportion )
DEC-16
Commisisoned 7/12.PGCIL 145 JUL-12D/C4 14514582220 82LILO of both ckts of Kawas-Navsari at Navsari.
JUL-12
Commissioned 01/14.PGCIL JAN-14D/C5 102400 102Shifting of Ankola -Aurangabad(MSETCL) to Aurangabad (PG)
JAN-14
Contract terminated 01 out of 02 packagesdue to unsatisfactory performance andfresh tender taken up. The new packagebifurcated into two part. Ist part awarded inDec'14 and second part in Feb'15. SevereROW being encountered. Due tothunderstrom and cyclone in Jun'18, about6 fdn, 11 tower erection & approx. 9 ckmstringing damaged.
PGCIL 960 JUN-19D/C6 OCT-129399616961200 536Wardha - Aurangabad (on 1200kV)
Commisisoned 7/12PGCIL 288 JUL-12D/C7 288288204400 204Gandhar - Navsari JUL-12
Commissioned 5/12.GETCO 333 MAY-12D/C8 333333216220 216LILO of Halvad-Morbi II atBhachau
MAY-12
Remark:
Mutiara (Melamaruthur) (Coastal Energen) TPP (2x600 MW),PS,CEPL,U1-12/14 (C),U2-1/16(C)
commissioned 3/12. (Interim arrangement).CEPL MAR-12D/C1 52400 52LILO of Madurai - Tuticorin atCostal Energen
MAR-12
TL: Total Location 50Page 23 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 10/2016CEPL 32 OCT-16D/C2 323224400 24Mutiara TPP(Coastal EnergenGen. Switchyard) - TuticorinPooling Station (Balanceportion)
OCT-16
Remark:
Muzaffarpur TPP Exp, Kanti-II (2x195MW) CS, Bihar, JV-NTPC U3-03/15 (C), U4-3/17 (C)
Commissioned 09/14.BSPTCL SEP-14S/C1 68220 68Kanti - Darbhanga (2nd Ckt) SEP-14
Commissioned 03/16.BSPTCL MAR-16S/C2 101220 101Kanti - Gopalganj (2nd Ckt.) MAR-16
Remark:
Myntdu (Leshka) HEP (3x42 MW),SS,Meg,MeECL, U1&U2-3/13,U3-3/13 (C)
The Line was initially charged at 33 kVfrom 22.05.2010 and subsequently at 132kV on 25.11.2011.
MeECL 85 MAY-10D/C1 858553132 53Leshka Myntdu - Khliehriat MAY-10
Remark:
NABINAGAR -II STPS (3x660), CS, Bihar, NTPC, U1-1/18,U2-6/18,U3-12/18
PGCIL 372 JUN-19D/C1 364390278400 207Nabinagar-II - Patna (Q)
Ready for Commissioning 02/18.PGCIL 245 FEB-18D/C2 245245184400 184Nabinagar-II - Gaya (Q) FEB-18
Award placed in Mar'17. Engg. in progress.PGCIL 0 JUN-193 JUN-1901000400 0Bay Extn. at 765/400KV atPatna S/stn. for 400KV D/CNabinagar-II -Patna line (Q)
Remark: Associated Transmission System for NABINAGAR -II STPS (3 x 660) - PGCIL
Nabi Nagar TPP (4x250 MW), CS,Bihar, NTPC, U1-3/16(C),U2-3/17,U3-12/17,U4-05/18
Commissioned 05/12.PGCIL 216 MAY-12D/C1 216216164400 164Nabinagar - Sasaram line (Twinlapwing)
MAY-12
Remark:
Nagarjana Sagar TR HEP ( 2x25 MW),SS,AP,APGENCO,Unit-1&2-01/17(c)
Commissioned 27.03.2013APTRANS 58 MAR-13S/C1 585817132 17Rentachintala - Macherla S/S MAR-17
Commissioned 11/08APTRANS 0 NOV-08D/C2 002220 2LILO of VTS - Tallapally line atRentachintala
NOV-08
Commissioned 08/14.APTRANS 34 AUG-14S/C3 343416132 16Rentachintala - NagarjunaSagar Plant
MAR-17
Commissioned 11/08APTRANS 100 NOV-084 100100200220/132 100Rentachintala S/S NOV-08
Remark:
Naitwar Mori HEP (2x30 MW),CS,UK,SJVNL,U1&2-9/21.
Construction of line will be planned as perConnectivity Schedule of Generators inYamuna Valley.
PTCUL 0 MAR-20D/C1 00200220 0Mori -Dehradun
PTCUL 0D/C2 000220 0Naitwar Mori HEP - Mori SS
Remark:
Namrup CCGT (100 MW),SS, Assam,GT/ST,U1-10/17,U2-11/17
Commissioned 01/16.AEGCL 448 JAN-16S/C1 DEC-13448448145220 145Namrup - Mariani JAN-16
Remark:
TL: Total Location 50Page 24 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.11 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Nasik (5x270 + 5x270) TPS, PS, Maha, India Bulls, ph-II- uncertain
Ready for commissioning 08/15.IBPL 152 AUG-15D/C1 15215257400 57Nasik - Bobleshwar (2nd Ckt) AUG-15
Commissioned 03/14.IBPL 152 MAR-14D/C2 15215257400 57Nasik-Bableshwar (1st Ckt) MAR-14
Remark:
Navapura TPP (TRN ) (2x300 MW), Chhattisgarh Pvt. Sector , TRN Energy Pvt. Ltd. U1-08/16 (C)
Commissioned 01/16.TRNE JAN-16D/C1 30400 30TRN (TPP) - Raigarh PS(Tamnar)
JAN-16
Remark: Unit-1 Commissioned on 14.08.2016.
Navbharat TPP Ph-1 (2x525 MW), PS,Chh, U1&2
EPTCL D/C1 400Navbharat TPP - Angul P.S. (PG)
Remark:
New Umtru HEP (2x20 MW),SS,Meg,MeECL,U1-4/17(C), U2-6/17(C)
1. Date of award of contract is 05.02.2016.2. Schedule date of completion work05.05.2016. 3. The 132 kV line wascompleted on 11.11.2016 andcommissioned on 25.03.2017. 4. Delay wasdue to delay in supply of conductor for lineby the vendor and also that the New UmtruHEP was not ready as this line is an ATS ofthe New Umtru HEP. 5. No issues of forestclearance. 6. Line parameter: one circuitonly of the 132 kV D/C line - 0.14 ckm and132 kV S/C line - 0.36 ckm 7. The totalexpenditure incurred is Rs. 448.76 Lakhsand is inclusive of the cost of 132 kV NewUmtru HEP - Norbong -EPIP-II line.
MeECL 1 MAR-17S/C1 110132 0New Umtru - Umtru HEP
1. Date of award of contract is 05.02.2016.2. Schedule date of completion was05.05.2016. 3. The 132 kV line wascompleted on 11.11.2016 andcommissioned on 25.03.2017. 4. Delay wasdue to delay in supply of conductor for lineby the vendor and also that the New UmtruHEP was not ready as this line is an ATS ofthe New Umtru HEP. 5. No issues of forestclearance. 6. Line parameter: one circuitonly of the 132 kV D/C line - 0.14 ckm, 132kV S/C line - 1.07 ckm 7. The totalexpenditure incurred is Rs.448.76 Lakhsand is inclusive of 132 kV New Umtru -Umtru HEP line.
MeECL 7 MAR-17D/C2 771132 1New Umtru HEP - Norbong(EPIP-II)
Remark:
Neyveli New TPP (2x500MW),CS, Tamil Nadu, NLC,U1-04/18,U2-09/18
PGCIL 119 JUL-19D/C1 JUL-1990213156400New Neyveli TPP - Ariyalur(Villupuram)
Remark:
TL: Total Location 50Page 25 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Neyveli TPS-II Exp. (2x250MW) CS,TN, NLC, U1-1/12(C),U2-1/15 (C)
Commissioned 08/09.NLC 576 AUG-09D/C1 576576398400 398Neyveli TS-II - Pugalur AUG-09
Commissioned 08/09NLC 17 AUG-092xS/C2 17173400 3Neyveli (Exp-II) - Neyveli TS-II AUG-09
Remark:
Nigri TPP (2x660 MW), PS,MP, JPVL, U1-8/14 (C),U2-2/15 (C)
MPPTCL D/C1 400LILO of one ckt of Vindhychal -Satna at Nigrie
Commissioned 08/2014 (Late Reported)JAL FEB-17D/C2 322400 322JP Nigri TPP - Satna (PG) FEB-17
Remark:
Nilanchal TPP,(3x350MW), PS,Orissa, KVK, uncertain
Work yet to Start.KVK 0 JUN-16D/C1 0016400 0LILO of Mendasal - Baripada atNilanchal TPP
Remark:
Nimoo Bazgo (NHPC) (3x15 MW),CS,J & K,NHPC,U1-11/13(C),U2-10/13(C),U3-10/13(C).
Commissioned 11/12.JKPDD 13 NOV-12S/C1 1313466 4Nimoo Bazgo HEP - Alachi NOV-11
Rerouting of line and ganglas s/s droped.Leh Army S/S shall be connected with LehS/S.
JKPDD 29 DEC-16S/C2 8531066 2Leh III (Army base) - Leh
Commissioned 12/12.JKPDD 39 DEC-12S/C3 3939766 7Leh (C.P.) - Leh S/S DEC-12
Commissioned.JKPDD 107 SEP-14S/C4 1071072566 25Leh (C.P.) - Kharu S/S MAR-17
Slow progress.JKPDD 239 DEC-16S/C5 2042425166 36Kharu S/S - Himya S/S
Commissioned.JKPDD 140 JUN-14S/C6 1401403166 31Alachi - Khalsi S/S MAR-17
Commissioned 09/12.JKPDD 77 SEP-12S/C7 77771766 17Nimoo S/S - Alachi S/S SEP-12
Commissioned 03/12.JKPDD 152 MAR-12S/C8 1521523166 31Nimoo S/S- Leh S/S MAR-12
Commissioned.JKPDD 100 JUL-139 1001006066/11 100Nimoo S/S
JKPDD 30 JUL-1310 01006066/11 0Himya
Commissioned 11/12.JKPDD 100 NOV-1211 100100666/11 100Alchi. S/S
CommissionedJKPDD 100 DEC-1312 1001006066/11 100Kharu
CommissionedJKPDD 100 JUL-1313 1001006066/11 100Khalsi
Commissioned 12/12.JKPDD 100 DEC-1214 1001001366/11 100Leh
Remark:
Niwari TPP (2x45MW), MP, BLA Power Ltd. , U2-uncertain
This Line is deleted.MPPTCL 0D/C1 000132BLA- Gadarwara line
Remark:
North Chennai TPS St.II (2x600 MW),SS,TN,U1-9/13(C),U2-3/13 (C).
Commissioned 11/10.TANTRAN 2 NOV-10D/C1 DEC-10222230 2LILO of NCTPS- Mosur at NCTPSStage II (for startup power)
NOV-10
Commissioned 03/14.TANTRAN MAR-14D/C2 100400 100Alamathy -Sunguvarchatram(2nd Ckt)
MAR-14
TL: Total Location 50Page 26 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 01/14.TANTRAN 161 JAN-14D/C3 JUN-1016116198400 98Alamathy -Sunguvarchatram(1st Ckt)
JAN-14
Commissioned 01/13.TANTRAN 114 JAN-13M/C4 114114136400 136NCTPS St.II- Alamathy 400 kVS/S
JAN-13
Remark:
North Karanpura (3x660MW), NTPC, Adani, U1-2/20,U2-8/20,U3-2/21
PGCIL M/C1 DEC-1838400LILO of Gaya-Chandwa(existing)at North Karanpura STPP(Interim)
TSA termination notice withdrawn on10.12.2018, which was allowed by CERC.NKTL having taken several steps tocomplete the project, is better placed toimplement the project in efficient andcompressed time. However, still NoC isawaited from CCL/MoC for construction ofthe lines over coal bearing area and henceforce-majeure for the project is continued.Further, in accordance with the provision ofthe TSA, NKTL has approached CERC forfurther course of action.
APL 31 SEP-19D/C2 SEP-190265185400North Karanpura - Gaya line(NKTL - TBCB)
TSA termination notice withdrawn on10.12.2018, which was allowed by CERC.NKTL having taken several steps tocomplete the project, is better placed toimplement the project in efficient andcompressed time. However, still NoC isawaited from CCL/MoC for construction ofthe lines over coal bearing area and henceforce-majeure for the project is continued.Further, in accordance with the provision ofthe TSA, NKTL has approached CERC forfurther course of action.
APL 4 SEP-17D/C3 SEP-17011263400North Karanpura - Chandwa(Jharkhand) PS line (NKTL -TBCB)
TSA termination notice withdrawn on10.12.2018, which was allowed by CERC.NKTL having taken several steps tocomplete the project, is better placed toimplement the project in efficient andcompressed time. However, still NoC isawaited from CCL/MoC for construction ofthe lines over coal bearing area and henceforce-majeure for the project is continued.Further, in accordance with the provision ofthe TSA, NKTL has approached CERC forfurther course of action.
APL 0 MAY-19D/C4 MAY-19002400LILO of both ckt. of Ranchi -Maithon-RB line at Dhanbad(NKTL-TBCB)
TL: Total Location 50Page 27 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
TSA termination notice withdrawn on10.12.2018, which was allowed by CERC.NKTL having taken several steps tocomplete the project, is better placed toimplement the project in efficient andcompressed time. However, still NoC isawaited from CCL/MoC for construction ofthe lines over coal bearing area and henceforce-majeure for the project is continued.Further, in accordance with the provision ofthe TSA, NKTL has approached CERC forfurther course of action.
APL 0 MAY-195 MAY-19001000400/220 0Dhanbad s/s (NKTL-TBCB)
Remark: SPV/BPC - North Karanpura Transco Ltd / REC
NSL TPP (2x660 MW), PS, Orrisa, NPPL,
Project Authority intimated that PGCIL yetto award construction of work.
NSLNPPL 0D/C1 0046400 0NSL TPP - Angul
Remark:
Obra-C STPP (1x660MW), UP, UPRVUNL , 2021
UPPTCL MAR-19D/C1 400400Obra-C-Jaunpur Line
UPPTCL MAR-19D/C2 30400LILO of one Ckt Obra C -Jaunpurat Obra
To be constructed in TBCB mode.UPPTCL 0 MAR-21S/C3 0040765LILO of Anpara D-Unnao line atObra
UPRVUNL TO COMMITIONED BEFOREMARCH-21
UPPTCL 04 003000765/400 0ICT at Obra C s/s
Remark:
OPGC TPS-II(2X660)& other projects in Odisha, Ib Valley, U3-8/18,U4-10/18
Ready for commissioned 08/2017.SGL 152 AUG-17D/C1 JUL-17152152103400 103OPGC - Jharsuguda (OGP-IITL -TBCB)
AUG-17
Commissioned 12/18.SGL 782 JAN-19D/C2 AUG-19782782610765 610Jharsuguda (Sundargarh) -Raipur (OGP-IITL - TBCB)
DEC-18
Remark: SPV/BPPC - Orissa Generation Phase-II Transmission ltd. / PFC
Orissa UMPP (Bedabahal, Orissa), (5x800MW),(Orissa Integrated Power Ltd. (OPIL)
XYZ D/C1 765Orrisa UMPP - JharsugudaPooling Station
Remark:
Painampuram TPP (2x660MW),PS,AP,Thermal power tech Development Corp (India) ltd.,U1-2/15 (C),U2-9/15 (C)
Commissioned 08/13.PGCIL 92 AUG-13D/C1 929265400 65Thermal Powertech - NellorePooling Station
AUG-13
Remark:
Palatana CCGT (2x363.3),P S,Tri,OTPC, Module-1:1/13(c), Module 2 - 11/14 (C)
Commissioned.NETC 590 FEB-13D/C1 590590428400 428Silchar - Byrnihat FEB-13
commissioned 3/13MeECL 10 MAR-13D/C2 10109400 9LILO of Palatana - Bongaigaonat Killing (Byrnihat)
MAR-13
Commissioned 8/12NETC 680 AUG-12D/C3 680680495400 495Palatana -Silchar AUG-12
TL: Total Location 50Page 28 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 01/15.AEGCL 14 JAN-15D/C4 14147400 7LILO of Palatana - Bongaigaonat Azara S/S
JAN-15
Commissioned 07/14.NETC JUL-14S/C5 42400 42Byrnihat - Azara (2nd Ckt) (Partof Silchar - Azara)
JUL-14
Commissioned 01/15.NETC JAN-15D/C6 159400 159Azara - Bongaigaon (2nd Ckt) JAN-15
Commissioned 03/15.NETC 442 MAR-15D/C7 DEC-14442442201400 201Azara - Bongaigaon MAR-15
Ist transformer commissioned.MeECL 100 FEB-138 100100315400/220 100Killing (Byrnihat) (Ist Trf.)S/S FEB-13
Commissioned 05/15.AEGCL 100 MAY-159 SEP-11100100630400/220 100Kukurmara (Azara) S/S MAY-15
completedAEGCL 90 JUN-1610 100100100220/132 98Kukumara S/S (2x50)
Remark:
Pallivasal HEP (2x30MW),SS,Kerala,KSEB, U1 & 2-2020-21
ATS of Pallivasal Extension HEP. Work is yetto start.
KSEB 0 JUN-17D/C1 051220 0LILO of Idukki-Udumalpet atPallivasal HEP
Remark:
Panan HEP (4x75MW), PS, Sikkim, HHEPL, U1&U4-2020-21
HHEPL 2xD/C1 220Panan HEP - Mangan
Remark:
Parbati-II HEP (4x200), (PGCIL & JP) CS, HP, NHPC, U1 to 4-03/19
Commissioned 9/14.PKTCL 157 SEP-14S/C1 15715776400 76Parbati -II- Koldam line -II SEP-14
Commissioned 10/14.PKTCL 173 OCT-14S/C2 17317381400 81Parbati- II - Koldam line-I OCT-14
Remark:
Parbati-III HEP (4x130 MW),CS,HP,NHPC,U1-6/14 (C),U2-2/14 (C),U3-3/14 (C),U4-5/14 (C)
Commissioned 07/2013.PGCIL 5 JUL-13D/C1 JAN-10551400 1LILO of Parbati -II - Koldam atParbati Pooling Point.
JUL-13
Commissioned 07/2013.PGCIL 668 JUL-13D/C2 668668501400 501Parbati Pooling Point - Amritsar JUL-13
Commissioned 07/2013.PGCIL 7 JUL-13D/C3 774400 4LILO of Parbati -II - ParbatiPooling Point at Parbati -III
JUL-13
Remark:
Pare HEP (2x55MW)CS,ARP,NEEPCO,U1,2-5/18(c)
Line work completed. Test charged on03.03.2018.
PGCIL 10 FEB-18D/C1 10103132 3LILO of Ranganadi - Nirjuli atPare HEP
Line work completed. a) RHEP Section:Charged on 06.07.2018. b) ItanagarSection: Charged on 07.07.2018.
12 MAR-18D/C2 12125132 5LILO of Ranganadi - Itanagar atPare HEP
Remark:
Parichha Extn. TPS (2x250 MW),SS,UP,UPRVUNL,U5-5/12(C),U6-3/13 (C)
Commissioned 3/11UPPTCL MAR-10S/C1 220Parichha - Bhauti MAR-10
Commissioned 01/14.UPPTCL 402 JAN-14D/C2 402402259400 259Paricha - Mainpuri 2nd Ckt.) JAN-14
Commissioned 3/12UPPTCL 606 MAR-12S/C3 606606210220 210Parichha - Banda MAR-12
Commissioned 12/13.UPPTCL 301 DEC-13D/C4 DEC-10301301259400 259Parichha - Mainpuri (1st Ckt.) DEC-13
Commissioned 11/2017.UPPTCL 100 NOV-175 100100315400/220 100Orai (New) (ICT-II) NOV-17
TL: Total Location 50Page 29 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 11/2016UPPTCL 100 NOV-166 100100315400/220 100Orai S/S (new) (ICT-I) NOV-16
Remark:
Parli TPP Expn. (250 MW), SS,Maha,MSPGCL, U8-3/16(C)
Commissioned 10/12.MSETCL 300 OCT-12M/C1 APR-11300300181220 181Parli TPS-Nanded (waghala) OCT-12
Remark:
Part ATS for RAPP U-7&8 in Rajasthan (TBCB)
Ready for Commissioning 06/16. (RTCL).SGL 521 JUN-16D/C1 FEB-16521521402400 402RAPP - Shujalpur line (RAPPTCL -TBCB)
JUN-16
Remark: SPV/BPC - RAPP Transmission Company Ltd. / PFC
Petronet LNG (3x395 MW), PS,Guj,PLNGL, U1,U2,U3
XYZ D/C1 400PLNGL TPP - Vadodra
Remark:
Phata Byung HEP (2x38 MW),PS, UK, Lanco, U1,U2-2020-21
LEPP 0 DEC-16D/C1 0208220 0Phata HEP-Baramwari (Rudrpur)
Stage-II forest clearance is awaited.Possibility of commissioning the line in thematching time frame of generation projecti.e. March 2019 is very low . Interim/alternative arrangement for connecting theSingoli Bhatwari HEP to 220 kV grid issuggested.
PTCUL 70 MAR-19D/C2 0260182220 0Rudrapur(Brahmwani) -Ghansali-Srinagar line
Revised Drawings has been submitted byM/s Siemens and has been approved.Totalprogress 4%.
PTCUL 0 DEC-183 00100220/132 0Baramwari (GIS)
Commissioned 07/16.PTCUL 100 JUL-164 DEC-12100100630400/220 100Srinagar S/S JUL-16
contract terminated with M/S CGL,retendering is in progress
PTCUL 0 AUG-175 010060220/132 0Ghansali (GIS)
Remark:
Pipalkoti HEP (Vishnugad Pipalkoti) (THDC) ( Kuwari Pass ) (4x111 MW),SS,UK,PTCUL,U1,2,3,4-2020-21
Work has been awarded to Tata and routealignment & survey has been completed.Line is passing through forest land andforest proposal is under process.
PGCIL 0 SEP-19D/C1 SEP-190036400Pipalkoti HEP - Pipalkoti (THDC)(Kuwari Pass)
Acquisition of land for Pipalkoti substationis under process with THDC which would beresolved by Sep-17.
PTCUL 02 00630400/220 0Pipalkot (THDC)
Remark:
Pipavav CCPP(2x351MW),SS,Guj,GSECL,Block-1-2/14 (C), Block-2-3/13 (C).
Ready for Commissioning 07/16.GETCO 152 JUL-16D/C1 MAR-1215215294220 94GPPC (Pipavav)- Dhokadva JUL-16
Commissioned 06/13.GETCO 161 JUN-13D/C2 16116196220 96Otha (Mahuva) - Sagapara(Palitana)
JUN-13
Commissioned 8/12GETCO 133 AUG-12D/C3 APR-1113313381220 81LILO of Savarkundla - Mahva(otha) at Pipavav (GPPC) (line-2)
AUG-12
TL: Total Location 50Page 30 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 3/12GETCO 149 MAR-12D/C4 AUG-1014914991220 91LILO of Savarkundla - Mahva(otha) at Pipavav (GPPC) (line-1)
MAR-12
Remark:
Polavaram HEP (12x80MW),SS,AP,PPA,U1-12 (2021/22)
APTRANS 0 AUG-20D/C1 AUG-1900140400Polavaram-Kamavarapukota(QM)
Remark:
Pragati CCGT Ph-III(4X250+2X250MW),SS,DEL,PPCL,GT1-10/10(C),GT2-2/11(C),GT3-6/12,(C)ST1-2/12(C),GT4-5/13(C),ST2-2/14 (C)
commissionedPPCL 01 00630400 0Extension of bus and connectionwith DTL Substation
Remark:
Pulichintala HEP (4x30MW),SS,TelanganA,TSGENCO,U1- 9/16 (C), U2-9/16,U 3-9/17,U4-10/17
Commissioned 10/2016 (Late Reported)TSTRANS 132 NOV-16D/C1 13213274220 74Pulichintala HEP - Huzurnagarline
NOV-16
Ready for commissioning 06/2017.TSTRANS 42 JUL-17D/C2 424224220 24LILO of Chillakallu S/S -Narketpally line at HuzurnagarS/S
JUN-17
TSTRANS 0 MAR-173 0100200220/132/33 0Huzumagar S/S
Remark:
RaghunathpurTPS (2x600 MW),CS,WB,DVC,U1-8/14 (C),U2-1/16(C).
Commissioned 08/2017(Late Reported).DVC 439 SEP-17D/C1 AUG-10439439311400 311Raghunathpur TPS -Ranchi (PG) SEP-17
Commissioned 3/11. (Interim arrangement)DVC 33 MAR-11D/C2 333321400 21LILO of Maithon-Ranchi (PG) atRaghunathpur
MAR-11
Remark:
Raikheda TPP (2x685 MW), PS,Chh, GMR, U1-2/15 (C), U2-3/16 (C),
Commissioned in February 2014. Reportedin July 2015.
GMR 181 JUL-15D/C1 181181131400 131Raikheda (GMR) - Raipur PoolingStation
JUL-15
Remark:
Rajasthan New Solar and Wind Power Plant
Commissioned 12/17 (Late Reported).RVPNL 445 MAR-18D/C1 445445420400 420Bikaner -Sikar (PG) MAR-18
Commissioned 04/16.RVPNL 138 APR-16D/C2 138138102400 102LILO of one ckt Raj west -Jodhpur at Jodhpur (New)
APR-16
W/O awarded to M/S SEW Hydrabad.Aviation NOC issued. Forest involved, In-principle aproval issued on 14.09.18.Aviation NOC issued on 16.05.2018. Workunder progress.
RVPNL 437 MAR-19D/C3 434446320400 241Ramgarh -Bhadla
Ready for Commissioning 12/2017.RVPNL 278 DEC-17D/C4 278278198400 198Ramgarh (Jaisalmer)-Akal(Jaisalmer )
DEC-17
W/O awarded to M/S Moji Construction.Permission to Work from Forest Depttissued on 28.03.2018. Work underprogress.
RVPNL 80 JAN-19S/C5 798023220 20Sirohi-Pindwara
under KFW. Scheme under reviewRVPNL 0 MAR-20D/C6 0020220 0LILO of Kolayat -Bajju at Kolayat
TL: Total Location 50Page 31 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Ready for Commissioning 11/18.RVPNL 557 DEC-18D/C7 557557405400 405LILO of Jodhpur -Merta atPooling station Badla
NOV-18
KFW funded scheme. PBG returned to thebidders, and Bid to be cancelled afterreceipt of NOC from KFW.
RVPNL 0 MAR-20D/C8 0020220 0LILO of Chandan- Pokaran atPokaran
under KFWRVPNL 0 MAR-20D/C9 0020220 0LILO of PS 1- Bajju at PS 1/Bajju
Bajju has been dropped and extension ofline is under planning. Line charged on 33KV on dt 08.02.16 for anti-theft
RVPNL 107 SEP-18D/C10 10710768220 68PS 1 /Bajju -Bhadla
Ready for commissioning 12/2016.RVPNL 1 DEC-16D/C11 111220 1LILO of both ckts Ramgarh GTPS-Dechu at Ramgarh
DEC-16
KFW funded scheme. W.O. awaded to M/sTATA Project Ltd. Route approval certificateissued. Final approval issued by State Govt.on 01.06.2018. Route approval certificateissued.
RVPNL 332 JAN-19D/C12 332332260400 233Jaisalmer -2 -Barmer
Ready for Commissioning 08/16.RVPNL 146 AUG-16D/C13 14614690220 90Chatrail-Ramgarh AUG-16
Commissioned 06/16.RVPNL 105 JUN-16D/C14 10510563220 63Bhadla-Kanasar JUN-16
Commissioned 04/2017RVPNL 512 APR-17D/C15 512512379400 378Bhadla-Bikaner APR-17
KFW funded scheme .W.O. awarded to M/SMonte Carlo. Final approval issued by NHAIon 07.09.18. In principle approval issued byForest deptt. PTW issued on 29.08.18.Route approval certificate issued.
RVPNL 398 JAN-19D/C16 398399280400 285Barmer-Bhinmal (PG)
RVPNL 0 MAR-17D/C17 0030220 0Badisid-Bap
Ready for Commissioning 08/18.RVPNL 620 AUG-18D/C18 620620447400 447Akal -Jodhpur (New) AUG-18
NOC received from KFW for award ofcontract on 30.05.2018. NOA issued infavor of M/s Skipper on dated 01.06.2018.Contract agreement signed by the firm.Survey work under progress.
RVPNL 0 MAR-19D/C19 0050400 0Akal (1)- Jaisalmer -2
Commissioned 11/14.RVPNL 155 NOV-14D/C20 15515593220 93Aau-Baithwasia NOV-14
Commissioned 04/16.RVPNL 196 APR-16D/C21 196196118220 118Aau - Badisid APR-16
RVPNL 022 00500400/220 0Akal (Aug.)
Commissioned 05/15.RVPNL 100 MAY-1523 100100160220/132 100Aau S/S MAY-15
Scheme deferred. SBG of tender releasedand tender dropped
RVPNL 024 0100160220/132 0Pokaran S/S
RVPNL 0 MAR-1725 00480220/132 0Ramgarh S/S
Commissioned 12/15.RVPNL 100 DEC-1526 100100100220/132 100Kuchera S/S DEC-15
TL: Total Location 50Page 32 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
W.O awarded to M/s Techno Pvt Ltd. 3*500MVA 400/220 KV X-Mers received. All threetransformers charged from 220kV side.220/132 kv 160 MVA Trans commissioned.ICT 3 commissioned on 21.09.17 & ICT 1 &2 commissioned on 10.10.17 . 3 Nosreactors installed. Trf.Third commissionedon 10.1.17 (220KV side). On 15.12.17commisioned on 400KV level
RVPNL 100 MAR-1827 1001001500400/220 100Ramgarh S/S
Scheme deferred. PBG returned to bidders.RVPNL 028 0100160220/132 0Kolayat S/S
commissionedRVPNL 10029 100100480220/132 100Bhadia Pooling Station
Scheme deferred. PBG returned to biddersRVPNL 030 0100160220/132 0Bajju S/S
Commissioned 06/16.RVPNL 100 JUN-1631 100100160220/132 100Kanasar S/S JUN-16
W.O. awarded to M/s Siemens. KFW fundedscheme. Testing Work under progress.
RVPNL 98 JAN-1932 971001000400/220 97Jaisalmer -2 S/S
Scheme deferred. PBG returned to biddersRVPNL 033 0100160220/132 0Chatrail S/S
W.O. awarded to M/s Alstom. ADB fundedscheme. 500MVA Trf. Test Charge on18.03.17 & comm. on 22.07.17. 2 nos Trf.Charged on 18.08.17 Trf ICT-3 charged on05.09.17. Repaird Trf. Commissioned on15.02.18.
RVPNL 10034 100100945400/220 100Bhadia Pooling Station
Remark:
Rajpura (NABA) TPP, (2x700MW) U1-1/13 (C) ,& U2-7/14 (C)
Commissioned 05/13.PSTCL 242 MAY-13D/C1 242242171400 171Rajpura - Dhuri MAY-13
Commissioned 05/13.PSTCL 29 MAY-13D/C2 292918400 18Rajpura Thermal - Rajpura MAY-13
Commissioned 05/14.PSTCL 381 MAY-14D/C3 381381279400 279Rajpura Thermal - Nakodar MAY-14
Commissioned 06/16.PSTCL 100 JUN-164 100100500400/220 100Rajpura (New) (2x500) (ICT-I) JUN-16
Commissioned 03/2017PSTCL 100 MAR-175 DEC-16100100500400/220 100Rajpura (New) (2x500) (ICT-II) MAR-17
Remark:
Ramgarh CCPP Extn.-III, (110+50 MW), SS,Raj, RRVUNL, (GT-3/13(C),ST-5/14 (C)
Commissioned 9/12.RVPNL 119 SEP-12D/C1 11911971220 71Dechu - Phalodi SEP-12
Commissioned 12/14.RVPNL 322 DEC-14D/C2 322322202220 202Chandan - Dechu DEC-14
Commissioned 11/14.RVPNL 309 NOV-14D/C3 309309194220 194Ramgarh (GTPP) - Chandan NOV-14
Remark:
RAMMAM-III HEP (3x40 MW), NTPC, WBSTCL, 2020-21
WBSETCL D/C1 APR-1920132LILO of 132 kV One Ckt ofRammam-II - NBU at Rammam -III HEP
WBSETCL D/C2 APR-19180132Rammam-III - New Jalpaiguri
Remark: Onus of development of ATS for the project is pending as PPA for purchase of power from Rammam - III HEP by WBSEDCL is yet to be executed. NTPC may be requested to finalise theevacuation plan and its development mechanism in consultation with CEA/CTU/STU.
Rampur HEP (6x68.67 MW),CS,HP,SJVNL,U1-2/14 (C),U2-2/14 (C),U3-3/14 (C), U4-6/14(C), U5-3/14 (C), U6 - 12/14(C)
TL: Total Location 50Page 33 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 8/11.PGCIL 90 AUG-11D/C1 NOV-11909066400 66LILO of Patiala - Hissar atKaithal
AUG-11
Commissioned 02/14.PGCIL 12 FEB-14D/C2 NOV-1112125400 5LILO of Nathpa Jhakri - Nalagarhat Rampur (Loop in portion)
FEB-14
Commissioned 9/11.PGCIL 217 SEP-11D/C3 NOV-11217217156400 156Patiala - Ludhiana SEP-11
Commissioned 10/14.PGCIL OCT-14D/C4 2400 2LILO of Nathpa Jhakri - Nalagarhat Rampur (2nd Ckt balance)
OCT-14
Remark:
Ranghit-IV HEP (3x40MW),PS,Sikkim,JPCL,U1,2,&3-2021-22
Work in generation project is stopped forsince 2013.
LEPP MAR-19D/C1 220Routing of one circuit ofJorthong - New Melli via Rangit -IV
Work of 220kV line has been awarded toM/s. Ashish Infratech and completionperiod is 8 months from start of work.Generation project will take about 2? yearsfor completion as against 8 months forcompletion of associated transmission line,there will be no mismatch for evacuation ofpower. It may also be mentioned that routesurvey of transmission line has beencompleted and design work of transmissionsystem including towers (15 nos.) has alsobeen completed. 220kV GIS bays at PGCILsubstation at New Melli have also beenawarded to M/s. PGCIL as deposit work.Line length is 3.3 KM. Associatedtransmission system comprises of 220kVGIS in PH building, 3.3 km long 220kV D/Cline from PH to PGCIL pooling station atNew Melli. Work for 220kV GIS substationat PH has been awarded to M/s. Siemensand GIS equipment has already beendelivered at site.
JPCL MAR-19D/C2 157220Rangit IV - New Melli line
Remark:
Rangit-II HEP (2x33MW)PS,Sikkim, SHPL,U1&2-2021-22
SHPL D/C1 220LILO of one ckt of Legship - NewMelli at Rangit-II
Remark:
Ratija ( 1x50 MW) TPS,P.S.,Spectrum Coal & Power ltd.,Chh, U1-2/13(C)
Commissioned.SCPL D/C1 24132 24Ratija - Kasiapalli MAR-17
Remark:
Ratle HEP, (4x205+1x30 MW), PS, J&K, GVK, U-I to U-5 2019-20
PGCIL 0S/C1 00400Kishenpur - Ratle, (Dulhasti-Kishenpur Second Ckt stringingextending up to Ratle HP)
PGCIL D/C2 400LILO of one circuit of Dulhasti -Kishenpur at Ratle HEP.
TL: Total Location 50Page 34 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark: Work yet to be award.
Rayalseema ( Stage-IV) (600 MW), SS,AP,BHEL,U6-08/17
Ready for commissioning 06/2017.APTRANS 321 JUL-17D/C1 MAY-15321321429400 429Rayalaseema TPP - Chittoor line JUN-17
Remark:
Reliable TPP (RTPL), (2x660 MW), PS, MP, RTPL,U1-6/16 (Tentative), U2-12/16 (Tentative)
XYZ D/C1 765Reliable TPP - VindhyachalPooling Station
Remark:
Rewa TPP, Khandwa (2x800 MW), SS,MP
MPPTCL D/C1 40220LILO of Handia - Barwaha atHandia
MPPTCL D/C2 20400LILO of Khandwa (PGCIL) -Rajgarh at Chhegaon
double entryMPPTCL 0D/C3 0040220LILO of Ratlam - Badnagar atBadnawar
MPPTCL 126 FEB-20D/C4 FEB-206914953400Nagda - Ujjain line (GEC-I)
MPPTCL D/C5 180400Handia - Ashta(2nd stage)
Remark:
Rongnichu HEP (2x48MW) PS,Sikkim, MBPCL,U1&2-2019-20
MBPC D/C1 220Rongnichu - Rangpo PoolingStation
Remark:
Rosa TPP Extn Ph-II (2x300), PS, UP, Reliance, Northern Region, U3-12/11 (C), U4-3/12 (C)
Commissioned 3/12RPTL MAR-12D/C1 15400 15LILO of Lucknow - Bareilly atShahjahanpur
MAR-12
Commissioned in March 2012. reported injuly 2015.(Line Charged by passingShahjehanpur S/S).
RPTL JUL-15D/C2 16400 16Rosa - Shahjehanpur (PG) JUL-15
Commissioned 04/16. (Late Reported.)UPPTCL 340 APR-16D/C3 340340216220 216Roza - Dohna AUG-16
Remark:
Sagardighi TPP (2x300 MW) Phase-II(2x660 MW),SS,WBPDCL U1-12/07(C),U2-7/08(C), U3-12/15(C), U4-12/16
Work Delayed due to poor performance ofthe vendor (Jyoti Structures Ltd.).
WBSETCL 153 DEC-18D/C1 JUL-1515315489400 87Sagardighi TPS - Gokarna line
Commissioned 4/11.WBSETCL 340 APR-11S/C onD/C
2 DEC-08340340255400 255Sagardighi - Parulia (PGCIL) APR-11
Remark:
Sainj HEP (2x50 MW) on Sainj river,SS,HP,HPPCL,U-08/17
Commissioned 04/17 (Late Reported).HPPTCL 1 MAR-18D/C1 111400 1LILO of Parbati - II HEP - Parbati-III Pooling station at Sainj
MAR-18
Remark:
Salaya (Essar Power ) (2x600 MW),PS, Guj, Essar Power U1-2/12(C),U2-6/12 (C)
Commissioned 5/11.GETCO 353 MAY-11D/C1 NOV-09353353226400 226Vadinar (Essar)-Hadala MAY-11
Commissioned 01/14.GETCO 294 JAN-14D/C2 294294117400 117Vadinar - Amreli (Part line) JAN-14
TL: Total Location 50Page 35 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
WIPGETCO 490 DEC-18D/C3 NOV-09447533180400 235Vadinar(Essar)- Amreli(Balance)
Ready for Commissioning 09/16. (Due todelay in Essar Generation Project & nonfinalization of gentry 6 ckm work is pendingbalance 446 ckm has been test charged.
PGCIL 606 SEP-16D/C4 FEB-14606606446400 446Essar Gujarat TPS - Bachau(Tripal)
SEP-16
Remark:
Salora TPS (M/s Vandana Vidyut ) (2x135 MW), U2- uncertain
Commissioned. 7/12. (Interim )VVL JUL-12D/C1 6400 6LILO of one ckt Korba-Birsinghpur at Vandana
JUL-12
Target Commissioning date will beprovided after approval/receipet of loanfrom lenders.
VVL MAR-17D/C2 8460400Salora TPS - Dharamjaigarh(Korba) (PGCIL) Pooling Station
Remark:
Sandila TPP (2x660 MW), PS,UP,TPL,
TOR. D/C1 400Sandila TPP - ATS not defind
Remark: Status Not Reported (UP share 1188 MW)
Santaldih TPP (250 MW),SS,WB,WBPDCL,U6-6/11(C)
Commissioned 12/07WBSETCL 152 DEC-07D/C1 15215280220 80LILO of Santaldih - Durgapur (ICkt) at Asansol
DEC-07
Commissioned 4/08WBSETCL 11 APR-08D/C2 11114220 4LILO of STPS - Arambagh atBishnupur
APR-08
Remark:
Sasan UMPP (6x660 MW),PS,MP,Reliance,U1-5/14 (C),U2-12/13 (C),U3-5/13 (C),U4-3/14 (C),U5-8/14 (C),U6-3/15 (C)
Commissioned 09/13.PGCIL 896 SEP-13S/C1 DEC-12896896334765 334Fatehpur- Agra line-II SEP-13
2nd Ckt Commissioned 06/13.PGCIL 139 JUN-13D/C2 13913950400 50Indore - Indore Ckt-II JUN-13
Commissioned 3/12.PGCIL 26 MAR-122xD/C3 262613400 13LILO of both ckt Vindhyachal -Jabalpur at Sasan
MAR-12
Commissioned 4/13.PGCIL 670 APR-13S/C4 670670242765 242Sasan - Satna line -II APR-13
Commissioned 6/12PGCIL 737 JUN-12S/C5 737737276765 276Satna - Bina line -II JUN-12
Commissioned 05/13.PGCIL 954 MAY-13S/C6 954954355765 355Sasaram - Fatehpur line-II MAY-13
Commisisoned 03/12PGCIL 139 MAR-12D/C7 13913950400 98Indore - Indore (MPPTL)(Partly) MAR-12
Commissioned 12/12.PGCIL 689 DEC-12S/C8 DEC-12689689241765 241Sasan - Satna line -I DEC-12
Line commissioned in Jan'12(charged at400 KV)
PGCIL 738 MAR-12S/C9 738738274765 274Satna - Bina line -I JAN-12
Commissioned 01/13.PGCIL 6 JAN-13D/C10 DEC-12661400 1Bina - Bina (MPPTCL) JAN-13
Commissioned 8/12.PGCIL 100 AUG-1211 1001001000765/400 100Satna (2nd ICT) AUG-12
Commissioned 03/13.PGCIL 100 MAR-1312 1001001000765/400 100Bina (ICT-II) S/S MAR-13
Commissioned 8/12.PGCIL 100 AUG-1213 1001001000765/400 100Bina. S/S AUG-12
Commissioned 03/13.PGCIL 100 MAR-1314 1001003000765/400 100Gwalior MAR-13
Commissioned 06/13.PGCIL 100 JUN-1315 1001001500765/400 100Indore (1st Trf.) JUN-13
Commissioned 09/13.PGCIL 100 SEP-1316 1001001500765/400 100Indore (2nd Trf.) SEP-13
TL: Total Location 50Page 36 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
ICT-I Commissioned 6/12.PGCIL 100 JUN-1217 1001001000765/400 100Satna (1st ICT) JUN-12
Remark:
Satpura Ext TPS (250 MW),SS, MP,MPPGCL, U10-3/13 (C), U11-12/13(C)
Commissioned 03/15.KPTL 651 MAR-15D/C1 651651482400 482Satpura - Ashta MAR-15
Commissioned 02/15.MPPTCL 317 FEB-15S/C onD/C
2 317317199220 199Ashta - Indore - II (Jetpura) FEB-15
Commissioned 01/15.MPPTCL 100 JAN-153 100100315400/220 100Ashta New (2nd Trf.) JAN-15
Commissioned 10/11MPPTCL 100 OCT-114 100100160220/132 100Ashta (Add.) Trf. S/S OCT-11
Commissioned 09/13.MPPTCL 100 SEP-135 100100315400/220 100Ashta New S/S SEP-13
Remark:
Shahpurkandi Dam(3x33+3x33+1x8), Punjab, Ravi river, PSPCL,2020-21
Amount not yet deposited by Punjab StatePower Corporation Limited.
PSTCL 0D/C1 0018220LILO of 1ckt RSP - Sarna atShahpur Kandi PH-I and PH-II
Amount not yet deposited by Punjab StatePower Corporation Limited.
PSTCL 0 MAR-20D/C2 0010220Shahpur Kandi PH-I - ShahpurKandi PH-II
Remark:
Shapoorji Pallonji,Kodinar,(2x660),PS,Guj, SPEPL. U1-5/15,U2-8/15
SPPCL 330D/C1 292339107400 59Shapporji Pallonji TPS - Amreli
SPPCL D/C2 400SPEL - Pirana (PG)
Generation not comingGETCO 0 DEC-16D/C3 00220400 0Shapoorji Pallonji generatingstation
Remark:
Shirpur TPP (2x150MW), Maharashtra, Shripur power, U1&2-11/17
Commissioned 01/2017 (Late Reported).MSETCL 0 OCT-17D/C1 0070220 70Shirpur Power Plant - Amalnerline
OCT-17
Remark:
Shongtong Karcham HEP (3x150 MW) on Satluj river, U1,U2&U3-09/21
The contract is to be awarded throughTBCB route and BPC is yet to placeRFQ/RFP.
HPPTCL 0D/C1 0018400Shongtong Karcham HEP -Wangtoo (Quad)
HPPTCL 85 DEC-182 85100630400/220 65Wangtoo (GIS) S/S
Remark:
Sikka TPP Extn, (2x250 MW) SS, Gujarat, GSECL, U3 -3/15 (C),U4-9/15 (C)
Commissioned 08/15.GETCO 259 AUG-15D/C1 259259157220 157Sikka - Moti Paneli line AUG-15
Commissioned 03/18.GETCO 189 MAR-18D/C2 189189117220 117LILO of Jamnagar - Jetpur line-IIat Sikka
MAR-18
Remark:
Simhapuri PH-I,(150 MW),PS,U2-7/12(C)
Commissioned 3/12MAR-12S/C1 26400 26Simhapuri-Nellore MAR-12
Remark:
Singareni Colleries Generation Project (2x 600 MW), Telangana,U1-3/16 (C),U2-11/16(C)
TL: Total Location 50Page 37 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 11/15.TSTRANS 459 NOV-15D/C1 459459325400 325Singareni TPS (Jaipur TPP) -Gajwel
NOV-15
Remark:
Singhitarai TPP (2x600 MW),PS,Chg,, Athena Chhg Power Ltd.,U1,U2-uncertain
Commissioned 4/16 (Late Reported)ACPLT 75 MAY-16D/C1 757550400 50Athena Singhitarai - RaigarhPooling Station (near Kotra)
MAY-16
Remark:
Singoli Bhatwari HEP (3x33MW)PS,UK,L&T,U1,2 &3-03/19
Contractual issue. PTCUL was requested byCEA to resolve the contractual issue ofBaramwari Srinagar 220 KV D/C line andcomplete it matching with thecommissioning of Singoli Bhatwari HEP toavoid power evacuation from the project.
PTCUL 70 MAR-19D/C1 02605220 0LILO of Baramwari - Srinagar atSingoli Bhatwari
Remark:
SJK Powergen TPP (2x660 MW),PS, MP GMR, U1-12/14,U2-6/14
XYZ 330D/C1 292339107400 59SJK TPS - Jabalpur PoolingStation
Remark:
Solapur TPP (2x660 MW),CS, Maha, TPL, U1-4/17(c) & U2-10/18
Ready for commissioning 04/15.PGCIL 35 APR-15D/C1 OCT-15353522400 22Sholapur STPP - Sholapur line-I APR-15
Award placed in Jun'15. Work underprogress.
PGCIL 60 SEP-172 MAR-17501000400 20Bay Extn. at 400/220KVSholapur S/stn.
SEP-17
Remark:
Sorang HEP (2x50 MW),PS,HP,HSPCL,U1,U2-2018-19
Commissioned 10/15.HSPPL 11 OCT-15D/C1 11117400 7LILO of one ckt Karcham wangto- Abdullapur at Sorang HEP
OCT-15
Remark: Generation project not working
Srinagar HEP, (4x82.5 MW),PS,UK,AHPC Ltd.,U1-4/15 (C) ,U2-6/15 (C), U3-4/15 (C)U4-6/15 (C)
Commissioned 07/16.PTCUL 39 JUL-16D/C1 393928400 28Srinagar HEP - Sringar 400 kVS/S.
JUL-16
Commissioned 11/14.UPPTCL 20 NOV-14D/C2 20207400 7LILO of Muzaffarnagar -Vishnuprayag at Srinagar
NOV-14
Remark:
Subansiri Lower (HEP) (8x250 MW) ,CS, ArP, NHPC, Unit 1 to 8 -2020-21
Works stand-still on a/c of localdisturbance/agitation against big dams.
PGCIL 327 MAR-22D/C1 AUG-13196465348400 35Lower Subhansiri - BiswanathChariyali line -II
Works stand-still on a/c of localdisturbance/agitation against big dams.
PGCIL 329 MAR-22D/C2 AUG-13228444335400 64Lower Subhansiri - BiswanathChariyali line -I
Remark:
Suratgarh Super Critical TPS (2x660 MW),SS, Raj,RRVUNL U7-11/17,U8-3/18
Commissioned 11/15.RVPNL 465 NOV-15S/C1 MAR-14465465172400 172Bikaner- Merta NOV-15
TL: Total Location 50Page 38 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Work order awarded to M/s Aster Chennai.Aviation NOC received. Route approvalcertificate issued on 25.06.2018. Stringingwork under progress.
RVPNL 676 JAN-19D/C2 JAN-13676676480400 448Suratgarh TPS - Babai (Jhunjhunu)
Commissioned 07/18.APL 351 JUL-18D/C3 JUL-18351351279400 279Suratgarh TPS- Bikaner JUL-18
Commissioned 03/18.RVPNL 100 MAR-184 100100315400/220 100GSS Babai S/S MAR-18
Remark:
Suzlon wind farm (100 MW), PS,Kutch, GETCO, U1-5/13
XYZ D/C1 220Suzlon wind farm - Bhachau(PG)
Remark:
S V Power TPP (63 MW),PS,Cha,KVK,U1-12/11(C),
Commissioned 11/11.SVPPL NOV-11D/C1 12132 12LILO of Korba-Mopaka line at S.V. Power
NOV-11
Remark:
Swara Kuddu HPPCL (3x37MW), U1,U2,U3-3/19
HPPTCL 25 DEC-18D/C1 MAR-17203828220Snail(Swara Kudu) -Hatkoti
Ready for Commissioning 08/18.HPPTCL 80 AUG-18D/C2 808052220 52Hatkoti - Gumma AUG-18
HPPTCL 9 DEC-18D/C3 MAR-174156400LILO of both ckt of Nathpa Jhakri- Abdullapur at Gumma
HPPTCL 04 000220 0Hatkoti Switching Station
HPPTCL 50 NOV-185 0100315400/220 0Gumma S/S
Remark:
Swastik TPP, (25 MW), PS,Chg, ACB, U1-12/13
CommissionedAPL D/C1 132 132LILO of Korba-Mopka at SwasticTPP
MAR-17
Remark:
System Strengthening
Ready for Commissioning 06/15.PGCIL 163 JUN-15D/C1 DEC-1216316397220 97Mariani (New) - Mokikchung(PG)
JUN-15
Work awarded to Transrail on 13.08.18 2loc excavation is under progress. One locconcrete under process. Check Survey inProgress. Excavation one number underprogress.
TANTRAN 0 MAR-19D/C2 SEP-17010818400ETPS to Tondiarpet point ATS
Baywork completed. line to be energized.TANTRAN 229 MAR-19D/C3 22922969230 55Kamudhi s/s - Tiruchulis/s(Muthuramlingapuram) - Ckt-II
1. Date of award of contract is 18.03.2011.2. Schedule date of completion was18.03.2012. 3. The line was completed on11.02.2016 and commissioned on12.05.2017. 4. Delay was due to RoWissue, all of which have been resolved andalso due to delay in commissioning of SASat 400/220/132 kV Killing sub-station.
MeECL 19 MAY-17M/C4 191917132 22Killing (Byrnihat)-EPIP-I
TL: Total Location 50Page 39 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
80% material supplied.AEGCL 12 DEC-18S/C onD/C
5 DEC-112335132 0Kukurmara - Azara line
Commissioned 9/12.AEGCL 8 SEP-12D/C6 884220 4LILO of Agia - Sarusajai line atKukurmara S/S
SEP-12
Line commissioned in Nov'18.PGCIL 17 NOV-18D/C7 DEC-12171730132 10LILO of Aizwol (PG) - Zemabawkat Melriat (PG)
Commissioned 03/13.PGCIL 4 MAR-13D/C8 441400 1LILO of Kaithalguri - Misa line atMariani (New) (Charged at220KV)
MAR-13
Commissioned 09/15.TANTRAN SEP-15D/C9 23220 23LILO of Korattur - Koyambedu atAlamathy (Balance Portion)
SEP-15
Commissioned 03/13.PGCIL 5 MAR-13D/C10 DEC-12551132 1LILO of Loktak - Imphal atImphal (New) line
MAR-17
Approval from State Govt. obtainedPEDMIZO 0 DEC-13S/C11 005132 0LILO of Zemabawk - W.Phailengat Sihhmui
Line commissioned in Nov'18.PGCIL 20 NOV-18D/C12 DEC-12202012132 12Melriat (New) - Sihmui line
Line commissioned in Jul'15.PGCIL 11 JUL-15D/C13 DEC-1211112132 2Mokokchung (PG) - Mokokchung(Nagaland) line
MAR-17
Commissioned 6/12PGCIL 118 JUN-12D/C14 11811874400 74Palatana - Surajmaninagar line(Charged at 132 KV)
JUN-12
Line commissioned in Jun'17.PGCIL 347 JUN-17S/C onD/C
15 DEC-12347347102132 104Pasighat - Roing line.
Line commissioned in Jun'17.PGCIL 244 JUN-17S/C onD/C
16 APR-1224424473132 72Roing - Tezu line
Commissioned 4/12.PGCIL 69 APR-12D/C17 696938132 38Silchar - Badarpur (PG) line. APR-12
Part line commissioned (35Ckm) throughcontingency in Jun'12. Balance linecommissioned in Nov'17.
PGCIL 110 NOV-17D/C18 11011060132 60Silchar - Hailakandi(Contingency arrangement)
Commissioned 03/15.PGCIL 479 MAR-15D/C19 DEC-12479479334400 334Silchar - Imphal (New) line (tobe charged at 132KV)
MAR-15
Commissioned 11/18.PGCIL 451 DEC-18D/C20 DEC-12451451287400 287Silchar - Melriat (New) NOV-18
Commissioned 07/15.PGCIL 373 JUL-15D/C21 DEC-12373373254400 254Silchar - Purba Kanchan Bariline (charged at 132KV)
JUL-15
Line commissioned in Mar'12.PGCIL 7 MAR-12D/C22 772132 2Silchar - Srikona line MAR-12
Completed 9/13TSECL 71 SEP-13D/C23 717118132 18Surajmani Nagar - Agartala 79Tilla Grid S/S
MAR-17
Fund proposed in World Bank.TSECL 0 AUG-16D/C24 006132 0Surajmani Nagar - Badarghat
Commissioned 08/12.TSECL 63 AUG-12D/C25 636336132 36Surajmani Nagar -Budhujngnagar
AUG-12
Fund not yet tied up. Proposed under WorldBank Financing /SPA/NEC.
TSECL 0 MAR-17D/C26 00260400 0Surajmani nagar-P.K.Bari
RoW issueTSECL 68 DEC-18D/C27 568020132 7Surajmani Nagar - Rokhia
Proposed under NEC.TSECL 0 JUN-15D/C28 05050132 0Surajmani Nagar - Udaipur
Line commissioned in Jul'18.PGCIL 332 JUL-18S/C onD/C
29 DEC-1233233296132 95Tezu - Namsai line.
Line test charged on 21.08.2011.TSECL 41 AUG-11D/C30 4134112132 12Udaipur - Palatana AUG-11
Commissioned 12/12TSECL 100 DEC-1231 100100100132/33 100Surajmaninagar S/S (Upgrdableto 400 kV)
DEC-12
TL: Total Location 50Page 40 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
400KV infrastructure is ready and its 220KVinfrastructure is under construction.
DVC 100 MAR-1932 FEB-1750100315400/220 50DSTPS ICT-II S/s
Commissioned in Jul'18.PGCIL 100 JUN-1833 10010030132/33 100Namsai S/S
Commissioned 12/11AEGCL 100 DEC-1134 10010050132/33 100Panchgram (Aug.) S/S DEC-11
Commissioned in Jun'17.PGCIL 100 JUN-1735 10010030132/33 100Roing S/S
ED, 0 MAR-1336 010090132/33 0Yurembam (Aug.) S/S
Commissioned 03/2017MSETCL 100 MAR-1737 10010050220/33 100Wathar (Addl.) MAR-17
Charged in Jun'17.PGCIL 100 JUN-1738 10010030132/33 100Tezu S/S
Remark:
Talwandi Sabo TPP (3x660MW),PS,Punjab, Sterlite, U1-6/14 (C),U2-10/15 (C),U3-03/16 (C)
Commissioned 09/14.PSTCL 277 SEP-14D/C1 277277201400 201Talwandi Sabo-Mukatsar SEP-14
Commissioned 04/14.PSTCL 178 APR-14D/C2 178178128400 128Moga- Nakodar APR-14
Commissioned 03/13.PSTCL 287 MAR-13D/C3 287287204400 204Talwandi Sabo - Moga MAR-13
Commissioned 01/13. (Line energised on21.8.12 but intimated in Jan 2013)
PSTCL 250 JAN-13D/C4 250250175400 175Talwandi Sabo - Dhuri JAN-13
Commissioned 09/14.PSTCL 100 SEP-145 JAN-13100100630400/220 100Mukatsar (2x315) SEP-14
Commissioned 04/14.PSTCL 100 APR-146 100100315400/220 100Nakodar (1st Trf.) APR-14
Remark:
Tamnar TPP (4x600 MW),PS,Chatt,JPL, U1-3/14 (C),U2-3/14 (C),U3-1/15 (C),U4-3/15 (C)
Commissioned 01/15.JPL 67 JAN-152xD/C1 676744400 44Tamnar TPP - Raigarh (Tamnar)Pooling Station
JAN-15
Remark:
Tanda Extn. (2x660 MW), CS,UP, NTPC,U1-3/19,U2-7/19
"Work is standstill for more than a year dueto poor financial health of SEUPPTCL, thetransmission service provider, owned byM/s Isolux. The line is a part of TBCBproject awarded to M/s Isolux. UPPTCLrepresentative informed that GoUP isconsidering to take over transmissionproject and evaluation of completed workis under progress. Bids for valuers havebeen invited by M/s PFC. Valuation is underprogress. Final decision will be taken aftervaluation."
SEUPPTC 97 OCT-18S/C1 54241100400 0Tanda TPS Extn - Gonda
The project is being developed under TBCBmode. The parent company M/s Isolux hasgone insolvent. Govt of UP is consideringvarious options for quick and amicableressolution for completion of project i.e.Take over of trnasmission project oncommercially viable purchase price orsubstitution of M/s Isolux as opted by leadlender M/s PFC.
UPPTCL 296D/C2 140543460400 0Gonda - Shahjehanpur (PG)
TL: Total Location 50Page 41 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Line Length 42.8 ckm. Fdn completed, Erec& Strg WIP on line of ETD- Basti is to bediverted for which 01 no. tower is to beerected.
UPPTCL 94 JAN-19D/C3 91940220 27TAnda (NTPC) - Tanda (New)
Proposal for Railway crossing submittedand approval awaited..
UPPTCL 206 JAN-19D/C4 201206120400 121LILO of Azamgarh - Sultanpur atTanda TPS Extn
Foundation work in progress.UPPTCL 16 OCT-19S/C5 014450400Tanda TPS Extn- Basti (Q)
The project is being developed under TBCBmode. The parent company M/s Isolux hasgone insolvent. Govt of UP is consideringvarious options for quick and amicableressolution for completion of project i.e.Take over of trnasmission project oncommercially viable purchase price orsubstitution of M/s Isolux as opted by leadlender M/s PFC.
UPPTCL 06 00630400/220 0Gonda
Work in progress.UPPTCL 0 MAR-207 JUL-1901001400400/220 0Basti GIS
NTPC scopeUPPTCL 08 00630400/220 0Tanda TPS
Remark:
Tangnu Romai-I HEP (2x22MW)PS,HP,U1,U2-3/19
Delay FCA approval.HPPTCL 45 MAR-19D/C1 MAR-17216950220Sunda-Hatkoti
Line is being constructed by HPPTCL underGreen Energy Corridor Scheme. Lineawarded.
HPPTCL 0 AUG-18D/C2 04124132Tangnu Romai-I HEP - 220/132kV Sunda S/S
Substation is being constructed with fundssourced from ADB.
HPPTCL 0 DEC-163 MAR-1700100220/132 0Sunda S/S
Remark: Project work stopped due to fund issue.
Tapovan Vishnugad HEP (4x130MW), CS,UK,NTPC,U1-4,9/20
Award for the scheme is expected by July2018. Implementation time of 26 monthshas been specified in the tender documentfrom the date of award.
PTCUL 0 SEP-20D/C1 00304400 0Srinagar - Kashipur
All 3 packages had been awarded in Sep2017.
PTCUL 0 SEP-19D/C2 00184400 0Kuwari Pass (Pipalkoti)-Karanprayag -Srinagar
PTCUL representative requested CEA toallow LILO of 400 KV DC Vishnuprayag-Muzaffarnagar line at Pipalkoti as analternate arrangement for powerevacuation of Tapovan Vishnugad (NTPC).PTCUL representative was advised to takeup matter with UPPTCL alongwith detailSystem Study report as UPPTCL is theowner of 400 KV DC Vishnuprayag-Muzaffarnagar Line and subsequently takeup with CEA for approval of StandingCommittee of power system in NR. TheSystem Study Report may also besubmitted to CEA and PGCIL.
PTCUL 0D/C3 002400LILO of Vishnu Prayag -Muzaffarnagar at TapovanVishnugarh HEP
TL: Total Location 50Page 42 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Route alignment and forest proposalpreparation is in progress.
PTCUL 0 DEC-19D/C4 0036400Tapovan Vishnugadh - KunwariPass (Pipalkoti)
Remark:
Tashiding HEP (2x48.5MW)PS,Sikkim,Shiga Energy,U1-11/17,U2-11/17
Commissioned 11/17 (Late Reported).SEPL 23 MAR-18D/C1 232317220 17Tashiding - Legship MAR-18
Commissioned 10/17 (Late Reported).SIKKIM 35 JUN-18D/C2 353520220 20Legship - New Malli JUN-18
PGCIL 03 00100220/132 0Legship S/S
Remark:
Teesta-III(6x200 MW),PS,Sikkim,TUL,U1to6- 2/17 (C)
Award placed in Dec'17. Engg. & surveyunder progress. Major portion of line is inforest (40 Ha), approval of the forestclearance is critical.
PGCIL 0 JUN-20D/C1 JUN-2003515400LILO OUT of Teesta-III -Kishanganj at Rangpo
Commissioned 03/16..(Late Reported).PGCIL 36 JUL-16MC+D/C
2 NOV-13363621400 21LILO IN of Both Ckt Teesta-III -Kishanganj at Rangpo
JUL-16
Teesta III Rangpo (CKT-II) and Teesta III Dikchu (Ckt 1(a)) Lines are in commercialoperation from 16.01.2017 & 14.04.2017respectively. Dikchu- Rangpo (Ckt 1 (b)) isenergized on 30.06.2018 (i.e. trialoperation for 24 hours) and couldsuccessfully complete the trial operation on1st July 2018. 46.1 Kms line fromKishanganj Substation has beensuccessfully energized for antitheftpurpose. Re-Stringing works, in last span of290-291 is under progress and back charging would be extended stretch bystretch on completion of re-stringing. RoWand Forest issues faced in Darjeeling distt.
TUL 586 OCT-18D/C3 581590427400 392Teesta III - Kishanganj
Remark:
Teesta LD IV HEP (4x40 MW),CS,WB,NHPC,U1:03/16, U2:03/16(C), U3-7/16 (C),U4-8/16 (C)
Ready for Commissioning 09/18.WBSETCL 94 SEP-18S/C1 SEP-08949421220 21Teesta LDP -III - Teesta LDP-IV SEP-18
Commissioned 02/16.WBSETCL 250 FEB-16D/C2 SEP-08250250145220 145Teesta LDP - IV - New Jalpaiguri(NJP)
FEB-16
Remark: Unit-4 (40MW) commissioned on 11.08.2016.
Teesta Low Dam III (4x33 MW),CS,WB,NHPC, U1-1/13(C) ,(C) U2-1/13(C), U3-2/13(C), U4/13(C)
Commissioned 01/13.WBSETCL 282 JAN-13S/C1 DEC-0928228281220 81Teesta LD III-New Jalpaiguri JAN-13
Remark:
Teesta VI HEP (4x125 MW), PS, M/S LANCO Urja, SIKKIM,U1-4 -2021-22
Detail survey completed section 164approval received. Work yet to started.
LEPP D/C1 25220Teesta VI HEP - Rangpo PoolingStation
Remark:
Tehri PSP (THDC) (4x250 MW) U1-4: 09/19
TL: Total Location 50Page 43 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
04 locations under severe ROW. Line linkedwith Tehri Generation (expected by Dec'20).
PGCIL 34 SEP-19D/C1 NOV-17343814400 9Tehri Gen. - Tehri PoolingStation (Q)
Being expedited for system improvementPGCIL 8 SEP-19D/C2 NOV-17782765Tehri Pooling Station - Meerut(Remaining part)
Civil work, supply & erection underprogress.
PGCIL 99 SEP-193 MAR-18971001500765/400 92Meerut (Aug.)
Civil work, supply & erection underprogress.
PGCIL 92 SEP-194 MAR-18871003200765/400 25Tehri PS (GIS)
Remark:
Telangana STPP (2x800 MW), Telangana, NTPC, U1-01/20, U2-01/20
works are under progress.TSTRANS 103 AUG-19D/C1 DEC-1970161110400 0Telangana STPP - Ramadugu
works are under progress.TSTRANS 477 FEB-19D/C2 DEC-19454492360400 209Telangana STPP - Narsapur
Remark:
Thamminapatnam (Meenakshi) (2x150, MW ),PS, Ph-II (U3-12/17,U4-3/18)
Commissioned 3/12MAR-12S/C1 26400 26Thamminapatnam (Meenakshi) -Nellore
MAR-12
Commissioned 3/12MAR-12D/C2 2400 2Meenakshi - Simhapuri MAR-12
Remark:
Tidong-I HEP (2x50MW)PS,HP,NSL,U1,U2- 2020-21
St-I FC received, St-II under progressNSLNPPL 0 DEC-20D/C1 05732220LILO of Kasang - Bhbaba atTidong-I
Remark: LTA has been surrendered by generating company. generation project has not been dropped from the generation program of CEA and construction activity is in progress at site andprogress has also been discussed recently in review meeting held in CEA.
Tilaiya UMPP
PGCIL D/C1 765LILO of Tilaiya - Balia line atGaya
Remark:
Tiroda TPP (Gondia ) PH-I (2x660 MW),PS,MAHA,ADANI,U1-9/12, (C),U2-11/12 ,PH II (3x660 MW) U1-6/13(C), U2- 3/14(C),U3-9/14 (C)
Commissioned 3/13.APL 587 MAR-13S/C1 587587218400 218Tiroda TPP -Warora (1st ckt) MAR-13
PGCIL 2xS/C2 765Aurangabad - III - Aurangabad(PG)
Commissioned 02/14.APL 90 FEB-14D/C3 909061400 61Akola- I - Akola-II FEB-14
Commissioned 02/14.APL 1011 FEB-14S/C4 10111011361765 361Tiroda - Akola-II FEB-14
Commissioned 03/15.APL 1582 MAR-15S/C5 AUG-1215821582575765 575Tiroda - Koradi - Akola -Aurangabad line ckt-II
MAR-15
218 Ckm Commissioned 8/12APL 587 AUG-12D/C6 587587218400 218Tiroda TPP - Warora (2nd ckt) AUG-12
Commissioned 02/14.APL 100 FEB-147 1001001500765/400 100Akola -II S/S FEB-14
Commissioned 03/16.MSETCL 100 MAR-168 1001001500765/400 100Aurangabad - III (Ektuni) S/S(ICT-II)
MAR-16
Commissioned 03/15.APL 100 MAR-159 1001003000765/400 100Koradi - III S/S MAR-15
Commissioned 02/14.APL 100 FEB-1410 1001001500765/400 100Tiroda S/S FEB-14
Commissioned 03/13.MSETCL 100 MAR-1311 SEP-12100100500400/220 100Warora S/S MAR-13
TL: Total Location 50Page 44 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:
Tori TPP (2x600 MW),PS,Jhh, Essar, Uncertain
EPTCL D/C1 400Tori - Jhharkhand PoolingStation
Remark: Delay in grant of mega power project status, cancellation of coal block & non-availability tapering/long term coal linkage etc.
Transmission system associated with IPPs of Nagapattinam / Cuddalore Area- Package A (TBCB)
Work completed. Checking under progress.PGCIL 575 JAN-19S/C1 DEC-15575575219765 219Salem - Madhugiri (PNMTL-TBCB)
Commissioned 10/2016.PGCIL 543 OCT-16D/C2 MAR-15543543406765 406Nagapattinam PS - Salem(PNMTL-TBCB)
OCT-16
Remark: SPV/BPC - Powergrid Nagapattinam Transmission Ltd. / PFC
Transmission System Associated with Mauda Stage-II (2x660MW) Gen. Proj. - PGCIL
Ready for Commissioning 08/16.PGCIL 435 AUG-16D/C1 MAY-16435435338400 338Betul - Khandwa (Quad) line AUG-16
Commissioned 07/2017.PGCIL 551 JUL-17D/C2 MAY-16551551393400 393Mauda-II - Betul (Quad) line JUL-17
Ready for Commissioning 08/16.PGCIL 479 AUG-16D/C3 MAY-16479479344400 344Khandwa - Indore line AUG-16
Remark:
Transmission System Associated with Mundra Ultra Mega Power Project - PGCIL
192 Ckm part line commissioned 11/11.PGCIL NOV-11S/C1 384400 192Mundra -Limbdi ( part Line) NOV-11
Commissioned 8/12.PGCIL 424 AUG-12S/C2 424424314400 314Mundra - Jetpur (Part line) AUG-12
Commissioned 12/12.PGCIL 918 DEC-12S/C3 918918358400 358Mundra - Jetpur (Balanceportion)
DEC-12
Commissioned 8/11PGCIL 285 AUG-11D/C4 285285198400 198Mundra - Bachchau AUG-11
Commissioned 9/11.PGCIL 755 SEP-11D/C5 755755566400 566Bachchau - Ranchodpura SEP-11
Commissioned 02/12.PGCIL 863 FEB-12D/C6 863863244400 244Mundra - Limbdi FEB-12
Commissioned.PGCIL 100 AUG-117 100100630400/220 100Bachchau S/S AUG-11
Commisisoned 7/12PGCIL 100 JUL-128 100100630400/220 100Navsari GIS JUL-12
Commissioned 02/12.PGCIL 100 FEB-129 1001003000765/400 100Wardha FEB-12
commissioned 3/12.PGCIL 100 MAR-1210 1001001500765/400 100Wardha 3rdTrf MAR-12
Remark:
Transmission System associated with Pallatana gas Based Power Project and Bongaigaon Thermal Power Station (BTPS) - PGCIL
Completed on 28.11.18.PGCIL 100 NOV-181 100100100132/33 100Melriat S/S (Upgadable to 400kV)
Commissioned 08/15.PGCIL 100 AUG-152 10010030220/132 100Mokokchung (ICT-II) AUG-15
ICT-I (50MVA) commissioned in Mar'13 &ICT-II commissioned in Apr'13.
PGCIL 100 APR-133 100100100132/33 100Imphal S/S
Commissioned 3/12.PGCIL 100 MAR-124 100100400400/220 100Silchar (New) MAR-12
Commissioned 07/15.PGCIL 100 JUL-155 DEC-1210010030220/132 100Mokokchung (New) JUL-15
Remark:
Transmission System for Transfer of Power from Generation Project in SIKKIM to NR/WR Part-A
TL: Total Location 50Page 45 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
PGCIL S/C1 19132LILO of Gangtok - Melli atRangpo
Remark:
Transmission System for Transfer of Power from Generation Project in SIKKM to NR/WR Part-B
Commissioned 11/14.PGCIL 21 NOV-14S/C1 NOV-1421217132 7LILO of Gangtok - Rangit atRangpo
MAR-17
Remark:
Transmission System for Ultra mega Solar Park in Rewa District, Madhya Pradesh - PGCIL
Ready for Commissioning 02/18.PGCIL 169 FEB-18D/C1 169169116400 116LILO of Vindhyachal - Jabalpurline (Q) (II Ckt.) at Rewa PS
FEB-18
Remark:
Transmission System of Phase-I Generation Projects in Orissa-Part-A
Commissioned 05/13.PGCIL 120 MAY-13D/C1 12012044400 44LILO of Rourkela - Raigarh atJharsuguda Pooling Stn. Ckt-II
MAY-13
Remark:
Transmission System strengthening in Western part of WR for IPP Generation Projects in Chhatisgsrh - part-D - PGCIL
Commissioned 01/14.PGCIL 100 JAN-141 100100630400/220 100Aurangabad S/S JAN-14
Remark:
Tuirial HEP (2x30MW),CS,Miz,NEEPCO, U1-8/17(c),U2-11/17(c)
The 132KV Sihhmui substation wasconstructed by P&E, Govt. of Manipur andcompleted on 31.03.2016. Line hascompleted.
PEDMIZO 135 DEC-16D/C1 13513547132 47Bawktlang (Kolasib) S/S -Sihhmui S/S
Line completed on Mar-17.PEDMIZO 85 FEB-17S/C2 858542132 42Tuirial HEP - Bawktlang(Kolasib) S/S
Remark:
Tuticorin TPP (Ind Barath), (660MW),TN, U1-10/18
IBPIL D/C1 200400Ind Barath TPP - Tuticorin (PS)
Remark:
Tuticorin TPS (JV) (2x500 MW), U1-3/14,U2-7/15 (C)
Commissioned 01/12.PGCIL 423 JAN-12D/C1 423423304400 304Tuticorin JV - Madurai JAN-12
Remark:
Uchpinda TPP, (4x360MW), PS,Chg, RKMPPL, U1-10/15(C),U2-1/16(C),U3-9/17,U4-12/17
Commissioned 10/2016 (41.42 CKm on D/C& 11 CKm on M/C)
RKMPPL 88 OCT-16D/C1 888853400 53Uchpinda (RKM PowergenPrivate Ltd.) - Kotra s/s(Raigarh) line
OCT-16
Commissioned (Interim Arrangement). De-LILO activity completed.
RKMPPL 73D/C2 7373400 39LILO of Raigarh (Kotra) - Raipurat Uchpinda (InterimArrangement)
Remark:
Udupi TPP (2x600 MW),PS,KAR,UPCL,U1-7/10(C),U2-4/11(C)
TL: Total Location 50Page 46 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 10/09. (For start up power)KPTCL 91 OCT-09D/C1 9191948220 48UTPS-Nandikur - Khemar (partlyon Multi-ckt Multi - Voltagetowers & partly on D/C towers)
OCT-09
Commissioned 8/12KPTCL 529 AUG-12D/C2 529529358400 319Nandikur (UTPS) - Shantigrama(Hassan)
AUG-12
Remark:
Ugo-Sugen (382.5MW), PS, Guj, Torrent Energy, Module1: 1/13(c)
XYZ D/C1 1400LILO of Sugen TPS- Pirana atUno-Sugen GPP
Remark:
Uhl-III BVPCL HEP, (3x33.3MW),SS,HP, HPSEB,U1,2, & 3- 3/18
completed on Mar-14HPSEBL 0D/C1 0071132Uhl-III - Hamir Pur (By BVPCL)
Remark:
Ukai Extn. (2x490 MW),PS,Guj,GSECL, U6-3/13(C),U7-3/13
Commissioned 03/13.GETCO 300 MAR-13D/C1 300300178220 178Kosamba-Mobha line MAR-13
Commissioned 08/14.GETCO 641 AUG-14D/C2 JUL-11641641460400 460Kosamba-Chorania line AUG-14
Commissioned 1/12.GETCO 96 JAN-12D/C3 969664400 64LILO of Asoj - Ukai at Kosamba JAN-12
Commissioned 03/13.GETCO 215 MAR-13D/C4 215215145400 145UKai-Kosamba MAR-13
Remark:
Unchahar TPS (500 MW), PS,UP,NTPC, U6-03/17(C)
Ready for Commissioning 09/2016.PGCIL 145 SEP-16D/C1 SEP-16145145107400 107Unchahar - Fatehpur line (PUTL-TBCB)
SEP-16
Remark:
Uppur SCTPP, (2x800MW), Tamilnadu, TANGENDCO, U1-3/21,U2-9/21
Estimate is under preparationTANTRAN 0D/C1 MAR-2100498765Virudhnagar - Coimbatore
Tender to be floated.TANTRAN 0D/C2 MAR-2100158400Virudhnagar - Kayathar
Tender to be floated.TANTRAN 0D/C3 MAR-2100114400Virudhnagar - Kamuthi
Tender to be floated.TANTRAN 0D/C4 MAR-2100204765Uppur SCTPP - Virudhunagar
Tender to be floated.TANTRAN 0D/C5 MAR-2100160400Virudhnagar - Thappagundu
Tender will be floatd shortly.TANTRAN 0 MAR-226 MAR-21003000765/400 0Virudhunagar
Remark:
URI-II HEP (4x60 MW), CS,J&K,NHPC,U1-9/13(C),U2-11/13(C),U3-9/13(C),U4-2/14 (C)
Commissioned 08/11.PGCIL 32 AUG-11S/C1 323211400 11URI I - URI II AUG-11
Commissioned 12/11.PGCIL 288 DEC-11S/C2 MAY-11288288105400 105URI II -Wagoora DEC-11
Remark:
Utraula IIPP (2x45 MW),PS,UP,BAJAJ,U1-2/12 (C),U2-3/12(C)
Existing line.BEPL D/C1 132Balrampur-Utraula line
Remark:
Utraula TPP, (2x45 MW), PS, UP, Bajaj
TL: Total Location 50Page 47 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Line was completed in May-17 but couldnot be charged due to non completion ofgantry at Dumariaganj. in a storm River X-ing tower at loc no. 66 collapsed in April-18, restoration of the tower is in progress.
UPPTCL 114 JAN-19S/C1 114114132 40Dumariaganj- - Utraula
Remark:
VallureTPS. (3x500 MW),CS,TN,NTPC,U1-2/12(C), U2-2/13(c), U3-2/14
Commissioned 7/11PGCIL 129 JUL-11D/C onM/C
1 JUL-10129129131400 131LILO of Alamathy -Sriperumbdur at Vallure TPS
JUL-11
Commissioned 03/14.PGCIL 59 MAR-14D/C2 595942400 42Tiruvelam (PG) - Chitoor MAR-14
Commissioned 8/12.TANTRAN 14 AUG-12D/C3 MAR-1114147400 7Vallur JV Project-NCTPS St.II AUG-12
Commissioned 03/13.PGCIL 104 MAR-13D/C4 10410471400 71Vallure TPS - Melakottaiyur line MAR-13
Remark:
Vijayawada TPS (Extn. -IV),500 MW,SS,AP,APGENCO, -10/09 (C )
Commissioned 8/11.APTRANS 411 AUG-11D/C1 JAN-11411411266220 266Vijayawada TPS-Tallapally AUG-11
Commissioned 02/13.APTRANS 316 FEB-13D/C2 JUN-11316316226400 226Vijayawada TPS-Suryapeta FEB-13
Commissioned 02/13.APTRANS 199 FEB-13D/C3 199199149400 149Narsapur-Suryapet FEB-13
Commissioned 02/13.APTRANS 209 FEB-13D/C4 209209147400 147Malkaram-Narsapur FEB-13
Commisioned 7/09APTRANS 22 JUL-09M/C5 222224400 24LILO of Srisaliam -Nunaa atVijayawada TPS
JUL-09
Remark:
Vindhyachal-IV ,CS,MP,NTPC, U11-6/12(C) C), U12-3/13(C), U13-08/15 (C) Rihand - III,(1000MW each) Gen. U5- U6-11/13(C)
Ready for Commissioning in 08/15.PGCIL 91 AUG-15D/C1 NOV-12919131765 31Rihand - Vindhyachal PoolingStation (2nd Ckt)
AUG-15
Commissioned 12/12.PGCIL 18 DEC-12D/C2 181812400 12Sasan - Vindhyachal Poolingstation
DEC-12
Commissioned 12/12PGCIL 19 DEC-12S/C3 NOV-12191912765 12Sasan - Vindhyachal PoolingStation line
DEC-12
Commissioned 08/14.PGCIL 782 AUG-14D/C+S/C
4 NOV-12782782300765 300Satna - Gwalior line (60 Km D/CPortion) Ckt-II
AUG-14
Commissioned 02/14.PGCIL 901 FEB-14S/C5 901901337765 337Satna - Gwalior line (Ckt-I) FEB-14
Ready for commissioning 12/12.PGCIL 84 DEC-12D/C6 848458400 58Vindhyachal-IV - VindhyachalPooling Station line (Q)
DEC-12
Commissioned 08/15.PGCIL 586 AUG-15S/C7 586586271765 271Vindhyachal Pooling Station -Satna Ckt-II
AUG-15
Commissioned 03/15.PGCIL 586 MAR-15D/C+S/C
8 NOV-11586586271765 271Vindhyachal Pooling Station -Satna line (2 Km D/C Portion)Ckt-I
MAR-15
Commissioned 06/14.PGCIL 91 JUN-14S/C9 NOV-12919131765 31Rihand - Vindhyachal PoolingStation (1st Ckt)
JUN-14
Commissioned 08/15.PGCIL 834 AUG-15S/C10 MAR-14834834305765 305Gwalior - Jaipur (Ckt 1) AUG-15
Commissioned 12/13.PGCIL 138 DEC-13D/C11 13813897400 97Bassi (PG)- Jaipur (RVPN) 765KV line (Q)
DEC-13
Commissioned 03/15.PGCIL 100 MAR-1512 NOV-121001001500765/400 100Vindhyachal Pooling Station(ICT-I)
MAR-15
TL: Total Location 50Page 48 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
Commissioned 08/15.PGCIL 100 AUG-1513 1001001500765/400 100Vindhyachal Pooling Station(ICT-II)
AUG-15
Remark:
Visa Power TPP (2x600 MW) PS, Chh, VPL, U1 & U2-uncertain
Work is under Construction.VISA 33 JUN-15D/C1 263726400 0Visa Power TPP - RaigarhPooling Station
Remark:
Vizag (Hinduja National Power) (2x520MW),PS,AP,U1-12/15 (C), U2-3/16 (C)
Ready for Commissioning 10/2016.APTRANS 242 OCT-16D/C1 SEP-15242242179400 179Kamavarapukota - Surypet(Kamavarrapukota -Chinnakorukondi)
OCT-16
Ready for Commissioning 10/2016TSTRANS 234 OCT-16D/C2 SEP-15234234170400 170Kamavarapukota - Surypet (Chinnakorukondi - Suryapet)
OCT-16
Commissioned 07/15.APTRANS JUL-15D/C3 14400 14Vizag TPP - Kalpaka JUL-15
Commissioned 05/14. for startup power.25 MAY-14D/C4 252515400 15Vizag ( Hinduja) TPP - Kalpaka
Ready for Commissioning 06/2017. (Earlierthe line was of 712 ckm now the length isrevised to 485 ckm ).
APTRANS 697 JUL-17D/C5 NOV-15697697486400 486Vizag TPP(HNPCL) -Kamavarapukota
JUN-17
Commissioned 10/18.TSTRANS 100 OCT-186 100100500400/220 100Shankarpally OCT-18
Commissioned 03/16.TSTRANS 100 MAR-167 MAR-15100100630400/220 100Suryapet S/S MAR-16
Commissioned 03/2017APTRANS 100 MAR-178 MAR-16100100315400/220 100Kamavarapukota s/s (ICT-2) MAR-17
Commissioned 02/2017APTRANS 100 FEB-179 MAR-16100100315400/220 100Kamavarapukota s/s (ICT-1) FEB-17
Remark:
Vyasi HEP(120 MW), Yamuna river,UK,UJVNL,3/19
Route Survey has been completed. Towerschedule and profile of line has beenapproved. Principal approval obtained fromMOEF on dated 11/09/2017. Proposal fortransfer of land (73.36 Hect.) forcompensatory afforestation was submittedto DM, Dehradun on dated 14/09/2017.SDM directed to Tehsildar on 03/10/2017for further necessary action. Total Progress12%
PTCUL 0D/C1 DEC-180016220LILO of Lakhwar- Dehradun atVyasi
Remark:
Wanakbori TPS(1x800), SS, Guj,GSECL,U8-10/18
Ready for Commissioning 03/18.GETCO 5 MAR-17D/C1 552400 2Wanakbori S/y -Wanakbori S/y(existing)
MAR-18
WIPGETCO 272 MAR-19D/C2 271343212400 144Wanakbori TPS-Soja
WIP/Severe RoW issueGETCO 387 MAR-19D/C3 381447268400 203Soja-Zerda Line
WIPGETCO 20 MAR-19D/C4 192414400 3LILO of Wanakbori -Soja line atDehgam (PG) S/S
Remark:
Welspun Energy Annupur,( 2x660 MW), PS,Annupur,MB Power, U1-4/15(C),U2-3/15
TL: Total Location 50Page 49 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019
AssociatedTransmission
Lines and Substations
STG(Ckm)/Erection
State/Agency
ExecutingAsociated
Trans.
TE(Nos)/Recp.Ma
teria
VoltageLevel(KV)
TL(Nos)/Land
Acq. (%)
STC(Nos)/CivilWork
RevisedTargetDate
OriginalTargetDate
Remark
(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs
to be mentioned here.)
Ckts(S/C)
&(D/C)
Construction progress Status
Ckm/MVA
Monthof
Completion
6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.
XYZ D/C1 400Welspun Anuppur TPS -Vindhyachal Pooling Station
Remark:
Yelanhanka CCPP (370MW), KPTL, Kar, U1-06/18
Commissioned on 14.09.2018.KPTCL 0 AUG-18D/C1 006220 12Yelanhanka(KPTCL)- Yelanhanka(PG)
Commissioned 12/15 (Late Reported)KPTCL 3 MAY-18D/C2 331220 1Yelanhanka CCPP - Yelanhanka(KPTCL)
MAY-18
Remark:
Yermarus TPS (2 x 800 MW), Karnataka, KPCL, U1-3/16 (C), U2-6/16
Ready for commissioning 06/2017.JPL 39 JUL-17D/C1 393919400 19JSW TPS - Bellary (PS) JUN-17
Ready for Commissioning 03/18.KPTCL 392 MAR-18D/C2 AUG-17392392285400 285Yermarus TPS - Bellary PoolingStation (BPS)
MAR-18
Detailed survey completed. Estimate isbeing prepared.
KPTCL MAR-18D/C3 400Yermarus TPS - Gulbarga
This work is not in planned works.KPTCL 0 MAR-18D/C4 005400Bellary (TPS) - Bellary (PS)
DPR approved. To be tenderedKPTCL 0 MAR-18D/C5 00400Bellary (PS) - C.N. Hally
Ready for commissioning 06/2017.KPTCL 520 JUL-17D/C6 DEC-16520520450400 450Bellary (PS) - New Madhugiri(near Tumakur)
JUN-17
Not in planned work for FY 16-17KPTCL MAR-18D/C7 400LILO of Both ckt of Nelamangala- Talaguppa at CN Halli
Land is in pocession of KPTCL. Preliminarysurvey work of 400kV line is completed.Estimate to be prepared.
KPTCL 08 SEP-1901001000400/220 0Gulbarga S/S
Remark:
TL: Total Location 50Page 50 ofSTG: Stringing CompletedSTC: Stubs Cast
Legends
TE: Towers Erected
Report generated through 10.44.12 AMFriday 18 January 2019