transport scotland - drawing no. drawing type drawing title … · and soil nailing screen views to...
TRANSCRIPT
A9 Crubenmore to Kincraig Volume 3 – Environmental Drawings
All Travellers
Drawing No. Drawing Type Drawing Title Projectwise Drawing Reference Software
9.1 BASELINE PLAN ALL TRAVELLERS OVERVIEW A9P09-CFJ-EGN-M_ZZZZZ_ZZ-DR-EN-0003 GIS
9.2 BASELINE PLAN ALL TRAVELLERS - VIEWS FROM THE ROAD A9P09-CFJ-EGN-M_ZZZZZ_ZZ-DR-EN-0004 GIS 9.3 ASSESSMENT PLAN ALL TRAVELLERS - VIEWS FROM THE ROAD - PROPOSED SCHEME A9P09-CFJ-EGN-M_ZZZZZ_ZZ-DR-EN-0005 GIS 9.4 ASSESSMENT PLAN ALL TRAVELLERS NMUS chainage 40000 to 42400 A9P09-CFJ-EGN-M_ML400_ZZ-DR-EN-0003 GIS 9.5 ASSESSMENT PLAN ALL TRAVELLERS NMUS chainage 42400 to 45600 A9P09-CFJ-EGN-M_ML424_ZZ-DR-EN-0003 GIS 9.6 ASSESSMENT PLAN ALL TRAVELLERS NMUS chainage 45600 to 48600 A9P09-CFJ-EGN-M_ML456_ZZ-DR-EN-0003 GIS 9.7 ASSESSMENT PLAN ALL TRAVELLERS NMUS chainage 48600 to 51800 A9P09-CFJ-EGN-M_ML486_ZZ-DR-EN-0003 GIS 9.8 ASSESSMENT PLAN ALL TRAVELLERS NMUS chainage 51800 to 55000 A9P09-CFJ-EGN-M_ML518_ZZ-DR-EN-0003 GIS 9.9 ASSESSMENT PLAN ALL TRAVELLERS NMUS chainage 55000 to 55645 A9P09-CFJ-EGN-M_ML550_ZZ-DR-EN-0003 GIS
Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right. All rights reserved. Transport Scotland Licence number 100046668, 2018
NMU4
NMU6
NMU7
NMU9
NMU10
NMU12NMU11 NMU13
NMU15
NMU14
NMU19
NMU5
NMU8
NMU1 (NCN7)NMU2 (Core Path)
NMU3
NMU18NMU16
NMU1(NCN7)
NMU20NMU22
NMU21
NMU23NMU24
NMU22
NMU25
NMU26
NMU1(NCN7)
NMU17
NMU13
NMU5
CP19 (at-grade)
CP20
CP18 (underpass)
CP17 (underpass)
CP16(at-grade)
CP15
CP14
CP13
CP12(underpass)
CP11(at-grade)
CP10(underpass)
CP9(at-grade)
CP8(at-grade)
CP7(underpass)
CP6(at-grade)
CP5(underpass)
CP4(at-grade)
CP3(underpass)
CP2(at-grade)
CP1(at-grade)
to Inverness
to Perth
end of Project 9 (ch. 56+645)
start of Project 9 (ch. 40+000)
¯¯
Docu
ment
Pat
h: J:
\9731
8\GIS
\Stag
e_3\P
09\C
hapt
er_9
_All_
Trav
eller
s\P09
- 9-1
All T
rave
llers
.mxd
CH2MHILL Fairhurst JVC/O: City Park 368 Alexandra Parade Glasgow G31 3AUTel + 44 (0) 141 552 2000 Fax +44 (0) 141 552 2525
DWG:A9P09-CFJ-EGN-M_ZZZZZ_ZZ-DR-EN-0003
DATE: 30/07/2018
PROJ: 495298
DESIGN:LF
DRAWN:ST
CHK:SWG
APP:JF
PROJECT 9 CRUBENMORE TO KINCRAIG EIABASELINE PLAN
DRAWING 9.1ALL TRAVELLERS - OVERVIEW
DESCRIPTIONSUIT APPREV DATE BY
LegendProposed SchemeExtents
Existing Dualled
Existing Single
Highland Mainline railway
= Type A Lay-by
= Type B Lay-by
k Parking Areas
Crossing Points (CP)
Assessment Study Area
NMU RoutesSustrans NCN7 (On-Road)
NCN7 (Off-Road)
CNPA Core PathEast Highland Way(National Route)
Scottish National Trail
Hill Walking Routes
CNPA Community Path
Badenoch Way
Speyside Way ExtensionSustrans Mountain BikeTrail
Informal Routes
0 1,000 2,000500Metres
SCALE 1:40000
SHEET: 1 of 1
SUITABILITY: A3
REVISION: C01
P01 S3 APR 2018 DRAFT FOR COMMENT ST JFP02 S3 MAY 2018 DESIGN UPDATE RT JFP03 S3 JUL 2018 FINAL REVISIONS RT JF
DESCRIPTIONSUIT APPREV DATE BY
Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right. All rights reserved. Transport Scotland Licence number 100046668, 2018
%__%
__
%__%
__
%__%
__ %__%
__
%__%
__%__
%__
%__%
__
%__%
__
%__%__
%__%
__
to Inverness
Glimpse viewsof mountainsbeyond Ralia
Glimpse views of Newtonmorethrough a screenof birch trees
Kingussie visible through scatteredvegetation
Views ofRuthven Barracksand Insh Marshes
A
B
D
C
EF H
G
M
N
OP
QR
S
T
IJK
L
Restricted views eastand west with densevegetation lining the road
Vegetation screens views to Kingussie at the approach to the junction
end of Project 9 (ch. 56+645)
start of Project 9 (ch. 40+000)
¯¯
Docu
ment
Pat
h: J:
\9731
8\GIS
\Stag
e_3\P
09\C
hapt
er_9
_All_
Trav
eller
s\P09
- 9-2
All T
rave
llers
.mxd
CH2MHILL Fairhurst JVC/O: City Park 368 Alexandra Parade Glasgow G31 3AUTel + 44 (0) 141 552 2000 Fax +44 (0) 141 552 2525
DWG:A9P09-CFJ-EGN-M_ZZZZZ_ZZ-DR-EN-0004
DATE: 30/07/2018
PROJ: 495298
DESIGN:LF
DRAWN:ST
CHK:SWG
APP:JF
PROJECT 9 CRUBENMORE TO KINCRAIG EIABASELINE PLAN
DRAWING 9.2ALL TRAVELLERS - VIEWS FROM THE ROAD
LegendProposed Scheme Extents
Highland Mainline railway
%__ Lay-by Viewpoints
Views From The RoadNo View
Restricted View
Intermittent View
Open View
Vistas
Landform
Screening
0 1,000 2,000500Metres
SCALE 1:40000
SHEET: 1 of 1
SUITABILITY: A3
REVISION: C01
P01 S3 APR 2018 DRAFT FOR COMMENT ST JFP02 S3 MAY 2018 DESIGN UPDATE RT JFP03 S3 JUL 2018 FINAL REVISIONS RT JF
Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right. All rights reserved. Transport Scotland Licence number 100046668, 2018
Retain open viewsof Ruthven Barracksand Insh Marshes
Areas of rock cutand soil nailing screenviews to the widerlandscapeExisting and proposed
planting restrict views around Newtonmore Junction
Views towards Kingussie
end of Project 9 (ch. 56+645)
start of Project 9 (ch. 40+000)
¯¯
Docu
ment
Pat
h: J:
\9731
8\GIS
\Stag
e_3\P
09\C
hapt
er_9
_All_
Trav
eller
s\P09
- 9-3
All T
rave
llers
.mxd
CH2MHILL Fairhurst JVC/O: City Park 368 Alexandra Parade Glasgow G31 3AUTel + 44 (0) 141 552 2000 Fax +44 (0) 141 552 2525
DWG: A9P09-CFJ-EGN-M_ZZZZZ_ZZ-DR-EN-0005
DATE: 30/07/2018
PROJ: 495298
DESIGN:LF
DRAWN:ST
CHK:SWG
APP:JF
PROJECT 9 CRUBENMORE TO KINCRAIG EIAASSESSMENT PLAN
DRAWING 9.3ALL TRAVELLERS - VIEWS FROM THE ROAD
PROPOSED SCHEME
DESCRIPTIONSUIT APPREV DATE BY
Legend
Proposed Scheme Extents
Highland Mainline railway
Views From The RoadNo view
Restricted view
Intermittent view
Open view
Vistas
0 1,000 2,000500Metres
SCALE 1:40000
SHEET: 1 of 1
SUITABILITY: A3
REVISION: C01
Note: Views from the Road are representativeof the Proposed Scheme at operation years15-25, when vegetation has becomeestablished, and shows the long term residual views from the road.
P01 S3 APR 2018 DRAFT FOR COMMENT ST JFP02 S3 MAY 2018 DESIGN UPDATE RT JFP03 S3 JUL 2018 FINAL REVISIONS RT JF
Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right. All rights reserved. Transport Scotland Licence number 100046668, 2018
to Perth
to Inverness
Estate and NMU underpass
JLA1a/JLA2a
JLA3
NMU4
NMU3
NMU2 (Core Path)NMU1(NCN7)
NMU5
ProposedSouthbound lay-by
417
434427
40500
42000
4250
0
41000
40000
¯ ¯
Docu
men
t Path
: J:\9
7318
\GIS
\Stag
e_3\P
09\C
hapt
er_9
_All_
Trav
eller
s\P09
- 9-4
All T
rave
llers
.mxdCH2MHILL Fairhurst JV
C/O: City Park 368 Alexandra Parade Glasgow G31 3AUTel + 44 (0) 141 552 2000 Fax +44 (0) 141 552 2525
DESCRIPTIONSUIT APPREV DATE BY
0 250 500125Metres
SCALE 1:10000
SUITABILITY:A3
SHEET:1 OF 6
REVISION:C01
DWG: A9P09-CFJ-EGN-M_ML400_ZZ-DR-EN-0003
DATE: 30/07/2018PROJ: 495298
DESIGN:LF
DRAWN:ST
CHK:SWG
APP:JF
PROJECT 9 CRUBENMORE TO KINCRAIG EIAASSESSMENT PLAN
DRAWING 9.4ALL TRAVELLERS - NMUschainage 40000 to 42400
LegendProposed Scheme DetailsHighland Mainline railwaySuDS IDAssessment Boundary -Permanent WorksAssessment Boundary -Temporary WorksPotential new journey lengthProposed Crossing Point(CP)
NMU (non-motorised user)Routes
Sustrans NCN7 (On-Road)NCN7 (Off-Road)CNPA Core PathHill Walking RoutesInformal Routes
P01 S3 APR 2018 DRAFT FOR COMMENT ST JFP02 S3 MAY 2018 DESIGN UPDATE RT JFP03 S3 JUL 2018 FINAL REVISIONS RT JF
Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right. All rights reserved. Transport Scotland Licence number 100046668, 2018
to Inverness
to Perth
to Inverness
to Perth
to Inverness
to Perth
to Inverness
to Perth
to Inverness
to Perth
to Perth
to Inverness
to Perth
NMU5
NMU8
NMU7
JLA1b/JLA2b
NMU6
JLA4
NMU9
NMU and Estate Underpass
417
434
458
427
461
4550
0
4400
0
4300
0
4500
0
4450
0
4250
0¯ ¯
Docu
men
t Path
: J:\9
7318
\GIS
\Stag
e_3\P
09\C
hapt
er_9
_All_
Trav
eller
s\P09
- 9-5
All T
rave
llers
.mxdCH2MHILL Fairhurst JV
C/O: City Park 368 Alexandra Parade Glasgow G31 3AUTel + 44 (0) 141 552 2000 Fax +44 (0) 141 552 2525
DESCRIPTIONSUIT APPREV DATE BY
0 250 500125Metres
SCALE 1:10000
SUITABILITY:A3
SHEET:2 OF 6
REVISION:C01
DWG: A9P09-CFJ-EGN-M_ML424_ZZ-DR-EN-0003
DATE: 30/07/2018PROJ: 495298
DESIGN:LF
DRAWN:ST
CHK:SWG
APP:JF
PROJECT 9 CRUBENMORE TO KINCRAIG EIAASSESSMENT PLAN
DRAWING 9.5ALL TRAVELLERS - NMUschainage 42400 to 45600
LegendProposed Scheme DetailsHighland Mainline railwaySuDS IDAssessment Boundary -Permanent WorksAssessment Boundary -Temporary WorksPotential new journey lengthProposed Crossing Point(CP)
NMU (non-motorised user)Routes
Sustrans NCN7 (On-Road)CNPA Core PathEast Highland Way (NationalRoute)Hill Walking RoutesInformal Routes
P01 S3 APR 2018 DRAFT FOR COMMENT ST JFP02 S3 MAY 2018 DESIGN UPDATE RT JFP03 S3 JUL 2018 FINAL REVISIONS RT JF
Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right. All rights reserved. Transport Scotland Licence number 100046668, 2018
to Perth
to Inverness
NMU7
NMU5
NMU8
NMU9NMU10
JLA6NMU11
NMU13
JLA7
NMU13NMU12
NMU13
NMU15
NMU andEstate UnderpassNMU14
NMU and Estate Underpass
Proposed Southbound Lay-by
Proposed Northbound Lay-by
JLA5474
458461 487
491
45500 4750
0
4600
0
4700
0
4800
0
48500
¯ ¯
Docu
men
t Path
: J:\9
7318
\GIS
\Stag
e_3\P
09\C
hapt
er_9
_All_
Trav
eller
s\P09
- 9-6
All T
rave
llers
.mxdCH2MHILL Fairhurst JV
C/O: City Park 368 Alexandra Parade Glasgow G31 3AUTel + 44 (0) 141 552 2000 Fax +44 (0) 141 552 2525
DESCRIPTIONSUIT APPREV DATE BY
0 250 500125Metres
SCALE 1:10000
SUITABILITY:A3
SHEET:3 OF 6
REVISION:C01
DWG: A9P09-CFJ-EGN-M_ML456_ZZ-DR-EN-0003
DATE: 30/07/2018PROJ: 495298
DESIGN:LF
DRAWN:ST
CHK:SWG
APP:JF
PROJECT 9 CRUBENMORE TO KINCRAIG EIAASSESSMENT PLAN
DRAWING 9.6ALL TRAVELLERS - NMUschainage 45600 to 48600
LegendProposed Scheme DetailsHighland Mainline railwaySuDS IDCompensatory StorageAreasAssessment Boundary -Permanent WorksAssessment Boundary -Temporary WorksPotential new journey lengthProposed Crossing Point(CP)
NMU (non-motoriseduser) Routes
NCN7 (Off-Road)CNPA Core PathHill Walking RoutesCNPA Community PathSpeyside Way ExtensionInformal Routes
P01 S3 APR 2018 DRAFT FOR COMMENT ST JFP02 S3 MAY 2018 DESIGN UPDATE RT JFP03 S3 JUL 2018 FINAL REVISIONS RT JF
Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right. All rights reserved. Transport Scotland Licence number 100046668, 2018
to Inverness
to Inverness
to Perth
NMU19
NMU13NMU15
NMU17
NMU16NMU18
NMU1 (NCN7)
NMU5
NMU22
NMU23
NMU21
Proposed NMU route to link Kingussie and Kincraig
Maintenance andlandowner underpass
NMU20
JLA7/8
NMU and Estate Underpass
Proposed Northbound Lay-by with Viewing Facilities
Proposed Southbound Lay-by with Viewing Facilities
490
502
474
509
513
530
487
493
507
50000
4900
0
51000 5150
0
50500
495004850
0¯ ¯
Docu
men
t Path
: J:\9
7318
\GIS
\Stag
e_3\P
09\C
hapt
er_9
_All_
Trav
eller
s\P09
- 9-7
All T
rave
llers
.mxdCH2MHILL Fairhurst JV
C/O: City Park 368 Alexandra Parade Glasgow G31 3AUTel + 44 (0) 141 552 2000 Fax +44 (0) 141 552 2525
DESCRIPTIONSUIT APPREV DATE BY
0 250 500125Metres
SCALE 1:10000
SUITABILITY:A3
SHEET:4 OF 6
REVISION:C01
DWG: A9P09-CFJ-EGN-M_ML486_ZZ-DR-EN-0003
DATE: 23/08/2018PROJ: 495298
DESIGN:LF
DRAWN:ST
CHK:SWG
APP:JF
PROJECT 9 CRUBENMORE TO KINCRAIG EIAASSESSMENT PLAN
DRAWING 9.7ALL TRAVELLERS - NMUschainage 48600 to 51800
LegendProposed Scheme DetailsHighland Mainline railwaySuDS IDCompensatory Storage AreasAssessment Boundary -Permanent WorksAssessment Boundary -Temporary WorksPotential new journey lengthProposed Crossing Point (CP)
NMU (non-motorised user)Routes
Sustrans NCN7 (On-Road)NCN7 (Off-Road)CNPA Core PathEast Highland Way (NationalRoute)Scottish National TrailHill Walking RoutesCNPA Community PathBadenoch WaySpeyside Way ExtensionInformal Routes
P01 S3 APR 2018 DRAFT FOR COMMENT ST JFP02 S3 MAY 2018 DESIGN UPDATE RT JFP03 S3 JUL 2018 FINAL REVISIONS RT JFP04 S3 AUG 2018 FINAL REVISIONS RT JF
Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right. All rights reserved. Transport Scotland Licence number 100046668, 2018
to Perth
to Inverness
NMU23
NMU22
NMU24
Proposed NMU route tolink Kingussie and Kincraig
NMU25JLA9
Proposed Northbound Lay-by
NMU and Estate Underpass
Proposed Northbound Lay-by
537
509
513
530
507
534
53500
54000
54500 5500
0
5250
0
5200
0
5300
0
¯ ¯
Docu
men
t Path
: J:\9
7318
\GIS
\Stag
e_3\P
09\C
hapt
er_9
_All_
Trav
eller
s\P09
- 9-8
All T
rave
llers
.mxdCH2MHILL Fairhurst JV
C/O: City Park 368 Alexandra Parade Glasgow G31 3AUTel + 44 (0) 141 552 2000 Fax +44 (0) 141 552 2525
DESCRIPTIONSUIT APPREV DATE BY
0 250 500125Metres
SCALE 1:10000
SUITABILITY:A3
SHEET:5 OF 6
REVISION:C01
DWG: A9P09-CFJ-EGN-M_ML518_ZZ-DR-EN-0003
DATE: 30/07/2018PROJ: 495298
DESIGN:LF
DRAWN:ST
CHK:SWG
APP:JF
PROJECT 9 CRUBENMORE TO KINCRAIG EIAASSESSMENT PLAN
DRAWING 9.8ALL TRAVELLERS - NMUschainage 51800 to 55000
LegendProposed Scheme DetailsHighland Mainline railwaySuDS IDCompensatory StorageAreasAssessment Boundary -Permanent WorksAssessment Boundary -Temporary WorksPotential new journey lengthProposed Crossing Point(CP)
NMU (non-motoriseduser) Routes
CNPA Core PathCNPA Community PathInformal Routes
P01 S3 APR 2018 DRAFT FOR COMMENT ST JFP02 S3 MAY 2018 DESIGN UPDATE RT JFP03 S3 JUL 2018 FINAL REVISIONS RT JF
Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right. All rights reserved. Transport Scotland Licence number 100046668, 2018
to Inverness
to Perth
Proposed NMU route tolink Kingussie and Kincraig
Proposed private track
NMU26
Proposed Southbound Lay-by with Viewing Facilities
Proposed Northbound Lay-by
561563
56000
56500
5500
0
5550
0
¯ ¯
Docu
men
t Path
: J:\9
7318
\GIS
\Stag
e_3\P
09\C
hapt
er_9
_All_
Trav
eller
s\P09
- 9-9
All T
rave
llers
.mxdCH2MHILL Fairhurst JV
C/O: City Park 368 Alexandra Parade Glasgow G31 3AUTel + 44 (0) 141 552 2000 Fax +44 (0) 141 552 2525
DESCRIPTIONSUIT APPREV DATE BY
0 250 500125Metres
SCALE 1:10000
SUITABILITY:A3
SHEET:6 OF 6
REVISION:C01
DWG: A9P09-CFJ-EGN-M_ML550_ZZ-DR-EN-0003
DATE: 23/08/2018PROJ: 495298
DESIGN:LF
DRAWN:ST
CHK:SWG
APP:JF
PROJECT 9 CRUBENMORE TO KINCRAIG EIAASSESSMENT PLAN
DRAWING 9.9ALL TRAVELLERS - NMUschainage 55000 to 55645
LegendProposed Scheme DetailsHighland Mainline railwaySuDS IDCompensatory StorageAreasAssessment Boundary -Permanent WorksAssessment Boundary -Temporary Works
NMU (non-motorised user)Routes
Sustrans NCN7 (On-Road)CNPA Core PathEast Highland Way (NationalRoute)Badenoch WaySpeyside Way ExtensionInformal Routes
P01 S3 APR 2018 DRAFT FOR COMMENT ST JFP02 S3 MAY 2018 DESIGN UPDATE RT JFP03 S3 JUL 2018 FINAL REVISIONS RT JFP04 S3 AUG 2018 FINAL REVISIONS RT JF