transport organization danone europe · 2019. 12. 12. · cost optimization extend visibility...

68
Transport organization Danone Europe 1

Upload: others

Post on 15-Feb-2021

20 views

Category:

Documents


0 download

TRANSCRIPT

  • Transport organization Danone Europe

    1

  • 2

    AGENDA

    1. ID Logistics 4PL specialist

    2. IDEO : an ID Logistics and Danone Company

    3. Danone project

    4. Road PL : ID Logistics TMS

    5. Technical solution

    6. Optimization lever

    7. Implementation

    8. Commercial offer

  • 3

    ID Logistics 4PL specialist

    Tran

    spo

    rt I

    D L

    ogi

    stic

    s

    1

  • 4

    ID LOGISTICS AND DANONE

    KEY FIGURES

    ID Logistics group turnover Breakdown of capital stockGroup description

    18 500Employees

    16Countries

    275 locations in the world

    5,000,000 sqm

    35% Mass Retail

    31% Industry

    34% Unit Picking

    Danone – ID Logistics partnership

    operations with Danone

    53 M€

    In 4 countries

    France S AFRICA Indonesia Brazil

    DANONE WATER

    European 4 PL( JV DNN- IDL)

    6 DC

    Early nutrition

    1 DC207 FTE

    5 DC + 12 XD

    Transportation

    170 KT

    DANONE DIARY

    20 000 m²

    1- ID Logistics 4PL specialist

  • AFRICA

    2 countries49,000 sqm

    EUROPE

    8 countries4,200,000 sqm

    ASIA

    3 countries215,000 sqm

    INDIAN OCEAN

    1 country37,000 sqm

    SOUTHAMERICA

    2 countries646,000 sqm

    5

    International footprint16 countries - More than 5,000,000 sqm of warehouses

    ID LOGISTICS WORLDWIDE

    1- ID Logistics 4PL specialist

  • 6

    FRANCE

    PORTUGAL

    SPAIN

    BENELUX

    POLAND

    GERMANY

    RUSSIA

    Leading contract logistics in Europe

    ID LOGISTICS IN EUROPE

    A pan-European offer

    8 countries

    200 warehouses

    More than 4,200,000 sqm

    1- ID Logistics 4PL specialist

  • FOOD RETAIL

    FMCG

    NON FOOD RETAIL

    7

    OUR CLIENTS

    HIGH-TECH

    1- ID Logistics 4PL specialist

  • FRAGRANCE

    & COSMETICSFASHION

    DEFENSE &

    AEROSPACE

    E-COMMERCE

    HEALTHCARE

    AUTOMOTIVE

    OUR CLIENTS

    10

    1- ID Logistics 4PL specialist

  • 9

    ID LOGISTICS ACTIVITIES

    UNIT PICKING AND AUTOMATIZATION

    •Unit Picking, Multi-SKU

    • Luxe, fashion fragrance and cosmetic, pharma, e-commerce

    •Mechanized systems for storage and picking

    WAREHOUSING FOR RETAIL AND INDUSTRY

    •Warehouse management ambient and fresh, SEVESO

    •Dedicated, pooled warehouses, Factory DC

    •Picking, Co packing and value added operations

    •Construction, tailored made building

    CONTROL TOWER AND TRANSPORTATION

    •Engineering : network modeling, transport optimization, lean management, purchase

    •4 PL organization, control tower

    •Transport with own fleet, chartering

    1- ID Logistics 4PL specialist

  • 10

    4PL Expert

    250 experts

    of transport management

    + de 3,5 millionsShipments management yearly

    22 control Towersin 13 countries

    Multi servicesCases

    FTL LTL

    Air

    Sea

    430 carriers

    connected

    1 TMSDeveloped internally

    ID LOGISTICS ACTIVITIES

    1- ID Logistics 4PL specialist

  • 1111

    Danone’s

    Plant in Beijing

    Warehouse

    Inner Plant

    Service:

    Co-packing inner Plant

    Service:

    PrimaryTransportation

    Regional Distribution

    Center in SH, GZ

    Service:

    Warehousing

    Service:

    Secondary Distribution

    Truck managed by

    IDL

    Stores

    ( 1200 in Shanghai, 300 in

    Guangzhou every day)

    Overall supply chain solutions from Plant to Stores

    (Time controlling & Temperature controlling)

    Temperature controlled

    warehouse & platform & truck

    Truck managed by

    IDL

    ID LOGISTICS AND DANONE

    1- ID Logistics 4PL specialist

  • 1212

    A chilled distribution network

    Delivery perimeter

    Distribution on National territory

    Export to neighbour countries

    Botswana, Namibia, Swaziland

    Our lead time

    All deliveries are performed within 24h/48h

    88% of our customers are

    delivered in 24h

    Profile of the company

    Volume

    Deliveries

    Trucks

    Creation

    Turnover

    Scope

    2014

    35 M€ (2015)

    Transportation and warehousing

    150 KT

    370 000

    197

    ID LOGISTICS AND DANONE

    1- ID Logistics 4PL specialist

  • 1313

    > In close cooperation with Danone, ID logistics has settled a complete and detailed business plan year by year from 2016 to 2021. Target is to include new customers inside the current network

    CHILED FOOD MARKET IN BRAZIL: 4 907 KT in 2014

    BP MODELLING : Reach 200 KT in 6 years ( 4% of the chilled market)

    TOP 5 market

    321 KTMarket size

    CHEESE PROCESS MEAT FLAVOURED MILK CHOCOLATE

    729 KT

    BUTER MARGARINE

    120KTTons included in BP 7KT

    533 KT525 KT

    40KT 10KT

    247 KT

    20KT

    > Our BP is settled on a detailed study based on market analysis and contacts with managers of the targeted companies.

    Alliance

    growth

    Companies included in our BPCheese

    Process Meat Flavoured milk drinks

    Butter margarine

    Chocolate

    15 KT

    ID LOGISTICS AND DANONE

    1- ID Logistics 4PL specialist

  • 1414

    Network modeling study

    Flux amont

    Flux AvalLege

    nd

    e

    RESULTS

    The current network is currently well optimized considering the French perimeter. Some opportunities to be studied including Belgium/Germany

    FRENCH NETWORK OK

    Opportunities in outsourcing

    ID LOGISTICS AND DANONE

    1- ID Logistics 4PL specialist

  • 1515

    Tactical optimization study Conclusions

    Yearly savings

    ID LOGISTICS AND DANONE

    1- ID Logistics 4PL specialist

  • 16

    IDEO : a Danone and ID Logisticscompany

    4 P

    L

    2

  • 17

    General presentation

    Operational coordination of Road, Rail

    and warehouse activitiesProcurement

    Studies and projects

    (optimization Rail and Road)

    Key features

    Presence

    Global

    management

    Management and

    animation of the road

    transportation plan

    Management and

    animation of the rail

    network

    Management and

    animation of the

    warehouse network

    Multi clients 4PL

    45 experts of the transportation

    management Loading and

    delivery area

    Delivery area

    Use of internal TMS : Road PL

    GENERAL PRESENTATION

    2- IDEO a Danone and ID Logistics company

  • 18

    • Adaptable solutions

    - Adaptability to customer needs (modular offer, organization location, ramp-up plan)

    - Projects and productivity plans are built, setup and adapted with the customer

    • Full transparency & 100% savings benefit

    – No hidden cost

    – Full benefit of transport plan : hauliers’ costs for the customer

    • Continuous Improvement & Innovation platform

    – Continuous improvement process with a optimization plan follow up

    – Innovation : customers benchmark & open innovation

    – Lean management

    GENERAL PRESENTATION

    2- IDEO a Danone and ID Logistics company

  • 19

    IDEO has been designed to serve an increasing quantity of customers

    This volume growth will allow us to generate additional savings that will boost the control tower attractiveness

    Saving evolution depending on the quantity of partners

    € saved

    Partners #

    A new partner join the ID Logisitics’

    control Tower

    Increase of the volume shipped

    Growth of the potential for synergies

    Decrease of the transportation cost

    Better attractiveness

    1

    2

    34

    5

    ID Logistics control tower

    CONCEPT

    2- IDEO a Danone and ID Logistics company

  • 20

    Innovation is our DNA

    A FOCUS ON OPTIMIZATION AND INNOVATION

    1- IDEO a Danone and ID Logistics company

    In 2016 IDEO has organized a call for project to selection the more promising start up able to provide added value to IDEO: This project was oriented on :

    - Dynamic optimization on an open environment

    - Big data, machine learning

    - “Uberization”, digitalization

    12 start up were selected by ID Logistcs to participle to the contest

    Jury was composed of 6 key customers and ID Logistics

    3 companies were awarded and are now developing their project with the operational and financial support of ID logistics

    5 finalists

    12 start-up enrolled

    3 winners

  • 21

    Activities

    Ad

    d V

    alu

    e

    Op

    era

    tio

    ns

    Skills Team Key elementsClients Implantation

    • Road • 20 ETP150 000 OT/

    year

    • Rail • 6 ETP 1 500 trens/year

    • Network • 4 ETP10

    warehouses

    • Procure

    ments• 3 ETP 150 M€/year

    • Road • 2 ETP+50% in peak

    season

    • Project • 5 ETP -1,5 M€/year

    A TEAM READY TO JUMP

    1- IDEO a Danone and ID Logistics company

  • 22

    Project scope

    NEE

    DS

    3

  • 23

    VOLUMES

    3- Project scope

    Map Key datas

    Trucks/ year 71 040

    Deliveries/ year 74 904

    1,05 deliveries/truck

    Factories 15

    Main unloading site 40

    Suppliers 9

    Volume per country

    Carriers 40

    Appointment for deliveries 50%

    Shipments/yearLoaded

    paletts/year

    France 40 831 1 330 128

    Unloaded

    paletts/year

    Poland 8 964 287 558

    Belgium 7 385 235 502

    Germany 7 526 233 378

    Czech Republic 3 168 104 165

    Spain 2 630 80 208

    Other 622 20 189

    1 152 737

    238 212

    109 687

    77 412

    89 815

    48 238

    576 058

    Total 71 136 2 291 129 2 292 158

  • 24

    Lanes

    Active lanes 350

    Direct lanes 316

    1 stop-point-lanes 31

    2 stop-point-lanes 3

    Loading density

    Shipments = 33pal 74 %

    26 %

    55 000 trucks

    19 000 trucks

    Shipments < 33pal

    Main countries in term of shipments are France, Germany, Poland and Belgium

    They represent 90% of the lanes 19 000 trucks are charged with less than 30 pallets

    Focus on shipments < 33pal ( 26% of the total volume)

    VOLUMES

    3- Project scope

    Focus on Departure point

  • 25

    DANONE TARGETS

    3- Project scope

  • 26

    ID LOGISTICS ANSWERS

    3- Project scope

    CSL

    COST OPTIMIZATION

    EXTEND VISIBILITY

    REACTIVITY FLEXIBILITY

    Our 4PL teams currently manage a transportation turnover of more than 390 M€ all over Europe with a large expertise of Danone

    A TMS developed internally tailor made for DANONE

    We offer a centralized and detailed data capture : performance management KPI, specific add hoc studies

    Our TMS is able to offer track and trace and go further to real time tracking

    Homogenous processes will by driven by our team in all Europe

    A great experience in implementation all over the world

    CO2

    We have settled a tool box to optimize the transportation plan of our customers

    In this offer, we have evaluated in a first A level approach of the saving potential

    The Carbon footprint is measured through our tools following ademe rules

    Our experience in leading green project ( biogas, density, roundtrips)

  • 27

    TMS

    Tran

    spo

    rt M

    anag

    em

    en

    t Sy

    ste

    ms

    4

  • 28

    Evolutive solution

    Mobilité

    Road PLGC Client

    WMS IDL et/ou Client

    Optimisation dynamique

    Yard management

    TMS Transporteurs

    Informations clients

    GPS

    Outil service client

    Rapports / KPI’s

    Easy Check-in

    CO2

    4- TMS

    A LARGE AND SCALABLE ENVIRONMENT

    28

  • 29

    TMS FEATURES

    Tracing• Real time follow up of the

    shipment status• GPS• PDA

    Consignee appointments• Key in • Expected Time Arrival

    Transport planning• Group, merge and optimize the

    planning

    Delivery feed back• Qualification of the delivery• POD on the web• Claim management

    Loading time slot management in DC

    • DC define its loading capacity per hour

    • Carrier select an available time slot

    Activity monitoring• Score cards• Business Object access• Alerts : Information push ( e mail

    sms)

    Multi users access• Restricted by a

    password

    Reverse logistics • Return shipment• Palett• packaging

    4- TMS

    FEATURES

  • 30

    4- TMS

    KPI

    5

    6

    1

    2

    3

    4

    Creation / delivery

    modification

    Booking : Loading

    appointment

    Truck arrival for loading

    Loading start

    Loading end

    Delivery information

    IT link

    7 Global cost per company

    ARCHITECTURE

    1

    2

    3

    6

    4 5

    7

    SAP

    Interfaces Link

    We estimate a minimum of 2

    interfaces per country with

    factories + 4 with transwide

    = 18 interfaces

  • 31

    Technical offer

    PR

    OC

    ESS

    5

  • 3232

    WHERE DO WE NEED TO SETTLE THE TEAM

    5- Technical offer

    To guarantee this service level, the team must by reactive, must understand cristal clear customer needs and must be able to influence decision at all levels

    France ?

    Bénélux ?

    Poland ?

    Germany ?

    Labour and site costs

    Availability of skilled personnel /

    Attractiveness for Employees

    Operational support

    and mutualisation

    Close to the biggest factories

    Business extension capabilities Poland and France seems to be 2 interesting options- Poland for the cost of human resources

    - France for the mutualization perspectives, the support team and the business extension capability

  • 33

    planner

    Manager1

    Admin

    deputy

    3 FTE

    1

    tracker

    2FTE

    5 FTE

    Organization chart for Poland Main tasks

    ORGANIZATION CHART

    5- Technical offer

    Considering the volume presented in this document ,the mains characteristics of your activity, the process and the TMS that will be implemented we can deduct the following organization. This sizing has to be fine tune during the latter steps

    Trackers

    Daily optimization of transportation plan

    Daily carrier management

    Back up and chartering

    Planners

    Deputy

    Manager

    Loading and unloading follow up

    Deliveries follow-up

    Team manager

    Customer contact

    Carrier management

    Control and cost follow-up

    Manager’s subsitute

    Lean management

    Improvement plan

    Project management

    KPI’s

    Interface with factories and DC”s

    Cost control

    Administrative

    Loading and unloading follow up

    Deliveries follow-up

    Interface with factories and DC”s

    Claims management

    Buyer1

    - Labour cost

    - Proximity with our polish transportation team

    - Far from IDEO, for start up especially

    - No mutualization

  • 34

    planner

    Manager1

    Admin

    deputy

    3 FTE

    0,8

    tracker

    2FTE

    5 FTE

    Organization chart for France

    5- Technical offer

    Buyer0,8

    - Mutualization

    - Team proximity during start up

    - ID Logistics’ competency center

    - France is the biggest country

    - Human ressources cost

    - Considering the volume presented in this document ,the mains characteristics of your activity, the process and the TMS that will be implemented we can deduct the following organization.

    - This sizing has to be fine tune during the latter steps

    ORGANIZATION CHART

  • 35

    OPTIMIZATION LEVERS

    CO

    ST O

    PTI

    MIZ

    ATI

    ON

    6

  • 36

    Dedicated

    Spot

    Density

    DPS

    COST Control

    Pallets & pack

    Lean

    Procurement

    Sustainability

    Implement a dedicated fleet on short distance

    Multi customer Dynamic optimization on to cut empty kilometer

    Increase truck usage (weight, Group, Multi pick, multi drop)

    Increase direct plant shipment

    Decrease fixe storage cost by flexible cloud storage

    implementation

    Use of Pallets and packaging delivery to cut empty kilometer

    Lean methodology to cut non added value task

    Procurement massification

    Rail, Alternative energy, CO2 measurement

    PRODUCTIVITY TOOL BOX

    6- Optimization levers

    OPTIMIZATION LEVERS DESCRIPTION

    primary

    secondary

  • 37

    SPOT OPTIMIZATION

    PRODUCTIVITY TOOL BOX

    6- Optimization levers

  • 38

    SPOT OPTIMIZATION

    6- Optimization levers

    IN CHARGE OF TOOL USED

    The deputy

    supported by the

    IDEO R&D team

    leaded by

    Constance Job

    Find in one spaghetti plate…. …A cost efficient round trip

    ✔ Empty km rate : 25%

    ✔ Returning to the departure point mandatory

    ✔ Maximum 3 order per truck

    ✔ Driving time: respect of European legislation

    MAPPINGA FIRST SIMULATION ON DANONE FLOWS

    RESULTS

    8 troundtrips (21 orders optimized)

    on 235 9% of Danone routes

    Empty km rate : 9 % (average)

  • 39

    SPOT OPTIMIZATION

    6- Optimization levers

    DANONE PRIMARY EU TACTICAL OPTIMIZATIONEXAMPLE 1

    • Loading in Parets (ES)

    • Delivery in Hatfield (UK)

    • Loading in Le Molay (FR)

    • Delivery in Bucarest (RO)

    • Loading in Bucarest (RO)

    • Delivery in Saint Cugat (ES)

    Roundtrip description

    Results :

    Empty km : 5%

    DANONE PRIMARY EU TACTICAL OPTIMIZATION EXAMPLE 2

    • Chargement à Aldaia (ES)

    • Livraison à Ochsenfurt (GE)

    • Rechargement à Ochsenfurt (GE)

    • Livraison à Getafe(ES)

    Roundtrip description

    Results :

    Empty km : 9%

    Tactical Optimization can be launched on DANONE’s primary flows only :

  • 40

    SPOT OPTIMIZATION

    6- Optimization levers

    DANONE PRIMARY EU + DISTRIBUTIONEXAMPLE 3

    Tactical optimization can be enlarge to the distribution flows

    Le Molay->Tour->SU OFS et/ou Leclerc Lisieux Le Molay->Paris Sud ->Logidis Carpiquet

    Villecomtal -> Toulouse -> Intermarché Lectoure Ferrieres -> Paris Nord -> Simply Rouen/DLP grand Quevilly

    FTL /week

    Km roundtrip

    Empty km

    Current cost

    5

    Savings

    600

    50

    860 €

    4%

    5

    590

    40

    823 €

    2%

    5

    327

    83

    431 €

    2%

    5

    352

    60

    612 €

    3%

    FTL /week

    Km roundtrip

    Empty km

    Current cost

    Savings

    FTL /week

    Km roundtrip

    Empty km

    Current cost

    Savings

    FTL /week

    Km roundtrip

    Empty km

    Current cost

    Savings

  • 41

    SPOT OPTIMIZATION

    6- Optimization levers

    Last steps would be to include other IDEO’s Customer …with a Dynamic optimization

    Shippeo is one of the French leader for transport tracking with mobile apps. Thanks to the data collected with this apps they are able to merge in the same tool fret volume of many customers. ID Logistics is supporting this start up to

    develop a new optimization tool with one target :

    DANONE PRIMARY EU TACTICAL OPTIMIZATION

    Explanation

    Fret client 1 Fret client n

    1. Information on the possible round trips provided by shippeo

    2. ID Logistics 4PL validates the round trips and the associated savings

    3. An offer is sent on the mobile app of the carrier

    4. The carrier refuse or accept the backway

    Distribution Danone

    Inter co FR

  • 42

    SPOT OPTIMIZATION

    6- Optimization levers

    SAVINGS EXTRAPOLATION

    SAVINGS EXTRAPOLATION

    % flowsAssociated

    turnoverSavings Accessibility Net savings

    9% 60 M€ 3% 60 % 100 K€Primary round trips

    18% 60 M€ 3% 60 % 195 K€Primary + distrbution

    22% 60 M€ 3% 60 % 240 K€Primary + distrbution +

    Multi DO

    The integration of the distribution will help up to find local optimization with dedicated

    trucks in high density areas : Density map

    Example in France : 3

    clusters with 70% of the

    volume

    Round trips

    250 K€Additional Net

    savings

    Stage 2

    Stage 3

  • 43

    INVOICE CONTROL

    COST CONTROL

    6- Optimization levers

  • 44

    CONCEPT

    In charge of

    The trackers will have the

    visibility on all the extra cost.

    He will work closely with the

    carriers to analyze the

    discrepancies. The manager

    will validate the invoices

    DIRECT VALIDATION OF THE COST ON THE WEB ACCESS BY THE CARRIER

    • ID Logistics send to the carriers each week the calculation of the transport cost shipment per shipment• The carrier receive on its web portal this first cost estimate. He is able to validate it directly on the web• In case of discrepancy, he can propose a modification and has to include the associated justification

    Thanks to our TMS, the process and the expertise of our team, we’ve reach a 99,955% accuracy on the invoices. It brings 2 important savings :

    - Invoice accuracy : -3% cost optimization on all the volume with exception of France

    SAVINGS EXTRAPOLATION

    % flowsAssociated

    turnoverSavings Accessibility Net savings

    50% 60 M€ 3% 95 % 855 K€

    Tool used

    Savings

    INVOICE CONTROL

    6- Optimization levers

  • 45

    DENSITY

    PRODUCTIVITY TOOL BOX

    6- Optimization levers

  • 46

    CONCEPT

    In charge of

    A global project has to be

    launched by our project

    manager ( deputy) to follow

    up and improve this ratio

    • 26 % of the shipments have less than 33 pallets• The available space in the trucks is 4,6% ( 31,5 pallets per shipment)• The target is to reach a better filling ratio

    SAVINGS EXTRAPOLATION

    % flowsAssociated

    turnoverSavings Accessibility Net savings

    100% 60M€ 4,6% 30 % 828 K€

    Methods

    • Give a better visibility to the replenishment team• Work closely with them to be able to push/hold volume

    into the network when it makes sense

    Replenishment

    • Optimize the transport with co-loading or multi drops

    Multi pick /multi drops

    • Improve the purchase policy for LTL and palettdistribution

    Purchase

    DENSITY

    6- Optimization levers

  • 47 15/11/1647

    Pallets

    PALLETS MANAGEMENT

    6- Optimization levers

  • 48

    CONCEPT

    In charge of

    • 2 200 000 paletts ( LPR, Europe..) are used each year in Europe to transport the products• Danone doesn’t have any tool to track and trace those packaging• The target is to limit the losses and optimize the pallets relocation to factory

    SAVINGS EXTRAPOLATION

    flowsAssociated

    turnoverSavings Access. Net savings

    2,2M pallets 26,4 M€ 0,5% 50% 65 K€

    Methods

    • Pallets are tack from loading to delivery

    Utilisation of Road PL

    • The debt of each site is monitored by our control tower

    • An alert is sent to Danone in case of discrepancy

    Accountability is verified by our team

    • Our team is in charge of the pallet relocation on factory to optimize the transportation and the stock level

    Pallet stock management

    1 administrative will be in

    charge of the pallets

    management

    PALLETS MANAGEMENT

    6- Optimization levers

    LOOSES

    5 ETP 100 K€ 100% 75% 75 K€Auto -

    accountability

    30% 2,3 M€ 3% 75% 15 K€Stock control pallet

    relocation

    Stock control pallet relocation 155K€

  • 49 15/11/16

    Purchase

    PURCHASE

    6- Optimization levers

  • 50

    Purchasing manager

    F.X. Dehay

    Rail buyer

    F. MOREAU

    Road FR

    S. Blanc

    Lapierre

    Road Inter

    C. Kapsa

    Road LTL

    C. job

    SPEND :

    90M€ Road

    57M€ Rail

    Volumes :

    115 000 trucks

    >1500 full trains

    Lanes :

    1700

    11 countries delivered

    Carriers :

    138 contracted>500 in our network

    PURCHASE

    6- Optimization levers

  • 51

    Needs and objectives

    identificationSourcing of suppliersPreparation of the RFQ

    Launch and sum up of

    the RFI

    Launch and follow up of

    the RFQ

    Negotiation animation

    RFQ analysis and

    negotiation strategy

    Analysis and feedback

    to the hauliersLast Round negotiation

    ContractualisationConstruction of the

    transportation plantKPI

    ConsultationValidation

    Client

    Participantlead

    Client

    Client Client Client

    Client

    Client ClientClient

    Client

    Client Client

    PURCHASE

    6- Optimization levers

  • 52

    Les aTouts achats IDEO

    IDEO invests in its relationship with carriers

    COMMUNICATION

    Attractivity of Ideo

    • Newsletter for carrier• Satisfaction survey followed by

    specific actions• Supplier Day : What are the objectives

    for the year to come , how to reach them ?

    • Audit before peak season

    DASHBOARD AND MAPPING

    • Monthly analysis of the top 10 carriers• Monthly analysis of the Bottom 10

    carriers• Identification of main problematic

    lanes• Trigger of COPIL with worse

    performing suppliers• Corrective actions and transport plan

    modifications

    Macro analysis

    COPIL

    • Proximity with operational teams and measurement of bad performance

    • Reactivity in finding replacement solutions

    • Use of PRISME classification• Exchanges of recap via extranet and

    follow up of corrective actions• Escalation with integration of the

    client in the main meetings

    Purchasing credibility

    Source : palmarès mensuel par transporteur + palmarès par ligne et par transporteurs

    TOP 10 Nb OT Perf Déjà M-1 Bottom 10 Nb OT Perf Déjà M-1

    GEODIS 444 98,2% oui TND CHAMBERY 365 92,2% oui

    SARL MULTITRANSPORTS 444 98,2% non TRANSALLIANCE 146 93,32% oui

    TLE 378 99% oui PALLUT 74 91,4% non

    DUPESSEY 355 100% oui ALTAVIA OPTITRANS DEF 55 91,4% oui

    CHEVALLIER 275 100% oui JC FIOLET 48 92,2% oui

    BOURRAT 219 99,5% oui TRANSPORTS LA VILAINOISE SAS46 88,3% non

    PERRENOT 139 98,6% non CARREFOUR TPT 40 81,3% non

    MALHERBE 136 98,5% non COTRAMA 31 85,7% non

    JACQUEMMOZ 131 99,2% oui LAHAYE S.A.S 31 83,4% non

    Corsi - F.I.T. sas 129 96,2% oui CODOGNOTTO 18 85,0% non

    Perf Déjà M-1

    92,87% oui

    86,05% non

    90,84% non

    91,92% non

    81,42% non

    Fx Dehay

    Tableau de Bord Performance DEF - Activité du mois de Février/ XXXX OT

    Bottom 5 Perf Lignes :

    Lignes Nb OT

    VOLVIC-AIN 132

    VOLVIC - COTE D'ARMOR 64

    BRETIGNY-PAS DE CALAIS 61

    AMBERIEU-RHONE 47

    VOLVIC - SARTHE 42

    92,00%

    96,00%

    98,00%

    91,00%

    88,00%

    90,00%

    93,00%

    88,63%

    96,00%

    93,00%

    94,78%

    89,00%

    96,94%

    85,0%

    87,0%

    89,0%

    91,0%

    93,0%

    95,0%

    97,0%

    99,0%

    PURCHASE

    6- Optimization levers

    Net savings

    0,5%/year

  • 53 15/11/16

    Sustainability

    PURCHASE

    6- Optimization levers

  • 54

    > CO2 is measured in our TMS following the Ademe rules

    > Detail carbon footprint is calculated per SKU/customer/truck/carrier

    > Possibility to include information coming from onboard devices ( real emissions : level 4)

    > Support/engineering to decrease Co2 emissions

    Carbon foot

    print

    Carbon footprint measurement

    9 kg CO² / pallet

    199 g CO²/box

    11 g CO² / SKU

    570 kg CO² / Truck

    Measure

    Improve

    Specifictrucks

    Rail Road

    Eco Driving

    Transport Optimization

    SUSTAINABILITY

    6- Optimization levers

  • 55 15/11/16

    LEAN

    LEAN MANAGEMENT

    6- Optimization levers

  • 56

    CENTRALIZATION – TMS IMPLEMENTATION

    6- Optimization levers

    CONCEPT• The implementation of a TMS allows an automation of the low value added tasks• The centralization of the team should give us the benefits of large scale

    Current situation Evolution 2017

    Impacts of this evolution

    • Local teams in charge of

    transport management in all

    the countries

    • 1 purchase dept in NL

    • 1 TMS : Transwide in France

    • 1 TMS in Poland

    • Manual operations for the

    rest of Europe

    • One single team in charge of

    the daily operations,

    purchase and re-engineering

    To Increase productivity

    To Improve efficiency on the continuous improvement process

    To Get a better visibility on the supply chain

    To Bring more reactivity

    THE IMPLEMENTATION OF THE ID LOGISTICS 4PL SOULD NOT

    GENERATE ADDITIONAL COST ON HUMAN RESSOURCES

  • 57 15/11/16

    RESUM

    RESUM

    6- Optimization levers

  • 58

    RESUM

    6- Optimization levers

    Savings resums

    100 K€Primary round trips

    855 K€Invoice control

    828 K€

    155 K€

    Density

    Pallets

    900 K€Purchase : O,5% during 3 years

    2,84 M€Targeted savings 5th year

    Implementation

    phase

    2018 VS 2017 : - 1,16M€

    2019 VS 2017 : - 1,92 M€

    2020 VS 2017 : - 2,76M€

    YEARLY SAVINGS

    Cumulative savings VS 2017

    0 K€Year 1

    - 1 160 K€Year 2

    - 1 920K€Year 3

    - 2 760 K€Year 4

    - 5 840 K€TOTAL

    ++

    +

  • 59

    IMPLEMENTATION

    STA

    RT

    UP

    7

    59

  • 60

    First DRAFT

    Jan. 17

    Feb.-17

    March.-17

    April.-17

    May.-17

    juin-17

    Juil.-17

    août.-17

    sept-17

    Oct -17

    nov.-17

    dec.-17

    janv.-18

    fev.-18

    2017

    3 PL selection

    Process definition

    LOIContract

    TMS

    Activity Start

    Go-Live

    Operations

    Work shops

    Process definition

    Training/operational support

    Project phase

    Training

    Data collection / AnalyseProject and

    purchase

    Work shops

    2018

    RAMP UP

    Specification book

    Contract

    Phase 1 : Benelux, Germany, north EU

    Take over

    Phase 2 : Poland, tchek rep, Eastern

    Phase 3 : France

    PLANNING

    7- Implementation

    Phase 4 : Rest of EU

  • 61

    Leader

    TBD Denis PaugetProject Director

    E. GuerinGM IDEO

    TBD

    Sponsor

    TDBLogistics operations

    TBDProcess and methods

    TBDIS IT

    Benoit MugnierOperations

    Frederic InfantiProcess

    Franck FerronIS IT

    Members

    Christophe SatinGM GroupID Logistics

    TBD

    WORKLOAD for DANONE

    Man day

    • Logistics operations 40

    • Process methods 60

    • IS IT ( Without EDI development) 60

    • Project manager 60

    • TOTAL 220

    PLANNING

    7- Implementation

    http://www.heliovision.fr/products/images/Danone.gifhttp://www.heliovision.fr/products/images/Danone.gif

  • 62

    CommercialOffer

    Co

    mm

    erc

    ial o

    ffe

    r

    8

  • YEARLY BUDGET

    8- Commercial offer

    • 1 project manager + 1 buyerPurchase and project team

    • 1 manager, 5 planners, 2 trackers, 3 administratives, TMS, Offices

    Operationnalteam and TMS

    12

    74 904Transport orders

    Yearly TOTAL, invoice in Zloty

    17 885 €

    10,17€

    Unit unit cost

    976 072 €

    214 505 €

    761 567€

    Yearly budget

    POLAND

    START UP COST, invoice in € 90 537€

    • 0,8 project manager + 0,8 buyerPurchase and project team

    • 1 manager, 5 planners, 2 trackers, 3 administratives, TMS, Offices

    Operationnalteam and TMS

    12

    74 904Transport orders

    Yearly TOTAL

    14 143€

    12,82€

    Unit unit cost

    1 129 832 €

    169 718 €

    960 115 €

    Yearly budget

    FRANCE

    START UP COST 71 191€

    Interface A level evaluation

    Interface A level evaluation

    72 000 €

    72 000 €

  • 64

    B CASE FRANCE

    8- Commercial offer

    4 PL 4 years

    4 096 K€

    Transport

    Cost

    4 years

    240 M€

    Start up Cost :

    72 K€

    Centralization

    2 469 K€

    Cost

    optimization

    5 840 K€

    Transport

    Cost

    4 years

    235.9 M€

    -4 070 K€ : -1,7%

    Interfaces:

    72 K€

  • 65

    B CASE FRANCE

    8- Commercial offer

    SAVINGS AND COST YEAR AFTER YEAR

    ROI < Y +2

    T1 T2 T3 T4 T1 T2 T3 T4 T1 T2 T3 T4 T1 T2 T3 T4START UP COST EDI 144 144 144 144 144 144 144 144 144 144 144 144 144 144 144 144

    4PL COST 141 424 706 989 1 271 1 553 1 836 2 118 2 401 2 683 2 966 3 248 3 531 3 813 4 096

    TRANSPORTATION SAVING - - 250 523 824 1 161 1 586 2 040 2 533 3 081 3 731 4 421 5 131 5 840

    CENTRALIZATION 99 296 494 691 889 1 086 1 284 1 481 1 679 1 876 2 074 2 271 2 469

    TOTAL COST DANONE 144 285 568 751 586 398 183 70 - 410 - 779 - 1 187 - 1 650 - 2 215 - 2 820 - 3 445 - 4 070 -

    2017 2018 2019 2020

  • 66

    B CASE

    8- Commercial offer

    VISIBILITY

    HOMOGENOUS PROCESS

    INNOVATION AND CONTINUOUS IMPROVEMENT

    COST CONTROL

    CARBON FOOTPRINT OPTIMIZATION

  • 67

    Terms and Conditions

    • Our prices are based on the elements supplied by DANONE specification data• Price are valid for the volumes indicated in our offer +/-15%• Prices provided are valid from Jan 1st 2017 to Dec 31st 2017• Prices expressed in Euro excluding VAT

    Price validity

    • Invoicing is monthly and payable at 30 days from the invoicing dateInvoicing

    • This proposal is based on a 3-years contract renewable Contract

    • TMS IT : Syntex index T2 2016• Human resources ( team in France : Indice INSEE du coût de la main d’oeuvre INSEE N° 1567433, To be defined if the

    team is located in Poland)Index

    • All the shipments received in the TMS will be invoiced• EDI and interfaces development are not integrated in the budget• Night work or activity during bank holidays or week end is not included• Shippeo apps and DC brain are not included in the budget

    Asumptions

  • 68

    POUR TOUTE DEMANDE D’INFORMATION

    ID LOGISTICS410, Route du Moulin de Losque - CS 70132

    84 304 Cavaillon Cedex - FRANCE

    Tél : +33 (0).4.32.529.600

    Email : [email protected]

    www.id-logistics.com

    68