126 - 126 - CONTROL ROOM (CR) COMMUNICATOR
REMOVE MANUAL TABLE OF CONTENTS DATE: 12/11/2003
ADD MANUAL TABLE OF CONTENTS- DATE:.04/06/2004
CATEGORY: PROCEDURES TYPE: EPID: EP-PS-126ADD: PCAF 2004-1271 REV: N/A
REMOVE: PCAF 2003-1481 REV: N/A
' N/A
UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTEDWITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENTPROCEDURES. PLEASE MAKE ALL CHANGES ANDACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPONRECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS,ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS ANDACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
-I.
PROCEDURE CHANGE PROCESS FORM
PCAF NO., 2-,27/ L 2. PAGE 1 OF - I/ j3. PROC. NO. EP-PS-126 REV. 19l
4. FORMS REVISED - A R 26, -B _ - 7 | 19 -
5. PROCEDURETITLE Q .e/ ~eJ ) |e J ecs Oel t ttecEmergency Plan Communicator: Emergency Plan Position Specific Instruction
6. REQUESTED CHANGE
PERIODIC REVIEW ih NO [I YES
INCORPORATE PCAFS El NO 0 YES '# 2003-1481 #_ # X
REVISION El PCAF Z DELETION [1 (CHECK ONE ONLY)
7. SUMMARY OF / REASON FOR CHANGE .1Incorporate PCAF 2003-1481. That PCAF added a sheet to indicate that various sections had been deleted.That PCAF was necessary to insure that the appropriate sections of the procedure were removed.This PCAF adds a sheet to indicate that TAB C has also been removed. The information was previouslydeleted. -This PCAF also adds guidance concerning how to contact the offsite agencies if the main conference callnumber is unavailable. The PCAF also refers to filling out the ENR form log/This is an administrative change in that it provides a visible indication tliat various tabs were removed andprovides guidence for an existing requirement. o' / C
i~ T N ¾ K'.Continued E8. DETERMINE COMMITTEE REVIEW REQUIREMENTS ')
'(Refer to Section 6.1.4) , _ _ _ _
PORC REVIEW REQ'D? U-NO TS . 9. PORC MTG# N/A.
BLOCKS 11 THRU 16 ARE ON PAGE 26OF'FRM'a
17. T.C. Dalpiaz / 322`/ 03/30/2004 18. COMMUNICATION OF CHANGE REQUIRED?PREPARER AETNI 7X-DATE E NO '[ YES (TYPE)
[ ~~(Print or Type) 'Ao i ',' -
S19 SIGNATURE-ATTESTS THAT RESPONSIBLE SUPERVISOR HAS9// CONDUCTED QADR AND TECHNICAL REVIEW UNLESS OTHERWISE
I/a / DOCUMENTED IN BLOCK 16 OR ATTACHED REVIEW FORMS.RESP IBLSIJERVIOR DTE' CROSS DISCIPLINE REVIEW (IF REQUIRED) HAS BEERZOMPLETED
' SPRIO-BY SIGNATURE IN BLOCK 16(0R ATTACHED REVIEW FORMS.
20.72,/Ai.'%f ______
X 9 RAPPI'VAL ' ' DATE
21. RESPONSIBLE APPROVER ENTER N/A IF FUM HAS APPROVAL AUTHORITYN/A
INITIALS DATE
DOCUAEN1T ZONITROL
Sr:\iICE-S SSES
FORM NDAP-QA-0002-8, Rev. 9, Page 1 of 2 (Electronic Form)
PROCEDURE CHANGE PROCESS FORM
1. PCAF NO. Ži @ /;4/ _ 12. PAGE 2 OF ) / 13. PROC. NO. EP-PS-126 REV. 19
11. This question documents the outcome of the 50.59 and 72.48 Review required by NDAP-QA-0726.Either 11a or b must be checked 'YES" and the appropriate form attached or referenced.a. This change is an Administrative Correction for which 50.59 and 72.48 are not [1 YES
applicable.s N/A
b. This change requires a 50.59/72.48 Applicability/Screen/Evaluation.(Attach if not previously issued).
Reference Applicability/Screening/Evaluation No. A-01-1543
12. This change is consistent with the FSAR or an FSAR change is required.
Change Request No.
13. Should this change be reviewed for potential effects on Training Needs or Material?If YES, enter an Action Item @ NIMS/Action/Gen Work Mech/PICN. *PICN #
14. Is a Surveillance Procedure Review Checklist required per NDAP-QA-0722?
15. Is a Special, Infrequent or Complex Test/Evolution Analysis Form required perNDAP-QA-0320? (SICT/E form does not need to be attached.)
0 YES El N/A
Z YES
El YES Z NO
E1 YES Z NOM YES Z NO
16. Reviews may be documented below or by attaching Document Review Forms NDAP-QA-0101-1.
REVIEWED BY WITH. DATEREVIEW NO COMMENTS
QADR
TECHNICAL REVIEW
REACTOR ENGINEERING/NUCLEAR FUELS *
ISI**OPERATIONS
STATION ENGINEERING
EMERGENCY PLANNING 7(7 L/04ib/MAINTENANCE
RADIATION PROTECTION
NUCLEAR MODIFICATIONS
NUCLEAR DESIGN _
CHEMISTRY
OTHER 10 CRF 50.54Q IV, A %/a//
* Required for changes that affect, or have potential for affecting core reactivity, nuclear fuel, core power levelindication or impact the thermal power heat balance. (58)
Required for changes to Section XI Inservice Test Acceptance Criteria.
- FORM NDAP-QA-0002-8, Rev. 9, Page 2 of 2 (Electronic Form)
. r
PCAF #E-L117PAGE-..-OF 1/_- EP-PS-1 26
Revision 19Page 2 of 3
EMERGENCY PLAN COMMUNICATOR: Emergency Plan Position-Specific Procedure
WHEN: Emergency plan is activated
HOW NOTIFIED: Assigned while on duty
REPORT TO: Shift Manager/ED
WHERE TO REPORT: Control Room
OVERALL DUTY:
Communicate information on emergency to specified personnel, agencies, andorganizations, until the Technical Support Center (TSC) takes over communications.
MAJOR TASKS: - TAB: REVISION:
Perform Event Notifications. TAB A 25 26
. .- V
PAr it U•''PAGE-12OF I/ -
EP-PS-126Revision 19Page 3 of 3
SUPPORTING INFORMATION: TAB:
Emergency Telephone Instructions TAB 1
lntentionally Lcft Bank TAB 2
Emergency Organization C
Logkeeping TAB 3
- Emergency Plan Communicator T4B4 4 -.Backup Communication Information
* Emergencv Plan Communicator GeneralInformation,
Emergency Forms TAB 5* Emergency Notification Report* Emergency Notification Logsheet
Brief Non-Technical Descriptions of EAL TAB 6
REFERENCES:
NUREG-0654, Planning Standards and Evaluation Criteria
NUREG-0696, Functional Criteria for Emergency. Response Facilities
NUREG-0731, Guidelines for Utility Management Structure and Technical Resources,September 1980
SSES Emergency Plan
NDAP-00-0316, Station Communications
NDAP-QA-0300, Conduct of Operations
OP-AD-003, Shift Routine - Log taking
Letter dated February 25, 2002, from Samuel J. Collins, Director, Office of NuclearReactor Regulations, to Robert G. Byram, Senior Vice President and Chief NuclearOfficer.
* S. .
PMS #: TAB AEP-PS-1 26-ARevision 25 (-Page 1 of2 2
MAJOR TASK:
Perform event notifications.
SPECIFIC TASKS: HOW:
Perform initial event notifications. l a. Obtain and review Event Notification Report(ENR) form with the Shift Manager/ED.
lb. Within 15 minutes of declaration,using the purple colored phonebutton, dial "191" to transmit theENR form to the following:(Dialing 191 will simultaneously iLconnect the listed agencies in aconference call)
(1) Penna. EmergencyManagement Agency
(2) Columbia County EMA
(3).' Luzerne County EMA -
(4) Media Operations Center
NOTE:If the MOC does not answer, do notwait. Transmit the ENR forminformation to the emergency.agencies.
1c. Verbally communicate the ENR form to theoffsite agencies
id. If the "191" function does not work, attemptto use conference line 196. then contact theEmergency Agencies directly. The MOCshould be contacted last.
HELPEmergency Telephone Numbers
See TAB 4
PCAF GEJL.JJPAGELOF 1.
TAB AEP-PS-1 26-ARevisions25 . (oPage 2 of 2
IL
L-'
SPECIFIC TASKS: HOW:i1t. e Using the TCC Hotline (Button or
8-1-484-634-4090), call theTransmission Control Center andprovide the emergencyclassification.
2. If the Emergency is upgraded, go.back to step 1.
3. If the TSC is activated, turn overnotifications to the TSCCommunicator(s) when conditionsallow.
4. If the TSC is not activated, continuenotifications as follows:
4a. Every hour using the purplecolored phone button, dial "191"to transmit the ENR formproviding a static update to thefollowing:
* Penna. EmergencyManagement Agency
* Columbia County EMA
* Luzerne County EMA
* Media Operations Center
5. If the TSC is not activated, when theemergency is terminated, perform thefollowing notifications.
5a. Using the purple colored phonebutton, dial "191" to notify thefollowing that the emergency isterminated.
* Penna. EmergencyManagement Agency
* Columbia County EMA
* Luzeme County EMA
* Media Operations Center
6. Loo all communications with offsiteagencies
6a. * See Tab 5 for the ENR loa U-
* Use a seDarate log sheet foreach notification or note thetime of subsequentnotifications in the commentsection
PCAF __1______
PAGE-2 OF ) /-TAB BEP-PS-1 26-B
THIS TAB HAS BEEN DELETED
I
__9 -~OF .)/.TAB C
EP-PS-126-C
THIS TAB HAS BEEN DELETED
PCAF #2-//PAGE 7 OF 1/ - TABF
EP-PS-1 26-F
THIS TAB HAS BEEN DELETED
PC"F 0-TBPASGE .j OF 1/ TABG
EP-PS-1 26-G
THIS TAB HAS BEEN DELETED
P-.ATAB7EP-PS-1 26-7
THIS TAB HAS BEEN DELETED
Tab 4EP-PS-126-4
EMERGENCY PLAN COMMUNICATOR
GENERAL INFORMATION
ACRONYM TABLE
ASCC Alternate Security Control Center MOC Media Operations CenterCCEMA Columbia County Emergency NERO Nuclear Emergency Response
Management Agency OrganizationCTN Centrex Telephone Network NRC Nuclear Regulatory CommissionDEP/BRP Department of Env. Protection/ PEMA Pennsylvania Emergency
Bureau of Radiation Protection Management AgencyENS Emergency Notification System PIM Public Information ManagerEOF Emergency Operations Facility SCC Security Controt CenterETN Electronic Tandem Network TPD Transmission Power DispatcherLCEMA Luzerne County Emergency TSC Technical Support Center
Management Agency
TELEPHONE INFORMATION
1. Alternate Security Control Center (ASCC)
2. Offsite Agencies (PEMA, LCEMA, CCEMA,and the MOC Communicator)
Dial 8-254-4918 (primary)Dial 8-254-3115 (backup)
Within 15 minutes, use extension 4915 and dial"191" to access the conference line. Transmitthe Emergency Notification Report.
NOTE: If the conference capability is notavailable, use the following back-upphone numbers:
BACKUP TELEPHONE NUMBERS
If calling from a 4xxx extension, dial thebackup numbers as follows:
PEMA: 4960,4961 or 8-1-717-651-2148
LCEMA: 4906,4907, or 8-1-800-821-3715
CCEMA: 4955, 4956, or 8-1-570-389-5720
EP-AD-000-328, Revision 14, Page 1 of 2
Tab 4EP-PS-126-4
EMERGENCY PLAN COMMUNICATOR
TELEPHONE INFORMATION
3. Transmission Control Center
If calling from a 3xxx extension, dial thebackup numbers as follows:
PEMA: 8-353-4960, 8-353-4961, or8-1-717-651-2148
LCEMA: 8-353-4906, 8-353-4907,or 8-1-800-821-3715
CCEMA: 8-353-4955, 8-353-4956, or8-1-570-389-5734
Use the TCC Hotline Button
OR
Dial 8-1-484-634-4090
Give the classification.
Use the ENS telephone
- OR-
1-301-816-51001-301-951-0550 (backup)
4. NRC
EP-AD-000-328, Revision 14, Page 2 of 2
Tab 4EP-PS-126-4
EMERGENCY PLAN COMMUNICATORBACKUP PHONE INFORMATION
ACRONYM TABLE
CCEMA Columbia County Emergency NRC Nuclear Regulatory CommissionManagement Agency
DEPIBRP Department of Env. Protection/ PEMA Pennsylvania EmergencyBureau of Radiation Protection Management Agency
LCEMA Luzeme County Emergency PIM Public Information ManagerManagement Agency -
MOC Media Operations Center
TELEPHONE INFORMATION
1. Offsite Agencies (PEMA, LCEMA, CCEMA,and the Public Information Manager (PIM)or MOC)
Within 15 minutes, use extension 4915 and dial"I91" to access the conference line. Transmitthe Emergency Notification Report.
NOTE: If the conference capability is notavailable, use the following back-upphone numbers:
BACKUP TELEPHONE NUMBERS
If calling from a 4xxx extension, dial thebackup numbers as follows:
PEMA: 4960, 496i or 8-1-717-651-2148
LCEMA 4906, 4907, or 8-1-800-821-3715
CCEMA: 4955,4956, or 8-1-570-389-5720
PIM: 4901,4902
MOC: 4903
If calling from a 3xxx extension, dial thebackup numbers as follows:
PEMA. 8-353-4960, 8-353-4961, or8-1-717-651-2148
LCEMA: 8-353-4906, 8-353-4907,or 8-1-800-821-3715
CCEMA 8-353-4955, 8-353-4956, or8-1-570-389-5734
PIM: 8-353-4901, 8-353-4902
MOC: 8-353-4903EP-AD-000-508, Revision 0, Page 1 of 2
Tab 4EP-PS-1 26-4
EMERGENCY PLAN COMMUNICATORBACKUP PHONE INFORMATION
TELEPHONE INFORMATION
2. Transmission Control Center Use the TCC Hotline Button
Dial 8-1-484-634-4090
Give the classification.
EP-AD-000-508, Revision 0, Page 2 of 2
Tab 5EP-PS-1 26-5
EMERGENCY NOTIFICATION LOG SHEET
EMERGENCY CLASSIFICATION
UNUSUAL EVENTALERTSITE AREA EMERGENCYGENERAL EMERGENCY
STATIC UPDATE
EMERGENCY NOTIFICATIONREPORT (ENR) CONTROL NO.
AGENCY NAME OF CONTACT TIME
PEMA __-_ __ I
LCEMA _
CCEMA ____ I
MOC/PIM l
ADDITIONAL INFORMATION
EP-AD-000-308, Revision 3, Page 1 of 1
- ^
0 Tab 5_ EP-PS-126-5
Control #
EMERGENCY NOTIFICATION REPORT
1. Call Status: a THIS IS A DRILL D THIS IS AN ACTUAL EVENT
2. This is:(Communicator's Name)
My telephonenumber is:
at Susquehanna Steam Electric Station.
Notification time is:(Callback telephone number) (Time notification
initiated)
3. EMERGENCY CLASSIFICATION:Ox UNUSUAL EVENTa] ALERTE The event has been terminated.
E SITE AREA EMERGENCYE1 GENERAL EMERGENCY
UNIT: Ex ONE
El Two[l ONE &TWo
DeclarationTime:
(Time classification/termination declared)
DATES
(Date classification/termination declared)
THIS REPRESENTS A/AN: El INmALDECLARATIONEl ESCALATION IN CLASSIFICATION STATUSE l No CHANGE J .
4. The Emergency Action Level (EAL) Number is__
. For initial declaration, static update, or escalation,provide current classification EAL number only.
. For significant events, or when directed by the ED, RM,or EOFSS, provide a brief description.
. For termination. write emergency has been terminated.BRIEF NON-TECHNICALDESCRIPTION OF THE EVENT:
5. THERE IS: El NoEl AN AIRBORNE NON-ROUTINE RADIOLOGICAL RELEASE IN PROGRESSEl ALIQUID
6. WIND DIRECTION IS FROM: :_ . WIND SPEED IS: mph.(Data from 10 meter meteorological tower, available on PICSY.)
7. Conclusion: [l THIS IS A DRILL El THIS IS AN ACTUAL EVENT
APPROVED:(ED, RM, or EOFSS)
Time:(Time form approved)
Date:(Date form approved)
EP-AD-000-31 0, Revision 6, Page 1 of 1