Transportation Improvement Program, FY 2020 to FY 2023 Consolidated Federal Lands Highway Divisions Federal Highway Administration Project Name Award Year State County FLMA Unit Project Description Type of Work Primary Fund Source Program Amount Funds From Title Delivered By Phase Congressional District FLMA Region Alabama AL FLAP BIBB CR51(1) 2019 AL Bibb USFS / Talladega National Forest Roadway culvert replacement, full depth reclamation, surfacing, pavement striping and guardrail 3RH FLAP $582,181 Title 23 LOCAL Planned AL-06 USFS AL FLAP CLARKE SCP(1) 2019 AL Clarke USACE / Silver Creek Park Resurface existing asphalt along with striping & pavement marking on 11 Mile Post Rd in Clarke Co. 3RL FLAP $152,639 Title 23 STATE In Design AL-07 USACE AL_FLAP_CLARKE_OLP(1) 2019 AL Clarke USACE / Old Lock No.1 Park & Silver Creek Park Resurface existing asphalt along with striping & pavement marking on Old Lock One Rd in Clarke Co. 3RL FLAP $171,502 Title 23 STATE In Design AL-04 USACE NP_NATR_2A18_2B7_2C6_2D12 2019 AL Colbert; Lauderdale Natchez Trace Parkway Overlay park road from MP 316.55 to MP 334.55 2R FLTP $5,211,990 Title 23 EFLHD In Design AL-04 NPS AL CE BW T Lakes(1) 2020 AL Hale Black Warrior and Tombigbee Lakes (BW&T) Black Warrior & Tombigbee Lakes, Overlay 7,000 SY at Lock 5 Park, & 4,330 SY at Lock 8 Park. 3RL_2R USACE $975,000 Title 23 EFLHD Planned AL-07 USACE AL FLAP WNSTN CR2(1) 2020 AL Winston USFS / Bankhead National Forest Resurface Forest Hwy 5 / Co. Rd. 2 and apply new traffic striping. 3RL FLAP $510,000 Title 23 LOCAL Planned AL-04 USFS AL FLAP WNSTN CR8(1) 2020 AL Winston USFS / Bankhead National Forest Resurfacing and full depth reclamation with portland cement on Co. Rd. 8. 3RL FLAP $920,000 Title 23 LOCAL Planned AL-04 USFS AL FLAP WNSTN CR23 CR60(1) 2021 AL Winston USFS / Bankhead National Forest Resurface Winston Co. Rd. 23 and 60 (also National Forest Rd. 4). 3RL FLAP $920,000 Title 23 LOCAL Planned AL-04 USFS FW_WHEE_15(1) 2023 AL Madison; Limestone Wheeler National Wildlife Refuge Rehabilitate Rockhouse Road (Route 15). 3RH FLTP $1,200,000 Title 23 EFLHD Planned _VARIOUS FWS Alaska AK ANCHORAGE T 2016(1) Connecting Anchorage Trail Improvements 2020 AK Municipality of Anchorage BLM Campbell Tract This project funds the construction of trail improvements, bridge replacements, wayfinding, and safety improvements. Construction FLAP $1,636,500 Title 23 Western Federal Lands Highway Division, FHWA In Design AK-at large BLM Alaska Region AK DOT 198(1) Chokosna River Bridge Replacement 2020 AK Valdez-Cordova Census Area Wrangell - St. Elias National Park & Preserve Replace the Chokosna River Bridge and minor roadway realignment. Reconstruction FLAP $2,758,159 Title 23 Alaska Department of Transportati on and Public Facilities In Design AK-at large NPS Alaska Region AK FNSB CHENA LAKE(2) Chena Lakes Recreation Area Access Improvements, Phase II 2020 AK Fairbanks North Star Borough Chena Lakes Recreation Area Construct ADA accessible parking and pathways, one prefabricated vault-style restroom, two open-space picnic areas, and erosion control features. Enhancement FLAP $1,008,761 Title 23 Fairbanks North Star Borough In Design AK-at large USACE Pacific Ocean Division AK FS CNF 164(1) Portage Curve Multi-Modal Connector 2020 AK Municipality of Anchorage FS - Chugach National Forest This project funds planning, design, and construction of a pedestrian overcrossing, parking, and trailheads for improved connectivity along the Iditarod National Historic Trail. Construction FLAP $10,350,862 Title 23 Alaska Department of Transportati on and Public Facilities In Design AK-at large FS Alaska - Region 10 Page 1

Upload: others

Post on 23-Mar-2022

14 views

Category:

Documents


0 download

TRANSCRIPT

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

Alabama

AL FLAP BIBB CR51(1) 2019 AL Bibb

USFS / Talladega

National Forest

Roadway culvert replacement, full depth

reclamation, surfacing, pavement striping

and guardrail 3RH FLAP $582,181 Title 23 LOCAL Planned AL-06 USFS

AL FLAP CLARKE SCP(1) 2019 AL Clarke USACE / Silver Creek Park

Resurface existing asphalt along with striping

& pavement marking on 11 Mile Post Rd in

Clarke Co. 3RL FLAP $152,639 Title 23 STATE In Design AL-07 USACE

AL_FLAP_CLARKE_OLP(1) 2019 AL Clarke

USACE / Old Lock No.1

Park & Silver Creek Park

Resurface existing asphalt along with striping

& pavement marking on Old Lock One Rd in

Clarke Co. 3RL FLAP $171,502 Title 23 STATE In Design AL-04 USACE

NP_NATR_2A18_2B7_2C6_2D12 2019 AL

Colbert;

Lauderdale Natchez Trace Parkway

Overlay park road from MP 316.55 to MP

334.55 2R FLTP $5,211,990 Title 23 EFLHD In Design AL-04 NPS

AL CE BW T Lakes(1) 2020 AL Hale

Black Warrior and

Tombigbee Lakes

(BW&T)

Black Warrior & Tombigbee Lakes, Overlay

7,000 SY at Lock 5 Park, & 4,330 SY at Lock 8

Park. 3RL_2R USACE $975,000 Title 23 EFLHD Planned AL-07 USACE

AL FLAP WNSTN CR2(1) 2020 AL Winston

USFS / Bankhead

National Forest

Resurface Forest Hwy 5 / Co. Rd. 2 and apply

new traffic striping. 3RL FLAP $510,000 Title 23 LOCAL Planned AL-04 USFS

AL FLAP WNSTN CR8(1) 2020 AL Winston

USFS / Bankhead

National Forest

Resurfacing and full depth reclamation with

portland cement on Co. Rd. 8. 3RL FLAP $920,000 Title 23 LOCAL Planned AL-04 USFS

AL FLAP WNSTN CR23 CR60(1) 2021 AL Winston

USFS / Bankhead

National Forest

Resurface Winston Co. Rd. 23 and 60 (also

National Forest Rd. 4). 3RL FLAP $920,000 Title 23 LOCAL Planned AL-04 USFS

FW_WHEE_15(1) 2023 AL

Madison;

Limestone

Wheeler National

Wildlife Refuge Rehabilitate Rockhouse Road (Route 15). 3RH FLTP $1,200,000 Title 23 EFLHD Planned _VARIOUS FWS

Alaska

AK ANCHORAGE T 2016(1) Connecting Anchorage

Trail Improvements 2020 AK

Municipality of

Anchorage BLM Campbell Tract

This project funds the construction of trail

improvements, bridge replacements,

wayfinding, and safety improvements. Construction FLAP $1,636,500 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design AK-at large

BLM Alaska

Region

AK DOT 198(1) Chokosna River Bridge Replacement 2020 AK

Valdez-Cordova

Census Area

Wrangell - St. Elias

National Park & Preserve

Replace the Chokosna River Bridge and minor

roadway realignment. Reconstruction FLAP $2,758,159 Title 23

Alaska

Department

of

Transportati

on and

Public

Facilities In Design AK-at large

NPS Alaska

Region

AK FNSB CHENA LAKE(2) Chena Lakes Recreation

Area Access Improvements, Phase II 2020 AK

Fairbanks North

Star Borough

Chena Lakes Recreation

Area

Construct ADA accessible parking and

pathways, one prefabricated vault-style

restroom, two open-space picnic areas, and

erosion control features. Enhancement FLAP $1,008,761 Title 23

Fairbanks

North Star

Borough In Design AK-at large

USACE Pacific

Ocean Division

AK FS CNF 164(1) Portage Curve Multi-Modal

Connector 2020 AK

Municipality of

Anchorage

FS - Chugach National

Forest

This project funds planning, design, and

construction of a pedestrian overcrossing,

parking, and trailheads for improved

connectivity along the Iditarod National

Historic Trail. Construction FLAP $10,350,862 Title 23

Alaska

Department

of

Transportati

on and

Public

Facilities In Design AK-at large

FS Alaska -

Region 10

Page 1

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

AK FS TNF 8508(1) Hoonah Road System AOP and

Rehabilitation 2020 AK

Hoonah-Angoon

Census Area

FS - Tongass National

Forest

The purpose of this project is to address

bridge maintenance, scour, and/or

replacement, and to address aquatic

organism passage corrections along roads

8508 and 85304 of the Hoonah Road System. AOP FLTP-USFS $853,225 Title 23

Tongass

National

Forest In Design AK-at large

FS Alaska -

Region 10

AK FWS IZM RUSSELL(1) High Russell Creek Road

(Master Planning) 2020 AK

Aleutians East

Borough

Izembek National

Wildlife Refuge

2019-Master Planning. Future project may

include Regravel and grade 9.85 miles of the

High Russell Creek Road to enhance safety

and improve visitor opportunities. Rehabilitation FLTP-FWS $550,000 Title 23

Izembek

National

Wildlife

Refuge In Design AK-at large

FWS Alaska -

Region 7

AK FWS KNA HLBA(1) Hidden Lake Boat Access 2020 AK

Kenai Peninsula

Borough Kenai NWR

Rehabilitate the concrete-plank boat ramp,

the asphalted approach ramp, and the

associated parking areas at the Hidden Lake

boat ramp in the Skilak area on the Kenai

NWR. Reconstruction FLTP-FWS $425,000 Title 23

Kenai

National

Wildlife

Refuge In Design AK-at large

FWS Alaska -

Region 7

AK NPS BELA 2017(1) BELA Emergency Public Use

Shelter Cabin Management Plan 2020 AK

Nome Census

Area

Bering Land Bridge

National Preserve

This project will develop a Safety

Management Plan for Emergency Shelters in

BELA. Planning FLTP-NPS $102,362 Title 23

Alaska

Region, US

Fish and

Wildlife

Service In Design AK-at large

NPS Alaska

Region

AK NPS DENA 10(45) Pretty Rocks Landslide Geotech 2020 AK Denali Borough Denali National Park

To drill, install instrumentation, conduct

slope stability analyses, and develop

conceptual designs to reduce or possibly stop

movement of the Pretty Rocks Landslide. Rehabilitation FLTP-NPS $380,278 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned At large

NPS Alaska

Region

AK NPS DENA 10(48) Culvert Replacement MP 52 &

Rockfall Mitigation MP 52.9 2020 AK Denali Borough Denali National Park

Rockfall mitigation: Perform the rock bolting

and mechanical/hand scaling to reduce

rockfall along the Toklat Bluffs and create

rockfall ditch to contain falling rocks from the

roadway. Low Water Crossing: Construct low

water ford crossing. Rehabilitation FLTP-NPS $2,900,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design AK-at large

NPS Alaska

Region

AK NPS DENA 2020(1) FY20 Conduct Gravel Scrape

for Materials for Denali Park Road 2020 AK Denali Borough Denali National Park

FY20 Conduct Gravel Scrape for Materials for

Denali Park Road. Rehabilitation FLTP-NPS $170,500 Title 23

National

Park Service

Alaska

Region In Design AK-at large

NPS Alaska

Region

AK NPS DENA 2020(2) Rebuild Trail connections in

reaction to New Wayside Construction at MP 231 2020 AK Denali Borough Denali National Park

Rebuild Trail connections in reaction to New

Wayside Construction at MP 231. Reconstruction FLTP-NPS $200,000 Title 23

National

Park Service

Alaska

Region In Design AK-at large

NPS Alaska

Region

AK NPS DENA 2020(3) Continue Implementation of

Sheetpile EA Mitigation Measures, Toklat River 2020 AK Denali Borough Denali National Park

Continue Implementation of Sheetpile EA

Mitigation Measures, Toklat River. Rehabilitation FLTP-NPS $2,000,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design AK-at large

NPS Alaska

Region

Page 2

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

AK NPS KEFJ 2018(1) Exit Glacier Area Summer

Transportation Feasibility Study 2020 AK

Kenai Peninsula

Borough National Park Service

This project will evaluate the feasibility of a

transit system operating between Seward

Alaska, and the parking area for Kenai Fjords

National Park. Planning FLTP-NPS $38,111 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned AK-at large

NPS Alaska

Region

AK NPS KLGO 2017(1) KLGO Dyea Area Transit

Feasibility Study 2020 AK

Skagway-

hoonah-angoon

Borough

Klondike Gold Rush

National Historic Park

Evaluate the demand for public

transportation (shuttle service) between two

of the Klondike Gold Rush National Historic

Park's units (Skagway and Dyea); gauge

shuttle capacity and frequency of service

needed; and applicable business models. Planning FLTP-NPS $113,568 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned AK - At Large

NPS Alaska

Region

AK NPS SITK 2018(1) Sitka NHP Transportation

Master Plan 2020 AK

City and

Borough of Sitka

Sitka National Historical

Park

This project will evaluate movement of

people entering and leaving the park grounds

by all modes of transportation and propose

safety and access solutions in and around

Sitka National Historical Park. Planning FLTP-NPS $60,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned AK-at large

NPS Alaska

Region

AK TAZLINA 0013(1) Tazlina Bike and Pedestrian

Pathway 2020 AK

Matanuska-

susitna Borough

Wrangell-St. Elias

National Park & Preserve

Design a 10’ wide pedestrian/bicycle pathway

from Glennallen, Alaska through Tazlina and

onto Copper Center, Alaska (10.9 miles)

within the existing right-of-way (ROW). The

project includes an approximately 469’ foot

pedestrian bridge. Construction FLAP $2,000,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design AK-at large

NPS Alaska

Region

KENAI NWR HANSEN TRAIL Rehab Hansen Trail 2020 AK

Kenai Peninsula

Borough

Kenai National Wildlife

Refuge

Agreement with SCA youth group and refuge

to oversee work. Rehabilitation FLTP-FWS $150,000 Title 23

Kenai

National

Wildlife

Refuge In Design AK-at large

FWS Alaska -

Region 7

AK BLM GFO 2019(1) Sourdough Campground Bridge 2021 AK

Valdez-Cordova

Census Area

BLM - Sourdough Creek

Campground

Remove existing bridge and concrete

abutments. Replace with 60-foot-long new

bridge with abutments on piles. Reconstruction REIMB $1,500,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned AK-at large

BLM Alaska

Region

AK DOT 170(3) Bison Gulch Parking Area & Trail

Enhancement 2021 AK Denali Borough

Denali National Park and

Perserve

This project replaces existing boardwalk with

crushed aggregate, make trail and access safe

for users. Reconstruct tram and repair float.

Repair bridge sills. Enhancement FLAP $609,560 Title 23

Alaska

Department

of

Transportati

on and

Public

Facilities In Design AK-at large

NPS Alaska

Region

AK FNSB TANANA(1) Tanana River Recreation Access

Improvements 2021 AK

Fairbanks North

Star Borough Army - Fort Wainwright

This project proposes to create new access to

the Tanana Lakes Recreation Area. Construction FLAP $5,426,532 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design AK-at large

United States

Army Pacific

Page 3

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

AK FS CNF 1015(1) Russian River Campground Access

Road Phase 1 2021 AK

Kenai Peninsula

Borough

FS - Chugach National

Forest

Redesign and reconstruct the campground

entrance/exit points, overflow parking area,

and the contact station. Reconstruction FLAP $2,580,423 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Construction AK-at large

FS Alaska -

Region 10

AK FS CNF 1015(2)* Russian River Campground

Access Road Phase 2 2021 AK

Kenai Peninsula

Borough Chugach National Forest

Redesign and reconstruct the campground

contact station through the river bend. Reconstruction FLTP-USFS $5,024,000 Title 23

Alaska

Department

of

Transportati

on and

Public

Facilities In Design AK-at large

FS Alaska -

Region 10

AK FWS IZM 70509(1) Trout Creek AOP

Improvements 2021 AK

Aleutians East

Borough

Izembek National

Wildlife Refuge

Design and replace two damaged culverts

with new AOP structures designed to the

Stream Simulation Method on Trout Creek

and Little Trout Creek. Construction FLAP $927,051 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned AK-at large

FWS Alaska -

Region 7

AK FWS KENAI 1192(1) Skilak Lake Road AOP

Improvements 2021 AK

Kenai Peninsula

Borough Kenai Wildlife Refuge

Work will include design and replacement of

two undersized and damaged culverts with

AOP structures designed to the Stream

Simulation Method on Jean Creek and Lower

Ohmer Creek. Work also includes roadway

improvements at the locations. Construction FLAP $1,997,838 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned AK-at large

FWS Alaska -

Region 7

AK FWS TET 2016(1) Tetlin NWR Visitor Center

Parking and Site Improvements 2021 AK

Southeast

Fairbanks

Borough

Tetlin National Wildlife

Refuge

Regravel and grade the parking lot at the

Tetlin National Wildlife Refuge Visitor Center.

RT#906. This project may also include

RT#903, Chisana & Scottie Cr Boat Parking

Area PE-or a new project will be created

depending on coordination with FWS. Rehabilitation FLTP-FWS $895,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned AK-at large

FWS Alaska -

Region 7

AK NPS DENA 10(47) Repair Two Denali Park Road

Bridges 2021 AK Denali Borough Denali National Park

The project scope includes correcting

deficiencies on the bridges at Sanctuary River

(Mile 22.96) and Stony Creek (Mile 60.70). Rehabilitation FLTP-NPS $1,934,922 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design AK-at large

NPS Alaska

Region

AK NPS SITK 2019(1) Pave and Stripe the Lower

Parking Lot at the Sitka Visitor Center 2021 AK Sitka Borough

Sitka National Historic

Park

Pave and Stripe the Lower Parking Lot at the

Sitka Visitor Center. Rehabilitation FLTP-NPS $227,500 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design AK-at large

NPS Alaska

Region

Page 4

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

AK PRA DENA 10(36) Removal of Ghiglione Bridge 2021 AK Denali Borough Denali National Park

This project will eliminate or replace

Ghiglione Bridge, one of 2 seismically

deficient bridges on the Denali Park Road. Reconstruction FLTP-NPS $4,625,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design AK-at large

NPS Alaska

Region

AK SITKA 2017(1) Sitka Sea Walk Phase II 2021 AK

City and

Borough of Sitka

Sitka National Historic

Park

This pedestrian facility provides both physical

and grade separation from traffic on the

O'Connell Bridge solving a long-standing

safety issue with pedestrians making

uncontrolled crossings of the State of Alaska

owned and maintained Harbor Drive. Construction FLAP $2,068,995 Title 23

City and

Borough of

Sitka In Design AK-at large

NPS Alaska

Region

AK DOT 198(2) Copper River Boat Launch Facilities

Improvements 2022 AK

Valdez-Cordova

Census Area

Wrangell - St. Elias

National Park & Preserve

Improve and upgrade the Copper River boat

launch facilities at mile 1.5 of the McCarthy

Road near Chitina. Reconstruction FLAP $1,827,959 Title 23

Alaska

Department

of

Transportati

on and

Public

Facilities In Design AK-at large

NPS Alaska

Region

AK DOT T 170(2) Parks Highway MP 231

Enhancements 2022 AK Denali Borough

Denali National Park &

Preserve

This project will reconstruct the Parks

Highway from MP229.7 to 232.3 and replace

the existing Nenana River Bridge No.694 to

meet current design standards. Reconstruction FLAP $2,210,000 Title 23

Alaska

Department

of

Transportati

on and

Public

Facilities In Design AK-at large

NPS Alaska

Region

AK DOT T 2954(1) Ben Grussendorf Memorial Trail

Interpretive Signs 2022 AK

City and

Borough of Sitka Tongass National Forest

This enhancement project updates the

orientation and interpretive information

along the Ben Grussendorf Memorial Trail. Enhancement FLAP $179,290 Title 23

Alaska

Department

of

Transportati

on and

Public

Facilities In Design AK-at large

FS Alaska -

Region 10

AK FNSB TANANA(2) Tanana River Recreation Access

Improvement, Phase II 2022 AK

Fairbanks North

Star Borough

Tanana River Recreation

Area

The purpose of this project is to complete the

road infrastructure and associated

improvements linking the City and Borough

of Fairbanks to the Tanana Lakes Recreation

Area. Construction FLAP $2,748,747 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned AK-at large

United States

Army Pacific

AK FS TNF T 2019(1) Mt. Bradley Trail Reroute and

Restoration 2022 AK

City and

Borough of

Juneau Tongass National Forest

This project will relocate Mt. Bradley Trail

Head to 6th Street with a new parking lot and

a new trail to connect to the existing trail. Construction FLAP $350,622 Title 23

Alaska

Department

of

Transportati

on and

Public

Facilities In Design AK-at large

FS Alaska -

Region 10

Page 5

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

AK FWS IZM 010(1) AOP Improvements Frosty Peak

and Russell Cr 2022 AK

Aleutians East

Borough

Izembek National

Wildlife Refuge

Design and replace two damaged culverts

with new AOP structures designed to the

Stream Simulation Method on Frosty Peak

Road and Russel Creek Road. AOP FLTP-FWS $387,500 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned AK-at large

FWS Alaska -

Region 7

AK FWS KENAI 74525(1) Swan Lake Road Project 2022 AK

Kenai Peninsula

Borough

Kenai National Wildlife

Refuge

Rehabilitate a portion of the Swan Lake Road

in the Kenai National Wildlife Refuge. Construction FLTP-FWS $1,185,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design AK-at large

FWS Alaska -

Region 7

AK NPS KATM 10(4) Rehabilitate Valley of 10,000

Smokes Road, Phase IV 2022 AK

Lake And

Peninsula

Borough Katmai National Park

Resurface the last 5 miles of the Valley of

10,000 Smokes Road. Reconstruction FLTP-NPS $3,279,277 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned AK-at large

NPS Alaska

Region

AK PFH 58(1) Neck Lake Rd. Reconstruction: NPOWI

Hwy. to Marine Access Facility Jct. 2022 AK

Prince Of Wales-

outer Ketchikan

Borough

FS - Tongass National

Forest

This project includes all phases of PE and

readying a contract for construction. Reconstruction FLAP $4,296,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design AK-at large

FS Alaska -

Region 10

AK PFH 58(2) Neck Lake Rd. Reconstruction: Marine

Access Facility Jct. to Whale Pass 2022 AK

Prince Of Wales-

outer Ketchikan

Borough

FS - Tongass National

Forest To reconstruct Neck Lake Road. Reconstruction OTHER $0 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned AK-at large

FS Alaska -

Region 10

AK PRA DENA 10(39) Sable Pass Area Repair 2022 AK Denali Borough Denali National Park

Repair 5.81 miles of road between Tattler

Creek & East Fork Bridge (MP 37.4 to MP

43.3). Major work items include repairing

subgrade, installing drains, replacing culverts,

eliminating oversteep outside road edges, &

applying a maintainable road surface. Reconstruction FLTP-NPS $5,740,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned AK-at large

NPS Alaska

Region

AK WHITTIER 2016(1) Shotgun Cove Road Extension 2022 AK

Valdez-Cordova

Census Area

FS - Chugach National

Forest

This project constructs a new extension to an

existing 2 mile route within the City limits of

Whittier. Construction FLAP $4,946,686 Title 23

City of

Whittier In Design AK-at large

FS Alaska -

Region 10

AK DOT 1(1) ARRC Portage Station and Trailhead 2023 AK

Municipality of

Anchorage Chugach National Forest

Planning, design, and construction of the

Portage Station & Trailhead. The facility will

include improved parking and passenger

shelter, interpretive signage, vault toilets, &

off-highway access to the Chugach NF via

backcountry, trail, & whistle stops. Construction FLAP $2,736,653 Title 23

Alaska

Department

of

Transportati

on and

Public

Facilities In Design AK-at large

FS Alaska -

Region 10

Page 6

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

AK DOT 198(3) Crystal Creek Culvert Replacement 2023 AK

Valdez-Cordova

Census Area

Wrangell - St. Elias

National Park & Preserve

Replace three undersized and failing culverts

on McCarthy Road MP 41 at the Crystal Creek

Crossing with a new culvert structure. Reconstruction FLAP $1,494,454 Title 23

Alaska

Department

of

Transportati

on and

Public

Facilities In Design AK-at large

NPS Alaska

Region

AK EAGLE T 2019(1) Ford Lake Trailhead Restoration 2023 AK

Southeast

Fairbanks

Borough

Yukon Charley National

Preserve

The project will restore the usability of the

Ford Lake Trail to provide winter access from

the termination of the Taylor Highway in

Eagle Alaska to the 2.5 million acre Yukon

Charley National Preserve. Reconstruction FLAP $660,865 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design AK-at large

NPS Alaska

Region

AK FS CNF 9(1) Vagt Lake Trailhead 2023 AK

Kenai Peninsula

Borough Chugach National Forest

This project will include the design and

construction of a trailhead for the Iditarod

National Historic Trail- Vagt Lake connector

segment. Construction FLAP $1,688,418 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design AK-at large

FS Alaska -

Region 10

AK FS TNF 10(2) FH-10 Culvert Replacement 2023 AK Yakutat Borough Tongass National Forest

This project includes survey/design and

construction of stream simulation culverts to

replace the failing culverts at two sites on

ADOT Forest Highway-10; direct replacement

of one culvert for maintenance; design of a

fourth site for future replacement. Construction FLAP $1,002,884 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design AK-at large

FS Alaska -

Region 10

AK FS TNF T 25725(1) Naha Trail Reconstruction 2023 AK

Ketchikan

Gateway

Borough Tongass National Forest

This project replaces existing boardwalk with

crushed aggregate, make trail and access safe

for users. It reconstructs a tram and repair

float and repairs bridge sills. Reconstruction FLAP $933,346 Title 23

Tongass

National

Forest In Design AK-at large

FS Alaska -

Region 10

Arizona

AZ FLAP SR181(1) CHIRICAHUA ACCESS ROAD 2020 AZ Cochise Chiricahua NM

Reconstruct SR 181 and extend drainage

crossings from Jct. SR 186 to Chiricahua NM 3R FLAP $4,000,000 Title 23 CFLHD Active AZ-2 NPS-IMR

AZ FTBR LEVEE ROAD(1) PAVE LEVEE ROAD 2020 AZ Yuma Yuma Area

Evaluate for safety and pave the unpaved

roadway. Pave Levee Road, Paradise Cove to

Strand Ave. & 22nd St. to Paradise Cove. 3R FTBR $1,800,000 Title 23 CFLHD Not Started AZ-3 BOR-LC

AZ FTFS 104(1) MINGUS MOUNTAIN 2020 AZ Yavapai Prescott NF Rehabilitation of Mingus Mtn Road 3R FTFS $450,000 Title 23 CFLHD Active AZ-1 FS-R3

AZ FTNP CAGR 10(2) ENTRANCE ROAD 2020 AZ Pinal Casa Grande Ruins NM

Rehabilitate Entrance Road at Casa Grande

Ruins. 3R FTNP $1,754,788 Title 23 CFLHD Not Started AZ-1 NPS-IMR

AZ FTNP LAKE 113(2) WILLOW BEACH ROAD 2020 AZ Mohave Lake Mead NRA

Rehabilitate 4 miles of Willow Beach Access

Road 3R FTNP $14,200,000 Title 23 CFLHD Active AZ-4 NPS-IMR

AZ/NM FTFS 275(1) & 233(1) AOP IMPROVEMENTS -

STONE CREEK 2020 AZ Greenlee Apache Sitgreaves NF

Replace Stone Creek AOP corssing on NFSR

275 3R FTFS $639,000 Title 23 CFLHD Active AZ-1 FS-R3

AZ FLAP 62(1) KING CANYON TRAILHEAD 2021 AZ Pima Saguaro NP

Parking and Safety improvements at King

Canyon Trailhead on Kinney Road. SPOT FLAP $412,000 Title 23 CFLHD Active AZ-3 NPS-IMR

AZ FLAP SR88(1) APACHE TRAIL 2021 AZ Maricopa Tonto NF

Re-gravel and improve drainage of Apache

Road from MP 229 to MP 241. 4R FLAP $12,600,000 Title 23 CFLHD On Hold AZ-4 FS-R3

Page 7

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

AZ FTNP GRCA 14(TBD) NORTH ENTRANCE ROAD 2021 AZ Coconino Grand Canyon NP

Rehabilitation of North Entrance Road. HPMA

Project. 3R FTNP $7,299,917 Title 23 CFLHD Not Started AZ-1 NPS-IMR

AZ FLAP SR261(1) EAGAR TO CRESCENT LAKE 2022 AZ Apache Apache Sitgreaves NF

Rehabilitate and resurface 12 miles of SR 261

from MP 294 to MP 406. 3R4R FLAP $9,000,000 Title 23 CFLHD Active AZ-1 FS-R3

AZ FTFS 708 FOSSIL CREEK ROAD 2022 AZ Yavapai Coconino NF

Roadway rehabilitation including new

aggregate surfacing, curve widening, drainage

improvements, pullouts, and bridge rail along

NFSR 708 3R FTFS $1,282,500 Title 23 CFLHD Not Started AZ-1 FS-R3

AZ_FTFW_BUAI_10(3)_11(1) 2019 AZ Pima

Buenos Aires National

Wildlife Refuge

Resurf Entrance Rd; replace 2 small pipes &

HW. Rehab Pronghorn Dr, low water Xings,

replace 1 pipe. 3RH_3RL FLTP $2,500,000 Title 23 EFLHD

Under

Construction AZ-03 FWS

AZ NPS PP GRCA 2019(2) Pavement Preservation

Grand Canyon 2020 AZ

Coconino

County

Grand Canyon National

Park

This project provides for cyclic pavement

preservation by chip sealing or micro

surfacing various routes at Grand Canyon

National Park. Rehabilitation FLTP-NPS $12,575,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design AZ-01

NPS

Intermountain

Region

AZ/NM FTFS 275(1) & 233(1) AOP IMPROVEMENTS -

BOB THOMAS 2020 AZ Greenlee Apache Sitgreaves NF

Replace Bob Thomas AOP crossing on NFSR

275 3R FTFS $862,000 Title 23 FS-R3 Active AZ-1 FS-R3

AZ NFSR 105 ROAD IMPROVEMENTS 2021 AZ Coconino Apache Sitgreaves NF Roadway rehabilitation 3R FTFS $1,813,045 Title 23 FS-R3 Active AZ-1 FS-R3

AZ NFSR 105 AMPHITHEATER/STORE PARKING LOT 2022 AZ Coconino Apache Sitgreaves NF

Amphitheater/store parking lot

reconstruction, expansion, and paving

improvements 4R FTFS $800,000 Title 23 FS-R3 Not Started AZ-1 FS-R3

Arkansas

FW_WHRI_13(1) 2020 AR Arkansas

White River National

Wildlife Refuge Rehabilitate Jack's Bay Road (Route 13) 3RL FLTP $1,500,000 Title 23 EFLHD In Design AR-01 FWS

AR FLAP LITT RCK TRL(1) 2021 AR Pulaski

NPS / Trail of Tears

Historic Trails

Stabilizing riverbank of AK River Trail Loop

and constructing a ramp to a newly built

bridge. MISC FLAP $1,672,564 Title 23 LOCAL Planned AR-02 NPS

FW_BAKN_100(1) 2023 AR White

Bald Knob National

Wildlife Refuge Rehabilitate Granary South Road (Route 100). 3RH FLTP $1,100,000 Title 23 EFLHD Planned AR-02 FWS

AR FLAP DOT 28(1) 2019 AR Scott

National Forest Service/

Ouachita National Forest

Improve pavement and safety of Highway 28;

add shoulders and resurfacing. 3RL FLAP $4,080,000 Title 23 STATE Planned AR-04 USFS

AR_ERFO_BUFF_2015-1(2) 2019 AR Marion Buffalo National River

ERFO repairs to low water crossings in Cove

Creek, Erbie Crossing and Erbie Compton Rd. 4R ERFO $2,855,857 Title 23 EFLHD In Design AR-03 NPS

AR_FLAP_HTSPR_SGN(1) 2019 AR Garland

National Park

Service/Hot Springs

National Park

Planning and design for the Hot Springs

Wayfinding Signage program. MISC FLAP $398,000 Title 23 LOCAL In Design AR-04 NPS

FW_FELS_11(1) 2019 AR Ashley

Felsenthal National

Wildlife Refuge Rehab Pine Island Rd (RT 11) 3RL FLTP $1,461,383 Title 23 EFLHD

Under

Construction AR-04 FWS

AR Polk Co. Rd. 64 (Shady Lake) 2019 AR Polk Ouachita National Forest AR Polk Co. Rd. 64 (Shady Lake) 3R FLTP $330,000 Title 23 USFS

Under

Construction AR-04 USFS

AR_FLAP_HTSPR_WHT(1) 2020 AR Garland

NPS, Hot Springs

National Park

Improve pedestrian access along Whittington

Avenue including sidewalk, ramps, and

crosswalk work. 3RL FLAP $690,773 Title 23 LOCAL In Design AR-04 NPS

AR_FLAP_LOGAN_CR19(1) 2020 AR Logan

USFS/ Ouachita National

Forest

Replace a bridge along Jack Creek Rd near

intersection with Golden City Rd south of

Booneville, AR BRRP FLAP $300,400 Title 23 LOCAL In Design AR-04 USFS

Page 8

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

AR_FLAP_PLSK_TRL(1) 2020 AR Pulaski

National Park Service/

Hot Springs National Park

/ LR Central HS Nat.

Historic Site

Conduct PE for a trail from Hot Springs, AR to

Little Rock, AR. MISC FLAP $2,165,000 Title 23 LOCAL In Design AR-02 NPS

FW_WHRI_13(1) 2020 AR Arkansas

White River National

Wildlife Refuge Rehabilitate Jack's Bay Road (Route 13) 3RL FLTP $1,500,000 Title 23 EFLHD In Design AR-01 FWS

Blanchard Springs-Mirror Lake Road-Asphalt Overlay

& Additional Parking - Design & Construction 2020 AR Stone

Ozark-St Francis National

Forest

Design of new parking area and asphalt

overlay of 0.70 miles of road. Construct

asphalt overlay for the entire 0.70 miles of

existing roadway and extend roadway in

isolated area to provide parking area. 3R FLTP $420,000 Title 23 USFS

Under

Construction AR-01 USFS

Bliss Ridge Road Improvements 2020 AR Pope

Ozark-St Francis National

Forest

Design of 1.3 miles asphalt replacement. First

0.6 mi requires sub-base repair, geotextile,

underdrains. Entire 1.3 miles - asphalt

overlay 3R FLTP $100,000 Title 23 USFS In Design AR-03 USFS

AR FLAP LITT RCK TRL(1) 2021 AR Pulaski

NPS/Trail of Tears Hist.

Trails

Stabilizing riverbank of AK River Trail Loop

and constructing a ramp to a newly built

bridge. MISC FLAP $1,672,564 Title 23 LOCAL Planned AR-02 NPS

Replace Arch Culverts on NFSR 114 MP 13.2 2021 AR Yell Ouachita National Forest

Replace failing arch culvert constructed by

CCC's. BRRC FLTP $160,000 Title 23 USFS Planned AR-04 USFS

Chip Seal NFSR 1003N 2021 AR Pope

Ozark-St Francis National

Forest

Chip Seal Reconstructed roadway for

durability and safety 2R FLTP $170,000 Title 23 USFS Planned AR-03 USFS

Chip Seal NFSR 1003J 2021 AR Pope

Ozark-St Francis National

Forest Chip Seal access to canoe launch area 2R FLTP $25,000 Title 23 USFS Planned AR-03 USFS

Alum Cove Road-Construction 2021 AR Newton

Ozark-St Francis National

Forest

Replace base aggregate and chip seal

surfacing for 0.20 miles of existing roadway. 3R FLTP $150,000 Title 23 USFS Planned AR-04 USFS

Repave NFSR 9940 2021 AR Yell Ouachita National Forest

Repair bad areas, repave, and pave the boat

launch parking area 3R FLTP $220,000 Title 23 USFS Planned AR-04 USFS

Reconstruct NFSR 152 2021 AR Yell Ouachita National Forest

Repair bad areas, repave, and pave the trail

head parking area and reconstruct remaining

road. 3R FLTP $175,000 Title 23 USFS Planned AR-04 USFS

Shores Lake Road Soil Stablization 2022 AR Franklin

Ozark-St Francis National

Forest

Stablize steep sections of road prism to

alleviate erosion MISC FLTP $50,000 Title 23 USFS Planned AR-04 USFS

FW_BAKN_100(1) 2023 AR White

Bald Knob National

Wildlife Refuge Rehabilitate Granary South Road (Route 100). 3RH FLTP $1,100,000 Title 23 EFLHD Planned AR-02 FWS

AR KS MO NPS PP 2019(1) Pavement Preservation

AR KS MO 2020 AR Searcy County National Park Service

This project provides for cyclic pavement

preservation by chip sealing or micro

surfacing various routes in National Park Sites

in Arkansas, Kansas, and Missouri. Rehabilitation FLTP-NPS $7,100,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design AR-01

NPS Midwest

Region

California

CA BLM 2020(1) SAN VICENTE BRIDGES 2020 CA Santa Cruz BLM Ukiah Field Office

Replace two bridges over San Vicente Creek

in Cotoni-Coastal Dairies NM. BR BLM $800,000 Title 23 CFLHD Active CA-18 BLM-CA

CA ER 511(1) TRINITY CTY RUTH-ZENIA ROAD 2020 CA Trinity Trinity NF

ER Repair work on Alder Point, Mad River,

Hyampom, Ruth Zenia, and Van Duzen roads ER ER $3,500,000 Title 23 CFLHD Active CA-2 FS-R5

CA ERFO S BERNARDINO 1N45(2) SANTA ANA RIVER

RD 2020 CA San Bernardino San Bernardino NF

Repair work on 1N45 Santa Ana Road, Phase

2 ERFO ERFO $975,000 title 23 CFLHD Not Started CA-36 FS-R5

Page 9

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

CA FLAP MAD CR26(1) ET AL AVENUE 26 AND ROAD

29 2020 CA Madera Eastman Lake

Rehabilitate and resurface Avenue 26 (SH 99)

and and Road 29 towards the Eastman Lake

entrance 3R FLAP $11,100,000 Title 23 CFLHD Active CA-19 USACE-SP

CA FS SALT GULCH BRIDGE SALT GULCH BRIDGE

REPAIR 2020 CA Siskiyou Klamath NF

Repair of Salt Gulch Bridge on Salt Gulch

Road 4RBR FS $1,410,000 Title 23 CFLHD Active CA-1 FS-R5

CA FTBR FOLSOM SO TRAIL(2) FOLSOM SOUTH TRAIL

IMPROVEMENTS PHII 2020 CA Sacramento

Folsom and Sly Park

Units

Rehabilitate and add safety improvements to

South Trail 3R FTBR $900,000 Title 23 CFLHD Active CA-3 BOR-MP

CA FTNP FOPO110(1)GOGA205(1) LONG AVENUE &

STINSON BEACH PARKING 2020 CA Marin Golden Gate NRA

Widen and reconstruct Long Avenue and

Stinson Beach Parking. 4R FTNP $5,295,160 Title 23 CFLHD Active CA-2 NPS-PWR

CA FTNP YOSE 14(7) WAWONA ROAD 2020 CA MA Yosemite NP Repairs on Wawona Road. Spot FTNP $2,141,200 Title 23 CFLHD Active CA-4 NPS-PWR

CA FTNP YOSE 15(2) GLACIER POINT ROAD 2020 CA Mariposa Yosemite NP

Rehabilitate Glacier Point Road, Badger Pass

to Glacier Point. 10.5 miles 3R FTNP $16,234,000 Title 23 CFLHD Active CA-4 NPS-PWR

CA FTNP/NPS YOSE 500(5)918(1 SOUTHSIDE DRIVE &

BRIDAL VEIL PKG 2020 CA Mariposa Yosemite NP Southside Drive and Bridal Veil Parking Lot. BR FTNP $3,000,000 Title 23 CFLHD Active CA-4 NPS-PWR

CA NPS YOSE 17(4) & 941(1) TUOLUMNE MEADOWS

PARKING 2020 CA Mariposa Yosemite NP Rehabilitate Tuolumne Meadows Parking Lot 3R NPS $6,382,185 Title 23 CFLHD Active CA-4 NPS-PWR

CA FLAP ED CR147(2) ICE HOUSE ROAD 2021 CA El Dorado Eldorado NF

Repave 8.3 miles of existing two lane paved

roadway from Picket Pen Road to the

northern intersection of Wentworth Springs

Road (MP 23.94). 3R FLAP $16,757,000 Title 23 CFLHD Active CA-4 FS-R5

CA FLAP LA CR2N40(1) SANTA ANITA CANYON ROAD 2021 CA Los Angeles Angeles NF

Rehabilitate 3.19 miles of Santa Ainta Canyon

Road 3R4R FLAP $3,080,000 Title 23 CFLHD Active CA-27 FS-R5

CA FLAP SCR T5(1) MONTEREY BAY SANCTUARY

SCENIC TRAIL 2021 CA Santa Cruz Ukiah Field Office

Construct 15 miles of new multi-use

bicycle/pedestrian trails providing access to

BLM Federal Lands Other FLAP $7,420,000 Title 23 CFLHD Active CA-18 BLM-CA

CA FLAP SCR T5(2) MONTEREY BAY SANCTUARY

SCENIC TRAIL 2021 CA Santa Cruz Ukiah Field Office

Construct 15 miles of new multi-use

bicycle/pedestrian trails providing access to

BLM Federal Lands Other FLAP $7,100,000 Title 23 CFLHD Active CA-18 BLM-CA

CA FLAP SF TR95(1) SOUTH OCEAN BEACH TRAIL 2021 CA San Francisco Golden Gate NRA

Construction of trail along South Ocean

Beach Other FLAP $1,425,000 Title 23 CFLHD On Hold CA-12 NPS-PWR

CA FLAP TRI CR502(1)&511(1) RUTH ZENIA ROAD

AND VAN DUZEN ROAD 2021 CA Trinity Six Rivers NF

Road reconstruction and widening on

portions of Van Duzen Road (CR 511) totaling

3.6 miles and Ruth-Zenia Road (CR 502)

totaling 1.6 miles 4R FLAP $6,900,000 Title 23 CFLHD Shelved CA-2 FS-R5

CA FTBR MTN QUARRY BRIDGE BRIDGE

IMPROVEMENTS 2021 CA Placer American River

Remove and replace bridge railing system;

regrade gravel bridge deck & install new

drainage system BR FTBR $400,000 Title 23 CFLHD Active CA-4 BOR-MP

CA FTBR PONDEROSA BRIDGE(1) PONDEROSA

BRIDGE REPLACEMENT 2021 CA Placer American River

Remove and replace 190 lf single span bridge.

Regravel approaches. BR FTBR $1,300,000 Title 23 CFLHD Active CA-1 BOR-MP

CA FTBR SENATOR WASH (1) FERGUSON ROAD TO

IMPERIAL DAM 2021 CA Imperial Imperial Dam Rehabilitation of Senator Wash Road 3R FTBR $1,400,000 Title 23 CFLHD Not Started CA-51 BOR-MP

CA FTFS 0007(1), FIBREBOARD ROAD 2021 CA Sierra Tahoe NF Pavement rehabilitation 3R FTFS $2,025,000 Title 23 CFLHD Not Started CA-1 FS-R5

CA FTFW R8 SADI NWR SCOPING SAN DIEGO NWR

FLTP SCOPING 2021 CA San Diego San Diego NWR

FWS R8 San Diego NWR Complex scoping for

future FLTP projects. Other FTFW Title 23 CFLHD Not Started CA-50 FWS-R8

CA FTNP REDW 100(1) CUSHING CREEK BOX

CULVERT 2021 CA Del Norte Redwoods NP

The work of this project replaces the

deteriorating Cushing Creek box culvert that

serves Endert’s Beach Road. SPOT FTNP $423,987 Title 23 CFLHD Active CA-2 NPS-PWR

CA FTNP SEKI 13(2) MINERAL KING ROAD 2021 CA Tulare Sequoia-Kings Canyon NP

Rehabilitate and resurface 8.7 miles of the

Generals Hwy Little Baldy North to Pythian

Camp Road. 3R FTNP $13,681,582 Title 23 CFLHD Active CA-23 NPS-PWR

Page 10

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

CA FTNP YOSE 13(7) BIG OAK FLAT ROAD 2021 CA Mariposa Yosemite NP

Rehabilitate Big Oak Flat Road, MP 0 to MP

9.8 3R FTNP $15,975,000 Title 23 CFLHD Active CA-4 NPS-PWR

CA FLAP 03S11(1) REDS MEADOW ROAD 2022 CA Mono Devils Postpile NM

Reconstruct, widen, and realign 8.3 miles of

Reds Meadow Road. 4R FLAP $21,320,000 Title 23 CFLHD Active CA-8 NPS-PWR

CA FLAP DN 511(1) KLAMATH BEACH ROAD 2022 CA Del Norte Redwoods NP

Replace drainage infrastructure on Klamath

Beach Road. SPOT FLAP $3,630,000 Title 23 CFLHD Active CA-2 NPS-PWR

CA FLAP MRN CR107(1) MUIR WOODS ROAD 2022 CA Marin Muir Woods NP Rehabilitate 2.48 miles of Muir Woods Road 4R FLAP $4,241,000 Title 23 CFLHD Active CA-2 NPS-PWR

CA FLAP RED 2017(3) SACRAMENTO ISLAND

TRAILHEAD 2022 CA Shasta Redding Field Office

Construction of paved Parking lot and trail to

access Sacramento Island ACEC Other FLAP $840,000 Title 23 CFLHD Active CA-1 BLM-CA

CA FTFW MODO VARIOUS ROUTES ROUTES 010,

900, 901, 300 2022 CA Modoc Modoc NWR Pavement Preservation at Modoc NWR. 1R FTFW $850,000 Title 23 CFLHD Active CA-1 FWS-R8

CA FTNP MOJA 13(1) MORNING STAR MINE ROAD 2022 CA San Bernardino Mojave NP Rehabilitaion of Morning Star Mine Road 3R4R FTNP $10,686,208 Title 23 CFLHD Not Started CA-8 NPS-PWR

CA FTNP SEKI 11(1) UPPER & LOWER KINGS RIVER

BRIDGES 2022 CA Fresno Kings Canyon NP

Replacement of both Upper and Lower Kings

River Bridges in Kings Canyon, Route 11. BR FTNP $8,085,369 Title 23 CFLHD Not Started CA-4 NPS-PWR

CA FLAP MAR 223(1) PIERCE POINT ROAD 2023 CA Marin Point Reyes NS Rehabilitate 9.32 miles of Pierce Point Road 3R FLAP $9,450,000 Title 23 CFLHD Active CA-2 NPS-PWR

CA FLAP MOD 258(1) BLUE LAKE ROAD & CG 2023 CA Modoc Modoc NF

Rehabilitaiton and paving of 6.5 miles of 3R

(pulverize and pave) on Blue Lake Road up to

South Warner Road.

Rehabilitaiton and paving of 6.5 miles of 3R

(pulverize and pave) on Blue Lake Road.

Pavement rehabilitation of campground

roads and trails. 3R FTFS/FLAP $7,450,000 Title 23 CFLHD Active CA-1 FS-R5

CA FLAP PLU 406(1) QUINCY JUNCTION ROAD 2023 CA Plumas Plumas NF

Construciton of 4-5 foot shoulders along

Quincy Junction Road for 0.95 miles to

improve safety along this section of roadway. 3R4R FLAP $2,340,000 Title 23 CFLHD Active CA-1 FS-R5

CA FLAP SH20(1) SH20 OHAIR ROAD INTERSECTION 2023 CA Colusa Colusa NWR

Intersection improvements at SH 20 and

O’Hair Road at the Entrance to Colusa NWR. 3R4R FLAP $1,640,000 Title 23 CFLHD Active CA-3 FWS-R8

CA FLAP SR89(3) LASSEN PEAK HIGHWAY 2023 CA Tehama Lassen Volcanic NP

Pavement rehabilitation, shoulder widening,

and drainage system improvements and

upgrades along Lassen Hwy. 3R FLAP $6,830,000 Title 23 CFLHD Active CA-1 NPS-PWR

CA FTFW HUBA 10(1) ENTRANCE ROAD 2023 CA Humboldt Humboldt Bay NWR

Repair Headquarters / Visitor Center

Entrance Rd (Rte 010) 3R FTFW $1,500,000 Title 23 CFLHD Not Started CA-2 FWS-R8

CA FTNP YOSE 500(4) NORTHSIDE DRIVE OVERPASS 2023 CA Mariposa Yosemite NP

Construct pedestrian grade-separated

crossing at Northside Drive and Yosemite

Lodge Drive. 4R FTNP $5,000,000 Title 23 CFLHD On Hold CA-4 NPS-PWR

CA NPS BP LAVO 2019(1) West Fork Sulphur Creek

Bridge Preservation 2020 CA Shasta County National Park Service

This project provides for full repainting of

West Fork Sulphur Creek Bridge. Maintenance FLTP-NPS $937,500 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned CA-01

NPS Pacific-

West Region

Page 11

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

CA NPS PP JOTR 2017(1) Pavement Preservation

Joshua Tree 2020 CA

Riverside

County

Joshua Tree National

Park

This project provides for cyclic pavement

preservation by chipsealing or micro

surfacing of various routes and parking areas

within Joshua Tree National Park. The project

is approximately 80 lane miles. Rehabilitation FLTP-NPS $6,200,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Construction CA - 41st

NPS Pacific-

West Region

CA NPS PP MANZ 2019(1) Pavement Preservation

Manzanar 2020 CA Inyo County

Manzanar National

Historic Site

This project provides for cyclic pavement

preservation by chip sealing or micro

surfacing various routes in Manzanar

National Historic Site. Rehabilitation FLTP-NPS $1,912,025 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design CA-08

NPS Pacific-

West Region

CA NPS PP LAVO 2019(2) Pavement Preservation

Lassen 2021 CA Shasta County

Lassen Volcanic National

Park

This project provides for cyclic pavement

preservation by chip sealing or micro

surfacing of various routes and parking areas

within Lassen Volcanic National Park. Rehabilitation FLTP-NPS $3,460,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned CA-01

NPS Pacific-

West Region

CA NPS PP SEKI 2018(3) Pavement Preservation SEKI

Phase I 2021 CA Tulare County

Sequoia - Kings Canyon

National Parks

This project provides for cyclic pavement

preservation by chipsealing or micro

surfacing of various routes and parking areas

within Sequioa Kings Canyon National Parks. Rehabilitation FLTP-NPS $4,490,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned CA-23

NPS Pacific-

West Region

CA NPS SEKI 2020(1) Pavement Preservation SEKI

Phase II 2022 CA Tulare County

Sequoia-Kings Canyon

National Parks

This project provides for cyclic pavement

preservation by chipsealing or micro

surfacing of various reoutes and parking

areas within Sequoia Kings Canyon National

Parks. Rehabilitation FLTP-NPS $5,570,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design CA-23

NPS Pacific-

West Region

CA FTFS HUME LAKE BRIDGE REPLACEMENT 2020 CA Fresno Sequoia NF

Replace/upgrade drainage structures,

reconstruct road with aggregate base and

asphalt surface, and clear vegetation 4RBR FTFS $1,555,000 Title 23 FS-R5 Not Started CA-4 FS-R5

Colorado

CO FLAP PIT 82(1) BRUSH CREEK PARKING 2020 CO Pitkin White River NF

Improve and enlarge Brush Creek parking

facility. Other FLAP $3,600,000 Title 23 CFLHD Active CO-3 FS-R2

CO FLAP US50(1) LITTLE BLUE CREEK CANYON 2020 CO Gunnison Curecanti NRA

Reconstruction of US 50 in Blue Creek Canyon

including safety improvements. 3R4R FLAP $25,800,000 Title 23 CFLHD Active CO-3 NPS-IMR

CO FTNP MEVE 100(1) & 101(1) CLIFF PALACE &

MESA TOP LOOP ROADS 2020 CO Montezuma Mesa Verde NP

Resurface 4.7 and 4.23 miles of Mesa Top

Loop Roads and Cliff Palace Road,

respectively. 3R FTNP $5,101,708 Title 23 CFLHD On Hold CO-3 NPS-IMR

CO OMAD 300(65) MINUTEMAN MISSILE ACCESS

ROAD 2020 CO Multiple OMAD

Continuing rehab of OMAD Missle access

roads. Other OMAD $7,000,000 Title 23 CFLHD Not Started Multiple N/A

CO FLAP JEF128(1) TRAIL CROSSING TO ROFL 2021 CO Jefferson Rocky Flats NWR

Construction of trail crossing of Indiana Ave

into Rocky Flats NWR 4RBR FLAP $3,080,000 Title 23 CFLHD Active CO-2 FWS-R6

CO FLAP PUW16(1) NICHOLS ROAD 2021 CO Pueblo Pueblo Dam

Reconstruction, repaving, and widening of

Nichols Road and McCulloch Boulevard. 3R4R FLAP $2,880,000 Title 23 CFLHD Active CO-3 BR-GP

Page 12

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

CO FLAP US36(1) DOWNTOWN ESTES PARK LOOP 2021 CO Larimer Rocky Mountain NP

Construction of new loop road and multi-use

trail through town of Estes Park. 4R FLAP $11,816,000 Title 23 CFLHD Active CO-2 NPS-IMR

CO FTBR CRYSTAL DAM(1) EAST PORTAL ACCESS

ROAD 2021 CO Montrose Crystal Dam Repave East Portal Access Road. 3R FTBR $1,400,000 Title 23 CFLHD Active CO-3 BOR-UC

CO FTFW ROFL TRAILS(1) ROCKY FLATS NWR TRAILS 2021 CO Jefferson Rocky Flats NWR

Trail construction within Rocky Flats NWR,

including connecting to FLAP Trail crossing

connection to Rocky Flats project. Other FTFW $1,000,000 Title 23 CFLHD Active CO-7 FWS-R6

CO FTFS MICHIGAN RIVER BRIDGE REPLACEMENT 2021 CO Jackson

Medicine Bow-Routt NF

& Thunder Basin NG Bridge replacement BR FTFS $580,000 Title 23 CFLHD Not Started CO-3 FS-R2

CO FTNP BLCA TBD REPAIR ENTRANCE 2021 CO Montrose

Black Canyon of the

Gunnison NP Repair Road Surface at BLCA Entrance 3R FTNP $935,887 Title 23 CFLHD Not Started CO-3 NPS-IMR

CO FTNP GRSA 10(3) DRAINAGE REPAIR 2021 CO Alamosa Great Sand Dunes NP

Spot Drainage Repair on Sand Dunes

Entrance road SPOT FTNP Title 23 CFLHD Not Started CO-3 NPS-IMR

CO OMAD 300(66) MINUTEMAN MISSILE ACCESS

ROAD 2021 CO Multiple OMAD

Continuing rehab of OMAD Missle access

roads. Other OMAD $7,000,000 Title 23 CFLHD Not Started Multiple N/A

CO FLAP ALA6(1) LANE 6 NORTH 2022 CO Alamosa Great Sand Dunes NP Rehabilitate and repave Lane 6 North. 3R FLAP $10,700,000 Title 23 CFLHD Active CO-3 NPS-IMR

CO FLAP MES18(1) 18 ROAD 2022 CO Mesa

Grand Junction Field

Office

Reconstruction and paving of 6.25 miles of 18

Road. 3R4R FLAP $7,400,000 Title 23 CFLHD Active CO-3 BLM-CO

CO FLAP LAR 10(1) HORSETOOTH RES AND CARTER

LAKE 2023 CO Larimer

Horsetooth and Carter

Lake Reservoirs

Rehabilitate 1.7 mi of roads and 10 parking

areas in Horsetooth Reservoir and Carter

Lake areas. Project includes trail construction

and repavement of campground. 3R4R FLAP $8,200,000 Title 23 CFLHD Not Started CO-2 BOR-GP

CO FLAP SH5(1) MOUNT EVANS HIGHWAY 2023 CO Clear Creek Arapaho NF

Improvement of 0.7 miles of State Highway 5

(Mount Evans Highway) from MP 8.7 to MP

9.4. 4R FLAP $2,500,000 Title 23 CFLHD Not Started CO-2 FS-R2

CO FLAP US550(1) RED MOUNTAIN PASS 2023 CO San Juan

Grand Mesa

Uncompahgre and

Gunnison NF

Improvement of parking areas and

construction of select retaining walls along US

550 between Ouray and Silverton. 4R FLAP $3,000,000 Title 23 CFLHD Not Started CO-3 FS-R2

CO FTFS CONTINENTAL DIVIDE NST #813 2020 CO Mineral Rio Grande NF Trail 3R FTFS $820,000 Title 23 FS-R2 Not Started CO-3 FS-R2

CO FTFS INDIAN PEAKS WILDERNESS PRIORITY

TRAILS PROJECTS 2020 CO Boulder Arapaho NF Trail reconstruction 3R FTFS $570,000 Title 23 FS-R2 Active CO-2 FS-R2

CO FTFS MAROON BELLS SCENIC LOOP TRAIL BRIDGE

#1 2020 CO Pitkin White River NF Bridge replacement and trail relocation 3RBR FTFS $260,000 Title 23 FS-R2 Active CO-3 FS-R2

CO FTFS RAINBOW LAKES - COMO CREEK - AOP

CONSTRUCTION 2022 CO Boulder Arapaho Roosevelt NF AOP construction 3R FTFS $295,000 Title 23 FS-R2 Not Started CO-2 FS-R2

CO FTFS TURKEY SPRINGS AGGREGATE 2020 CO Archuleta San Juan NF Aggregate surfacing placement 3R FTFS $300,000 Title 23 FS-R2 Not Started CO-3 FS-R2

CO FTFS BUFFALO PASS ROAD RECONSTRUCTION 2023 CO Routt Routt NF

Roadway rehabilitation including aggregate

surface, prism drainage, and safety

improvements 3R FTFS $706,000 Title 23 FS-R2 Active CO-3 FS-R2

CO FTFS ELEVENMILE CANYON ROAD BRIDGES 2024 CO Park South Park NF Replace bridge guardrail on 5 bridges Other FTFS $691,500 Title 23 FS-R2 Not Started CO-5 FS-R2

Connecticut

CT_FLAP_HARTFORD_SGN(1) 2020 CT Hartford

Coltsville National

Historical Park

Design and install wayfinding signs to

improve pedestrian access to Coltsville

National Park. MISC FLAP $141,000 Title 23 LOCAL In Design CT-01 NPS

Page 13

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

CT_FLAP_WSTBRK_KIRT(1) 2020 CT Middlesex

(USFWS), Stewart B.

McKinney National

Wildlife Refuge

Parking lot expansion and resurfacing, boat

ramp replacement, river bank stabilization. 3RH_3RL FLAP $132,146 Title 23 FWS In Design CT-02 FWS

Bombay Hook Auto Tour Chip Seal 2020 CT Kent

Bombay Hook National

Wildlife Refuge Chip Seal on Routes 10, 11, 12, 13, 14, 15 3R FLTP $120,000 Title 23 FWS

Under

Construction DE-AtLarge FWS

Bombay Hook NWR 2018313780 2023 CT Kent

Bombay Hook National

Wildlife Refuge Visitor Center Entrance Road and Parking Lot 3R FLTP $400,000 Title 23 FWS Planned DE-AtLarge FWS

District of Columbia

DC FLAP DOT STDY(1) 2019 DC

District of

Columbia

National Park Service,

National Mall and

Memorial Parks,

President's Park

Feasibility Bicycle Study to fill in key bicycle

connectivity & safety gaps from 14th to 15th

st. MISC FLAP $510,000 Title 23 STATE Planned DC-AtLarge NPS

DC_FLAP_DOT_TILDN(1) 2019 DC

District of

Columbia Rock Creek Park

Const. trail Tilden St. & crosswalk to Peirce

Mill Spring House. MISC FLAP $200,000 Title 23 EFLHD In Design DC-AtLarge NPS

WHHO_400(1)_413(1)_ETC 2019 DC

District of

Columbia

White House -

President's Park

Resurfacing Ellipse, South Grounds Road and

associated connection roads. 3RL REIMB $1,233,000 Title 54 EFLHD In Acquisitions DC-AtLarge NPS

DC FLAP DOT ARTTRL(1) 2020 DC

District of

Columbia

NPS, National

Arboretum; Kenilworth

Aquatic Gardens

Multi-use trail and PED bridge design and

construction. MISC FLAP $6,600,000 Title 23 STATE Planned DC-AtLarge NPS

JFK1(2)_NAMA16(2)TRL 2020 DC

District of

Columbia

Kennedy Center /

National Mall and

Memorial Parks

Kennedy Center Ped/Bicycle Trail & Rehab

Rock Creek & Potomac Pkwy 3RL OTHER $2,700,000 Title 23 EFLHD In Design DC-AtLarge NPS

NP ROCR ES(3) 2020 DC

District of

Columbia Rock Creek Park Feasibility study for study safety gate and ITS. MISC FLTP $250,000 Title 23 EFLHD Planned DC-AtLarge NPS

NP_NAMA_20(2)_ETC 2020 DC

District of

Columbia

National Mall &

Memorial Parks

17th St, EB & WB Ind Ave, and E&W Tidal

Basin Turnaround Pvmt rehab. 3RL FLTP $5,415,585 Title 23 EFLHD In Design DC-AtLarge NPS

WHHO 407(2) 2020 DC

District of

Columbia

White House - Presidents

Park

Rehabilitation of Pennsylvania Avenue,

Jackson Place and Madison Place 3RL FLTP $1,085,061 Title 23 EFLHD In Design DC-AtLarge NPS

DC_FLAP_DOT_GALWY(1) 2021 DC

District of

Columbia Rock Creek Park Construct a trail along Galloway Street MISC FLAP $500,000 Title 23 EFLHD In Design DC-AtLarge NPS

DC_ST_REV_ANA_PRK(1) 2021 DC

District of

Columbia Anacostia Park Revitalization of Anacostia Park MISC DOT $2,850,000 Title 23 EFLHD Planned DC-AtLarge NPS

NACE Folger Park 2021 DC

District of

Columbia

National Capitol Parks-

East

Complete reconstruction of walkways and

paving stones within park. MISC FLTP $800,000 Title 23 EFLHD Planned DC-AtLarge NPS

NAMA_12(3) 2021 DC

District of

Columbia

National Mall &

Memorial Parks

Rehab Outlet Bridge & resurface East Basin

Dr. 3RL_BRRH FLTP $4,763,776 Title 23 EFLHD In Design DC-AtLarge NPS

NP ROCR 503(1) 24(2) 2021 DC

District of

Columbia Rock Creek Park

Waterside Dr. Rdway Reconst & street light

replacement & misc 3RH_BRRP FLTP $6,000,000 Title 23 EFLHD Planned DC-AtLarge NPS

ROCR_14(1)_17(1) 2021 DC

District of

Columbia Rock Creek Park

Light pave rehab & replace drainage system

on Bingham and Morrow Dr 3RL FLTP $1,191,000 Title 23 EFLHD Planned DC-AtLarge NPS

ROCR_15(2) 2021 DC

District of

Columbia Rock Creek Park Joyce Rd Bridge at Military Rd Reconst BRRC FLTP $1,500,000 Title 23 EFLHD In Design DC-AtLarge NPS

CHOH_238(1) 2022 DC

District of

Columbia

Chesapeake & Ohio

Canal National Historical

Park

Fletcher's Boathouse ent. relocation &

replace Structure No. 3100-029P 4R FLTP $2,400,000 Title 23 EFLHD In Design DC-AtLarge NPS

NAMA 10(3) 409(1) 2022 DC

District of

Columbia

National Mall and

Memorial Parks

Develop Safe Crosswalk at 18th and

Constitution Avenue NW MISC FLTP $176,000 Title 23 EFLHD In Design DC-AtLarge NPS

Page 14

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

NP NAMA 11(7) 506(2) 2022 DC

District of

Columbia

National Mall &

Memorial Parks Rehabilitate Ohio Dr. & West Basin Dr. 3RL FLTP $2,810,000 Title 23 EFLHD In Design DC-AtLarge NPS

NP_NAMA_21(2)_501(3) 2022 DC

District of

Columbia

National Mall &

Memorial Parks 15th St & Jefferson Dr Resurfacing 3RL FLTP $4,248,149 Title 23 EFLHD In Design DC-AtLarge NPS

NP_ROCR_16(2) 2022 DC

District of

Columbia Rock Creek Park

Ross Drive Rehabilitation and Drainage

Replacement. 3RL FLTP $3,200,000 Title 23 EFLHD Planned DC-AtLarge NPS

NP_ROCR_910(1) 2022 DC

District of

Columbia Rock Creek Park Edgewater Stable Bridge Replacment. BRRC FLTP $1,200,000 Title 23 EFLHD In Design DC-AtLarge NPS

ROCR_12(1)_19(1) 2022 DC

District of

Columbia Rock Creek Park Rehab Wise & Glover Roads 3RL FLTP $2,124,000 Title 23 EFLHD In Design DC-AtLarge NPS

ROCR_BMS_(1) 2022 DC

District of

Columbia Rock Creek Park

Rehab Structures 3450-029P, 033P, 004P,

012P and 013P BRRH FLTP $1,990,000 Title 23 EFLHD In Design DC-AtLarge NPS

NAMA_11(6) 2023 DC

District of

Columbia

National Mall &

Memorial Parks Rehab Inlet Bridge (3400-033) BRRH FLTP $1,002,759 Title 23 EFLHD In Design - NPS

Florida

FL ERFO NPS GUIS 2019-1(1) 2019 FL Escambia

Gulf Islands National

Seashore

Repair State HWY 399 (Rte 11) & Fort Pickens

Rd (Rte 12) damaged by Hurricane Michael. 3RH ERFO $600,000 Title 23 EFLHD Planned FL-01 NPS

FL_FLAP_ESCMB_FER(2) 2019 FL Escambia

National Park Service/

Gulf Islands Naitonal

Seashore

Safety upgrade and widening Quietwater

Beach Ferry Dock. MISC FLAP $1,020,000 Title 23 LOCAL In Design FL-01 NPS

EVER 10(5), 900(1) 2019 FL

Monroe and

Miami-dade Everglades National Park

Mill and resurface asphalt pavement; stations

840t00 to boundary, route 10 main park road 3RH FLTP $2,700,000 Title 23 EFLHD

Under

Construction FL-26 NPS

SO FL ERFO FW MEIS 2016-1(1) 2019 FL Brevard

Merritt Island National

Wildlife Refuge

Huricane Matthew repair on Bio Lab Dike Rd.

(Rte 118), Bio Lab Rd. (Rte 119), & L Dike Rd.

(Rte 127) 3RH FLTP $3,006,106 Title 23 FWS Planned FL-08 FWS

GUIS 2020 FL Santa Rosa

Gulf Islands National

Seashore Compliance to Redesign Road 4R FLTP $500,000 Title 23 NPS Planned FL-01 NPS

FL FLAP DOT 406(1) 2020 FL Brevard

FWS / Merritt Island

National Wildlife Refuge

Construct secondary 12' asphalt multi-use

path on the south side of SR406 with

approved amenities. MISC FLAP $2,295,000 Title 23 LOCAL Planned FL-08 FWS

FL FLAP DOT 804(1) 2020 FL Palm Beach

USACE / Intercoastal

Waterway - Jacksonville

to Miami

Construction of 4' bike lanes and widening

sidewalks to 9' along SR 804. 3RL FLAP $646,530 Title 23 LOCAL Planned FL-21 USACE

FL FLAP JKSVL A1A 2020 FL Duval

NPS / Timucuan

Ecological & Historical

Preserve

Safety and facilities improvements for the St.

Johns River Ferry. MISC FLAP $1,469,400 Title 23 LOCAL Planned FL-05 NPS

FL FLAP LIB FH13(1) 2020 FL Liberty, Wakulla

USFS/Apalachicola

National Forest

Resurfacing 3.9 miles of FH 13 connecting

Liberty and Wakulla counties and replacing

guardrail. 3RL FLAP $1,538,000 Title 23 USFS Planned FL-02 USFS

FL_FLAP_LEON_375(1) 2020 FL Leon

USFS/Apalachicola

National Forest

Add 2 bike lanes & Overlay/re-stripe Leon

Co. Rd. 375 8.3miles. 3RL FLAP $1,020,000 Title 23 LOCAL In Design FL-05 USFS

FW_FLPA_419(1) 2020 FL Collier

Florida Panther National

Wildlife Refuge Rehab Fritz Rd (RT 419) 3RL FLTP $750,000 Title 23 EFLHD In Design FL-25 FWS

NFSR 120 MP 2.095 Bridge Replacement 2021 FL Liberty

Apalachicola National

Forest Replace Load limited bridge BRRP FLTP $960,000 Title 23 USFS Planned FL-02 USFS

Page 15

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

FL_FLAP_JKSVL_STDY(1) 2021 FL Duval

National Park

Service/Timucuan

Ecological and Historical

Preserve

Bike and ped feasibility study to connect 3

areas within Timucuan Ecological and

Historical Preserve MISC FLAP $1,020,000 Title 23 LOCAL Planned FL-04 NPS

FL_FLAP_STPRK_TRL(2) 2021 FL Martin

FWS, Hobe Sound

National Wildlife Refuge

Construction of a 1900 foot long multi-modal

path and an overpass across the FEC railway. MISC FLAP $3,135,000 Title 23 STATE In Design FL-18 NPS

CE Lake Seminole (1) 2022 FL

Jackson and

Gadsden

JIM WOODRUFF LOCK

AND DAM - LAKE

SEMINOLE - DAMSITE

EAST BANK

Resurfacing on an approximate 1 mile

segment of roadway located on the dam

structure and a 25,000 sq 3RH USACE $250,000 Title 23 USACE Planned _VARIOUS USACE

NP_BISC_10(2) 2022 FL Miami-Dade Biscayne National Park

Resurface Entrance Road and Parking Lot at

Convoy Point 3RH FLTP $1,099,382 Title 23 EFLHD Planned FL-11 NPS

Georgia

FS_Line_Branch_Culvert(1) 2019 GA Fannin

Chattahoochee National

Forest Replacement of Old Culvert MISC FLTP $17,250 Title 23 USFS In Design GA-04 USFS

GA FLAP GLYNN FRED(1) 2019 GA Glynn

NPS/Fort Frederica

National Monument Frederica Road Realignment. 3RL_4R FLAP $800,000 Title 23 LOCAL Planned GA-01 NPS

GA_FLAP_COBB_TRL(1) 2019 GA Cobb

NPS/Kennesaw

Mountain National

Battlefield Park

Construct 3 trail segments (Whitlock Ave,

Cheatham Hill Rd, and Burnt Hickory Rd) in

Cobb County, GA MISC FLAP $4,080,000 Title 23 LOCAL In Design GA-11 NPS

CE Butler Creek Bridge (1) 2020 GA Henry

USACE South Atlantic

Division Savannah

District’s

Repairs to West Streambank clearing,

grubbing, adding compacted fill, and armour

with rip rap to mat 3RL_BRRH USACE $500,000 Title 23 USACE

Under

Construction GA-03 USACE

GA ERFO NPS CUIS 2017-1(1) 2020 GA Camden

Cumberland Island

National Seashore

ERFO Permanent repairs on St. Mary's Ferry

Dock, the Sea Camp Dock, and the Dungeness

Dock at Cumber MISC ERFO $1,000,000 Title 23 EFLHD In Design GA-01 NPS

GA FLAP BRTW 276(1) 2020 GA Bartow USACE / Allatoona Lake

Resurfacing .7 miles of two 10 ft. lanes with a

rural cross-section on Chitwood Cove Road

(CR 276). 3RL FLAP $205,304 Title 23 LOCAL Planned GA-11 USACE

GA FLAP BRTW 280(1) 2020 GA Bartow USACE / Allatoona Lake

Resurfacing 1.6mi of two 10 ft. lanes with

rural cross-section on McCaskey Creek Rd (CR

280). 3RL FLAP $134,069 Title 23 LOCAL Planned GA-11 USACE

GA FLAP FORSYTH 104(1) 2020 GA Forsyth USACE -Lake Lanier

Construction of Multi-use Path along Pilgrim

Mill Rd. MISC FLAP $2,487,760 Title 23 LOCAL Planned GA-09 USACE

GA FLAP STPHN 227(1) 2020 GA Stephens

Chattahoochee - Oconee

National Forest

Mill and overlay apprx 3 in deep for 2.43 mi

from the south end of Ayersville Rd. @ W.

Currahee St. 3RH FLAP $286,808 Title 23 LOCAL Planned GA-09 USFS

FSR 70 MP 1.2868 Bridge 2021 GA Union

Chattahoochee-Oconee

National Forest Replace load limited narrow bridge BRRP FLTP $1,380,000 Title 23 USFS Planned GA-09 USFS

NP_CHCH_502(1) 2021 GA Catoosa

Chickamauga

Chattanooga National

Park

Repair, Rehabilitate, Reconstruct .34 miles of

Rt 0502 Poe Road 3R FLTP $228,369 Title 23 EFLHD In Design GA-14 NPS

NP_CHCH_102(1)_503(1) 2021 GA Catoosa

Chickamauga

Chattanooga National

Park

Reconstruction of 1.96 Miles of Rt. 102

Brotherton Rd. and 0.78 Miles of Rt. 503 of

Glenn Viniard Rd 3RH FLTP $1,859,577 Title 23 EFLHD Planned GA-14 NPS

NP_CHAT_102(1)_103(1)_ETC 2022 GA

Cobb, Fulton,

etc.

Chattahooche River

Recreational Area CHAT Pavement Rehabilitation & Repairs 2R FLTP $1,186,802 Title 23 EFLHD Planned GA-11 NPS

Page 16

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

NP_CHCH_101(1) 2023 GA Catoosa

Chickamauga

Chattanooga National

Park

Repair, Rehabilitation, Reconstruction of 0.76

Miles of Rt. 0101 Dyer Road 3RH_3RL FLTP $533,674 Title 23 EFLHD Planned GA-14 NPS

NP_CHCH_500(1)_501(1)_ETC 2021 GATN

Walker and

Catoosa, GA,

Hamilton, TN

Chickamauga

Chattanooga National

Park

Repair, Rehabilitation, Reconstruction of

Multiple Roads near CHCH National Park 3RH FLTP $3,596,392 Title 23 EFLHD In Design _VARIOUS NPS

HawaiiHI STP SR200 SADDLE ROAD EXTENSION 2020 HI Hawaii N/A Construct Saddle Road Extension 4R STP $75,000,000 Title 23 CFLHD Active HI-2 N/A

HI STP 360 HANA HIGHWAY BRIDGES 2021 HI Maui N/A Repair Bridges along SR 360. BR STP $32,500,000 Title 23 CFLHD Active HI-2 N/A

HI NPS PP 2019(1) Pavement Preservation Hawaii 2020 HI Hawaii County National Park Service

This project provides for cyclic pavement

preservation by chip sealing or micro

surfacing various routes for 7 National Park

Sites in Hawaii. Rehabilitation FLTP-NPS $6,745,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design HI-01

NPS Pacific-

West Region

Idaho

ID BOISE 24(17) Banks-Lowman Road 2020 ID Boise County Boise National Forest

Repair isolated areas of failing road base (soft

spot repair). With remaining funding, chip

seal/slurry/micro seal prioritized sections of

Banks-Lowman Road up to the available

funding amount. Rehabilitation FLAP $1,934,089 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design ID-01

FS

Intermountain

- Region 4

ID BOUNDARY 5806(1) Riverside Road

Improvements 2020 ID

Boundary

County

Panhandle National

Forest

Reconstruct the existing roadway base, widen

and pave with HMA. Reconstruction FLAP $8,958,589 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design ID-01

FS Northern -

Region 1

ID DOT T 33(1) Idaho Teton Centennial Trail 2020 ID Teton County

Caribou-Targhee

National Forest

Decrease the probability and severity of

vehicle/bicycle/pedestrian crashes on State

Route 33 from Moose Creek to the

Idaho/Wyoming border. Construction FLAP $3,441,997 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design ID-02

FS

Intermountain

- Region 4

ID FS NEZ 60(1) French Creek Bridge Replacement 2020 ID Idaho County

Nez Perce National

Forest

Replace a wooden stringer bridge along

French Creek with a concrete and steel

structure. Construction FH $340,000 Title 23

Nez Perce

National

Forest Planned ID-01

FS Northern -

Region 1

ID KOOTENAI 5762(1) Bunco Road Improvements 2020 ID Kootenai County

Idaho Panhandle

National Forest

Improve safety on the roadway and preserve

the pavement on Bunco Road. The project

begins just west of the intersection of Hatch

Road and ends at the USFS Parking area. Reconstruction FLAP $3,525,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design ID-01

FS Northern -

Region 1

ID VALLEY 21(8) Warren Wagon Road, MP 7.6 to 9.7 2020 ID Valley County Payette National Forest

Improve the existing roadway between

milepost (MP) 7.6 and 9.6 by repairing areas

of failed base material, pulverizing existing

asphalt, regrading and paving, and replacing

obsolete guardrail. Reconstruction FLAP $3,422,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design ID-01

FS

Intermountain

- Region 4

Page 17

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

ID CASSIA 972(1) West Milner Road, 700W to 1100W 2021 ID Cassia County

Milner

Historic/Recreation Area

Improve the access roadway to the Milner

Historic / Recreation Area by reconstructing

and paving West Milner Road from 700W to

1100W. Reconstruction FLAP $5,068,483 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design ID-02

BLM Idaho

Region

ID DOT 55(3) Idaho 55 / Banks Lowman Road

Intersection Study 2021 ID Boise County Boise National Forest

Planning Study for the intersection

improvement of State Highway 55 with Banks

Lowman Road and Banks Grade Road will

include a topographic survey, materials

investigation and environmental scan to be

used in an alternatives analysis. Planning FLAP $750,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned ID-01

FS

Intermountain

- Region 4

ID FS SC 2017(1) Custer Motorway and Yankee Fork

Road Improvements 2021 ID Custer County

Salmon-Challis National

Forest

Surface stabilization, dust control, bridge

work, bridge guardrail and curb upgrades,

culvert replacement, vehicular turnouts

within the one-lane roadway section, restore

shoulders and ditches, fill stabilization, and

signage upgrades. Rehabilitation FLAP $3,768,875 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned ID-02

FS

Intermountain

- Region 4

ID KOOTENAI 8450(1) Yellowstone Trail Road, MP

1.9 to 2.1 2021 ID Kootenai County

Wallace L. Forest

Conservation Area Repair slide area. Reconstruction FLAP $2,000,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design ID-01

BLM Idaho

Region

ID LEMHI 93(1) 2L Trails Highway 93 South 2021 ID Lemhi County

Salmon-Challis National

Forest

Construct paved trail in the Highway 93 right

of way from Salmon to Shoup Bridge BLM site

and improvements to BLM site. Construction FLAP $2,898,500 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design ID-02

FS

Intermountain

- Region 4

ID LEWISTON SNAKE(1) Snake River Avenue Access

Improvements 2021 ID

Nez Perce

County

Clearwater Snake River

National Recreation Trail

System

Construct Demolay Trail with signalized

crossing. Enhancement FLAP $235,000 Title 23

City of

Lewiston In Design ID-01

USACE

Northwestern

Division

ID CLARK 6805(1) Yale-Kilgore Road, MP 9 to 16.9 2022 ID Clark County

Caribou-Targhee

National Forest

To widen the roadway to a consistent 30 feet

and improve the roadway base through

excavation and adding additional base

aggregate and improving the roadway

surface from gravel to hot mix asphalt

pavement. Reconstruction FLAP $8,110,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design ID-02

FS

Intermountain

- Region 4

ID CLEARW 4783(1) Dent Bridge Road Improvements 2022 ID

Clearwater

County Dworshak Reservoir

Use available funding to rehabilitate northern

section of road, including guardrail, Cement

Recycled Asphalt Base (CRAB) and asphalt

concrete pavement, minor realignment,

retaining walls, drainage, and erosion control. Rehabilitation FLAP $4,000,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design ID-01

USACE

Northwestern

Division

Page 18

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

ID DOT 21(1) SH-21 Wildlife Overpass at Cervidae

Peak, MP 19.3 2022 ID Boise County Boise National Forest

Construction of a 150-ft wildlife overpass at

MP 19.32 and approximately 12,500 linear

feet of 8-ft high big game exclusion fence

paralleling SH-21 with jump-outs.

Wildlife

Crossing FLAP $3,227,593 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design ID 1st & 2nd

FS

Intermountain

- Region 4

ID FREMONT 6805(1) Yale-Kilgore Road, MP 16.9 to

30.8 2022 ID Fremont County

Caribou-Targhee

National Forest

New gravel trail running parallel to the road

on the south side; ideally this trail would be

paved but due to the size of the project, this

phase will only include a gravel trail. Reconstruction FLAP $8,284,655 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design ID-02

FS

Intermountain

- Region 4

ID BONNER 841(1) Trestle Creek Road, MP 100 to

103 2023 ID Bonner County

Idaho Panhandle

National Forest

Reconstruct Trestle Creek Road to a single

lane with turnouts. Work includes associated

intersection improvements, horizontal and

vertical alignment upgrades, drainage

improvements, stream bank restoration, and

roadside safety improvements. Reconstruction FLAP $5,042,500 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned ID-01

FS Northern -

Region 1

ID BOUNDARY 5806(2) Riverside Road

Improvement/Enhancement Project 2024 ID

Boundary

County

Panhandle NF, Kootenai

NWR, BLM

Rebuild and widen the paved surface and

include a widened shoulder on the river side

of the road for bicycle and pedestrian use. Reconstruction FLAP $2,705,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned ID-01

FS Northern -

Region 1

ID CLEARW 4783(2) Dent Bridge Road Safety

Improvements 2024 ID

Clearwater

County

Nez Perce-Clearwater

National Forests

Guard rail demolition and installation,

Cement Recycled Asphalt Base (CRABS) and

an asphalt concrete pavement, some minor

realignment, some retaining wall

construction, drainage improvements, as well

as environment compliance and erosion

control. Reconstruction FLAP $4,000,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned ID-01

FS Northern -

Region 1

ID CUSTER 051(1) Bayhorse Bridge 2024 ID Custer County

Salmon-Challis National

Forest

Improve access to federal lands by replacing

the structurally deficient Bayhorse Bridge

over the Salmon River. Construction FLAP $4,794,046 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned ID-02

FS

Intermountain

- Region 4

ID ELMORE 61(2) Pine-Featherville Roadway

Rehabilitation 2024 ID Elmore County Boise National Forest

Rehabilitate the roadway surface with the use

of CRABS (Cement Recycled Asphalt Base

Stabilization) process. The project will also

include the replacement of

one set of culverts at Dog Creek with a clear

span bridge. Rehabilitation FLAP $4,623,190 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned ID-02

FS

Intermountain

- Region 4

Page 19

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

ID KOOTENAI 8450(2) Yellowstone Trail Road

Improvements – Segment 1, Part 2 2024 ID Kootenai County

Wallace L. Forest

Conservation Area

Address current safety deficiencies and

accommodate increased recreational use by

providing a wider road with roadside safety

measures for visiting and local

recreationalists, as well as Federal forestry-

related users. Reconstruction FLAP $5,879,760 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned ID-01

BLM Idaho

Region

Illinois33621-8510-TWORV 2019 IL Calhoun Two Rivers NWR Trail Accessibility Improvements MISC FLTP $315,000 Title 23 FWS Planned IL-13 FWS

FW_UPSA_101(1) 2019 IL Carroll

Upper Mississippi NWFR-

Savanna District Rehabilitate River Road (Route 101). 3RL FLTP $1,000,000 Title 23 EFLHD Planned IL-17 FWS

IL_FLAP_KANE_360(1) 2019 IL Kane

U.S. Department of

Energy, Fermilab Facilit

Construct a right-turn lane on Kirk Road

northeast-bound onto Pine Street and the

Fermilab campus. 3RL_NEW FLAP $220,000 Title 23 LOCAL

Under

Construction IL-14 Other

FX.RS8510037COBR 2020 IL Williamson Crab Orchard NWR

Bridge Rehab Work - Little Grassy Deck

Replacement BRRH FLTP $515,000 Title 23 FWS In Design IL-12 FWS

33610-8510-TACOM 2020 IL Williamson Crab Orchard NWR Rehabilitate Tacoma Lake Road 3RH FLTP $2,100,000 Title 23 FWS Planned IL-12 FWS

IL FLAP CLHN 68(1) 96(1) 2020 IL Calhoun

Fish and Wildlife Services

/ Two Rivers National

Wildlife Refuge

Resurface and widen TR 68, TR 96, and TR

96A. 3RH FLAP $191,260 Title 23 LOCAL In Design IL-13 FWS

IL_FLAP_LSAL_CH34(1) 2020 IL LaSalle

USACE,Starved Rock

Lock/Dam&Illinois

Waterway

Relocation of Dee Bennett Rd from Route 178

to east of entrance to Starved Rock Lock and

Dam. MISC FLAP $564,000 Title 23 LOCAL Planned IL-16 USACE

33650-8510-CHAUT 2021 IL Mason Chautauqua NWR Rehabilitate Main Entrance Road 3RH FLTP $650,000 Title 23 FWS Planned IL-17 FWS

IL_FLAP_SHELBY_CH5(1) 2021 IL Shelby USACE/Lake Shelbyville

Resurface County Highway 5 and improve

drainage 3RH FLAP $1,632,000 Title 23 LOCAL In Design IL-15 USACE

33610-8510-CAMPG 2022 IL Williamson Crab Orchard NWR Campground/Prairie Creek 3RL FLTP $1,155,000 Title 23 FWS Planned IL-12 FWS

33610-8510-LINE6 2022 IL Williamson Crab Orchard NWR Line 6 Road 3RL FLTP $515,000 Title 23 FWS Planned IL-12 FWS

Indiana31530-8510-MUSC 2021 IN Jackson Muscatatuck NWR Auto Tour Route Surface Upgrade 3RH FLTP $525,000 Title 23 LOCAL Planned IN-09 FWS

FW_BIOA_12(1) 2021 IN Ripley

Big Oaks National

Wildlife Refuge

Replace Shaped Charge Road Bridge over

Falling Timbers Branch BRRP REIMB $100,000 Other EFLHD In Design IN-06 FWS

NP_INDU_0945(1) 2021 IN Porter

Indiana Dunes National

Lakeshore Replace Douglas Center Pedestrian Bridge. BRN FLTP $1,000,000 Title 23 EFLHD In Design IN-01 NPS

NP_INDU_5215(1) 2021 IN Porter

Indiana Dunes National

Lakeshore

Safety Improvements to Intersections of

Lake/Porter County Line Road. 3RH FLTP $1,200,000 Title 23 EFLHD In Design IN-01 NPS

IowaDeSoto NWR 2019 IA Harrison FWS - DeSoto NWR Flood Repairs 3RL FLTP/ERFO $75,000 Title 23 LOCAL Planned IA-04 FWS

IA_FLAP_DNR_EDNRT(1) 2019 IA Marion USACE/Lake Red Rock

Regrade roadway, add parking area, and

construct boat ramp. 3RH FLAP $69,930 Title 23 STATE

Under

Construction IA-02 USACE

IA FLAP JASPER TRL(1) 2020 IA Jasper

FWS - Neal Smith

National Wildlife Refuge

Construct a multi-use trail between Prairie

City and Neal Smith NWR. MISC FLAP $510,000 Title 23 LOCAL In Design IA-02 FWS

FW-DESO 107(1) 2021 IA Harrison FWS - DeSoto NWR Rehab Southgate Rec Area (Rte 107) 3RL FLTP $1,010,000 Title 23 EFLHD Planned IA-04 FWS

Union Slough 2018313499 2022 IA Kossuth FWS - Union Slough NWR Handicapped Access Improvements 3RL FLTP $185,000 Title 23 LOCAL Planned IA-04 FWS

Kansas

Page 20

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

KS FLAP MRS 10(1) LAKE ROAD SAFETY PROJECT 2020 KS Morris Council Grove Lake

Replace guardrail and other safety

improvements on Lake Road at Council Grove

Lake. 1R FLAP $150,000 Title 23 CFLHD Not Started KS-1 USACE-NWD

KS FTFW MACY 10(2) HQ ROAD, PARKING, REFUGE

INTRO TRAIL 2020 KS Linn Marais De Cygnes NWR

Pave office entry and parking and construct

Refuge Intro Trail. 3R4R FTFW $450,000 Title 23 CFLHD Active KS-2 FWS-R6

KS FLAP KIN 50(1) CHENEY RESERVOIR ACCESS 2021 KS Kingman Cheney Reservoir

Rehabilitate Cheney Reservoir South Access

Road. 3R FLAP $1,000,000 Title 23 CFLHD Not Started KS-4 BOR-GP

KS FLAP MIA 253(1) HILLSDALE LAKE ACCESS 2022 KS Miami Hillsdale Lake

Rehabilitate and Pave .75 miles of 253rd

Street and Orleans Road. 3R FLAP $800,000 Title 23 CFLHD Not Started KS-2 USACE-NWD

KS_FTFW_KIRW_14(1) 2020 KS Phillips

Kirwin National Wildlife

Refuge

Reconstruct Xavier Road, S. Kirwin Road (new

bridge), and multiple BRN FLTP $1,400,000 Title 23 EFLHD In Design KS-01 FWS

Kentucky

KY_ERFO_FS_2016-1(1) 2019 KY Menifee

Daniel Boone National

Forest

ERFO landslide and drainage repairs on

Daniel Boone National Forest. LSR ERFO $491,332 Title 23 EFLHD

Under

Construction KY-06 USFS

NP_MACA_13(1)_14(2) 2019 KY Shelby

Mammoth Cave National

Park

Parks western Boundary Green River Ferry

Crossing Roads. MISC REIMB $340,000 Other EFLHD Planned KY-02 NPS

MACA_15(3) 2020 KY Edmonson

Mammoth Cave National

Park

Reconstruct Brownsville Rd RT 015 Sloan's

Crossing 3RH FLTP $2,820,998 Title 23 EFLHD In Acquisitions KY-02 NPS

NP MACA 12(1) 908(1) SPEC 2021 KY Hill

Mammoth Cave National

Park NP MACA 12(1) 908(1) SPEC 3RL_NEW NPS $7,275,000

REIMBURSA

BLE

AUTHORITY EFLHD Planned KY-02 NPS

Louisiana

LA FLAP BPPJ BD(1) CV(1) 2019 LA Bossier Parish

US Army Corp of

Engineers- Bodcau Dam

Rehabilitation of roughly 4.1 miles of Bodcau

Dam Road and 3.2 of Cotton Valley Road. 3RL FLAP $1,938,000 Title 23 LOCAL Planned LA-04 USACE

LA FLAP STP 434(1) 2019 LA

St. Tammany

Parish

Fish and Wildlife Service/

Southeast Louisiana

Refuges

Raise and resurface the existing aggregate

road and the improvement of two bridges on

Lake Road. 3RL FLAP $265,240 Title 23 LOCAL Planned LA-01 FWS

LA ERFO FW BLBA 2016-2(1) 2020 LA Ouachita

Black Bayou Lake

National Wildlife Refuge Remove & replace 3 boardwalks. MISC ERFO $2,222,106 Title 23 EFLHD In Acquisitions LA-05 FWS

LA ERFO FW BOCH 2016-2(1) 2020 LA St Tammany

Bogue Chitto National

Wildlife Refuge Remove & Replace the Pearl River Boardwalk. MISC ERFO $382,707 Title 23 EFLHD In Acquisitions LA-01 FWS

Maine

SO NP ACAD(1) 2019 ME Hancock Acadia National Park

Pavement Rehab. Paradise Hill Rd and various

Routes. 3RL FLTP $242,000 Title 23 NPS In Design ME-02 NPS

ME FLAP WELLS FURBISH(1) 2020 ME York

USFWS/Rachel Carson

National Wildlife Refuge

Rehabilitate the flooded Furbish Road and

protect from future washouts. 3RL FLAP $260,961 Title 23 LOCAL In Design ME-01 FWS

ME_FLAP_UPTN_BHIL(1) 2020 ME Oxford

Umbagog National

Wildlife Refuge

Complete final design and the NEPA

documents for the resurfacing of East B Hill

Road project. MISC FLAP $505,000 Title 23 LOCAL Planned ME-02 FWS

ME_FLAP_WELLS_HARBOR(1) 2020 ME York

USFWS, Rachel Carson

National Wildlife Refuge

Design and construct sidewalks, bike lanes,

and streetscape improvements along Harbor

Road 3RL FLAP $612,000 Title 23 LOCAL In Design ME-01 FWS

NP ACAD 10(3) 2020 ME Hancock Acadia National Park

Duck Brook Bridge Interior Repairs and

Lighting (001S). BRRH FLTP $620,000 Title 23 EFLHD Planned ME-02 NPS

Rachel Carson NWR 2015260400 2021 ME York Rachel Carson NWR Road, Parking and Trail Improvements Trail FLTP $500,000 Title 23 FWS Planned ME-01 FWS

Page 21

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

FW GREE 10(1) 100(1) 2021 ME Hancock

Green Lake National Fish

Hatchery

Patch and resurface Hatchery Entrance Rd

(Rte 10), Hatchery Access Loop (Rte 100), and

Parking Lots. 3RL FLTP $300,000 Title 23 EFLHD Planned ME-02 FWS

ME FLTP NP ACAD(3) 2021 ME Hancock Acadia National Park Cadillac Mountain. 3RH_3RL FLTP $2,983,000 Title 23 NPS In Design ME-02 NPS

ME FLTP NP ACAD(5) 2021 ME Hancock Acadia National Park Replace 2010 Propane Buses. MISC FLTP $2,711,326 Title 23 NPS Planned ME-02 NPS

Aroostook NWR 2018313787 2022 ME Aroostook Aroostook NWR Auto Tour Route Improvement Project 3RL FLTP $400,000 Title 23 FWS Planned ME-02 FWS

ME FLTP NP ACAD(4) 2022 ME Hancock Acadia National Park Park Loop Road. 3RL_2R FLTP $2,750,000 Title 23 NPS In Design ME-02 NPS

Maryland

GREE_11(1) 2019 MD Prince George's Greenbelt Park

Main Enrtance & Park Central Rd. Bridge

Replacement and Resurfacing 3RH_BRRP FLTP $7,570,000 Title 23 EFLHD In Acquisitions MD-05 NPS

NP_BAWA_1(7)_2(7)_LC 2019 MD Anne Arundel

Baltimore Washington

Parkway

Resurfacing BW Parkway from Big Patuxent

River Bridge to Little Patuxent River Bridge. 3RL FLTP $4,200,000 Title 23 EFLHD

Under

Construction MD-05 NPS

NP_BAWA_1(8)_2(8) 2019 MD Anne Arundel

Baltimore Washington

Parkway

Resurfacing BW Parkway from Little Patuxent

River Bridge to MD 175. 3RL FLTP $3,000,000 Title 23 EFLHD

Under

Construction MD-05 NPS

SUIT_1(2)_2(2) 2019 MD Prince George's

National Capital Parks-

East

Improve Ped Cross at SUIT Prky & Forestville

Rd MISC FLAP $1,400,000 Title 23 EFLHD

Under

Construction MD-05 NPS

FW-PATU 13(1) 2020 MD Prince George's

Patuxent Research

Refuge

Rehabilitation and Resurfacing of Powder Mill

Road 3RL FLT{ $190,000 Title 23 EFLHD In Design MD-05 FWS

GWMP_6(1)_7(2) 2020 MD

Montgomery

and Prince

George's

George Washington

Memorial Parkway

Clara Barton Pkwy mill including guardrail

and guardwall 3RH FLTP $4,048,150 Title 23 EFLHD In Design _VARIOUS NPS

NP_ANTI_300(2)_307(1)_ETC 2020 MD Washington

Antietam National

Battlefield

Pavement preservation of various Routes and

trail work at Burnside Bridge. 2R FLTP $1,259,300 Title 23 EFLHD In Design MD-06 NPS

NP_BAWA_1(9)_2(9) 2020 MD Anne Arundel

Baltimore Washington

Parkway

BW Parkway Guardrails and Sign

Replacement from Big Patuxent River Bridge

to MD 175. 3RL FLTP $2,000,000 Title 23 EFLHD Planned MD-05 NPS

MD_FLAP_WMSPT_63(1)_68(1) 2021 MD Washington

National Park Service /

C&O Canal National

Historical Park

Rehabilitating the roadway and sidewalks

along MD 63 and MD 68 in the Town of

Williamsport, MD. 3RL FLAP $1,003,407 Title 23 LOCAL In Design MD-06 NPS

FW_PATU_16(3) 2021 MD Anne Arundel

Patuxent Research

Refuge

Rehab Wildlife Loop Duvall Bridge Rd to

south of Little Patuxent River bridge. 3RL OTHER $1,085,000 Title 23 EFLHD In Design MD-04 NPS

NP CHOH 104(1) 206(1) ETC 2021 MD

Washington,

Montgomery,

Allegany

Chesapeake & Ohio

Canal National Historical

Park

Repair/Rehabilitate bridges 3100-001P, -

005P, -001P, and -013P. BRRH FLTP $625,000 Title 23 EFLHD Planned _VARIOUS NPS

NP NACE 300(1) 301(1) 2021 MD Prince George's

National Capital Parks

East

Marshall Hall Access Road & Loop Road

reconstruction 3RH REIMB $629,000 Title 23 EFLHD Planned MD-04 NPS

NP BAWA 507(1) 509(1) 2022 MD

Prince Georges

and Anne

Arundel

Baltimore Washington

Parkway

Lighting Improvements on Route 197, Route

32, and I-95 Interchanges MISC FLTP $250,000 Title 23 EFLHD Planned MD-04 NPS

NP CATO 10(5) 11(2) ETC 2022 MD Frederick Catoctin Mountain Park Repair RT 11 Section 0 Foxville-Deerfield Rd 3RH_3RL FLTP $500,000 Title 23 EFLHD In Design MD-06 NPS

NP GWMP 6(2) 2022 MD

Montgomery

County

George Washington

Memorial Parkway Rehab cantilever Structure 3300-044. BRRH FLTP $4,000,000 Title 23 EFLHD Planned MD-08 NPS

BAWA_1(6)_2(6) 2023 MD Prince George's

Baltimore Washington

Parkway

Baltimore Washington Parkway median

safety improvements MISC REIMB $350,000 Title 23 EFLHD Planned MD-05 NPS

BAWA_1A26_E20 2023 MD Anne Arundel

Baltimore Washington

Parkway

Rehab walls Baltimore Washington Parkway

near Rt 197. RW FLTP $450,000 Title 23 EFLHD In Design MD-05 NPS

Page 22

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

NP BAWA 1(10) 2(10) 2023 MD Anne Arundel

Baltimore Washington

Parkway

Improve shoulder areas at 8 locations for

vehicles to safely stand outside of the traffic

lanes. MISC FLTP $5,000,000 Title 23 EFLHD Planned MD-04 NPS

NP BAWA 1(11) 2(11) 2023 MD Anne Arundel

Baltimore Washington

Parkway

Improve 4 median crossover areas for

authorized vehicles MISC FLTP $440,000 Title 23 EFLHD Planned MD-04 NPS

Massachusetts

MA FLAP DCR TRL(1) 2019 MA Bristol

National Park Service/

Wild & Scenic Taunton

River

Design multi-use trail to improve safety for

users from Veterans Memorial Bridge to City

of Taunton. MISC FLAP $206,000 Title 23 STATE Planned MA-04 NPS

SO_FW_PARK_2008868537 2019 MA Essex

Parker River National

Wildlife Refuge Replace Hellcat Trail boardwalk. BRN FLTP $1,000,000 Title 23 FWS Planned MA-06 FWS

MA_FLAP_HADLEY_MDY(1) 2020 MA Hampshire

USFWS - Silvio O. Conte

National Fish and

Wildlife Refuge

Rehabilitate 3,000 feet of Moody Bridge

Road, a gravel Town of Hadley owned road. 3RL FLAP $182,500 Title 23 LOCAL In Design MA-02 FWS

MA_FLAP_LOWELL_RW(1) 2020 MA Middlesex

(NPS), Lowell National

Historical Park (LNHP)

Extend Merrimack Riverwalk pedestrian path

& construct a plaza/overlook, and deck for

viewing. 3RH OTHER $2,964,632 Title 23 LOCAL In Design MA-03 NPS

FW MASH 1000(1) 2020 MA Barnstable

Mashpee National

Wildlife Refuge

Remove & replace box culvert on Carriage

Shop Road at Childs River. BRRP FLTP $350,000 Title 23 EFLHD In Design MA-09 FWS

MA_FLAP_LGMDW_PNDSD(1) 2020 MA Hampden

USFWS, Silvio O. Conte-

Fannie Stebbins National

Wildlife Refuge

Rehabilitate Pondside Rd, a section of Tina

Lane including a gravel parking area, replace

2 culverts 3RL FLAP $2,260,000 Title 23 LOCAL Planned MA-02 FWS

MA_FLAP_LOWELL_PED(1) 2020 MA Middlesex

NPS, Lowell National

Historical Park

Improvements to crosswalks and ramps along

canalways and repairing Pawtucket Canal

Bridge. BRRH FLAP $1,051,000 Title 23 LOCAL In Design MA-03 NPS

SO NP ADAM(1) 2020 MA Norfolk

Adam National Historical

Park Trolley Bus Purchase MISC FLTP $202,000 Title 23 NPS In Acquisitions MA-04 NPS

SO NP MIMA(1) 2020 MA Middlesex

Minute Man National

Historic Site Battle Road Trail. Trail FLTP $236,360 Title 23 NPS In Design MA-05 NPS

MA FLAP NAN WWNT(1) 2021 MA Nantucket

Nantucket National

Wildlife Refuge

Construct 1.18 miles multi-use trail along

Wauwinet Road Trail FLAP $1,150,000 Title 23 EFLHD Planned MA-09 FWS

MA FLTP NP CACO(3) 2021 MA Barnstable

Cape Cod National

Seashore

Pavement Rehabilitation Race Point, Marconi

Beach and various roads. 3RL_2R FLTP $3,330,000 Title 23 NPS In Design MA-09 NPS

MA FLTP NP CACO(5) 2021 MA Barnstable

Cape Cod National

Seashore Doane Rock. 3RH_3RL OTHER $1,200,000 Title 54 NPS In Design MA-09 NPS

MA ST STRBRDG GTT(001) 2021 MA Worcester

Westville Dam

Recreation Area

Design and construction of approximately

0.77 miles of multi-use trail. MISC USACE $655,191 Title 23 EFLHD Planned MA-02 USACE

MA FLTP NP CACO(4) 2022 MA Barnstable

Cape Cod National

Seashore

Pavement Recon Salt Pond Visitor Center

Parking & Rehab Park HQ Parking. 3RH_3RL FLTP $1,000,000 Title 23 NPS In Design MA-09 NPS

CE Cape Cod Bridges 2019D MA Barnstable Cape Cod Canal

NEPA Decision Document for Major

Rehabilitation Evaluation Study. BRRH USACE $130,000 Title 23 EFLHD Planned MA-09 USACE

Michigan

MI FLAP CCRC FH42(1) 2019 MI Chippewa

US Forest Service/

Hiawatha National

Forest, Bay Mills Indian

Community

Resurfacing Lakeshore Drive between Salt

Point Road and M-123. 3RL FLAP $509,500 Title 23 LOCAL

Under

Construction MI-01 USFS

Page 23

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

MI FLAP LAKE GLA(1) 2019 MI Lake

Forest Service/ Manistee

National Forest

Reconstruct and widen the roadways access

to Gleasons Landing. 3RL FLAP $1,020,000 Title 23 LOCAL

Under

Construction MI-02 USFS

MI FLAP LCRC 669(1) 2019 MI Leelanau

National Park Service/

Sleeping Bear Dunes

National Lakeshore

Replace culvert with 30' box culvert over

Shalda Creek and along County Road 669. BRN FLAP $231,000 Title 23 LOCAL In Design MI-01 NPS

MI FLAP SGNW AM(1) BP(1) 2019 MI Saginaw

Fish and Wildlife Service

/ Shiawassee National

Wildlife Refuge (SNWR)

Roadway reconstruction from gravel to

asphalt and widen existing road on Ambrose

and Bishop Road. 3RH FLAP $489,500 Title 23 LOCAL

Under

Construction MI-05 FWS

MI_FLAP_ISCO_TRL(1) 2019 MI Iosco

Huron Manistee National

Forest

Construction 2.1 mile, 10 ft wide, paved trail

with 2 ft shoulders, and a pedestrian bridge. NEW FLAP $459,000 Title 23 LOCAL

Under

Construction MI-04 USFS

SO NP ISRO(1) 2019 MI Houghton

Between the National

Park Service, Midwest

Regional Office, and Isle

Royale National Park

Mandatory Dry-docking of the Motor Vessel

Ranger III. 3RH_NEW FLTP $400,000 Title 23 NPS Planned MI-01 NPS

MI FLAP GGBC 513(1) 2020 MI Gogebic

Forest Service/ Ottawa

National Forest

Roadway resurfacing and safety upgrades on

CR 513. 3RH FLAP $475,215 Title 23 LOCAL In Design MI-01 USFS

MI FLAP IRON OTTW RD(1) 2020 MI Iron

Forest Service/Ottawa

National Forest Rehabilitation of Ottawa Lake Road. 3RL FLAP $844,800 Title 23 STATE In Design MI-01 USFS

31510-8510-BRIDG 2021 MI Schoolcraft Seney NWR Auto Tour Bridges Rehabilitation BRRH FLTP $1,070,000 Title 23 EFLHD Planned MI-01 FWS

NP_SLBE_5109(1) 2021 MI Leelanau

Sleeping Bear Dunes

National Lakeshore

To construct right and left turnlanes on M109

Dune Climb Entrance. 3RH_NEW FLTP $750,000 Title 23 EFLHD Planned MI-01 NPS

FW_SENE_10(1)_900(1) 2022 MI Schoolcraft

Seney National Wildlife

Refuge

Reconstruct Entrance Rd (RT 10), Visitor

Center Parking (RT 900), 3RL FLTP $2,205,000 Title 23 EFLHD In Design MI-01 FWS

Minnesota

The Grade Reconstruction 2019 MN Saint Louis Superior National Forest

Safety Improvements (slope flattening)

Aggregate Surfacing Replacement

Culvert Replacement

Aquatic Organism Passage Improvements. Other FLTP $795,000 Title 23 USFS

Under

Construction MN-08 USFS

Detroit Lakes WMD 2019 MN Becker

Detroit Lakes Wetland

Management District HQ Pavement Install 3RH FLTP $445,000 Title 23 LOCAL In Design MN-07 FWS

Big Stone 2018305317 2019 MN Lac Qi Parle Big Stone NWR Auto Tour Route Rehabilitation 3RH FLTP $1,275,000 Title 23 LOCAL Planned MN-07 FWS

MN FLAP BLTRMI 39(3) 2019 MN Beltrami

USFS, Chippewa National

Forest

Reconstruct 2.8 miles of Route 39 in Beltrami

County 3RL FLAP $1,020,000 Title 23 LOCAL

Under

Construction MN-08 USFS

MN FLAP DAKOTA TRL(1) 2020 MN Dakota

USFWS - Minnesota

Valley NWR - Black Dog

Unit

Construction of a trailhead and a parking area

near Minnesota Valley NWR. MISC FLAP $612,000 Title 23 LOCAL In Design MN-02 FWS

MN FLAP TR WCRDRP(2) 2020 MN Hennepin

NPS, Mississippi National

River and Recreation

Area

Reconstruction and improvement to

pavement infrastructure at WCRDRP. 3RH FLAP $715,000 Title 23 LOCAL In Design MN-03 NPS

Rice River Bridge Replacement 2021 MN Cass Chippewa NF

Replace existing 40' span timber bridge with a

new pre-stressed concrete girder/concrete

deck bridge of 80' span. BRRP FLTP $700,000 Title 23 USFS Planned MN-08 USFS

Page 24

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

MN_FLAP_DAKOTA_45(2) 2021 MN Dakota

NPS, Mississippi National

River and Recreation

Area

Construct 10-ft wide, 1.7 mile long, paved

trail on the Mississippi River Trail (MRT),

Dakota County MISC FLAP $1,020,000 Title 23 LOCAL In Design MN-02 NPS

Mississippi

MS_FLAP_BNTN_LBRTY(1) 2019 MS Benton

USFS/Holly Springs

National Forest

Bridge Replacement on Liberty Church Road

in Benton County, MS BRRP FLAP $375,745 Title 23 LOCAL In Design MS-02 USFS

MS_FLAP_CALCO_820(1) 2019 MS Calhoun

USACE/Grenada Lake

Reservoir

Overlay of 7.6 miles of CR 306 and the

replacement of 7 bridges. 3RL_BRRP FLAP $4,080,000 Title 23 STATE In Design MS-03 USACE

MS_FLAP_CRNTH_145(1) 2019 MS Alcorn

Shiloh National Military

Park

North Polk St. (Route MS 145) Bridge and

Road Improvements 3RL_BRRP FLAP $3,314,600 Title 23 LOCAL In Design MS-01 NPS

MS_FLAP_FRKN_MDCR(1) 2019 MS Franklin

Homochitto National

Forest

Remove and replace existing bridges (#026

and #022) along Middleton Creek Road BRRP FLAP $768,976 Title 23 LOCAL In Design MS-03 USFS

MS_FLAP_PRNT_3485(1)_3560(1) 2019 MS Prentiss USACE / Bay Springs Lake

Widening and improve .85 miles of

CR3560;Upgrade .57 miles of CR3485 to

oblige with all modes. 3RH FLAP $633,835 Title 23 STATE In Design MS-01 USACE

MS_FLAP_SMITH_CR539(1) 2019 MS Smith

USFS - Bienville National

Forest

Replace deficient bridge on CR539 in Smith

Co. BRRP FLAP $360,600 Title 23 LOCAL In Design MS-03 USFS

NP VICK 12(5) 20(2) 2019 MS Warren

Vicksburg National

Military Park

Emergency repair work for Confederate

Avenue and Union Avenue. 3RH FLTP $350,000 Title 23 EFLHD In Acquisitions MS-02 NPS

NP_NATR_3O19_3P24 2019 MS Madison Natchez Trace Parkway

Overlay park road from MP 103.7 to MP

110.32. 3RL FLTP $1,753,429 Title 23 EFLHD In Design MS-02 NPS

NATR_BMS_FY18(1) 2019 MS Various Natchez Trace Parkway Bridge Preventative Maintenance Projects. BRRH FLTP $750,000 Title 23 EFLHD In Design _VARIOUS NPS

NP NATR 2A18 B7 C6 D11 3A17 B9 2020 MS Various Natchez Trace Parkway

Pavement Reconstruction and Safety

Improvement from MP 291.00 to MP 331.00 3RH Other $39,500,000 Title 23 EFLHD Planned MS-02 NPS

NP_GUIS_15(3) 2020 MS Jackson

Gulf Islands National

Seashore

Safety improvements on Park Road - paved

shoulders, guardrail NEW REIMB $640,000 Title 54 EFLHD In Design MS-04 NPS

NATR_BMS_FY19(1) 2020 MS Various Natchez Trace Parkway Bridge Preventative Maintenance Projects BRRH FLTP $957,000 Title 23 EFLHD In Design _VARIOUS NPS

NP NATR BMS FY20(1) 2020 MS Various Natchez Trace Parkway FY 20 REGION WIDE BMS, AT NATR PKWY. BRRH FLTP $500,000 Title 23 EFLHD In Design _VARIOUS NPS

NP_NATR_3D34_3E15 2021 MS Pontotoc & Lee Natchez Trace Parkway

Overlay park road from MP 253.44 to MP

268.63 2R FLTP $5,188,832 Title 23 EFLHD In Design MS-02 NPS

NP_NATR_3E16_3F25 2021 MS

Pontotoc,

Chicksaw, Lee Natchez Trace Parkway

Overlay park road from MP 238.84 to MP

253.44 2R FLTP $3,772,351 Title 23 EFLHD In Design MS-02 NPS

NP_VICK_12(4)_20(1)_21(1) 2021 MS Warren

Vicksburg National

Military Park

Repairs of Confederate Ave, Union Ave., and

Louisiana Circle 3RH FLTP $1,304,717 Title 23 EFLHD Planned MS-02 NPS

NP_NATR_3J11_3K5_3L14_3M21 2022 MS Attala, Choktaw Natchez Trace Parkway

Overlay park road from MP 160.74 to MP

182.82 2R FLTP $5,933,236 Title 23 EFLHD Planned MS-02 NPS

NP_NATR_3O20 2022 MS Madison Natchez Trace Parkway

Overlay Park Road from MP 112.4 to MP

114.6 3RH FLTP $4,840,621 Title 23 EFLHD Planned MS-02 NPS

NP_VICK_12(5)_14(1)_ETC 2022 MS Warren

Vicksburg National

Military Park

Replace Several Tour Bridges' Railings and

Guardrails MISC FLTP $204,937 Title 23 EFLHD Planned MS-02 NPS

NP_NATR_3P25 2023 MS Madison Natchez Trace Parkway

Reconstruct Parkway in Ridgeland from MP

102.3 to MP 103.7 3RH FLTP $5,324,061 Title 23 EFLHD Planned MS-02 NPS

Missouri

Page 25

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

CE Table Rock Dam Bridge(1) 2019 MO Taney

Table Rock Dam MO Hwy

165-265 Spillway Bridge

Table Rock Dam overlay on non-overflow

approach sections and overflow sections of

the roadway; hatch 3RL_BRRH USACE $875,000 Title 23 USACE

Under

Construction MO-07 USACE

CE Truman Dam (2) 2019 MO Jackson and Clay

Harry S Truman National

Historic Site

Install new expansion joints & hatch joints

and repair/repaint steel surrounding the

joints. Add dec 3RL_BRRH USACE $526,000 Title 23 USACE

Under

Construction MO-05 USACE

MO FLAP BNCLWY BR(1) 2019 MO

Boone and

Calloway

USFS/Mark Twain

National Forest

Replace Burnett School Road Bridge across

Cedar Creek in Boone and Calloway Counties,

MO BRRP FLAP $643,000 Title 23 LOCAL In Design MO-03 USFS

MO FLAP BTS STLN(1) 2019 MO Bates

USFWS/ Marais des

Cygnes National Wildlife

Refuge

Stabilizing stream bank that threatens SW

County Road 1431. LSR FLAP $102,320 Title 23 LOCAL

Under

Construction MO-04 FWS

MO_FLAP_CRTR_151(1) 2019 MO Carter

NPS, Ozark National

Scenic Riverways Park

Widen and pave 0.8 miles of County Road

151 located in Carter County, MO. 3RH_3RL FLAP $130,176 Title 23 LOCAL

Under

Construction MO-08 NPS

MO_FLAP_WASH_CR(1) 2019 MO Washington

USFS, Mark Twain

National Forest

Rehabilitating Jinkerson Road from aggregate

to chip seal from MO 8 to Washington County

Road. 3RL FLAP $204,944 Title 23 LOCAL

Under

Construction MO-03 USFS

MO ERFO FS 2017-1(2) 2019 MO Ripley

Mark Twain National

Forest

Low Water Crossing FR 3412 at Big Barren

Creek. Design only. 3RL ERFO $23,550 Title 23 USFS In Design MO-08 USFS

FW_BIMU_107(1) 2020 MO Cooper

Big Muddy National Fish

& Wildlife Refuge

Recon. Loesing RD & improve intersctn safty

at Brady LN & SR 179/98 3RH FLTP $1,998,000 Title 23 EFLHD In Design MO-04 FWS

MO ERFO FS 2017-1(1) 2020 MO Madison

Mark Twain National

Forest

Audubon Trail Repairs at Mark Twain

National Forest MISC ERFO $2,000,000 Title 23 EFLHD In Design MO-08 USFS

MO ERFO NPS OZAR 2017-1(3) 2020 MO Shannon

Ozark National Scenic

Riverways

Powder Mill Spring Road & Powder Mill

Campground Road. MISC ERFO $520,970 Title 23 EFLHD In Design MO-08 NPS

MO FLAP CRTR 201(1) 2020 MO Carter

National Park Service/

Ozark National Scenic

Riverways

Roadway widening and resurfacing

improvements along 2.4 miles on CR 201. 3RL FLAP $253,880 Title 23 LOCAL In Design MD-08 NPS

MO FLAP DOT 67(1) 2020 MO Saint Charles

U.S Army Corps of

Engineers/ River Project

Office

Relocate ¾ miles 2 SB lanes next to NB lanes

fr. S of Clark Bridge to Lincoln-Shields S access

lot. 4R FLAP $1,020,000 Title 23 STATE In Design MO-03 USACE

MO_ERFO_NPS_OZAR_2017-1(1) 2020 MO Carter, Shannon

Ozark National Scenic

Riverways

ERFO repairs on multiple trails in Ozark

National Scenic Riverways. MISC ERFO $133,994 Title 23 EFLHD In Design MO-08 NPS

MO_FLAP_WASH_657(1) 2020 MO Washington

USFS - Mark Twain

National Forest

Replacement of Hazel Creek Bridge along

County Road 657 in Washington County, MO. BRRP FLAP $310,000 Title 23 LOCAL In Design MO-03 USFS

Council Bluff I/II/III 2022 MO Phelps

Mark Twain National

Forest

Pavement, Drainage, AOP. Design of camp

ground improvements 3RH FLTP $180,000 Title 23 USFS Planned MO-08 USFS

Swan Lake 2019326003 2023 MO Chariton Swan Lake

Improve & Expand Accessible Portion of

Nature Trail Trail FLTP $525,000 Title 23 FWS Planned MO-06 FWS

Montana

MT BEAVERHEAD 73(1) Pioneer Mountain Scenic

Byway Pavement Marking 2020 MT

Beaverhead

County

Beaverhead-Deerlodge

National Forest

Improve safety of the existing paved Pioneer

Mountain Scenic Byway by painting

pavement markings and placing reflective

shoulder delineators for the full length of the

road (49 miles).

Surface

Preservation FLAP $364,482 Title 23

Beaverhead

County In Design MT-at large

FS Northern -

Region 1

Page 26

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

MT BLAINE 2015(1) Cow Island Trail and Lloyd Road

Preservation 2020 MT Blaine County

Upper Missouri River

Breaks National

Monument

Improve the surface condition of the Cow

Island Trail and the Lloyd Road. This project

will accomplish this through the addition of

four (4) inches of gravel to the surface of

both roads. Rehabilitation FLAP $960,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned MT-at large

BLM Montana-

Dakotas

Region

MT BLM WMDD 0427(1) McNamara Road 2020 MT Missoula County

Bureau of Land

Management

Recondition and pave existing road, site road

reconditioning, and recondition or construct

pullouts and parking areas, widen travel way

at MP 3.3, drainage, and signage. Reconstruction FLTP-BLM $4,935,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT-at large

BLM Montana-

Dakotas

Region

MT BOR GPR 2019(1) Barretts Pedestrian Bridge 2020 MT

Beaverhead

County Barretts Station Park

Replace the pedestrian bridge at Barretts

Station Park. Construction FLTP-BOR $200,000 Title 23

Montana

Area Office In Design MT-at large

BOR Great

Plains Region

MT DAR 2018(2) Defense Access Roads POP Update

2018 2020 MT Cascade County

Malmstrom Air Force

Base

Update the DAR Program of Projects for fiscal

years 2021, 2022, and 2023. Planning DAR $200,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned MT-at large Not Applicable

MT DAR 2020(1) Defense Access Roads FY 2020 2020 MT Cascade County NA

The purpose of the improvements is to

maintain the network of county gravel roads

the air force uses to access ICBM sites in a

condition in which they can remain open to

all air force traffic at all times. Maintenance DAR $10,190,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT-at large Not Applicable

MT DOT 14203(1) Maiden Road 2020 MT Fergus County

Judith Peak Scenic

Outlook

Rehabilitate the existing Double Shot surface

to include improving the driving, gravel the

last mile with CaCl dust paliative, pavement

markings and signing. Reconstruction FLAP $7,134,300 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT-at large

BLM Montana-

Dakotas

Region

MT DOT 399(1) Boulder South 2020 MT

Jefferson

County

Beaverhead-Deerlodge

National Forest

Reconstruct 10.2 to 19.3 (gravel to gravel)

and reconstruct/rehabilitate 23.5 to 25.0

(pavement to pavement) to improve

alignment, slopes, drainage, and safety.

Additional intersection, signage, and safety

improvements will be made from 10.2 to

23.5. Reconstruction FLAP $2,765,671 Title 23

Montana

Department

of

Transportati

on In Design MT-at large

FS Northern -

Region 1

MT FWS CMR 61520(1) Charles M Russell Refuge

Repairs 2020 MT Phillips County Charles M Russel NWR

Scoping for 7 sites on 201, 301, 220, 210 and

307 + Route 101. Construction FLTP-FWS $1,558,735 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT-at large

FWS Mountain-

Prairie -

Region 6

Page 27

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

MT GLACIER 14(1) Many Glacier Road 2020 MT Glacier County Glacier National Park

Reconstruction of 4.8 miles of primary access

through the Blackfeet Indian Reservation to

Glacier National Park.

Capital

Improvement FLAP $9,900,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT-at large

NPS

Intermountain

Region

MT LEWISCLARK 2016(5) Snowdrift Road Surface

Preservation 2020 MT

Lewis and Clark

County BLM - North Hills Area

Resurface 1 mile of Snowdrift Road beginning

at the intersection of Snowdrift Road &

Collins Drive. Project includes applying gravel

with dust palliative over the width of the road

to increase stability & extend the life of the

road surface.

Surface

Preservation FLAP $167,079 Title 23

Lewis and

Clark

County Planned MT-at large

BLM Montana-

Dakotas

Region

MT LEWISCLARK 2016(7) Ferry Drive Surface

Preservation 2020 MT

Lewis and Clark

County BLM - North Hills Area

Resurface 1.5 miles of Ferry Drive. Apply

gravel with a dust palliative to limit road dust,

increase stability, & extend road life. Also,

recondition surface near intersection of

Fantasy Road to resolve drainage issues.

Surface

Preservation FLAP $262,863 Title 23

Lewis and

Clark

County Planned MT-at large

BLM Montana-

Dakotas

Region

MT LEWISCLARK 2016(8) Collins Drive Surface

Preservation 2020 MT

Lewis and Clark

County BLM - North Hills Area

Resurface 1.5 miles of Collins Drive. Apply

gravel and dust palliative. Replace crushed

culverts along the easter road dtich and

located at the intersections of Collins Drive

with Tea and Fantasy Roads.

Surface

Preservation FLAP $267,009 Title 23

Lewis and

Clark

County Planned MT-at large

BLM Montana-

Dakotas

Region

MT LEWISCLARK 208(1) Sun Canyon Road

Resurfacing 2020 MT

Lewis and Clark

County

Lewis and Clark National

Forest

Proposed Work is to resurface 4.9 miles of

the upper Sun Canyon Road with 6 inches of

crushed aggregate surface course with dust

palliative to complete the gravel corridor.

Surface

Preservation FLAP $987,207 Title 23

Lewis and

Clark

County Planned MT-at large

FS Northern -

Region 1

MT MADISON 2015(1) Cliff and Wade Lake Road

Gravel Surface Preservation Project 2020 MT Madison County

Beaverhead-Deerlodge

National Forest

Improve the driving surface of Cliff Lake Rd

(No. 932), Wade Lake Rd (No. 572), and Horn

Creek Rd (No. 122). A total of 13 miles is

proposed. Work includes: aggregate

placement, spot subgrade repair, culvert &

sign installation, & drainage improvements. Rehabilitation FLAP $635,251 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT-at large

FS Northern -

Region 1

MT NPS GLAC 14(4) Rehabilitate Many Glacier Road 2020 MT Glacier County Glacier National Park

Rehabilitate Many Glacier Road inside Glacier

National Park. Reconstruction FLTP-NPS $10,900,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT-at large

NPS

Intermountain

Region

MT PHILLIPS 2015(1) Content Road 2020 MT Phillips County

CMR Wildlife Refuge,

BLM, Army Corps of

Engineers

Reshape the current road to proper crown

and width, and replace several culverts and

cattleguards in the roadway. Regravel the 23

miles with crushed road base gravel. Rehabilitation FLAP $3,055,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned MT-at large

FWS Mountain-

Prairie -

Region 6

Page 28

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

MT PHILLIPS 364(1) Short Oil Road 2020 MT Phillips County

CM Russell Wildlife

Refuge, USACE

Campground, Fort Peck

Lake, BLM

Install an asphalt overlay to protect the

existing road. Reconstruction FLAP $2,496,495 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT-at large

FWS Mountain-

Prairie -

Region 6

MT PRA GLAC 10(30) West Entrance to Avalanche -

Phase 10 2020 MT Flathead County Glacier National Park

This project will rehabilitate Going-to-the-Sun

Road from the West Entrance to Avalanche

Campground. Reconstruction FLTP-NPS $10,000,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Construction MT - at large

NPS

Intermountain

Region

MT PRA GLAC 10(44) Lake McDonald Utility

Relocation 2020 MT Flathead County Glacier National Park

Sewer replacement along Going to the Sun

Road near Lake McDonald. Reconstruction PLHD $6,500,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT - at large

NPS

Intermountain

Region

MT PRA GLAC 14(3) Rehabilitate Many Glacier Road

Slide 2020 MT Glacier County Glacier National Park

Improve the stability of an active landslide on

the Many Glacier Road at MP 6.2. The

stability of the slide will be improved by

lowering the static water table through the

installation of horizontal drains. Reconstruction FLTP-NPS $2,715,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT-at large

NPS

Intermountain

Region

MT BIGHORN 46(1) Warman Loop Road 2021 MT Big Horn County

Bighorn Canyon National

Recreation Area

Improve Warman Loop with new asphalt

overlay on the 4.2 miles of the roadway.

Capital

Improvement FLAP $3,639,218 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design Mt at Large

NPS

Intermountain

Region

MT BROADWATER 2016(1) Goose Bay Road 2021 MT

Broadwater

County Canyon Ferry Reservoir

Proposed work includes regrading Goose Bay

Road, adding a new 6-inch aggregate base

course to the existing road, installing new

culverts, and paving.

Capital

Improvement FLAP $1,501,541 Title 23

Broadwater

County In Design MT-at large

BOR Pacific

Northwest

Region

MT DOT 89(5) Hudson Bay Divide - South 2021 MT Glacier County Glacier National Park

Realignment and reconstruction of 4.82 miles

of primary highway on the Blackfeet Indian

Reservation accessing Glacier National Park. Reconstruction FLAP $5,780,671 Title 23

Montana

Department

of

Transportati

on In Design MT-at large

NPS

Intermountain

Region

MT FLATHEAD 486(1) North Fork of the Flathead

River 2021 MT Flathead County Flathead National Forest

Improve 20.75 miles of North Fork Road,

including aggregate surfacing; road widening;

drainage; slope reinforcement; culvert

replacement; raise road grade in areas;

aggregate surfacing of parking areas; &

signing.

Capital

Improvement FLAP $2,033,202 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned MT-at large

FS Northern -

Region 1

Page 29

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

MT MUSSELSHELL 192(1) Old Divide & S Fattig Creek

Road Surfacing 2021 MT

Musselshell

County

Signal Peak Energy

Federal Coal Lease Area

Conduct a crack seal, chip seal, and striping of

routes of Old Divide Road and a portion of

Fattig Creek Road that service a local coal

mine that is operating, in part, under a

Federal coal lease.

Surface

Preservation FLAP $2,459,875 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT-at large

BLM Montana-

Dakotas

Region

MT NPS GLAC 1041(2) Apgar Loop Reconstruction 2021 MT Flathead County Glacier National Park

This project will rehabilitate the .8 mile

portion of the Apgar Loop Road from the

intersection with the Going-to-the-Sun Road

to the curve where the Loop Road meets the

circle drive and parking leading from the boat

rental concession area. Rehabilitation FLTP-NPS $1,008,036 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT-at large

NPS

Intermountain

Region

MT NPS GLAC 11(3) Camas Road Slump 2021 MT Flathead County Glacier National Park

Rehabilitate 4 miles of Camas Road within

Glacier NP by applying a 3-inch overlay. In

existing areas that have been damaged by

frost heave and the surface is broken up, we

will dig the base out and replace with better

material. Rehabilitation FLTP-NPS $3,459,066 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT-at large

NPS

Intermountain

Region

MT PRA LIBI 10(2) Little Bighorn Battlefield Road 2021 MT Big Horn County

Little Bighorn Battlefield

National Monument

Widen the eixsting 5-mile road that connects

the Custer Battlefield and the Reno-Benteen

Battlefield. The finished route will be 24 feet

wide with two 11-foot travel lanes and 1-foot

shoulders. Reconstruction FLTP-NPS $11,428,125 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT-at large

NPS

Intermountain

Region

MT PRAIRIE 2016(3) Milwaukee Bridge Resurfacing

and Rehabilitation 2021 MT Prairie County Terry Badlands WSA

Rehabilitation of the existing Milwaukee Road

Bridge, including installation of new precast

concrete deck panels and installation of

concrete armor units for scour remediation.

Capital

Improvement FLAP $1,617,050 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned MT-at large

BLM Montana-

Dakotas

Region

MT DAR 2021(1) Defense Access Roads FY 2021 2022 MT

Chouteau

County Not Applicable

The purpose of the improvements is to

maintain the network of county gravel roads

the air force uses to access ICBM sites in a

condition in which they can remain open to

all air force traffic at all times. Maintenance DAR $9,273,100 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT-at large Not Applicable

MT DOT 206(1) Slope Flatten S-206 2022 MT Flathead County Glacier National Park

Widen and overlay 9.4 miles of S-206 (24'' to

36''). There will be several locations of

guardrail placed. Additionally, the inslopes

will be flattened to 6:1 and 4:1 with 6:1 and

4:1 backslopes providing for recoverable

slopes.

Capital

Improvement FLAP $2,310,002 Title 23

Montana

Department

of

Transportati

on In Design MT-at large

NPS

Intermountain

Region

Page 30

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

MT DOT 86(2) Bridger Canyon Road 2022 MT Gallatin County

Custer Gallatin National

Forest

Make improvements at two locations along

Bridger Canyon Road to implement

alternative transportation systems that will

increase the safety and convenience of

accessing federal recreational areas

surrounding Bozeman.

Capital

Improvement FLAP $3,160,955 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned MT-at large

FS Northern -

Region 1

MT FTPECK 2016(4) Yellowstone Road - Fort Peck 2022 MT Valley County Fort Peck Dam

Replacement of culverts and resurfacing of .4

mi existing roadway.

Surface

Preservation FLAP $249,840 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design MT-at large

USACE

Northwestern

Division

MT GRANITE 8686(1) Georgetown Lake Road

Rehabilitation 2022 MT Granite County

Beaverhead-Deerlodge

National Forest

Rehabilitate 3.1 miles of Forest Road No.

8686. Work items include subgrade; roadside

ditches; culvert replacement; aggregate

surfacing; widening from 18' to 24';

improve/construct pullouts; drainage

improvements; & signing.

Capital

Improvement FLAP $1,464,750 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned MT-at large

FS Northern -

Region 1

MT LIBERTY 366(1) Lake Elwell BOR Lands Access 2022 MT Liberty County Lake Elwell

Apply a surface course of crushed aggregate

to MT Hwy 366 from the intersection of MT

Hwy 223 to Tiber Dam including Sanford Park

access road and adjacent vehicle

parking/viewpoint. Narrow MT Hwy 366

surface width to 28 feet.

Surface

Preservation FLAP $1,209,177 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned MT-at large

BOR Great

Plains Region

MT LINCOLN 2016(2) Sophie Lake Road

Reconstruction 2022 MT Lincoln County Kootenai National Forest

Proposed work includes regrading 5.6 mi. of

Sophie Lake Road, adding a new 6" aggregate

base course to the existing road, installation

of one (1) large culvert, realigning a

dangerous section of road, and paving.

Capital

Improvement FLAP $818,000 Title 23

Lincoln

County In Design MT-at large

FS Northern -

Region 1

MT POWDRRIVR 2016(6) Belle Creek Road Surface

Preservation 2022 MT

Powder River

County BLM Oil Field Lease

Shape existing Belle Creek Road for 12.4 miles

from State Highway 59 to State secondary

544 intersection. Haul in state spec material,

apply as base and treat with stabilization

compound. Replace old signs and add new as

needed.

Surface

Preservation FLAP $1,400,100 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned MT-at large

BLM Montana-

Dakotas

Region

MT TETON 109(1) South Fork Teton River Road 2022 MT Teton County

Lewis and Clark National

Forest

Replace bridge, reshape 5 mi. of road, new

gravel surface and stabalize surface (Teton

County''s priority #2 of 2).

Capital

Improvement FLAP $2,789,752 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned MT-at large

FS Northern -

Region 1

MT TETON 144(2) North Fork Teton River Road Chip

Seal 2022 MT Teton County

Lewis and Clark National

Forest

Chip seal 18.2 miles of paved road with

striping (Teton County''s Priority #1 of 2).

Surface

Preservation FLAP $1,197,732 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned MT-at large

FS Northern -

Region 1

Page 31

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

NebraskaNE FTFW FTNI TRAIL(1) FORT FALLS TRAIL 2020 NE Cherry Fort Niobrara NWR Rehabilitate Fort Falls Trail. 3R FTFW $470,000 Title 23 CFLHD Active NE-3 FWS-R6

NE FTFW VALE 13(1) & 100(1) AUTO TOUR RTE #013

& RTE #100 2020 NE Cherry Valentine NWR

Rehabilitate ATR #13 & Pelican Lake Rd.

Rte.#100. 3R FTFW $900,000 Title 23 CFLHD Active NE-3 FWS-R6

NE FLAP 31099(1) MONUMENT PEDESTRIAN - BIKE

LANE 2021 NE Scotts Bluff Scotts Bluff NM

Construction of 2.2 miles of 10ft-wide

pedestrian/bike path from west border of

Scott Bluff NM to U Street, along Old Highway

92 and 5 Rocks Rd. 4R FLAP $500,000 Title 23 CFLHD Active NE-3 NPS-MWR

FW-BOYE 10(1), 11(1) 2021 NE Washington Boyer Chute NWR Rehab Auto Tour Route 3RL FLTP $990,000 Title 23 EFLHD Planned NE-1 FWS

Nevada

NV FLAP 300(1) FOSSIL HOUSE ROAD 2020 NV Nye Humboldt-Toiyabe NF

Road widening and improvements to 0.21

miles of Fossil House Road. 4R FLAP $850,000 Title 23 CFLHD Active NV-4 FS-R4

NV FLAP 39(1) KINGS CANYON ROAD 2020 NV Carson City Humboldt-Toiyabe NF

Reconstruct .73 miles of road and new

parking lot at trailhead. BR3R FLAP $2,660,000 Title 23 CFLHD Active NV-2 FS-R4

NV FLAP US50(1) ROUND HILL PINES ACCESS AND

MULTIMODAL 2020 NV Douglas

Lake Tahoe Basin

Management Unit

Construct new parking facility and improve

ingress and egress on US 50 at Round Hill

Pines. Safety improvements including multi-

modal opportunities. Other FLAP $5,100,000 Title 23 CFLHD Active NV-2 FS-R5

NV FLAP US93(1) PAHRANAGAT NWR ACCESS 2020 NV Lincoln Pahranagat NWR

Construct new accel and decel lanes on US 93

to access Pahranagat NWR. Other FLAP $10,830,000 Title 23 CFLHD Active NV-4 FWS-R8

NV FTBR HOOVER DAM SAFETY(1) GUARDRAIL

IMPROVEMENTS 2020 NV Clark Hoover Dam Guardrail Safety Improvements Other FTBR $600,000 Title 23 CFLHD Not Started NV-3 BOR-LC

NV FTNP LAKE 237(2) COTTONWOOD COVE ACCESS

ROAD 2020 NV Clark Lake Mead NRA

Reconstruct Cottonwood Cove Access Road at

Lake Mead. 4R FTNP $11,248,640 Title 23 CFLHD Active NV-3 NPS-PWR

NV NPS LAKE 1035C(1) HISTORIC RAILROAD TUNNEL

REPAIRS 2020 NV Clark Lake Mead NRA

Repairs of Tunnel 3 at Lake Mead Historic

Railroad Trail. Other NPS Title 23 CFLHD Active NV-3 NPS-PWR

NV FLAP 400(1) LOGANDALE TRAILS ACCESS ROAD 2021 NV Clark Las Vegas Field Office

Reconstruct and pave 3.25 miles of Logandale

Trails Access Road. 3R4R FLAP $4,600,000 Title 23 CFLHD Active NV-4 BLM-NV

NV FLAP 500(1) RED ROCK TRAIL 2021 NV Clark Las Vegas Field Office

Construct paved multi-use trail from

Summerlin to Red Rock Visitor Center. Other FLAP $6,900,000 Title 23 CFLHD Active NV-3 BLM-NV

NV FTFW STIL 104(1) VARIOUS ROUTES 2022 NV Churchill Stillwater NWR

Rehabilitate various roads within Stillwater

NWR 3R FTFW $1,200,000 Title 23 CFLHD Shelved NV-4 FWS-R8

NV NPS PP LAKE 2019(1) Pavement Preservation

Lake Mead Phase 2 2020 NV Clark County National Park Service

This project provides for cyclic pavement

preservation by chip sealing or micro

surfacing all routes in the Southern half of the

park: Willow Beach; Temple Bar; Katherine

Landing; and, Cottonwood Cove. Rehabilitation FLTP-NPS $7,500,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design NV-01

NPS Pacific-

West Region

NV FTFS LAMOILLE CANYON PAVEMENT

PRESERVATION 2021 NV Elko Humboldt-Toiyabe NF Roadway surface preservation 3R FTFS $650,000 Title 23 FS-R4 Not Started NV-2 FS-R4

New Hampshire

NH_FLAP_DOT_SLR(1) 2019 NH Grafton

USFS - White Mountain

National Forest

Roadway grading, placing aggregate and

drainage improvements along Stinson Lake

Road. 3RL FLAP $343,000 Title 23 STATE

Under

Construction NH-01 USFS

SO FW UMBA 103(1) 2019 NH Coos

Umbagog National

Wildlife Refuge

Potter Farm Road Realignment and Box

Culvert. 4R FLTP $300,000 Title 23 FWS Planned NH-02 FWS

NH_FLAP_DOT_16(1) 2020 NH Coos

FWS / Umbagog National

Wildlife Refuge

Rehabilitate Route 16 through Umbagog

National Wildlife Refuge. LSR_3RL FLAP $539,600 Title 23 STATE In Design NH-02 FWS

Page 32

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

NH_FLAP_STTB_TRL(1) 2020 NH Coos

FWS / Silvio O. Conte

National Fish and

Wildlife Refuge

Rehabilitate the Presidential Range

Recreational Trail with a new surface and

improve drainage MISC FLAP $88,240 Title 23 STATE Planned NH-02 FWS

FW-UMBA 906(1) Steamer Diamond 2021 NH Coos Umbagog NWR Parking area, trail, structures MISC FLTP $650,000 Title 23 FWS Planned NH-02 FWS

FW NASH 10(1) 2021 NH Hillsborough

Nashua National Fish

Hatchery

Patch and resurface Entrance Road and

Parking 3RL FLTP $300,000 Title 23 EFLHD Planned NH-01 FWS

New Jersey

SO NP DEWA(2) 2019 NJ Sussex

Delaware Water Gap

NRA South Old Mine Road (Rte 10) Heavy 3R. 3RH FLTP $2,832,000 Title 23 NPS In Design NJ-05 NPS

SO NP GATE(4) 2019 NJ Monmouth

Gateway National

Recreation Area

Pavement Rehab. Altlantic Drive and various

routes Sandy Hook Unit 3RL FLTP $146,000 Title 23 NPS In Design NJ-06 NPS

FW EDFO 104(1) 906(1) 2020 NJ Atlantic

Edwin B. Forsythe

National Wildlife Refuge

Reconstruct Scotts Landing Road (Route 104)

& Parking Lot (Route 906). 3RH FLTP $530,000 Title 23 EFLHD In Design NJ-02 FWS

NJ FLAP LHT RD(1) 2020 NJ Morris

Fish and Wildlife/ Great

Swamp National Wildlife

Refuge

Mill 2'' of existing HMA on Pleasant Plains

Roads and resurface it. 3RL FLAP $350,000 Title 23 EFLHD In Acquisitions NJ-07 FWS

SO NP DEWA(3) 2020 NJ North Hampton

Delaware Water Gap

NRA Old Mine Road North 3RL FLTP $1,500,000 Title 23 NPS In Design NJ-07 NPS

NJ FLAP WARI PVRTRL(1) 2021 NJ Sussex

USFWS/Wallkill River

National Wildlife Refuge Rehabilitate Papakating Valley Rail Trail. MISC FLAP $1,188,000 Title 23 EFLHD Planned NJ-05 FWS

NJ FLTP NP DEWA(4) 2021 NJ Warren

Delaware Water Gap

NRA Old Mine Road South MP 0-3. 3RH FLTP $2,900,000 Title 23 NPS In Design NJ-05 NPS

NJ_FLAP_GALWY_SCOTT(1) 2021 NJ Atlantic

USFWS, Edwin B.

Forsythe National

Wildlife Refuge

Preapring for widening and grading Scott's

Landing Road. MISC FLAP $153,847 Title 23 LOCAL Planned NJ-02 FWS

NJ FLTP NP DEWA(7) 2023 NJ Warren

Delaware Water Gap

NRA Old Mine Road South MP 3-5.92. 3RH FLTP $3,200,000 Title 23 NPS In Design NJ-05 NPS

NJ FLTP NP DEWA(8) 2023 NJ Sussex

Delaware Water Gap

NRA NPS Rt 615 and Route 209. 3RH FLTP $3,800,000 Title 23 NPS Planned NJ-05 NPS

New Mexico

NM DAR MAFR AV(1) N ROOSEVELT ROAD AV 2020 NM Roosevelt Melrose Air Force Range

Repave and reconstruct N. Roosevelt Road

AV. CFL project starts South of existing

Railroad and ends at the gate to Melrose

Range. 3R4R DAR $4,800,000 Title 23 CFLHD Active NM-2

NM FLAP 159(1) CATWALK ACCESS ROAD 2020 NM Catron Gila NF

Reconstruct and rehabilitate 4.78 miles of

NM 174. 3R4R FLAP $7,800,000 Title 23 CFLHD Active NM-2 FS-R3

NM FLAP NM152(1) NM 152 BRIDGES 2020 NM Various Gila NF Bridge Replacement BR FLAP $4,753,000 Title 23 CFLHD Shelved NM-2 FS-R3

NM FTBL 2004(1) WILD RIVERS ROAD 2020 NM Taos Taos Field Office

Shoulder widening, chip seal, guardrail for

18.5 Mi.; New detached bike path;

Rehabilitate two parking areas. 3R4R FTBL $16,000,000 Title 23 CFLHD Active NM-3 BLM-NM

NM FTFW RIMO 10(1) ENTRANCE ROAD AND

PARKING AREAS 2020 NM Mora Rio Mora NWR

Rehabilitate 2.09 mi. Entrance Road and

3,800 SY parking areas. 3R FTFW $2,500,000 Title 23 CFLHD Active NM-3 FWS-R2

NM FLAP SIE 10(1) LAKESHORE ROAD 2021 NM Sierra Elephant Butte Reservoir

Drainage improvements, culvert repair, and

bridge replacement on Lakeshore Road. 4RBR FLAP $5,800,000 Title 23 CFLHD Active NM-2 BOR

NM FTFW LAVE 10(1) ENTRANCE ROAD AND VISITOR

PARKING 2021 NM San Miguel Las Vegas NWR Rehabilitate Entrance Road and parking lot. 3R FTFW $750,000 Title 23 CFLHD Active NM-3 FWS-R2

Page 33

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

NM FLAP SJU 10(1) COTTONWOOD CAMPGROUND

BRIDGE 2022 NM San Juan Navajo Reservoir

Construction of a bridge at Cottonwood

Campground, replacing a low water crossing. 4RBR FLAP $1,950,000 Title 23 CFLHD Active NM-3 BOR

NM FLAP TAO B007(1) JOHN DUNN BRIDGES 2022 NM Taos Taos Field Office

Replace Bridge #3807 and repair Bridge

#5243 on County Road CB-007 4RBR FLAP $2,200,000 Title 23 CFLHD Active NM-3 BLM-NM

NM FLAP TAO CB110(1) VETERANS MEMORIAL

ROAD 2022 NM Taos Taos Field Office

Rehabilitation of 2 miles of County Road CB-

110. 3R FLAP $1,550,000 Title 23 CFLHD Active NM-3 BLM-NM

NM FTFS 233(1) TULAROSA AOP IMPROVEMENTS 2022 NM Catron Gila NF

Improve Tularosa low-water crossing on NFSR

233 3R FTFS $450,000 Title 23 CFLHD Not Started NM-2 FS-R3

NM FLAP CHA TR(1) PECOS VALLEY TRAIL 2023 NM Chaves Bitter Lake NWR

Construct three trails and bike lanes that

would Connect City of Roswell and City of

Dexter with Bitter Lake NWR and Bottomless

Lake State Park 4R FLAP $3,800,000 Title 23 CFLHD Active NM-2 FWS-R2

NM FLAP TRAIL52000(2) 2ND STREET SW CORRIDOR

PHASE 2 2023 NM Bernalillo Valle de Oro NWR

Roadway reconstruction of 1.7 miles

accessing the Valle de Oro NWR. Project

includes construction of sidewalks and

pedestrian bridge. 3R4R FLAP $2,250,000 Title 23 CFLHD Not Started NM-1 FWS-R2

NM FTFS 333(2) JUAN TABO AND LA LUZ ACCESS

ROAD 2022 NM Bernalillo Cibola NF

Phase II involves sight distance improvements

and pavement preservation 3R FTFS $245,000 Title 23 FS-R3 Not Started NM-1 FS-R3

New York

FIIS Watch Hill Marina GFI 2019 NY Suffolk

Fire Island National

Seashore

Installation of individual Ground Fault

Protected Breakers at each electrical

pedestal, Watch Hill M MISC NPS $300,000 Title 23 EFLHD

Under

Construction NY-02 NPS

NY_FLAP_BROOME_PARK(1) 2019 NY Broome

USACE, Whitney Point

Lake

Rehabilitate Bridge, Reconstruct park road,

install sidewalk for pedestrian improvements. BRRP FLAP $450,500 Title 23 LOCAL

Under

Construction NY-22 USACE

SO NP GATE(3) 2019 NY Richmond

Gateway National

Recreation Area

Pavement Rehab. Miller Field Access Road

and various Routes. 3RL FLTP $225,000 Title 23 NPS In Design NJ-11 NPS

Shawangunk Grasslands NWR 2008867420 2020 NY Orange

Shawangunk Grasslands

NWR Resurfacing Entrance Road and parking area 3RL FLTP $50,000 Title 23 FWS

Under

Construction NY-18 FWS

FIIS Burma Route 2020 NY Suffolk

Fire Island National

Seashore

Reconstruct a section of the “Burma Route”

for emergency travel between Lighthouse

Checkpoint and Ki 3RH REIMB $800,000 Other EFLHD In Design NY-02 NPS

NY_FLAP_NYC_BKTRL(1) 2020 NY Kings

(NPS), Gateway National

Recreation Area

Construct the missing segment of existing

NYC Bike Network & the NPS Canarsie Pier in

Kings County. MISC FLAP $530,000 Title 23 STATE In Design NY-11 NPS

Wertheim NWR 2015260169 2021 NY Suffolk Wertheim NWR Analysis & purchase of tram vehicle Study FLTP $40,000 Title 23 FWS Planned NY-01 FWS

NP GATE 205(1) 901(1) 2021 NY Kings

Gateway National

Recreation Area

Heavy 3R Riding Academy Access Rd and

Gateway Sports Parking (JBU) 3RH FLTP $1,000,000 Title 23 EFLHD Planned NY-01 NPS

NY FLTP NP GATE(6) 2021 NY Queens

Gateway National

Recreation Area Fort Tilden Theater Parking. 3RH_3RL FLTP $3,200,000 Title 23 NPS In Design NY-05 NPS

NY FLTP NP SARA(1) 2021 NY Saratoga

Saratoga National

Hstorical Park Entrance Road 2R FLTP $1,300,000 Title 23 NPS In Design NY-21 NPS

NY_FLAP_DOT_63(1) 2021 NY

Genesee and

Orleans

FWS-Iroquois National

Wildlife Refuge

Pavement overlay of 2.0 miles of

roadway/parking access, replace 15 ft. span

concrete culvert 3RL FLAP $1,980,000 Title 23 EFLHD In Design NY-27 FWS

NY FLTP NP SARA(2) 2022 NY Saratoga

Saratoga National

Hstorical Park Tour Road 2R FLTP $1,000,000 Title 23 NPS In Design NY-21 NPS

North Carolina

Page 34

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

NP BLRI 2F26 2018 NC Watauga Blue Ridge Pkwy Slide repair MP 277 LSR FLTP $750,000 Title 23 EFLHD

Under

Construction NC-05 NPS

BLRI_BMS_FY19(1) 2019 NC Various Blue Ridge Parkway FY19 Bridge Preventive Maintenance at BLRI BRRH FLTP $500,000 Title 23 EFLHD In Acquisitions _VARIOUS NPS

NC FLAP DOT 1395(1) 2019 NC Haywood

Forest Service/ Pisgah

National Forest

Construction of soil nail retaining wall on SR

1395 Cove Creek Road. RW FLAP $490,000 Title 23 STATE Planned NC-11 USFS

NC FLAP DOT 276(1) 2019 NC Transylvania

Forest Service/ Pisgah

National Forest

Roadway widening & installing turn lanes

from US 64 to Avery Creek Trail head. MISC FLAP $1,940,000 Title 23 STATE Planned NC-11 USFS

NC_ERFO_FS_2016-1(1) 2019 NC Various FS Region 8 Southern

ERFO repairs in Nantahala and Pisgah

National Forests. 3RH_LSR_BRRP ERFO $1,604,300 Title 23 EFLHD In Design NC-11 USFS

NP BLRI 2H16 2019 NC Avery Blue Ridge Pkwy

Linn Cove Viaduct post-tensioning repair

project BRRC FLTP $900,000 Title 23 EFLHD In Acquisitions NC-05 NPS

NP_BLRI_PVT_PRES_FY18 2019 NC TBD Blue Ridge Parkway

Pavement Preservation work at Blue Ridge

for FY18. 2R FLTP $4,500,000 Title 23 EFLHD

Under

Construction _VARIOUS NPS

NP_GRSM_116(1) 2019 NC Swain

Great Smoky Mountains

National Park Overlay of Deep Creek Area Roads. 2R FLTP $468,000 Title 23 EFLHD In Acquisitions NC-02 NPS

SO NP CALO(1) 2019 NC Carteret

Cape Lookout National

Seashore, NC

Design Build replacement of the lighthouse

ferry docks at Cape Lookout National

Seashore. MISC FLTP $1,724,120 Title 23 NPS In Acquisitions NC-03 NPS

VA_ERFO_FW_GRDI_2017-1(1) 2019 NC Gates

Great Dismal Swamp

National Wildlife Refuge

Remove obstructions, repair embankment on

Weyerhaeuser Ditch Road. 3RH ERFO $190,000 Title 23 EFLHD Planned NC-03 FWS

NC_ST_BLRI_I26 2019 NC Buncombe Blue Ridge Parkway

Prelim Design of Blue Ridge Pkway Bridge

over Interstate 26 BRRP REIMB $2,275,000 Title 23 EFLHD In Design NC-11 NPS

FW_ALRI_10(4) 2020 NC Dare

Alligator River National

Wildlife Refuge

Rehabilitate Milltail Bridge and Milltail Road

(Route 10). Length = 0.83 mile. BRRH FLTP $1,315,000 Title 23 EFLHD In Acquisitions NC-03 FWS

NP BLRI 2F27 2020 NC Watauga Blue Ridge Pkwy

BLRI MP 277 and MP 323 Cut Slope Slide

Repairs LSR FLTP $1,000,000 Title 23 EFLHD In Design NC-05 NPS

NP BLRI 2F28 2020 NC Watauga Blue Ridge Pkwy BLRI MP 277 Landslide – Fill Slope LSR FLTP $1,000,000 Title 23 EFLHD Planned NC-05 NPS

NP BLRI NSFLTP 2020 NC Various Blue Ridge Parkway

Rehabilitation work on Blue Ridge Parkway

MP 229 to MP 304 3RH FLTP ########## Title 23 EFLHD Planned _VARIOUS NPS

NP BLRI PVT PRES Asheville 2020 NC Various Blue Ridge Parkway

Pavement preservation (ultra-thin lift asphalt

overlay) BLRI MP 365.5 Craggy Flats Tunnel to

MP 388. 2R FLTP $4,000,000 Title 23 EFLHD In Design NC-10 NPS

NP_BLRI_PVT_PRES_FY21 2021 NC TBD Blue Ridge Parkway

Pavement Preservation work at Blue Ridge

for FY21. 2R FLTP $5,000,000 Title 23 EFLHD Planned _VARIOUS NPS

BLRI_2J17 2021 NC Avery Blue Ridge Parkway Rehab Linville River Bridge Section 2J BRRH FLTP $1,440,000 Title 23 EFLHD In Design NC-11 NPS

NP_BLRI_2D17 2021 NC Ashe Blue Ridge Parkway

Repair and Reconstruct Laurel Fork Bridge

5140-159P. BRRC FLTP $15,000,000 Title 23 EFLHD In Design NC-08 NPS

NP_BLRI_PVT_PRES_FY20 2021 NC TBD Blue Ridge Parkway

Pavement Preservation work at Blue Ridge

for FY20. 2R FLTP $3,000,000 Title 23 EFLHD Planned NC-08 NPS

NP_BLRI_PVT_PRES_FY22 2022 NC TBD Blue Ridge Parkway

Pavement Preservation work at Blue Ridge

for FY22. 2R FLTP $5,000,000 Title 23 EFLHD Planned _VARIOUS NPS

NP GRSM PMS(1) 2022 NC Cherokee

Great Smoky Mountains

National Park

Pavement Preservation of Heintooga Ridge

Road and Balsam Mountain campground RT

107 2R FLTP $1,332,220 Title 23 EFLHD Planned NC-11 NPS

Page 35

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

NP_BLRI_2M25_2N20 2022 NC Various

Blue Ridge Parkway

National Park

Repave repair Mainline road section MP

336.39 to 359.39 3RH_3RL FLTP $12,594,036 Title 23 EFLHD Planned NC-08 NPS

BLRI_2A16 2023 NC Alleghany Blue Ridge Parkway

Repair 3 Bridges -Str. #080P; Str. #077P; &

Str. #081P BRRP FLTP $2,700,000 Title 23 EFLHD Planned NC-09 NPS

NP_GRSM_17(2) 2023 NC Swain

Great Smoky Mountains

National Park

Repave Lake View Road East and repair

Noland Creek Bridge 3RL_BRRP FLTP $4,000,000 Title 23 EFLHD Planned NC-11 NPS

North Dakota

ND FTNP THRO 11(10) SOUTH UNIT SCENIC LOOP

SLIDE REPAIR 2020 ND Billings Theodore Roosevelt NP

Constructed Drainage System, Remove

Culverts and Repair Frost Heaves at Cedar

Pass. SPOT FTNP $2,000,000 Title 23 CFLHD Active ND-1 NPS-MWR

ND FLAP 136(1) & 145(1) TEWAUKON STRUCTURES 2021 ND Sargent Tewaukon NWR

Replacement of two bridges on Tewaukon

and Sprague Lake access roads. SPOT FLAP $1,100,000 Title 23 CFLHD On Hold ND-1 FWS-R6

ND FTFW CLSA 12(4) AUTO TOUR ROUTE 2021 ND McHenry J Clark Salyer NWR Rehabilitate gravel Auto Tour Route 12. 3R FTFW $1,300,000 Title 23 CFLHD Not Started ND-1 FWS-R6

ND FLAP 704(1) & 795(1) MAGPIE AND WHITETAIL

CROSSINGS 2022 ND Billings Little Missouri NG

Construction of box culverts on Magpie and

Whitetail access roads. SPOT FLAP $1,500,000 Title 23 CFLHD On Hold ND-1 FS-R2

ND FTFW DESL 11(4) AUTO TOUR ROUTE 2022 ND Ward Des Lacs NWR Rehabilitate Auto Tour Route 11. 3R FTFW $700,000 Title 23 CFLHD Not Started ND-1 FWS-R6

ND FTFW AUDU VARIOUS ROUTES ROUTES 011, 012,

105 2023 ND McLean Audubon NWR

Rehabilitate routes 11, 12, and 105 at

Audubon NWR 3R FTFW $1,300,000 Title 23 CFLHD Not Started ND-1 FWS-R6

ND Tewaukon Auto Tour Route Resurfacing 2020 ND Sargent Tewaukon NWR Repair Prairie Auto Tour Route 13 3R FTFW $150,000 Title 23 FWS-R6 Not Started ND-1 FWS-R6

Ohio

OH FLAP DOT 73(2) 2019 OH Warren

USACE Caesar’s Creek

Reservoir

Rehabilitate bridge WAR-73-1818 L/R over

Caesar's Creek. BRRH FLAP $350,600 Title 23 STATE

Under

Construction OH-01 USACE

OH FLAP SUMMIT STDY(1) 2019 OH Summit

National Park Service/

Cuyahoga Valley National

Park Rehabilitation of Boston Mills Road. MISC FLAP $233,200 Title 23 LOCAL In Design OH-13 NPS

OH_FLAP_BNTN_44(1) 2019 OH Ottawa

USFWS - Ottawa National

Wildlife Refuge

Reconstruction, widening, and drainage

improvements of 1300 feet of Lindsey-

Limestone Road. 3RL FLAP $129,057 Title 23 STATE

Under

Construction OH-05 FWS

OH_FLAP_BNTN_76(1) 2019 OH Ottawa

USFWS - Ottawa National

Wildlife Refuge

Resurfacing, widening, and drainage

improvements to Krause Road (approx. 1

mile). 3RL FLAP $342,283 Title 23 LOCAL

Under

Construction OH-05 FWS

OH_FLAP_JRSLM_211(1) 2019 OH Lucas

USFWS - Ottawa National

Wildlife Refuge

Resurface Bono Road, Metzger Marsh Road

and 2 parking areas in Lucas County, OH. 3RL FLAP $212,400 Title 23 LOCAL

Under

Construction OH-09 FWS

SO NP CUVA CVNP 2019 OH Brecksville

Cuyahoga Valley National

Park

Complete Design & Compliance of CVNP

Pedestrian Bridge at Boston Mill Visitor

Center MISC FLTP $186,780 Title 23 NPS In Design OH-14 NPS

SO NP CUVA(1) 2019 OH Brecksville

Cuyahoga Valley National

Park Construction of Railway Pedestrian Crossing 3RH_NEW FLTP $361,000 Title 23 NPS

Under

Construction OH-11 NPS

NP CUVA 6160-001T 2020 OH

Summit &

Cuyahoga

Cuyahoga Valley National

Park

Repair/rehab. of Station Road Bridge over

Cuyahoga River. Struc. #6160-001T. BRRH REIMB $740,000 Title 23 EFLHD In Design OH-11 NPS

OH FLAP DOT 73(1) 2020 OH Warren

USACE Caesar’s Creek

Reservoir

Rehabilitate SR 73 to include safety and

guardrail improvements. 3RL FLAP $95,110 Title 23 STATE In Design OH-01 USACE

OH_FLAP_SUMMIT_32(2) 2021 OH Summit

NPS - Cuyahoga Valley

National Park

Widen Boston Mills Road to 30 feet, with 11

ft lanes and 4 ft paved shoulders on both

sides. 3RL FLAP $306,000 Title 23 LOCAL In Design OH-13 NPS

Oklahoma

Page 36

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA RegionOK ERFO RS KERR 10301(1) POWERHOUSE PARKING

LOT 2020 OK Le Flore

Robert S. Kerr Lock and

Dam Damage Repair at Powerhouse Parking Lot ERFO ERFO $750,000 Title 23 CFLHD Active OK-2 USACE-SW

OK ERFO SEQU T500(1) HORTON SLOUGH TRAIL 2020 OK Sequoyah Sequoyah NWR Trail and trail bridge repair ERFO ERFO $550,000 Title 23 CFLHD Active OK-2 FWS-R2

OK FLAP 5407(1) BLACKGUM LANDING ROAD 2021 OK Sequoyah Tenkiller Lake Repave 1.75 miles of Blackgum Landing Road 3R FLAP $2,150,000 Title 23 CFLHD Shelved OK-2 USACE-SW

OK FTNP CHIC 100(TBD) BUCKHORN ROAD 2021 OK Murray Chickasaw NRA

Rehabilitation RT 100 Cedar Blue Entrance RD

to Buckhorn Rd. 3R FTNP $366,699 Title 23 CFLHD Not Started OK-4 NPS-IMR

OK FTFW WIMO 14(1) MEERS ROAD (SH115) BIKE

TRAIL 2023 OK Comanche Wichita Mountains NWR

Construct a 1.87 mi. bike trail along Meers

Rd. 4R FTFW $700,000 Title 23 CFLHD Not Started OK-4 FWS-R2

Oregon

OR BENTON 482(1) South Fork Road Comprehensive

Corridor Plan 2020 OR Benton County

Marys Peak Resrouce

Area

Develop a comprehensive and cohesive plan

for private and commercial use of the road,

including roadway capacity improvements,

pull-outs, way finding, parking, and

recreation site improvements. Planning FLAP $197,000 Title 23

Oregon

Cascades

West

Council of

Governmen

ts In Design OR-04

BLM Oregon-

Washington

Region

OR BOR CCAO 2018(1) Haystack Reservoir Paving 2020 OR

Jefferson

County Haystack Reservoir

This project is to pave and stripe current

gravel roads within the Haystack Reservoir

recreational area, and to repave existing

paved parking lot and boat ramp. Rehabilitation FLTP-BOR $624,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned OR-02

BOR Pacific

Northwest

Region

OR CLACK 2639(1) East Salmon River Road Surface

Preservation 2020 OR

Clackamas

County Mt Hood National Forest

Apply a 2 inch asphalt overlay on 2.03 miles

of roadway extending from US26 to the edge

of the Mt. Hood National Forest and the

Salmon Huckleberry Wilderness. The work

will include guardrail adjustments and

striping. Rehabilitation FLAP $493,099 Title 23

Clackamas

County In Design OR-03

FS Pacific

Northwest -

Region 6

OR CLACK 37005(2) Lolo Pass Road Stabilization and

Surface Preservation 2020 OR

Clackamas

County Mt Hood National Forest

Stabilize and improve Lolo Pass Road by

extending an already existing revetment and

also by improving and preserving the road

surface with the addition of 2 inches of

pavement. Reconstruction FLAP $4,052,403 Title 23

Clackamas

County In Design OR-03

FS Pacific

Northwest -

Region 6

OR COTTAGE GROVE LAKE Cottage Grove Lake - Pine

Meadows Campground 2020 OR Lane County

Pine Meadows

Campground

Reconstruct subsurface in areas along the

road and parking lots of the Pine Meadows

Campground and overlay road. Rehabilitation FLTP-USACE $479,000 Title 23

Northweste

rn Division In Design OR-04

USACE

Northwestern

Division

OR DOT 140(1) OR 140 - Klamath County Boat

Marina to Lakeshore Drive 2020 OR Klamath County

Fremont-Winema

National Forest

Perform preliminary engineering, design and

acquire right of way for corridor from MP ~57

to MP ~63. Construction includes the

construction of the entire corridor. Reconstruction FLAP $22,217,741 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-02

FS Pacific

Northwest -

Region 6

OR DOT 204(1) Weston-Elgin Highway Resurfacing 2020 OR Union County Umatilla National Forest

Resurface the highway with a grind/inlay.

Also overlay the Sno-Parks in the project

limits. Rehabilitation FLAP $8,241,922 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-02

FS Pacific

Northwest -

Region 6

Page 37

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

OR DOT 26(1) Mt. Hood Mountain Express Transit

Service Expansion 2020 OR

Clackamas

County Mt Hood National Forest

Decrease congestion on US 26/OR 173 to the

ski areas and other recreation attractors

around Mt. Hood. Operations FLAP $4,230,865 Title 23

Clackamas

County Planned OR-05

FS Pacific

Northwest -

Region 6

OR DOT 26(3) Mt. Hood City of Sandy Transit Service

Expansion 2020 OR

Clackamas

County Mt Hood National Forest

Decrease congestion on US 26/OR 173 to the

ski areas and other recreation attractors

around Mt. Hood. Operations FLAP $439,872 Title 23

City of

Sandy Planned OR-05

FS Pacific

Northwest -

Region 6

OR DOT 9(1) US101: Moolack Landslide Repair MP

135.7-136.31 2020 OR Lincoln County Not Applicable Mitigate the slide area and repair US101. Reconstruction OTHER $2,082,100 Title 23

Oregon

Department

of

Transportati

on In Design OR-05 Not Applicable

OR DOT 97(1) US 97 - South Century Drive to USFS

Boundary 2020 OR

Deschutes

County

Deschutes National

Forest

Construct and improve the

Vandevert/Lambertiana (FS 9720) and US 97

Intersection to increase safety and traffic

mobility. Reconstruction FLAP $14,102,774 Title 23

Oregon

Department

of

Transportati

on In Design OR-02

FS Pacific

Northwest -

Region 6

OR DOT CRGNSA 100(4) Historic Columbia River

Highway State Trail, Mitchell Point Crossing 2020 OR

Hood River

County

Columbia River Gorge

National Scenic Area

Develop plans for the Historic Columbia River

Highway State Trail from Viento State Park to

the City of Hood River, and construct the trail

segment between Perham Creek Bridge and

Mitchell Point crossing. Construction FLAP $31,454,838 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-02

FS Pacific

Northwest -

Region 6

OR DOT CRGNSA 100(5) Historic Columbia River

Highway, Oneonta Tunnel Rehabilitation 2020 OR

Multnomah

County

Columbia River Gorge

National Scenic Area

Restore fire-damaged elements of Oneonta

Tunnel and surrounding facilities. Rehabilitation OTHER $2,320,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-03

FS Pacific

Northwest -

Region 6

OR FS MTH 46(1) 46 Road Pavement Preservation 2020 OR

Clackamas

County Mt. Hood National Forest

Patching, crack sealing, slurry seal, clearing,

ditch reconditioning. Rehabilitation FLTP-USFS $300,000 Title 23

Mt Hood

National

Forest In Design OR-05

FS Pacific

Northwest -

Region 6

OR FS WAW 51(1) Trail Creek Bridge 2020 OR Wallowa County

Wallowa-Whitman

National Forest

Replace culvert with a single-span

prestressed concrete bridge. Reconstruction FLTP-USFS $645,000 Title 23

Wallowa

Whitman

National

Forest In Design OR-02

FS Pacific

Northwest -

Region 6

OR FS WIL T 126(1) McKenzie River Trail Bridge and

Safety Railing 2020 OR Linn County

Willamette National

Forest

Replace wooden safety rails on the McKenzie

River Trail and Trail Bridge. Rehabilitation FLTP-USFS $257,000 Title 23

Willamette

National

Forest In Design OR-04

FS Pacific

Northwest -

Region 6

OR FWS ANK 13588(1) Ankeny Hill Nature Center

Access 2020 OR Marion County

Ankeny National Wildlife

Refuge

The purpose of this project is to design and

construct the necessary site developments

needed to support the Ankeny Hill Nature

Center. Construction FLTP-FWS $1,890,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-05

FWS Pacific -

Region 1

OR FWS BKS 2016(1) Baskett Slough Headquarters

Access Design 2020 OR Polk County

Baskett Slough Natonal

Wildlife Refuge

Complete Preliminary Engineering to relocate

entrance to Baskett Slough NWR from

Oregon Route 22, including the addition of a

right and left auxillary turn lane. Work

includes NEPA Decision and completion of

Design. Reconstruction FLAP $2,965,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR 5th

FWS Pacific -

Region 1

Page 38

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

OR FWS MAL 2019(1) Malheur NWR East Canal

Bridge 2020 OR Malheur County

Malheur National

Wildlife Refuge

Replace East Canal bridge at the Malheur

National Wildlife Refuge. Construction FLTP-FWS $125,000 Title 23

Malheur

National

Wildlife

Refuge In Design OR-02

FWS Pacific -

Region 1

OR HARNEY 127(1) Hines Logging Road Overlay 2020 OR Harney County

Three Rivers Resource

Area, Malheur National

Forest, Ochoco National

Forest

Broom the existing surface and overlaying

with 2" of asphalt. Rehabilitation FLAP $1,919,206 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR 2nd

BLM Oregon-

Washington

Region

OR LANE 5070(1) North Fork Siuslaw Landslide

Repair 2020 OR Lane County Siuslaw National Forest

Complete PE for the repair and stabilization

of an unstable, 300-foot long section uphill of

North Fork Siuslaw Road. Reconstruction FLAP $334,336 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-04

FS Pacific

Northwest -

Region 6

OR MARION 2016(1) North Fork and Gates Hill Road

Chip Seal 2020 OR Marion County

Willamette National

Forest, Cascades

Resource Area

Construct a double chip seal on North Fork

and Gates Hill Roads. Rehabilitation FLAP $1,456,275 Title 23

Marion

County In Design OR-05

FS Pacific

Northwest -

Region 6

OR MARION 960(1) North Fork Road Slide

Stabilization 2020 OR Marion County

Willamette National

Forest

Restoring the three distinct areas that are

experiencing recurring landslide and stability

problems within a 0.6 mile section of North

Fork Road SE, or a portion thereof. Construction FLAP $7,322,810 Title 23

Marion

County In Design OR-05

FS Pacific

Northwest -

Region 6

OR NPS CRLA 2018(1) Cleetwood Trail and Marina

Improvements 2020 OR Klamath County Crater Lake National Park

This project includes reconstruction of the

Cleetwood Cove Trail marine access facility,

rock scaling of the Cleetwood trail area, and

reconditioning of the Cleetwood Cove Trail. Rehabilitation FLTP-NPS $4,640,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-02

NPS Pacific-

West Region

OR PRA CRLA 14(1) Rehabilitate West Rim Drive and

East Rim Drive 2020 OR Klamath County Crater Lake National Park

Rehabilitate West Rim Drive and East Rim

Drive. Reconstruction FLTP-NPS $21,146,644 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Construction OR-02

NPS Pacific-

West Region

OR TILLAMOOK B780(1) Cape Meares Road

Relocation 2020 OR

Tillamook

County

Cape Meares National

Wildlife Refuge

Relocate a county road accessing Federal

Lands that is currently closed because of a

landslide. Reconstruction FLAP $18,396,996 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-05

FWS Pacific -

Region 1

OR BLM NWO 1516291(1) Yaquina Head 2021 OR Lincoln County Yaquina Head

Reconstuct fee booths, entrance, and parking

lot, preserve 1.2 mi asphalt road. Rehabilitation FLTP-BLM $1,175,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned OR-05

BLM Oregon-

Washingon

Region

Page 39

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

OR BPRD T 372(1) Bend Haul Road Trail

Improvements 2021 OR

Deschutes

County

Deschutes National

Forest

Reconstruct the original 2 mile stretch of the

Haul Road Trail. Improvements include

reconstruction of existing pavement, base,

safety improvements at intersections, paving

of unpaved segments, and ADA Compliance. Reconstruction FLAP $2,252,029 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-02

FS Pacific

Northwest -

Region 6

OR DOT 18(1) OR58: US-97 to I-5 2021 OR Lane County Not Applicable

Replace bridges 05286 and 02071A; Retrofit

and rehabilitate 07894, 02073C,

01519A for seismic resiliency. Reconstruction OTHER $21,065,622 Title 23

Oregon

Department

of

Transportati

on In Design OR-04 Not Applicable

OR DOT 18(2) OR58: Fix-It Corridor Culverts 2021 OR Lane County Not Applicable

Repair or replace culverts in poor condition

on OR58 from milepost 2.73 to 67.27. Rehabilitation OTHER $10,428,836 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-04 Not Applicable

OR DOT 20(3) US 20 Upper Sunken Grade and

Double Gate Slide Repair 2021 OR Linn County

Willamette National

Forest

Repair and stabilize Upper Sunken Grade

Slide (MP 56.1) and Double Gate Slide (MP

53.7). Reconstruction FLAP $5,251,504 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-04

FS Pacific

Northwest -

Region 6

OR DOT 2016(3) Columbia Gorge Express 2021 OR

Multnomah

County

Columbia River Gorge

National Scenic Area

Increase mobility to and decrease congestion

in the Columbia River Gorge through the

Columbia Gorge Express. Operations FLAP $3,433,983 Title 23

Oregon

Department

of

Transportati

on In Design OR-03

FS Pacific

Northwest -

Region 6

OR FS MAL 16(1) Forest Road 16 Repairs 2021 OR Grant County Malheur National Forest

This project consists of repairing 11.2 miles of

FR 16. The road needs deep patch repairs in

order to maintain the structure of the road.

The USFS will provide a structural bridge over

cracked areas with fabric and chip seal the

road. Construction FLTP-USFS $4,300,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-02

FS Pacific

Northwest -

Region 6

OR FS STATEWIDE 2019(1) Statewide Revegetation

and Restoration 2021 OR Lane County Not Applicable

Restoration Services team to complete

procurement of plant material and seeds,

initiation and planning of revegetation

efforts, consultation and on-call services for

Federal Lands Access Program projects. Enhancement FLAP $91,942 Title 23

Pacific

Northwest

Region, US

Forest

Service In Design OR-04

FS Pacific

Northwest -

Region 6

OR FWS RSA 2019(1) Christensen Road RSA-Nestucca

NWR 2021 OR

Tillamook

County

Nestucca National

Wildlife Refuge

Christensen Road Road Safety Audit (WFL)

and Rehab and Safety Enhancements from

RSA (FWS). Planning FLTP-FWS $60,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-05

FWS Pacific -

Region 1

Page 40

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

OR GRANT 24(1) Granite Hill Road Reconstruction 2021 OR Grant County

Wallowa-Whitman

National Forest

Rehabilitate 9.32 miles of roadway pavement

surface, including a 3-inch overlay. Reconstruction FLAP $7,907,183 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-02

FS Pacific

Northwest -

Region 6

OR NPS CRLA 2018(2) Cleetwood Cove Rock Scaling 2021 OR Klamath County Crater Lake National Park

Improve safety of the Cleetwood cove area

by rock scaling the highest rated unstable

slope sections 7, 8, & 9 of the WFL Unstable

Slope Corridor Assessment Report. Rehabilitation FLTP-NPS $3,638,837 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-02

NPS Pacific-

West Region

OR POLK 2016(1) Mitchell Street and Black Rock

Road Reconstruction 2021 OR Polk County

Mary's Peak Resource

Area

Reconstruct and pave Mitchell Street and

Black Rock Road, including the replacement

of Little Luckiamute Bridge and Dutch Creek

Crossing. Reconstruction FLAP $4,832,178 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-05

BLM Oregon-

Washington

Region

OR SHERMAN 2016(1) Starvation Lane

Improvements 2021 OR Sherman County

Central Oregon Resource

Area

Restore and resurface Starvation Lane,

including drainage improvements. Resurface

the first 5 miles to include 2 uniform lanes,

keeping within existing Right of Way.

Resurface the remaining 1.5 miles,

maintaining a single-lane with turnouts. Reconstruction FLAP $1,714,769 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-02

BLM Oregon-

Washington

Region

OR UNION 101(1) North Powder River Lane

Reconstruction 2021 OR Union County

Wallowa-Whitman

National Forest

Reconstruct N Powder River Lane from I-84 to

Ellis Road, and reconstruct Ellis Road from

the intersection of N Powder River Lane to

Anthony Lakes. Reconstruction FLAP $3,421,790 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned OR-02

FS Pacific

Northwest -

Region 6

OR CURRY 595(1) Jerry's Flat Road Preservation and

Improvements 2022 OR Curry County

Rogue River-Siskiyou

National Forest

Full-width bituminous asphalt overlay,

asphalt grinding, shoulder work, upgrade of 2

bridge guardrails to current bridge standards. Construction FLAP $3,175,319 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-04

FS Pacific

Northwest -

Region 6

OR DOT 126(1) Blue Pool Safety and Access

Enhancment Project 2022 OR Linn

Willamette National

Forest

Includes a right turn lane added off OR 126, a

new parking area, short trail connection, and

paving access road and new parking spots

alongside the road. Construction FLAP $2,035,156 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-04

FS Pacific

Northwest -

Region 6

OR DOT 205(1) OR205:Jct of Steens Hwy. - Roaring

Springs Ranch 2022 OR Harney

Steens Mountain

Cooperative

Management &

Protection Area Malheur

NWR

Rejuvenate fog seal, crack seal, chip seal,

asphalt concrete pavement overlay, and

widening on various sections of OR205 and

construction of 3 vehicle

pullouts/interpretive sites. Rehabilitation FLAP $5,264,682 Title 23

Oregon

Department

of

Transportati

on In Design OR-02

FWS Pacific -

Region 1

Page 41

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

OR DOT 97(2) US 97: Lava Butte to La Pine Multi-Use

Path Planning Study 2022 OR Deschutes

Deschutes National

Forest

Study will identify and evaluate planning

corridors for a bicycle and pedestrian multi-

use path connectiong Lava Butte to La Pine

along the US 97 Corridor. Planning FLAP $416,200 Title 23

Oregon

Department

of

Transportati

on In Design OR-02

FS Pacific

Northwest -

Region 6

OR DOUGLAS 200(1) North Bank Road

Reconstruction 2022 OR Douglas County

Swiftwater Resource

Area

Widening of approximately 0.30 miles of

roadway, The replacement of two culverts,

Full Depth Reclamation, excavation and

embankment, aggregate subbase and base,

paving, installation of guardrail, and other

miscellaneous items ofwork. Reconstruction FLAP $2,141,524 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-04

BLM Oregon-

Washington

Region

OR LANE 6178(2) Kitson Springs Slide Repair at MP

2.6 2022 OR Lane

Willamette National

Forest

Provide funding for construction based on

the design solution identified as part of the

previous FLAP project. Reconstruction FLAP $3,815,000 Title 23

Lane

County In Design OR-04

FS Pacific

Northwest -

Region 6

OR MULTNOM 558(1) Larch Mountain Road

Improvements 2022 OR

Multnomah

County

Columbia River Gorge

NSA

Repair and apply overlay to Larch Mountain

Road between MP 7 and MP 9. Additional

work includes adding gravel to shoulders,

repair and replacement of signs, minor

drainage improvements, and revegetation

work. Rehabilitation FLAP $864,005 Title 23

Multnomah

County In Design OR-03

FS Pacific

Northwest -

Region 6

OR MULTNOM 558(2) Larch Mountain Road

Improvements, Phase II 2022 OR Multnomah Mt. Hood National Forest

Surface preservation project with

accompanying improvements for 5.5 miles of

East Larch Mountain Road that provide

access to the Larch Mountain recreation area

in Mt. Hood National Forest and the CRGNSA. Rehabilitation FLAP $2,750,064 Title 23

Multnomah

County In Design OR-03

FS Pacific

Northwest -

Region 6

OR PFH 60(3) Powers - Agness, State Section

including Burma Slide 2022 OR Coos County

Rogue River - Siskiyou

National Forest

Lower maintenance costs and improve safety

by decreasing the probability of landslide

failure (including Burma Slide) on OR 542. Reconstruction FLAP $21,259,884 Title 23

Oregon

Department

of

Transportati

on In Design OR-04

FS Pacific

Northwest -

Region 6

OR UMATILLA 582(1) Mill Creek Road 2022 OR Umatilla County Umatilla National Forest

Pave Mill Creek Road, maintaining it's existing

width, and provide turnouts. Rehabilitation FLAP $3,200,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned OR-02

FS Pacific

Northwest -

Region 6

OR CROOK 123(1) Ochoco Ranger Station Road

Overlay Project 2023 OR Crook Ochoco National Forest

Overlay Ochoco Ranger Station Road from

Highway 126 to Ochoco Ranger Station (End

of Crook County Jurisdiction). Rehabilitation FLAP $1,909,132 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-02

FS Pacific

Northwest -

Region 6

OR DESCHUTES 2018(1) Bend to Mt. Bachelor and

Devils Lake Summer Transit Service 2023 OR Deschutes

Deschutes National

Forest

Funding to operate a two-year summer

transit service pilot project between bend

and Mt. Bacehlor and Devils Lake on the

Deschues NF. Operations FLAP $243,425 Title 23

Oregon

Division

Office,

FHWA In Design OR-02

FS Pacific

Northwest -

Region 6

Page 42

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

OR DESCHUTES 46(4) Chip Seal of Cascade Lakes

Highway: Mount Bachelor to Elk Lake 2023 OR

Deschutes

County

Deschutes National

Forest

Application of a chip seal surfacing to the

existing road surface from Mt. Bachelor

(beginning of County maintenance) south to

Elk Lake. Rehabilitation FLAP $784,379 Title 23

Oregon

Division

Office,

FHWA In Design OR-02

FS Pacific

Northwest -

Region 6

OR DOT 197(1) US 197: Maupin to BLM Access

Improvements 2023 OR Wasco

Lower Deschutes River

Area

The project will improve pedestrian, bicycle,

and parking connections between Maupin

residents and visitors to BLM and other local

recreation areas. Construction FLAP $684,867 Title 23

Oregon

Department

of

Transportati

on In Design OR-02

BLM Oregon-

Washingon

Region

OR DOT 2018(1) Rogue-Umpqua Bike & Pedestrian

Plan 2023 OR

Jackson Douglas

Klamath BLM USACE USFS NPS

Look at the infrastructure and the support

services for people biking the corridors

between Medford/Gold Hill, Crater Lake NP,

and Roseburg. Planning FLAP $350,000 Title 23

Oregon

Department

of

Transportati

on In Design OR-02 OR-04 Not Applicable

OR DOT 2018(2) CRGNSA Sign Inventory,

Maintenance, and Replacement Project 2023 OR

Mulnomah

Hood River

Wasco

Columbia River Gorge

National Scenic Area

Sign Inventory, maintenance, and

replacement of all CRGNSA thematic, facility

and wayfinding signs located within the

Columbia River Gorge National Scenic Area

boundary. Maintenance FLAP $512,450 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned OR-02 OR-03

FS Pacific

Northwest -

Region 6

OR DOT 203(1) Hwy 340 (OR203); Union to

Catherine Creek 2023 OR Union

Wallowa-Whitman

National Forest

Resurface the highway with a full width 2"

grind and asphalt concrete pavement inlay

from MP 0.00 to 0.25, resurface the project

limits with a 2" ACP overlay and pave the

Catherine Creek Summit Sno-Park. Rehabilitation FLAP $3,234,522 Title 23

Oregon

Department

of

Transportati

on In Design OR-02

FS Pacific

Northwest -

Region 6

OR DOT 242(2) OR 242: McKenzie Pass Pavement

Preservation Project (MP 77.30 - 92.22 ) 2023 OR Deschutes

Deschutes National

Forest

Improve roadway between Dee Wright

Observatory and US 20, rebuilding shoulders,

removing safety hazards adjacent to travel

lanes, and replacing or repairing signs. Reconstruction FLAP $4,102,595 Title 23

Oregon

Department

of

Transportati

on In Design OR-02

FS Pacific

Northwest -

Region 6

OR DOT 26(4) Summit Highway Safety Rest Stop and

Snow Park 2023 OR Clackamas Mt. Hood National Forest

Refurbish the entire highway safety rest area

and snow park paved surface and entry. Reconstruction FLAP $701,632 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-03

FS Pacific

Northwest -

Region 6

OR DOT 46(1) Oregon Caves Highway (OR 46)

Restoration 2023 OR Josephine

Oregon Caves National

Monument & Preserve,

Rogue River-Siskiyou NF

Repave OR 46 from the National Park Service

boundary at MP 15.7 to the oregon Caves

parking lot at MP 19.3. Reconstruction FLAP $1,486,692 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-04

NPS Pacific-

West Region

OR DOT 97(3) US 97: Baker/Knott Road to Lava Butte

Multi-Use Path 2023 OR Deschutes

Deschutes National

Forest

Design and construct a multi-use path

connecting Bend to the Lava Lands Visitor

Center along the US 97 corridor (MP 143.45 -

MP 149.58). Construction FLAP $5,687,172 Title 23

Oregon

Department

of

Transportati

on In Design OR-02

FS Pacific

Northwest -

Region 6

Page 43

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

OR DOT CRGNSA 100(6) Historic Columbia River

Highway State Trail, Viento to Mitchell Point

Crossing 2023 OR Hood River

Columbia River Gorge

NSA

Construct 2.27 mile segment of the State Trail

in hood River County, that spans from viento

state park to Perham Creek and from Perham

Creek to Mitchell Creek. Construction FLAP $17,000,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-02

FS Pacific

Northwest -

Region 6

OR DOUGLAS 251(1) Oregon Dunes National

Recreation Area - Umpqua Dunes Access

Improvements 2023 OR Douglas

Siuslaw NF, Oregon

Dunes NRA

Move a 1.3-mile OHV route in ROW to

improve safety and re-route 0.5 mile sand

road. Construction FLAP $1,776,480 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-04

FS Pacific

Northwest -

Region 6

OR FS MTH 50(1) Timberline Lodge Parking Area

Improvements 2023 OR

Clackamas

County Mt Hood National Forest

Enhance the approach to the Timberline

Complex by directing visitors towards the

Wy’East Day Lodge to help them find their

way to the entrance of the Timberline

Complex, and improve pedestrian and vehicle

circulation. Reconstruction FLAP $282,500 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned OR-03

FS Pacific

Northwest -

Region 6

OR LAKE 2-20(1) Cottonwood Road Preservation 2023 OR Lake

Fremont-Winema

National Forest

Improve and enhance the integrity of the

road by installing 6 inches of dense graded

aggregate. Maintenance FLAP $568,099 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-02

FS Pacific

Northwest -

Region 6

OR LAKE 3-30(1) Hogback Road Surface Preservation 2023 OR Lake BLM

Install 6 inches of aggregate on 4.95 miles of

road. Rehabilitation FLAP $667,671 Title 23

Oregon

Division

Office,

FHWA In Design OR-02

BLM Oregon-

Washingon

Region

OR LAKE 531(1) Westside Road Chip Seal 2023 OR Lake

Fremont-Winema

National Forest

Chip seal the entire Westside Road (16.87

miles). Rehabilitation FLAP $586,254 Title 23

Oregon

Division

Office,

FHWA In Design OR-02

FS Pacific

Northwest -

Region 6

OR LAKE 603(1) Clover Creek Chip Seal 2023 OR Lake

Fremont-Winema

National Forest

Chip seal the entire Clover Creek Road (21.59

miles). Rehabilitation FLAP $547,430 Title 23

Oregon

Division

Office,

FHWA In Design OR-02

FS Pacific

Northwest -

Region 6

OR LINN 908(1) North River Drive Public Access

Improvement Project 2023 OR Linn Willamette Valley Project

Project will include a combination of roadway

widening improvements, road surface repair,

andpavement preservation to meet current

and future needs. Reconstruction FLAP $3,143,555 Title 23 Linn County In Design OR-04

FS Pacific

Northwest -

Region 6

OR NPS CRLA 13(1) Rehabilitate East Rim Drive 2023 OR Klamath County Crater Lake National Park

This project would improve the road

pavement on East Rim Drive with a

combination of pavement overlay and full

depth 3R pavement rehabilitation. Rehabilitation FLTP-NPS $20,000,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-02

NPS Pacific-

West Region

Page 44

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

OR PFH 163(21) Multnomah Falls Viaducts Repairs 2023 OR

Multnomah

County

Columbia River Gorge

National Scenic Area

Restore two historic viaducts on the Historic

Columbia River Highway (US 30) and restore

serviceability of parking lots by Mulnomah

Falls Lodge. Reconstruction FLAP $5,217,750 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design OR-03

FS Pacific

Northwest -

Region 6

Pennsylvania

CE Blue Marsh Lake (1) 2019 PA Berks

DRY BROOKS BOAT

LAUNCH AND DAY USE

AREA

Minor base repair, milling and paving of

roadways and parking lots in day use area

and roadways and 3RH USACE $526,000 Title 23 USACE

Under

Construction PA-09 USACE

CE Lake Raystown (1) 2019 PA Huntingdon

RAYSTOWN LAKE -

SEVEN POINTS AND

AITCH RECREATION AREA

7Points Boat Ramp asphalt rehab 29,375 ft²

by 4 inch. 7Points Campground chip seal

rehab 5 road segm 3RH USACE $645,000 Title 23 USACE In Design PA-13 USACE

CE Lake Shenango(1) 2019 PA Mercer

Shenango Recreation

Area

Removal of pavement, regrading subgrade,

replacing subbase aggregate, asphalt

concrete pavement, an 3RH USACE $675,000 Title 23 USACE

Under

Construction PA-16 USACE

PA_FLAP_BUSHKILL_STDY(1) 2019 PA

Pike and

Monroe

NPS/Delaware Water

Gap National

Recreational Area

Analysis for transit bus shuttle and park

improvements. MISC FLAP $273,080 Title 23 LOCAL In Design PA-17 NPS

PA_FLAP_DOT_307(1)_3002(1) 2019 PA Elk

USFS/Allegheny National

Forest

Rehabilitate 6.41 Miles of T-307 and 1.42

Miles of SR 3002 and in Elk County. 3RH FLAP $1,500,000 Title 23 STATE

Under

Construction PA-05 USFS

PA_FS_Longhouse_Scenic_Byway 2019 PA Allegheny

Allegheny National

Forest

Replacement of existing culverts and repaving

of the entire 11.3 mile road. 3RH_LSR_BRRP FLTP $7,575,000 Title 23 USFS In Design PA-05 USFS

PA_ST_Keystone 2019 PA Crawford

Army Reserve; Keystone

Training Area

Rdway Improvements detailed in DAR

evaluation report of June 2012 3RH REIMB $5,510,000 Title 23 EFLHD In Acquisitions PA-03 Other

Cherry Valley NWR 2015260382 2020 PA Monroe Cherry Valley NWR Resurfacing Entrance Road at Golf Course 3RL FLTP $30,000 Title 23 FWS In Design PA-07 FWS

PA_FLAP_PHIL_LNDBRGH(1) 2020 PA Philadelphia

FWS/John Heinz National

Wildlife Refuge

Construct 2.1 miles of protected bicycle lanes

along Lindbergh Boulevard MISC FLAP $190,500 Title 23 LOCAL Planned PA-01 FWS

FW JOHE T401(1) 2020 PA Philadelphia

John Heinz National

Wildlife Refuge Resurface 0.25 mile of Dike Trail. 3RL REIMB $156,160 Title 23 FWS Planned PA-01 FWS

PA FLAP DOT WANA(1) 2020 PA Delaware John Heinz NWR

Parking lot reconstruction on SR420 at south

entrance to John Heinz NWR. MISC FLAP $340,000 Title 23 EFLHD Planned PA-01 FWS

PA FLTP NP GETT(2) 2020 PA Adams

Gettysburg National

Military Park GETT 221207. 3RL_2R FLTP $3,850,000 Title 23 NPS

Under

Construction PA-13 NPS

PA_FLAP_LHVA_TRL(1) 2020 PA Lackawanna

National Park Service /

Steamtown National

Historic Site

Construct pedestrian bridge to connect

Steamtown NHS to the Lackawanna River

Heritage Trail BRN FLAP $270,000 Title 23 LOCAL In Design PA-17 NPS

PA_FLAP_SMRST_TRL(1) 2020 PA Somerset

NPS, Flight 93 National

Memorial

Construct 1.3 miles 9/11 National Memorial

Trail in Somerset County, PA. MISC FLAP $410,000 Title 23 LOCAL In Design PA-09 NPS

FW ALLE 10(1) 900(1) 2021 PA Warren

Allegheny National Fish

Hatchery

Resurface Hemlock Road (Rte 10) & Parking

Lot (Rte 900). 3RL FLTP $300,000 Title 23 EFLHD Planned PA-15 FWS

FW NOFI 10(1) 100(1) 2021 PA Clinton

Northeast Fishery Center

& Lamar NFH

Patch and resurface Washington Ave (Rte 10),

Rear Access Rd (Rte 100), and Parking Lots. 3RL FLTP $300,000 Title 23 EFLHD Planned PA-12 FWS

PA FLTP NP GETT(3) 2021 PA Adams

Gettysburg National

Military Park GETT Pavement Pres FY21. 3RL_2R FLTP $1,950,000 Title 23 NPS In Design PA-13 NPS

Page 45

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

PA FLTP NP GETT(4) 2021 PA Adams

Gettysburg National

Military Park GETT Pavement Pres FY22. 3RL_2R FLTP $600,000 Title 23 NPS In Design PA-13 NPS

PA_FLAP_DOT_209(1) 2022 PA Pike

NPS, Delaware Water

Gap National Recreation

Area

Rehabilitate or replace structurally deficient

bridge on SR 209 over Sawkill Creek. BRRP FLAP $2,376,400 Title 23 STATE In Design PA-10 NPS

PA FLTP NP DEWA(5) 2022 PA Monroe

Delaware Water Gap

NRA River Road MP 0-3.72. 3RH FLTP $2,100,000 Title 23 NPS In Design PA-07 NPS

FW_ALLE_2005265077 2023 PA Warren

Allegheny National Fish

Hatchery Rehabilitate public roads 3RL FLTP $100,000 Title 23 FWS Planned PA-05 FWS

PA FLTP NP DEWA(6) 2023 PA Monroe

Delaware Water Gap

NRA River Road MP 3.72 to 5.92. 3RH FLTP $1,760,000 Title 23 NPS In Design PA-07 NPS

PA FLTP NP FRHI(1) 2023 PA Fayette

Friendship Hill National

Historic Site Entrance Roaad 3RH FLTP $350,000 Title 23 NPS In Design PA-14 NPS

NP_DEWA_14(18)_121(1) 2020 PANJ

Pike (PA) &

Sussex (NJ)

Delaware Water Gap

National Recreation Area

Bridge repair/rehab 4320-009, -013, -022,-

049 BRRH FLTP $1,500,000 Title 23 EFLHD In Design PA-08 NPS

NP_DEWA_10(6)_218(2) 2021 PANJ

Pike (PA) &

Sussex (NJ)

Delaware Water Gap

National Recreation Area

Replace Dingmans Falls Access Bridge #1

DEWA 4320-019 & Rehab-041(Vancampens

Glen Bridge). 3RL_BRRP FLTP $2,450,000 Title 23 EFLHD In Design PA-08 NPS

Puerto Rico

PR FS Route 10 Storm Damage 2019 PR Rio Grande

El Yunque National

Forest

Pavement and drainage repair 0.5 miles from

the intersection with PR-191 to an existing

observation 3RH_3RL REIMB $1,500,000 Other EFLHD In Design PR-AtLarge USFS

PR FS Route 27 StormDamage FAA 2019 PR Rio Grande

El Yunque National

Forest

Landslide and culvert repairs starting at the

intersection with FS Route 930 to 3.2 miles

southeast. LSR_3RH REIMB $130,000 Other EFLHD In Design PR-AtLarge USFS

PR ST ER CEIS(1) 2019 PR Various N/A

Construction Engineering and Inspection

Services for Highway and Bridge Projects in

Puerto Rico MISC DOT $8,100,000 Title 23 EFLHD

Under

Construction PR-AtLarge Other

PR ST FEMA PR(1) 2019 PR Multiple Multiple

Design of Permanent Repairs in Puerto Rico

funded by FEMA MISC REIMB $36,000,000 Other EFLHD In Design PR-AtLarge Other

PR ERFO FS 2017-1(3) 2020 PR Rio Grande

El Yunque National

Forest

Repair storm damage at 43 sites on PR-191 &

3 sites on PR-9938 LSR_3RL ERFO $10,000,000 Title 23 EFLHD In Design PR-AtLarge USFS

PR ST ER PRMNT RPR(1) 2020 PR Various N/A

PRHTA - Design and permanent repair of

storm damaged bridges BRRC DOT $36,000,000 Other EFLHD Planned PR-AtLarge Other

PR ST ER PRMNT RPR(2) 2020 PR Various N/A

PRHTA - Design and permanent repair of

minor landslides (54) LSR DOT $2,000,000 Title 23 EFLHD Planned PR-AtLarge Other

PR ST ER PRMNT RPR(3) 2020 PR Various N/A PRHTA - Sign and Safety LSR DOT $96,000,000 Title 23 EFLHD Planned PR-AtLarge Other

PR ST ER PRMNT RPR(4) 2020 PR Various N/A PRHTA - Regular Landslides LSR DOT $70,000,000 Title 23 EFLHD Planned PR-AtLarge Other

South Carolina

CE Lake Hartwell (1) 2019 SC Pickens

LAKE HARTWELL -

TWELVE MILE PARK

Remove pavement repave asphalt, sealcoat

asphalt with Sealmaster’s Liquid Road. line

stripe parking 3RH USACE $275,000 Title 23 USACE Planned SC-03 USACE

South Dakota

SD ERFO CHEYENNE RIVER 12(1) 17 MILE ROAD 2020 SD Dewey

Cheyenne River

Reservation Repair Work on BIA 12 ERFO ERFO $3,700,000 Title 23 CFLHD Active SD-1 BIA-GP

SD FTBL HORSE SOLDIER BCB(1) HORSE SOLDIER TO

FORT MEADE BCB 2020 SD Meade SD Field Office

Reconstruct and rehabilitate 5.2 miles of Fort

Meade BCB. Construct new parking lots. 3R4R FTBL $1,500,000 Title 23 CFLHD Active SD-1 BLM-SD

Page 46

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA RegionSD FTBR BELLE FOURCHE (1) GAIDEN PT BOAT RAMP

IMPROVEMENTS 2020 SD Butte Belle Forche Dam Gaiden Point Boat Ramp Improvements 3R4R FTBR $1,000,000 Title 23 CFLHD Active SD-1 BOR-GP

SD FTFW SALA 10(1) HQ ENTRANCE ROAD AND

PARKING 2020 SD Brown Sand Lake NWR

Pave existing gravel HQ Entrance Road &

parking. 3R FTFW $900,000 Title 23 CFLHD Active SD-1 FWS-R6

SD TIG BIA 10(1) LOWER BRULE HIGHWAY 10

RECONSTRUCTION 2020 SD Lyman Lower Brule Reservation

Reconstruction of Highway 10 at Lower Brule

Reservation 4R TIGER $20,000,000 Title 23 CFLHD Active SD-1 BIA-GP

SD FLAP CS23A(1) DELTA-01 ACCESS ROAD 2021 SD Jackson Minuteman Missile NHS

Rehabilitation of .59 miles of Jackson County

C23A. 3R4R FLAP $840,000 Title 23 CFLHD Not Started SD-1 NPS-MWR

SD FLAP 392(1) MAGA TA-HOHPI ACCESS ROAD 2022 SD Beadle Huron WMD

Rehabilitation/gravel resurfacing of one mile

of existing 392nd Ave between US 14 and

207th Street adjacent to the Maga Ta-Hohpi

WPA 4R FLAP $600,000 Title 23 CFLHD Not Started SD-1 FWS-R6

SD FLAP WAUB 10(2) WAUBAY ENTRANCE ROAD 2022 SD Day Waubay NWR

Rebuild intersection between Waubay

Entrance Road and Day County Hwy 1. SPOT FLAP $200,000 Title 23 CFLHD Not Started SD-1 FWS-R6

SD FLAP 454(1) MYRON GROVE ACCESS ROAD 2023 SD Clay Missouri NRR

Rehabilitation and paving of 1.5 miles of

roadway, including signing and striping. 3R FLAP $1,000,000 Title 23 CFLHD Not Started SD-1 NPS-MWR

Tennessee

GRSM 158579 2019 TN Blount

Great Smoky Mountains

National Park

Pavement Preservation of Look Rock

Developed Area 2R FLTP $965,000 Title 23 EFLHD Planned TN-02 NPS

GRSM 257435 2019 TN

Sevier and

Blount

Great Smoky Mountains

National Park

Conduct a Visitor Use Study for visitor

counting procedures on Foothills Parkway Study FLTP $208,000 Title 23 EFLHD Planned TN-01, TN02 NPS

GRSM 253191 2019 TN Sevier

Great Smoky Mountains

National Park

EA for Safety and Improvements to

Gatlinburg Spur (US 441) Study FLTP $2,000,000 Title 23 EFLHD Planned TN-01 NPS

FS_Bald_River_Falls_Bridge(1) 2019 TN Mitchell Cherokee National Forest Bridge Replacement 3RH_BRRP FLTP $125,000 Title 23 USFS In Design TN-01 USFS

GRSM_15(1) 2019 TN Blount

Great Smoky Mountains

National Park Repair Bote Mountain Tunnel TUN FLTP $1,360,000 Title 23 EFLHD

Under

Construction TN-01 NPS

NP STRI TRAFFIC Impact Study 2019 TN Murfreesboro

Stones River National

Battlefield

Develop SOW, IGE&proposal STRI Traffic

Impact& Safety Study Coordinate A&E &

award EFL serve as COR MISC FLPP $130,000 Title 23 EFLHD Planned TN-06 NPS

NP_GRSM_13(1)14(2)18(1) 2019 TN Sevier, Blount

Great Smoky Mountains

National Park

Pvmt Preservation of Fighting Creek Gap,

Little River Gorge and Elkmont Rds 2R FLTP $4,400,000 Title 23 EFLHD In Acquisitions TN-02 NPS

TN_FLAP_MLGTN_AST(1) 2019 TN Shelby

Dept of the Navy, Naval

Support Activity (NSA)

Mid-South

Construct an extension of a two-lane access

route from the Millington Jetport to the Navy

Base. 3RH_NEW FLAP $2,389,360 Title 23 LOCAL In Design TN-08 X_NA

NP NATR 5570-463P 2019 TN Williamson Natchez Trace Parkway

Pedestrian Barrier on Double Arch Bridge

(Str. #5570-463P) to reduce suicide fatalities. BRRC NPS $1,250,000 Title 23 EFLHD In Design TN-07 NPS

NP FOOT 8D5 2020 TN

Sevier and

Blount

Great Smoky Mountains

National Park

Complete EIS / ROD for Section 8D of

Foothills Parkway I/3R FLTP $4,500,000 Title 23 EFLHD Planned TN-01, TN02 NPS

NP GRSM 10N(2) 2020 TN Knox

Great Smoky Mountains

National Park

Pavement Preservation of Newfound Gap

Road, TN Side (MP 12.32 to 14.64). 3RL_2R FLTP $5,408,000 Title 23 EFLHD In Design TN-02 NPS

Page 47

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

NP GRSM 14(3) 112(1) ETC 2020 TN Sevier

Great Smoky Mountains

National Park

Rehabilitate & Repair 8 Bridges on TN Side of

the Park: 5460-013P,-042P,-048P-050P,-060P,-

078P,-162P 3RH FLTP $3,081,989 Title 23 EFLHD In Design TN-01 NPS

NP NATR 1D6 2020 TN Hickman Natchez Trace Parkway

Stabilization of Pier 2 on NATR Bridge over

Duck River BRRC NPS $1,096,517 Title 23 EFLHD In Design TN-07 NPS

NP_BISO_10(2) 2020 TN Scott, Fentriss

Big South Fork National

River and Recreation

Area

Leatherwood Ford Road Resurfacing, MP 0.00

to MP 7.56. Replace existing signs and posts

and stripe. 3RL FLTP $4,828,900 Title 23 EFLHD In Design TN-03 NPS

NP_GRSM_10N(1) 2020 TN Knox

Great Smoky Mountains

National Park

Pavement Preservation of Newfound Gap

Road, TN Side (MP 6.5 to 13) 2R FLTP $3,163,298 Title 23 EFLHD In Design TN-02 NPS

NP_GRSM_126(1) 2020 TN Various

Great Smoky Mountains

National Park Replace five bridges on Forge Creek Road. BRRC FLTP $2,799,026 Title 23 EFLHD In Design TN-01 NPS

TN FLAP HARDIN FED(1) 2020 TN Hardin

NPS - Shiloh National

Military Park Rehabilitation of Federal Rd. 3RL FLAP $505,360 Title 23 LOCAL In Design TN-07 NPS

TN FLAP HKMN SHEB(1) 2020 TN Hickman

NPS/Natchez Trace

Parkway

Resurfacing of New Sheboss Road to the

concrete ditch lines. 3RL FLAP $936,912 Title 23 LOCAL In Design TN-07 NPS

TN FLAP HNRY RHB(2) 2020 TN Henry USFWS - Tennessee NWR Rehabilitation of Bobcat Den Rd. 3RL FLAP $486,000 Title 23 LOCAL In Design TN-08 FWS

TN FLAP LEWIS KEG(1) 2020 TN Lewis

NPS/Natchez Trace

Parkway

Resurfacing of Keg Springs Road and Falls

Branch Rd. to improve safety. 3RL FLAP $450,148 Title 23 LOCAL In Design TN-05 NPS

TN FLAP TDEC NEMOBR(1) 2020 TN Morgan

National Park Service/

Obed Wild and Scenic

River

Restoration of culturally historic vehicular

bridge. BRRP FLAP $1,020,000 Title 23 STATE Planned TN-03 NPS

TN FLAP WAYNE PINEY(1) 2020 TN Wayne

NPS/Natchez Trace

Parkway

Resurfacing and widening of Piney Road to

improve safety. 3RL FLAP $542,120 Title 23 LOCAL In Design TN-09 NPS

TN_FLAP_CHAT_MBC(1) 2020 TN Hamilton

NPS, Chickamauga and

Chattanooga National

Military Park

Extend the Moccasin Bend Connector in

Chattanooga, TN. 3RH_3RL FLAP $1,631,829 Title 23 LOCAL In Design TN-03 NPS

TN_FLAP_DOT_461(1) 2020 TN Stewart

USFS - Land Between the

Lakes National

Recreation Area

Resurfacing 3 miles of Route 461 from

intersection with Route 76 heading north 3RL FLAP $533,500 Title 23 STATE Planned TN-07 USFS

TN_FLAP_FRKN_BKLN(1) 2020 TN Franklin

Department of the Air

Force, Arnold

Eng.Development Ctr

Resurfacing and widening of UTSI Road for

the accommodation of new bike lanes in

Franklin County,TN. 3RH FLAP $572,183 Title 23 LOCAL In Design TN-04 Other

TN_FLAP_HNRY_RHB(1) 2020 TN Henry

USFWS, Tennessee

National Wildlife Refuge

Rehabilitate portions of Bobcat Den Rd &

Elkhorn Nobles Rd within TN National Wildlife

Refuge. 3RH_3RL FLAP $263,024 Title 23 LOCAL In Design TN-08 FWS

TN_FLAP_MTGMRYLAF(1) 2020 TN Montgomery

Department of the Army

Fort Campbell

Reconstruction and widening of 1,100 feet of

Lafayette Road. 3RH_NEW FLAP $1,958,000 Title 23 LOCAL In Design TN-07 Other

TN_FLAP_POLK_LADD(1) 2020 TN Polk

USFS - Cherokee National

Forest

Resurface and widen Ladd Springs Road to

improve safety in Polk County, TN. 3RL FLAP $941,011 Title 23 STATE Planned TN-03 USFS

TN_FLAP_POLK_SGLF(1) 2020 TN Polk

USFS - Cherokee National

Forest

Resurface and widen Sugarloaf Drive to

improve safety in Polk County, TN. 3RL FLAP $270,872 Title 23 STATE Planned TN-03 USFS

TN_FLAP_SWRT_WLKR(1) 2020 TN Stewart

FWS/Cross Creeks

National Wildlife Refuge

Upgrading Walker Rd. & Webb Hollow Rd. to

paved surface. 3RL FLAP $587,292 Title 23 LOCAL Planned TN-07 FWS

Page 48

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

TN_FLAP_WAYNE_WCRK(1) 2020 TN Wayne

NPS, Natchez Trace

Parkway

Resurface and widen Weatherford Creek

Road from 18 ft. to 22 ft. in Wayne County,

TN. 3RL FLAP $432,192 Title 23 LOCAL In Design TN-07 NPS

TN_FLAP_WAYNE_WRR(1) 2020 TN Wayne

National Park Service

(NPS), Natchez Trace

Parkway

Resurface and widen Wright Ridge Road from

18 ft. to 22 ft. in Wayne County, TN. 3RL FLAP $290,004 Title 23 LOCAL Planned TN-07 NPS

TN_FLAP_WNCH_TWNLK(1) 2020 TN Franklin Twin Creeks Marina

Construct an asphalt road leading to Twin

Creeks Marina. NEW FLAP $956,627 Title 23 LOCAL In Design TN-05 Other

FW_TENN_12(1) 2021 TN Henry. Benton.

Tennessee National

Wildlife Refuge Rehabilitate Big Sandy Road (Route 12) 3RH FLTP $1,200,000 Title 23 EFLHD In Design TN-08 FWS

NP FOOT PMS(1) 2021 TN

Sevier and

Blount

Great Smoky Mountains

National Park

FY21 Pavement Preservation of Foothills

Parkway, West MP 55 to 65 3RH_3RL FLTP $5,921,693 Title 23 EFLHD Planned TN-02 NPS

NP FOOT PMS(2) 2021 TN

Sevier and

Blount

Great Smoky Mountains

National Park

Pavement Preservation of Foothills Parkway,

East 3RH_3RL FLTP $2,846,624 Title 23 EFLHD Planned TN-02 NPS

NP_GRSM_17(1) 2021 TN Sevier

Great Smoky Mountains

National Park

Pavemant Preservation of Clingman's dome

Road 3RL_2R FLTP $2,737,138 Title 23 EFLHD In Design TN-01 NPS

NP_GRSM_26(2)_137(1) 2021 TN Townsend

Great Smoky Mountains

National Park

Pavement Preservation of Cades Cove Loop

road and Campground entrance road 3RL_2R FLTP $2,206,133 Title 23 EFLHD In Design TN-02 NPS

TN_FLAP_SWRT_BELL(1) 2021 TN Stewart

FWS/Cross Creeks

National Wildlife Refuge

Resurfacing Bellwood Hollow & Bellwood

Landing Rd. 3RL FLAP $1,081,341 Title 23 LOCAL In Design TN-07 FWS

TN_FLAP_WAYNE_BGCYP(1) 2021 TN Wayne

NPS, Natchez Trace

Parkway Resurfacing and widening Big Cypress Road. 3RL FLAP $502,744 Title 23 LOCAL Planned TN-07 NPS

NP FOOT PMS(3) 2022 TN

Sevier and

Blount

Great Smoky Mountains

National Park

FY22 Pavement Preservation of Foothills

Parkway (East) from MP 65 to MP 72. 3RH_3RL FLTP $2,737,138 Title 23 EFLHD Planned TN-01, TN02 NPS

NP_GRSM_21(1) 2022 TN Cosby

Great Smoky Mountains

National Park

Rehabilitate Cosby Campground Entrance

Road and Picnic Area Roads 3RL FLTP $3,736,958 Title 23 EFLHD Planned TN-02 NPS

Texas

TX ERFO SAM HOUSTON 215(1) STUBBLEFIELD ROAD 2020 TX Walker Sam Houston NF

Bridge replacement and roadway ER repair

on Stubblefield Rd BR/ERFO FS/ERFO $3,000,000

Title 23 / FS

Hurricane

Supp. CFLHD Active TX-8 FS-R8

TX FWS ANAH VARIOUS ROUTES ROUTES 010, 011,

012, 101, 102 2020 TX Chambers Anahuac NWR

Paving, chip seal, graveling of 18 mi. within

Anahuac NWR from Hurricane Harvey

damage. 3R FWS $5,700,000 Title 23 CFLHD Not Started TX-36 FWS-R2

TX USACE STR ACCESS(1) TOWN BLUFF STRUCTURE

ACCESS ROAD 2020 TX Tyler Steinhagen Lake

Rehabilitate Town Bluff Structure Access

Road and Parking Lot. 3R USACE $1,125,000 Title 23 CFLHD Active TX-36 USACE-SW

TX_FTFW_INDA_10(1)_11(1) 2020 TX Burnet

Inks Dam National Fish

Hatchery

Improve intersec safety, Entrance Rd @ Park

Road. Resurface Visitor Center Rte 10 &

Entrance Rte 11 3RL FLTP $300,000 Title 23 EFLHD In Design TX-25 FWS

TX_FTFW_SAMA_10(1) 2020 TX Hays

San Marcos National Fish

Hatchery

Relocate Entrance Rd to existing signalized

intersection 3RL_4R FLTP $400,000 Title 23 EFLHD In Design TX-35 FWS

Page 49

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

TX_FTFW_UVAL_10(1)_900(1) 2020 TX Uvalde

Uvalde National Fish

Hatchery

Reconstruct Entrance Rd., replace culverts,

ditch grading. Resurface 2 parking lots. 3RH FLTP $1,050,000 Title 23 EFLHD In Acquisitions TX-23 FWS

TX_FLAP_200(1) 2021 TX Denton USACE, Lewisville Lake

Widen Jones Street (0.5 mi) and North Kealy

Avenue (0.34 mi) and construct an adjacent

trail. 3RH FLAP $3,327,883 Title 23 EFLHD In Design TX-26 USACE

TX NPS PP BIBE 2020(1) Pavement Preservation Big

Bend 2021 TX Presidio County Big Bend National Park

This project provides for cyclic pavement

preservation by chip sealing or micro

surfacing various routes in Big Bend National

Park. Rehabilitation FLTP-NPS $16,250,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design TX-23

NPS

Intermountain

Region

TX USACE Pat Mayse Lake Reconstruction 2020 TX Lamar Pat Mayse Lake

Reconstruction of various portions of the

park entrance, interior road and parking lots. 3R4R USACE $500,000 Title 23 USACE Not Started TX-4 USACE-SW

Utah

UT FLAP 218(1) SHEEP CREEK LOOP 2020 UT Uintah Ashley NF

Rehabilitate and repave 1.8 miles of Sheep

Creek Loop. 3R FLAP $2,775,000 Title 23 CFLHD Active UT-1 FS-R4

UT FTFW OURA 11(1) AUTO TOUR ROUTE 2020 UT Uintah Ouray NWR

Rehabilitate 4.7 miles of Ouray Auto Tour

Route. 3R FTFW $1,400,000 Title 23 CFLHD Active UT-1 FWS-R6

AZ FTNP GLCA 6(3) BULLFROG BASIN ACCESS, FERRY

RAMP RD 2021 UT Garfield Glen Canyon NRA

Rehabilitate Bullfrog Basin Access and Ferry

Ramp Rd. 3R FTNP $4,631,470 Title 23 CFLHD Not Started UT-2 NPS-IMR

UT CAUSEY RESERVOIR ROAD CAUSEY RESERVOIR

ROAD REPAIRS 2021 UT Weber Uinta-Wasatch-Cache NF

Improvements include repairing road

shoulder, fill slope slumps, and addressing

safety concerns on the Causey Reservoir

Road. 3R4R FTFS $640,000 Title 23 CFLHD Not Started UT-1 FS-R4

UT FLAP 2500(1) TAYLOR MOUNTAIN ROAD 2021 UT Uintah Ashley NF

Rehabilitate and repave 6.6 miles of Taylor

Mountain Road. 3R FLAP $10,030,000 Title 23 CFLHD Active UT-1 FS-R4

UT FTNP ARCH 100(2) DELICATE ARCH ROAD

BRIDGES 2021 UT Grand Arches NP Contstruct Bridges over three wash crossings BR FTNP $9,733,223 Title 23 CFLHD Not Started UT-3 NPS-IMR

UT FLAP 73(2) LA SAL MOUNTAIN LOOP ROAD 2022 UT San Juan Manti-La Sal NF

Rehabilitate and repave 7.4 miles of La Sal

Mountain Loop Road. 3R FLAP $11,970,000 Title 23 CFLHD Active UT-3 FS-R4

UT FLAP 2016(1) LION BOULEVARD 2023 UT Washington Zion National Park

Construction of on street parking and

underpass 3R FLAP $690,000 Title 23 CFLHD Active UT-2 NPS-IMR

UT FTBL 7133(1) CANYON RIMS ROAD 2023 UT San Juan Moab FO

38 miles of 3R road reconstruction, including

16 Miles new base and pavement, 22 Miles

shoulder widening, then cip seal entire 38

Miles 3R FTBL $6,150,000 Title 23 CFLHD Shelved UT-3 BLM-UT

UT_FTFW_JOHO_10(1) 2020 UT Uintah

Jones Hole National Fish

Hatchery Resurface Jones Hole Road. 3RL FLTP $3,800,000 Title 23 EFLHD In Design UT-01 FWS

UT NPS PRES 15(1) Pavement Preservation Utah 2020 UT Garfield County Multiple

Pavement Preservation at multiple NPS units

in Utah. Rehabilitation FLTP-NPS $9,665,228 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design UT-02

NPS

Intermountain

Region

UT BOR East Bay Parking 2020 UT Utah Utah Lake

Parking lot rehabilitation including improved

drainage Other FTBR $1,100,000 Title 23 BOR Not Started UT-3 BOR-UC

UT FTFS YELLOWSTONE BRIDGE 2020 UT Duchesne Ashley NF Bridge replacement BR FTFS $750,000 Title 23 FS-R4 Active UT-1 FS-R4

Page 50

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

UT FTFS CAUSEY DRIVE REPAIRS 2022 UT Weber Uinta-Wasatch-Cache NF Road repairs 3R FTFS $450,000 Title 23 FS-R4 Not Started UT-1 FS-R4

UT FTNP IMR Bridge Preservation 2020 UT Multiple Multiple IMR Bridge Preservation BR FTNP $11,330,000 Title 23 NPS-DSC Active Multiple NPS-IMR

UT FTNP TICA Road Rehab 2020 UT Utah Timpanogos Cave NM Rehab road and parking for public safety 3R FTNP $2,317,500 Title 23 NPS-DSC Active UT-3 NPS-IMR

Vermont

FW SICO 10(1) 104(1) 105(1) 2019 VT Coos & Essex

Umbagog National

Wildlife Refuge & Silvio

O'Conte Replace culverts at Silvio O'Conte MISC FLTP $790,000 Title 23 EFLHD In Design _VARIOUS FWS

VT_FLAP_DERBY_17(1)_6(1) 2019 VT Orleans

USFWS, Missisquoi

National Wildlife Refuge

Replace failing culverts on Eagle Point Rd & N.

Derby Rd with precast concrete

structures/bridges. BRRP FLAP $601,000 Title 23 LOCAL

Under

Construction VT-01 FWS

Virgin Islands

VI ERFO NPS 2017-1(1) 2019 VI

St. John and St.

Thomas

Virgin Islands National

Park

Hurricane Maria permanent repairs at Virgin

Islands National Park. LSR_3RH ERFO $740,000 Title 23 EFLHD Planned VI-AtLarge NPS

VI NH 66(9) C5 2019 VI

Anna's Hope

Village and

Christiansted

Sub-Districts, St.

Croix St. Croix

Christiansted Bypass Contract 5 Contentment

Road Historic Site Rehabilitation of Building

Number 2 MISC DOT $450,000 Title 23 EFLHD Planned VI-AtLarge Other

VI ST ER STT(003) STJ(001) 2019 VI

Central (St.

John), Northside

and Charlotte

Amalie (St.

Thomas) St. John and St. Thomas

Storm damage repair to roadway, retaining

walls, embankment and cut slopes, guardrail,

and culverts. MISC DOT $1,992,511 Title 23 EFLHD In Design VI-AtLarge Other

VI ST ER STJ(002) STT(004) 2020 VI

St. John / St.

Thomas St. John and St. Thomas

2017 Emergency Relief, St. Johns Project 2, St.

Thomas Project 4. LSR_3RH ERFO $7,274,000 Title 23 EFLHD Planned VI-AtLarge Other

VI ST ER STT(005) 2020 VI St. Thomas St. Thomas

Embankment stabilization and drainage

repair for Rt 33-Shibui. LSR_3RH ERFO $2,400,000 Title 24 EFLHD Planned VI-AtLarge Other

VI ST ER STX(003) 2020 VI St. Croix St. Croix 2017 Emergency Relief, St. Croix Project 3. LSR_3RH ERFO $2,984,000 Title 25 EFLHD Planned VI-AtLarge Other

VI ST STX 6405(1) 2020 VI St. Croix

US Virgin Islands

Department of Public

Works Route 64 Bridge STX6405 on St Croix BRRC DOT $4,000,000 Title 23 EFLHD Planned VI-AtLarge Other

VI_38(2)_C2 2021 VI St. Thomas

US Virgin Islands

Department of Public

Works

Raphune Hill Rd and RT 381 intersection

improvements - Contract 2 NEW TERR HWY $4,700,000 Title 23 EFLHD In Design VI-AtLarge Other

VI_ST_70(12) 2021 VI St. Croix

Christiansted/Frederikste

d Area

Rehab. 9 mi of Queen Mary Hwy. fr Sunny Isle

Int., Christiansted to Hannah’s Rest Int.,

Frederiksted 3RL_BRRP FAST $120,000 Title 23 EFLHD In Design VI-AtLarge Other

VI_ST_9999(135) 2021 VI St. Croix Christiansted Area

Imprvmnts to Rte 754 (King Cross St), Rte 75

E. (King St) and 75 W. (Company St). 3RL REIMB $3,000,000 Title 23 EFLHD In Design VI-AtLarge Other

VI_38(2)_C3 2022 VI St. Thomas

US Virgin Islands

Department of Public

Works

Raphune Hill Rd widen & improve between

the Contact 1 and 2 (0.7 mile) 3RH TERR HWY $28,500,000 Title 23 EFLHD In Design VI-AtLarge Other

Virginia

FW_OCBA_T302(1) 2019 VA Prince William

Occoquan Bay National

Wildlife Refuge Repair Deephole Point Rd Trail 3RH FWS $450,000 Title 54 EFLHD

Under

Construction VA-11 FWS

Page 51

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

NP COLO 1C17 1D49 2019 VA

York and James

City Counties

and City of

Williamsburg

Colonial National Historic

Park

Conceptual design and NEPA for COLO

Parkway rehabilitation and reconstruction. 3RL_BRRP FLTP $3,000,000 Title 23 EFLHD In Design VA-01 NPS

NP GWMP 007P(1) 2019 VA Arlington

George Washington

Memorial Parkway Repair of Gulf Branch Bridge BRRH FLTP $500,000 Title 23 EFLHD

Under

Construction VA-10 NPS

NP GWMP 1(2) 2(4) 2019 VA

Arlington and

Fairfax

George Washington

Memorial Parkway

GWMP North Section and Clara Barton Pkwy

Interim Pavement Repairs 2R NPS $1,066,172 Other EFLHD

Under

Construction VA-08 NPS

NP GWMP 2(3) 2019 VA Fairfax

George Washington

Memorial Parkway Sinkhole near Turkey Run LSR NPS $1,600,000 Title 52 EFLHD

Under

Construction VA-10 NPS

SO FW OCBA 2015260171 2019 VA Prince William

Occoquan Bay National

Wildlife refuge

Access road and parking area for a new multi-

purpose facility. 3RH_NEW FLTP $254,492 Title 23 FWS Planned VA-11 FWS

VA_FLAP_DOT_AHRT(1) 2019 VA Appomattox

NPS Appomattox Court

House National Historic

Park

Multi-use trail, 1.5 mile long, 8-10 foot wide

with aggregate surface, parallel to SR24 MISC FLAP $587,000 Title 23 STATE In Design VA-05 NPS

VA_FLAP_PWC_PHTRL(1) 2019 VA Prince William

Featherstone NWR /

Potomac Heritage

National Scenic Trail

Construct 1.2 mile segment of the Potomac

Heritage NST MISC FLAP $597,000 Title 23 LOCAL In Design VA-11 USFS

VA_FLAP_RRG_TRL(1) 2019 VA Roanoke

(NPS), Blue Ridge

Parkway

Construct 1.7 mile ext. of Roanoke River

Greenway from BLRI visitor Ctr to Explore

Park River Trail. MISC FLAP $1,387,000 Title 23 LOCAL In Design VA-06 NPS

VA_FLAP_VMI_CNT(1) 2019 VA Rockbridge

FS GW National Forest,

NPS Appalachian Trail

and Blue Ridge Parkway

PED bridge replacement, & trail and

associated parking improvements on VMI’s

Chessie Nature Trail BRRP FLAP $1,020,000 Title 23 LOCAL In Design VA-06 NPS

Jordan Road Bridge 2020 VA Amherst

George Washington-

Jefferson National Forest Bridge Replacement BRRP FLTP $710,000 Title 23 USFS In Design VA-06 USFS

NP BLRI BMS FY20(1) 2020 VA Various Blue Ridge Parkway FY20 Bridge Preventive Maintenance at BLRI. BRRH FLTP $500,000 Title 23 EFLHD In Design VA-09 NPS

NP COLO 1A20 1B40 1C16 2020 VA

York and James

City Counties,

City of

Williamsburg

Colonial National Historic

Park

Rehabilitation work on Colonial Parkway,

Segments A, D, E and F 3RL_BRRH FLTP $60,000,000 Title 23 EFLHD Planned VA-02 NPS

NP COLO 1B38 1C14 2020 VA

York County and

James City

County

Colonial National Historic

Park

Rehab Structures 4290-008, 009, 010, and

018 BRRH FLTP $375,000 Title 23 EFLHD Planned VA-02 NPS

NP_BLRI_PVT_PRES_FY19 2020 VA TBD Blue Ridge Parkway

Pavement Preservation work at Blue Ridge

for FY19. 2R FLTP $4,000,000 Title 23 EFLHD In Design _VARIOUS NPS

NP_GWMP_MVT(5) 2020 VA Fairfax

George Washington

Memorial Parkway

Replace Bridges #23 & #24 over Dyke Marsh

on Mount Vernon Trail BRRP FLTP $705,032 Title 23 EFLHD In Design VA-08 NPS

NP_GWMP_MVT(6) 2020 VA Fairfax

George Washington

Memorial Parkway

Replacement of Bridge 12 on Mount Vernon

Trail BRRP DOT $1,100,000 Title 23 EFLHD In Design VA-08 NPS

NP_NCR_PMS_VA(1) 2020 VA Prince William

Prince William Forest

Park Pvmt Mgnt and sign updating at PWFP 2R FLTP $1,000,000 Title 23 EFLHD In Design VA-11 NPS

PRWI_201(1)_400(1)_ETC 2020 VA Prince William

Prince William Forest

Park Rehabilitate Park Roads and Parking. 3RL REIMB $884,000 Other EFLHD In Design VA-11 NPS

Page 52

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

SO NP SHEN(4) 2020 VA

Rockingham,

Page, Greene,

Madison

Shenandoah National

Park

SHEN pavement pres Skyline Drive MP 50. to

65.3 and various Routes. 2R FLTP $225,000 Title 23 NPS In Design VA-05 NPS

VA ERFO FS 2018-1(1) 2020 VA

Dickenson &

Wise Jefferson National Forest

Landslide & road repair of Mullins Rd (Rte

616) & Beaver Dam Gap Rd (Rte 621). LSR_3RL ERFO $446,368 Title 23 EFLHD Planned VA-09 USFS

VA FLTP NP FRSP(1) 2020 VA

Spotsylvania &

city of

Fredericksburg

Fredericksburg &

Spotsylvania National

Military Park Lee Drive & Jackson Trail 3RL_2R FLTP $875,000 Title 23 NPS In Design VA-01 NPS

VA ST NASA 1(8) 2020 VA Accomack NASA-Wallops Island

Wallops Island Causeway Bridge

Rehabilitation. BRRH REIMB $3,500,000 Other EFLHD In Design VA-02 Other

VA ST TFHRC 50(5) 2020 VA Fairfax

Turner-Fairbank Highway

Research Center Reconstruction of test lanes at TFHRC 3RH FAST $30,000 Title 23 EFLHD In Design VA-10 Other

VA_FLAP_ARL_BKSHR(1) 2020 VA Arlington

(NPS), George

Washington Memorial

Parkway (GWMP)

Install 8 Capital Bike Share stations in and

around the George Washington Memorial

Parkway. MISC FLAP $286,000 Title 23 LOCAL In Design VA-08 NPS

VA_FLAP_FRKN_TRL(1) 2020 VA Franklin

NPS Booker T.

Washington National

Monument

Two miles of 8-10 foot wide aggregate PED

trail w/ 6 bridges connecting retirement

community to BOWA MISC FLAP $617,412 Title 23 LOCAL In Design VA-06 NPS

VA_FLAP_NPNWS_105(1) 2020 VA Newport News Joint Base Langley-Eustis Ft. Eustis Boulevard Bridge 3RL_BRRH FLAP $15,500,000 Title 23 EFLHD In Design VA-01 Other

VA_ST_Lee_Ave_Gate 2020 VA Prince George Fort Lee Garrison Improvements to RT. 36 onto Lee Avenue. 4R ERFO $1,800,000 Title 23 EFLHD In Design VA-03 Other

FSR 95 North River Road Slope Stab. 2021 VA Amherst

George Washington-

Jefferson National Forest Slope Stability investigation and repair LSR FLTP $400,000 Title 23 USFS Planned VA-06 USFS

Pave bridge abutments 6 Bridges 2021 VA Amherst

George Washington-

Jefferson National Forest

construct asphalt approach apron at 6 bridge

locations BRRH FLTP $250,000 Title 23 USFS Planned VA-06 USFS

BLRI_1M20 2021 VA Roanoke Blue Ridge Parkway

Repair Asphalt Wearing Surface and

Approaches on Roanoke River Bridge 028P 3RH FLTP $5,282,092 Title 23 EFLHD Planned VA-06 NPS

BLRI_1M21 2021 VA

Botetourt,

Roanoke and

Bedford Blue Ridge Parkway

Repave/Repair Mainline Road Section 1M -

(MP 105.65 to 121.05) 3RH_3RL FLTP $6,000,000 Title 23 EFLHD Planned _VARIOUS NPS

NP COLO 1B39 1C15 1D48 2021 VA

York and James

City

Colonial National Historic

Park

Rehab Structures 4290-013, 014, 019, 020,

and 025. BRRH FLTP $400,000 Title 23 EFLHD In Design VA-02 NPS

NP COLO 1D47 2021 VA

City of

Williamsburg

Colonial National

Historical Site

Repairs to structure 4290-033 Williamsburg

Tunnel. TUN FLTP $500,000 Title 23 EFLHD In Design VA-02 NPS

PRWI_401(1)_402(1) 2021 VA Prince WIlliam

Prince William Forest

Park North Multi-use Trail access MISC FLTP $500,000 Title 23 EFLHD In Design VA-11 NPS

VA ST CP GNRL BTH 2021 VA

City of Virginia

Beach Camp Pendleton

Extend turning lanes from General Booth Blvd

to Headquarters Rd and install traffic signal at

inters 3RL_NEW REIMB $850,000 Other EFLHD In Design VA-02 Other

VA ST DSCR STRTHMR 2021 VA Chesterfield

Defense Supply Center,

Richmond

Realignment of Strathmore and "G" Road

Intersection 3RL_NEW DOT $3,200,000 Other EFLHD In Design VA-07 Other

Page 53

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

VA ST FP MG750TRX 2021 VA

Nottoway and

Dinwiddie Fort Pickett

Rehab Rt 750 fr US 460 to Ft. Pickett Main

Gate & various tank/RR crossing

improvements 3RL_NEW DOT $3,376,106 Other EFLHD Planned VA-08 Other

VA_ST_ANC(1) 2021 VA Arlington

Arlington National

Cemetary

Arlington National Cemetery - Realign

Southgate Rd 4R DAR $40,000,000 Title 23 EFLHD In Design VA-08 Other

VA_ST_FB_KNGMNWLKR_GT 2021 VA Fairfax Fort Belvoir

Add left turn lane fr. SB FFCP to Kingman Rd,

extend NB Mt. Vernon Hwy left turn lane at

Walker ACP 3RL_NEW REIMB $7,439,500 Title 23 EFLHD In Design VA-11 Other

VA_ST_FL_MHN_GT 2021 VA Prince George Fort Lee

Add one additional EB driving lane on Hickory

Hill Rd from .25 mi. E. of Jamestown Dr. to

Mahone Ave 3RL_NEW DOT $2,500,000 Other EFLHD In Design VA-04 Other

VA_ST_JBMHH_HTFLD_GT 2021 VA Arlington

Joint Base Myer

Henderson Hall

Construct ramp and two additional exit lanes

for access to Hatfield Gate from NB

Washington Blvd. 3RL_NEW REIMB $3,769,000 Other EFLHD In Design VA-08 Other

GWMP_MVT(4) 2022 VA Fairfax

George Washington

Memorial Parkway

Replace Deck, reduce deflection, correct trail

alignment Bridge 31/32 4R FLTP $1,260,000 Title 23 EFLHD In Design VA-08 NPS

NP BLRI BMS FY22(1) 2022 VA Various Blue Ridge Parkway FY22 Bridge Preventive Maintenance at BLRI. BRRH FLTP $500,000 Title 23 EFLHD Planned _VARIOUS NPS

VA_FLAP_ARL_ANDR(1) 2022 VA Arlington

Department of Defense

(DOD), Pentagon

Reconstruct 3,549 feet of Army Navy Drive:

complete street bike/ped transit

improvements. 3RH FLAP $714,000 Title 23 LOCAL Planned VA-08 Other

VA FLTP NP FRSP(2) 2023 VA Spotsylvania

Fredericksburg &

Spotsylvania National

Military Park Bridge rehab BRRH FLTP $220,000 Title 23 NPS Planned VA-01 NPS

VA ST NASA 1(9) 2023 VA Accomack NASA-Wallops Island

Wallops Island Causeway Bridge

Reconstruction. BRRC REIMB $50,000,000 Other EFLHD Planned VA-02 Other

VA_FLAP_NORTON_TRL(1) 2023 VA Wise and Scott

USFS High Knob

Recreation Area

Trail improvements between City of Norton &

USFS High Knob Rec area and Rt. 619

improvements. MISC FLAP $3,565,000 Title 23 LOCAL In Design VA-09 USFS

Washington

Little Pend Oreille NWR Little Pend Oreille NWR-Bear

cr, Blacktail, Webking 2020 WA

Pend Oreille

County

Little Pend Oreille

National Wildlife Refuge

Repair 2 miles of the Blacktail Mountain

Road, repair 2 miles of the Webking Road,

and replace 5 culverts along both Bear Creek. Construction FLTP-NPS $150,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-01

FWS Pacific -

Region 1

NISQUALLY NWR VIEWING AREA Billy Frank-

Nisqually NWR Wildlife Viewing Area 2020 WA Thurston County

Billy Frank Nisqually

NWR

Design and construct a vehicle pullout along

Endicott Road to allow visitors a safe place to

stop and view of wildlife. Construction FLTP-FWS $135,000 Title 23

Nisqually

National

Wildlife

Refuge In Design WA-10

FWS Pacific -

Region 1

WA BOR SRP 2020(1) Scooteney Recreation Area

Pavement Rehabilitation 2020 WA Franklin County

Scooteney Reservoir Park

& Recreation Area

The project scope is to repair and seal asphalt

on park roads and parking areas and make

parking ADA compliant. Rehabilitation FLTP-BOR $2,562,600 Title 23

Columbia-

Cascades

Area Office In Design WA-04

BOR Pacific

Northwest

Region

WA DOT 14(2) CRGNSA Sign Inventory Maintenance

and Replacement Project 2020 WA Clark County USDA Forest Service

Inventory, Maintenance, and Replacement

for all thematic, facility and

wayfinding signs located within the CRGNSA

boundary, primarily along SR-14 and its

auxiliary route. Planning FLAP $340,555 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-03

FS Pacific

Northwest -

Region 6

Page 54

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

WA DOT 14(4) SR-14 Congestion and Safety

Mitigation Plan 2020 WA

Skamania

County

Columbia River Gorge

NSA

Develop a strategy to address congestion and

safety concerns along the SR-14 corridor

within the Columbia River Gorge NSA. Planning FLAP $300,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-03

FS Pacific

Northwest -

Region 6

WA FS OLY 24(1) Cushman Road Reconstruction 2020 WA Mason County Olympic National Park

Reconstruct road from the BOP at the end of

SR 119 to the EOP at the entrance road to

Olympic NP at Staircase. Create a more

durable surface, reduce sediment delivery to

waterways, improve traffic flow, reduce

congestion, increase safety. Construction FLTP-USFS $3,250,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-06

FS Pacific

Northwest -

Region 6

WA JEFF 134309(1) Oil City Road Engineering

Assessment 2020 WA

Jefferson

County Olympic National Park

To preserve vehicular access to Olympic

National Park Wilderness: South Coast Trail,

the Pacific Northwest National Scenic Trail,

Washington State Dept. of Natural Resources

land, Hoh River Trust land, and private

property. Planning FLAP $250,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-06

NPS Pacific-

West Region

WA JEFF 91420(1) Upper Hoh River Road Phase 2 2020 WA

Jefferson

County Olympic National Park

Reduce risk of catastrophic road failure on

the Upper Hoh River Road (County Road #

91420). Reconstruction FLAP $14,149,431 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-06

NPS Pacific-

West Region

WA LINCOLN 57860(1) Hawk Creek Road

Improvements 2020 WA Lincoln County Lake Roosevelt NRA

Lower probability and severity of crashes,

lower maintenance costs on Hawk Creek

Road (CR #57860) MP 11.41 to MP 11.86. Reconstruction FLAP $854,000 Title 23

Lincoln

County In Design WA-07

NPS Pacific-

West Region

WA NPS BP MORA 2019(1) Nisqually Glacier Bridge

Preservation 2020 WA Pierce County National Park Service

This project provides for spot painting of

Nisqually Glacier Bridge in Mt Rainier

National Park. Maintenance FLTP-NPS $1,500,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-08

NPS Pacific-

West Region

WA NPS MORA 13(7) Rehabilitate Stevens Canyon

Road, MP 5.0 to 14.0 2020 WA Pierce County Mt Rainier National Park

This project will repair and rehabilitate

approximately 9 miles in the middle of the 19-

mile long Stevens Canyon Road from MP 5 to

14. This will be the final phase of

rehabilitation with two 5 mile segments being

completed previously. Rehabilitation FLTP-NPS $18,225,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-08

NPS Pacific-

West Region

WA NPS MORA 500(2) Mitigate Rockfall Hazards at

Paradise Valley Loop Road 2020 WA Pierce County Mt Rainier National Park

Mitigate Rockfall Hazards at Paradise Valley

Loop Road. Rehabilitation FLTP-NPS $390,625 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-08

NPS Pacific-

West Region

Page 55

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

WA NPS OLYM 12(1) Heart O' the Hills Entrance

Station Improvements 2020 WA Clallam County Olympic National Park

This project will reduce congestion and

improve safety at the Heart of the Hills

Entrance by lengthening the segment with

two inbound lanes by approx 300';

reconfigure traffic lanes for bypass traffic;

and VMS signs. Construction FLTP-NPS $1,320,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-06

NPS Pacific-

West Region

WA NPS OLYM 2019(1) South Beach Culvert

Replacement 2020 WA

Jefferson

County Olympic National Park

This project will replace the existing failed

metal pipe culvert at South Beach

Campground. Reconstruction FLTP-NPS $1,315,600 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Construction WA-06

NPS Pacific-

West Region

WA NPS PP MORA 2019(1) Pavement Preservation

Mt Rainier 2020 WA Pierce County Mt Rainier National Park

This project provides for cyclic pavement

preservation by chip sealing or micro

surfacing SR410, Sunrise Road, and SR 12 in

Mt Rainier National Park. Rehabilitation FLTP-NPS $4,375,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-08

NPS Pacific-

West Region

WA NPS PRES 15(2) Pavement Preservation Olympic 2020 WA Clallam County Olympic National Park Pavement Preservation within Olympic NP. Rehabilitation FLTP-NPS $120,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-06

NPS Pacific-

West Region

WA NPS WHMI 2020(1) Emergency Stabalization for

Mill Creek Bridge 2020 WA

Walla Walla

County

Whitman Mission

National Historic Site

Emergency Stabalization for Mill Creek

Bridge. Rehabilitation FLTP-NPS $85,000 Title 23

Whitman

Mission

National

Historic Site In Design WA-05

NPS Pacific-

West Region

WA PACIFIC 2015(1) Public Access Enhancement to

Willapa National Wildlife Refuge 2020 WA Pacific County

Willapa National Wildlife

Refuge

Replace a failing culvert, repair deteriorating

county road. Construction FLTP-FWS $2,602,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-03

FWS Pacific -

Region 1

WA PEND OREI 1100(1) Flowery Trail Pavement

Preservation Project 2020 WA

Pend Oreille

County Colville National Forest

Rehabilitate and resurface pavement

structure with full-depth reclamation and hot-

mix asphalt paving. Rehabilitation FLAP $2,618,388 Title 23

Pend Oreille

County Planned WA-05

FS Pacific

Northwest -

Region 6

WA PEND OREI 7140(1) Smackout Pass Bridge

Replacement 2020 WA

Pend Oreille

County Colville National Forest

Replace the existing single-lane timber bridge

with a two-lane concrete bridge. Reconstruction FLAP $710,190 Title 23

Pend Oreille

County In Design WA-05

FS Pacific

Northwest -

Region 6

WA PIERCE 2016(1) Fairfax Forest Reserve Road East 2020 WA Pierce County

Mount Rainier National

Park

This project will include the construction of

new culverts, the addition of guardrail, and

pavement resurfacing between Mile post

5.67 and Milepost 7.70 on Fairfax Forest

Road East. Reconstruction FLAP $4,361,001 Title 23

Pierce

County In Design WA-08

NPS Pacific-

West Region

Page 56

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

WA PORT ANGELES 2018(3) Race Street Construction

Phase 1 2020 WA Clallam County Olympic National Park

Construct the first phase of the project

beginning at Lauridsen Blvd to the north and

ending at the National Park Visitor Center

including shared use path, buffered by

landscaping and street trees, and stormwater

retention features. Construction FLAP $3,187,013 Title 23

City of Port

Angeles In Design WA-06

NPS Pacific-

West Region

WA PRA NOCA 10(6) Stehekin Valley Road; Phase 2 2020 WA Chelan County

North Cascades National

Park Reconstruction of Stehekin Valley Road. Reconstruction FLTP-NPS $10,686,208 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Construction WA-08

NPS Pacific-

West Region

WA PRA OLYM 12(2) Hurricane Ridge Road, Phase II 2020 WA Clallam County Olympic National Park

Rehabilitate about 5 miles of the Hurrican

Ridge Road from the intersection of Mt.

Angeles Road to the Heart of the Hills

Entrance Station. Reconstruction FLTP-NPS $8,750,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Construction WA-06

NPS Pacific-

West Region

WA CLALLAM 112(1) Joyce Piedmont Road

Reconstruction 2021 WA Clallam County Olympic National Park

Improve the road by widening, slope failure

repair, drainage repair, fish passage culvert

replacement, partial road realignment to

address extreme horizontal alignment

problems and full repaving. Reconstruction FLAP $7,500,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-06

NPS Pacific-

West Region

WA CLARK 2018(1) E 5th St and NPS Parking

Improvements 2021 WA Clark County

Fort Vancouver National

Historic Site

Improve one-half mile of East 5th Street

within public right-of-way, and redevelop the

national park’s main parking area. Reconstruction FLAP $2,091,930 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-03

NPS Pacific-

West Region

WA DOT 20(7) SR20 Preservation Project, Rock Creek

to Granite Creek (MP 102.09 to MP 148.12) 2021 WA Skagit County

North Cascades National

Park

Bituminous Surface Treatment (BST) of SR 20

from MP 102.09 to MP 148.12. Parking area

paving with Hot Mix Asphalt (HMA) at the

Ross Dam Trailhead for the National Parks

Service. Rehabilitation FLAP $7,013,370 Title 23

Washington

State

Department

of

Transportati

on In Design WA-01

NPS Pacific-

West Region

WA FS STATEWIDE 2019(1) Statewide Revegetation

and Restoration 2021 WA Multiple Not Applicable

Restoration Services team to complete

procurement of plant material and seeds,

initiation and planning of revegetation

efforts, consultation and on-call services for

Federal Lands Access Program projects. Rehabilitation FLAP $82,500 Title 23

Gifford

Pinchot

National

Forest Planned WA-04

FS Pacific

Northwest -

Region 6

WA LINCOLN 9510(1) Miles Creston Road 2021 WA Lincoln County

Lake Roosevelt National

Recreation Area

Will include asphalt surfacing, replace

drainage culverts, remove roadside hazards,

widen and safety enhance road shoulders

and roadside slopes, install guardrail, and

complete other safety enhancements as

determined necessary. MP 3.01-4.66. Construction FLAP $2,242,741 Title 23

Lincoln

County In Design WA-05

NPS Pacific-

West Region

Page 57

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

WA NPS BP OLYM 2019(2) OLYM Bridge Preservation 2021 WA Clallam County Olympic National Park

This project provides for bridge preservation

on six bridges in Olympic National Park:

Dickey River Bridge, Howe Creek Bridge,

Quinault River Bridge, Sol Duc Hot Springs

Bridge, Canning Creek Bridge, and Old Barnes

Creek Bridge. Maintenance FLTP-NPS $1,200,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-06

NPS Pacific-

West Region

WA NPS LARO 208(1) Hawk Creek Road Stabilization 2021 WA Lincoln County

Lake Roosevelt National

Recreation Area Realign and stabilize road. Reconstruction FLTP-NPS $500,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-05

NPS Pacific-

West Region

WA NPS MORA 11(1) Replace Fryingpan Creek

Bridge 2021 WA Pierce County Mt Rainier National Park Replace Fryingpan Creek Bridge. Reconstruction FLTP-NPS $4,250,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-08

NPS Pacific-

West Region

WA NPS OLYM 115(1) Repair Storm Damage on

Mora Road 2021 WA Clallam County Olympic National Park

Permanent repairs on Mora Road (700 linear

ft) to replace installation of interim rip rap

protection. Permanent repairs will include

erosion protection, slump and subgrade

repairs, and paving/striping. Rehabilitation FLTP-NPS $750,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-06

NPS Pacific-

West Region

WA NPS OLYM 2015(3) Olympic Hot Springs Road

Rehabilitation 2021 WA Clallam County Olympic National Park Rehabilitate about 8 miles of Elwha Road. Rehabilitation FLTP-NPS $16,813,470 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-06

NPS Pacific-

West Region

WA PACIFIC 2016(1) Discovery Bay Trail (Willapa

NWR Bicycle/Pedestrian Trail) 2021 WA Pacific County

Willapa National Wildlife

Refuge

Planning study to create a bicycle/pedestrian

path connecting Willapa National Wildlife

Refuge to Lewis and Clark National Historic

Park and vehicle turn lane(s) from Sandridge

Road to 95th Street to allow safe access to

the planned Refuge Visitor Center. Planning FLAP $420,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-03

FWS Pacific -

Region 1

WA PWRO 2010(1) Technical Assistance to NPS PWR 2021 WA Clallam County NPS Pacific West Region PWR Technical Assistance. Operations FLTP-NPS $230,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-06

NPS Pacific-

West Region

WA CLALLAM 2016(1) Dungeness NWR and

Recreation Area 2022 WA Clallam County

Dungeness National

Wildlife Refuge

Expand and resurface existing parking lots,

create speed table, and renovate restroom. Enhancement FLAP $724,808 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-06

FWS Pacific -

Region 1

Page 58

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

WA DOT 14(3) Dog Mtn Trailhead Study 2022 WA Skamania

Columbia River Gorge

National Scenic Area Study relocation of trailhead. Planning FLAP $155,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-03

FS Pacific

Northwest -

Region 6

WA DOT 410(1) SR 410 MP 26.2 to 58.29 2022 WA King, (Pierce)

Mt. Baker-Snoqualmie

National Forest

Will apply Bituminous Surface Treatment

(BST) on SR 410 from MP 26.02 to MP 58.29

in order to rehabilitate and resurface the

existing roadway. Rehabilitation FLAP $6,029,654 Title 23

Washington

State

Department

of

Transportati

on In Design WA-08

FS Pacific

Northwest -

Region 6

WA JEFF 150009(1) Undie Road Relocation 2022 WA

Jefferson

County Olympic National Park

Preserve vehicular access to Olympic National

Forest and Olympic National Park: Bogachiel

Rain Forest Trail #825, the Pacific Northwest

National Scenic Trail, and private property, by

relocating Undie Road. Reconstruction FLAP $2,001,815 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-06

NPS Pacific-

West Region

WA KITTITAS 5301(1) Manastash Rd 2022 WA Kittitas County

Okanogan-Wenatchee

NF

Repair the embankment and washed out

portion of the roadway, widen approximately

0.36 miles of Manastash Road to

accommodate parking for recreational

access, and provide a turn around for

vehicles. Construction FLAP $1,541,004 Title 23

Kittitas

County In Design WA-08

FS Pacific

Northwest -

Region 6

WA KITTITAS 5880(1) Dickey Crk Bridge 2022 WA Kittitas County

Okanogan-Wenatchee

NF

The project will replace the bridge with a

wider and longer structure that will safely

provide access for all vehicles. bicyclists, and

pedestrians, while reducing flood impacts

and restoring natural river processes. Construction FLAP $3,688,900 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-08

FS Pacific

Northwest -

Region 6

WA MASON 1640(1) Skokomish Valley Road 2022 WA Mason County Olympic National Forest

Preserve and improve access to the upper

Skokomish River Valley and the Olympic

National Forest via FS-23 by stabilizing,

strengthening, and elevating the roadway

and improving drainage between MP 3.8 and

MP 4.6 of Skokomish Valley Road. Construction FLAP $1,849,711 Title 23

Mason

County In Design WA-06

FS Pacific

Northwest -

Region 6

WA PIERCE 2018(1) Fairfax Rd Tolmie Crk Bridge 2022 WA Pierce County

Mount Rainier National

Park

Rehabilitate the existing bridge over Tolmie

Creek on Fairfax Forest Reserve Road East. Construction FLAP $3,253,711 Title 23

Pierce

County In Design WA-08

FS Pacific

Northwest -

Region 6

WA SAN JUAN 118(1) MacKaye Harbor Rd (Agate

Beach County Park Road Relocation) 2022 WA San Juan County

San Juan Island National

Monument

Relocate MacKaye Harbor Road inland

approximately 300 feet from the eroding

bluff. Construction FLAP $920,546 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-02

BLM Oregon-

Washingon

Region

Page 59

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

WA CLALLAM 2018(1) Olympic Discovery Trail 2023 WA Clallam Olympic National Park

Construct 11.5 miles of new, non-motorized,

traffic separated, multi-user, shared use

pathway next to SR 110 to provide a safe

bicycling corridor within the widened right of

way of the highway. Construction FLAP $6,157,501 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-06

NPS Pacific-

West Region

WA CLALLAM 2018(2) Dungeness NWR Access

Improvements 2023 WA Clallam

Dungeness National

Wildlife Refuge

The project relocates 1440 feet of the Voice

of America Road which is the main access

road to the Dungeness National Wildlife

Refuge and re-aligns curves on Kitchen-Dick

Road. Construction FLAP $1,999,350 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-06

FWS Pacific -

Region 1

WA FS OKW 76(1) Icicle Creek Road Rock Fall

Mitigation 2023 WA Chelan County

Okangogan Wenatchee

National Forest

The purpose of this project is to address the

unstable slopes causing rock fall on about 1.5

miles of FSR 7600. Rehabilitation FLTP-USFS $250,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WA-08

FS Pacific

Northwest -

Region 6

WA JEFF 4207(1) Upper Hoh Rd Resurfacing 2023 WA

Jefferson

County Olympic National Park

Preserve safe vehicular access to Olympic

National Park by resurfacing 12 miles of

Upper Hoh Road with a combination of chip

seal and asphalt, installing guardrail, and

replacing signs and pavement markings. Rehabilitation FLAP $1,975,672 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-06

NPS Pacific-

West Region

WA NPS MORA 123(2) Rehabilitate Highway 123,

M.P. 3.0 – M.P. 5.2 2023 WA Pierce County Mt Rainier National Park

Rehabilitate Highway 123, M.P. 3.0 – M.P.

5.2, from Stevens Canyon Road Entrance (MP

3.0) to Panther Creek Bridge (MP 5.2). Rehabilitation FLTP-NPS $5,872,500 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-08

NPS Pacific-

West Region

WA NPS OLYM 103(4) Rehabilitate Sol Duc Valley

Road 2023 WA Clallam County Olympic National Park

The project will perform heavy 3R

rehabilitation on 1.92 miles and light 3R

rehabilitation on 5.66 miles of Route 103, Sol

Duc Valley Road and Route 955 Sol Duc Hot

Springs Parking. The project also includes

guardrail and culvert work. Rehabilitation FLTP-NPS $11,097,570 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Planned WA-06

NPS Pacific-

West Region

West Virginia

WV_ERFO_FS_2016-1(3) 2019 WV

Pocahontas,

Randolph,

Greenbrier

Monongahela National

Forest

Emergency repairs on FS-86 from milepost 12

to 15. 3RH ERFO $4,337,688 Title 23 EFLHD In Design WV-02 USFS

WV_ERFO_FS_2016-1(4) 2019 WV

Pocahontas,

Randolph,

Greenbrier

Monongahela National

Forest

Emergency repairs on FS-86 from milepost 8

to 11.1. 3RH ERFO $2,830,108 Title 23 EFLHD In Design WV-02 USFS

WV_ERFO_FS_2016-1(7) 2019 WV

Pocahontas,

Randolph,

Greenbrier

Monongahela National

Forest

Emergency repairs on FS-719B Brushy

Mountain Rd. 3RH_LSR_BRRP ERFO $2,848,752 Title 23 EFLHD In Design WV-02 USFS

WV_FLAP_HUNT_PATH(1) 2019 WV

Cabell and

Wayne

US Army Corps of

Engineers, Harris

Riverfront Park PED bridge & multi-use trail. MISC FLAP $867,000 Title 23 LOCAL In Design WV-03 USACE

Page 60

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

FW_CAVA_102(1) 2020 WV Tucker

Canaan Valley National

Wildlife Refuge

Major Reconst of Camp 70 Rd (RT 102), and

new parking area at (RT 913) 4R FLTP $750,000 Title 23 EFLHD In Design WV-01 FWS

NP NERI TRL(1) 2020 WV Raleigh

New River Gorge

National River

Rehab Mouth of Glade Creek Trail Structure

4780-006T. BRRH FLTP $150,000 Title 23 EFLHD Planned WV-03 NPS

WV FLTP NP GARI(1) 2020 WV Nicholas

Gauley River National

Recreation Area Trail Water Road. 3RL FLTP $550,000 Title 23 NPS In Design WV-03 NPS

WV FLTP NP NERI(1) 2020 WV Raleigh

New River George

National River Grandview and Turkey Spur. 3RH FLTP $1,300,000 Title 23 NPS In Design WV-03 NPS

WV FLTP NP NERI(2) 2020 WV Raleigh

New River George

National River Glade Creek Trail Bridge. BRRH FLTP $112,120 Title 23 NPS In Design WV-03 NPS

WV_ERFO_FS_2016-1(2) 2020 WV

Pocahontas,

Randolph,

Greenbrier

Monongahela National

Forest

Emergency repairs on FS-86 from milepost

15.1 to 18.4. 3RH ERFO $3,790,975 Title 23 EFLHD In Design WV-02 USFS

WV_ERFO_FS_2016-1(5) 2020 WV

Pocahontas,

Randolph,

Greenbrier

Monongahela National

Forest

Emergency repairs on FS-86 from milepost

0.2 to 7.2. 3RH ERFO $3,548,783 Title 23 EFLHD In Design WV-02 USFS

WV_ERFO_FS_2016-1(6) 2020 WV

Pocahontas,

Randolph,

Greenbrier

Monongahela National

Forest

Decommissioning of FS-719 and

rehabilitation of new segment. 3RH_LSR_BRRP ERFO $3,302,692 Title 23 EFLHD In Design WV-02 USFS

WV FLTP NP NERI(3) 2021 WV Raleigh

New River George

National River Rend Trail Bridge 2. BRRH FLTP $363,220 Title 23 NPS In Design WV-03 NPS

Wisconsin

FS_Pvmt_Preservation_FY17(1) 2019 WI Multiple Region Wide

Pavement Preservation in Various Forest

Units MISC FLTP $180,000 Title 23 USFS In Design _VARIOUS USFS

FW_IRRI_10(1) 2019 WI Bayfield

Iron River National Fish

Hatchery

Rehabilitate Entrance Road (Route 10) and

Public Parking Area (Route 900). 3RH FLTP $1,840,000 Title 23 EFLHD

Under

Construction WI-07 NPS

WI FLAP CWFD CTHN(1) 2019 WI Crawford

USFWS, Upper

Mississippi River National

Wildlife and Fish Refuge

Reconstruct CTH N between STH 35 and STH

27 in Crawford County, WI. 3RL FLAP $2,983,280 Title 23 STATE

Under

Construction WI-01 FWS

WI FLAP DOT 35(1) 2019 WI Vernon

USFWS Genoa National

Fish History

Install guardrail, bypass lane, and 4 end

treatments at the high crash area along WI

Route 35. MISC FLAP $234,000 Title 23 STATE

Under

Construction WI-03 FWS

WI_ERFO_FS_2016-1(2) 2019 WI

Ashland,

Bayfield

Chequamegon Nicolet

National Forest Emergency repairs on FS-199 and FS-198. 3RH ERFO $4,118,913 Title 23 EFLHD In Acquisitions WI-07 USFS

WI_ERFO_FS_2016-1(3) 2019 WI

Ashland,

Bayfield

Chequamegon Nicolet

National Forest Emergency repairs on FS-199 and FS-198. BRRC ERFO $1,738,476 Title 23 EFLHD In Design WI-07 USFS

WI_ERFO_FS_2016-1(5) 2019 WI Bayfield, Sawyer

Chequamegon Nicolet

National Forest

Emergency repairs on various roads in

Bayfield and Sawyer Counties. 3RH ERFO $4,564,534 Title 23 EFLHD In Design WI-07 USFS

WI_FLAP_FIFIELD_143(1) 2019 WI Price

US Forest Service,

Chequamegon-Nicolet

National Forest

Replacement of the existing culvert over

Squaw Creek Crossing along FR 143. 3RL FLAP $440,800 Title 23 STATE

Under

Construction WI-07 USFS

WI_FLAP_LACRS_GIP(1) 2019 WI La Crosse

U.S. Army Corps of

Engineers, Goose Island

Park

Goose Island Park CTH GI road, shoreline,

canoe/kayak boat landing improvements. 3RL FLAP $2,835,157 Title 23 LOCAL

Under

Construction WI-03 USACE

Page 61

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

WI_FLAP_POPL_2404(1) 2019 WI Forest

US Forest Service,

Chequamegon-Nicolet

National Forest

Bridge Replacement or open bottom box

culvert with concrete footings off old State

Highway 139. BRRP FLAP $275,600 Title 23 STATE

Under

Construction WI-07 USFS

WI ERFO FS 2016-1(7) 2019 WI Ashland

Chequamegon Nicolet

National Forest

Trail 25 Decommissioning. Design & NEPA

only. Construction by Forest Service. 3RH ERFO $300,000 Title 23 EFLHD Planned WI-07 USFS

WI FLAP BFLD CTHM(2) 2020 WI Bayfield

Forest Service /

Chequamegon-Nicolet

National Forest Rehabilitation of CTHM 3RL FLAP $1,020,000 Title 23 STATE In Design WI-07 USFS

WI_ERFO_FS_2016-1(6) 2020 WI Bayfield, Sawyer

Chequamegon Nicolet

National Forest FR 383 Snake Road Decommissioning. 3RH ERFO $961,754 Title 23 EFLHD In Design WI-07 USFS

WI_FLAP_RUSL_LSBR(1) 2020 WI Bayfield

NPS, Apostle Islands

National Lakeshore

Roadway rehab, widening, shoulder

construction, drainage improvements, and

miscellaneous work. 3RH_3RL FLAP $526,388 Title 23 STATE In Design WI-07 NPS

WI_FLAP_RUSL_OCHK(1) 2020 WI Bayfield

NPS, Apostle Islands

National Lakeshore

Roadway rehab, widening, shoulder

construction, drainage improvements, and

miscellaneous work 3RH_3RL FLAP $1,892,040 Title 23 STATE In Design WI-07 NPS

WI_FLAP_TRIPP_FRVW(1) 2020 WI Bayfield

Iron River National Fish

Hatchery

Reconstruction of 1 mile of Fairview Road in

Tripp Township, WI. 3RH FLAP $300,184 Title 23 STATE In Design WI-07 FWS

FW-UPLA 100(1) 2021 WI La Crosse

LaCrosse District, Upper

Miss. NWFR Rail Crossing Work 3RH FLTP $3,240,000 Title 23 FWS Planned WI-03 FWS

WI FLAP ASH FH32(1) 2021 WI Ashland

Forest Service/

Chequamegon- Nicolet

National Forest

Milling and resurfacing 9.2 miles of Forest

Highway 32 through Chequamegon-Nicolet

NF. 3RL FLAP $1,020,000 Title 23 STATE In Design WI-07 USFS

WI FLAP WASH 2178(1) 2021 WI Vilas

Forest Service,

Chequamegon- Nicolet

National Forest

Resurfacing, widening, increased shoulder

width & improve safety on Military Road (RT

2178) 3RL FLAP $677,000 Title 23 STATE In Design WI-07 USFS

WI_FLAP_FENC_2183(1) 2021 WI Florence

US Forest Service,

Chequamegon-Nicolet

National Forest

Rock Creek Bridge Replacement P-19-0902,

south of Popple River. BRRP FLAP $291,840 Title 23 STATE In Design WI-07 USFS

Stockfarm Birdge Replacement 2022 WI Ashland

Chequemegon-Nicolet

NF

Replacement of a 63-year old, seven-span,

single lane, timber bridge with new, three-

span, 2-lane timber bridge. BRRP FLTP $1,400,000 Title 23 USFS Planned WI-07 USFS

FW_TREM_10(1) 2022 WI Buffalo

Trempealeau National

Wildlife Refuge

Safety improvements for Entrance Road

(Route 10) 3RL FLTP $2,100,000 Title 23 EFLHD In Design WI-03 FWS

Wyoming

WY FLAP 30400(1) GROS VENTRE ROAD 2020 WY Teton Bridger-Teton NF

Rehabilitate and repave 3.8 miles of Gros

Ventre Road. 3R FLAP $3,400,000 Title 23 CFLHD Active WY-1 FS-R4

WY FTBR BOYSEN ACCESS RD (1) BOYSEN ACCESS RD

AND PARKING 2020 WY Fremont Boysen Reservoir

Repave 1.9 mi. access road and parking area.

And guardrail 3R FTBR $1,100,000 Title 23 CFLHD Active WY-1 BOR-GP

WY FLAP 407(1) KORTES ROAD 2021 WY Natrona BLM Casper Field Office

Rehabilitate and repave 7 miles of Kortes

Road. 3R FLAP $9,040,000 Title 23 CFLHD Active WY-1 BLM-WY

WY/CO FTFS MICHIGAN RIVER BRIDGE

REPLACEMENT 2021 WY Jackson

Medicine Bow-Routt NF

& Thunder Basin NG Bridge replacement BR FTFS $600,000 Title 23 CFLHD Not Started CO-3 FS-R2

Page 62

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA RegionWY FLAP 740(1) SKYLINE DRIVE AND FREMONT LAKE

RD 2022 WY Sublette Bridger-Teton NF

Reconstruct and widen 4.2 miles of Skyline

Drive and Fremont Lake Road. 3R4R FLAP $8,110,000 Title 23 CFLHD Active WY-1 FS-R4

WY FTFS 302(1) ROARING FORK ROAD 2023 WY Fremont Shoshone NF Rehabilitation of Roaring Fork Rd. 3R FTFS $390,000 Title 23 CFLHD Not Started WY-1 FS-R4

WY_FLAP_FREMO_277(1) 2020 WY Fremont

Shoshone National

Forest, BLM, Washakie

Wilderness and Wind

River Reservation

Replacement of 87 ft span bridge and

reconstruction of 0.10 mi of bridge

approaches. BRRP FLAP $2,240,000 Title 23 EFLHD In Design WY-AtLarge USFS

WY_FLAP_FREMO_285(1) 2020 WY Fremont

Shoshone National

Forest

0.8 mi rdway improvements along Horse

Creek Rd, med 4R work realign/widen rd to

28 ft min drainage. 3RL_4R FLAP $2,570,000 Title 23 EFLHD In Design WY-AtLarge USFS

WY DOT 22(1) Wyoming Teton Pass Centennial Trail 2020 WY Teton County

Caribou-Targhee

National Forest

Construct a mixed-use pathway from the

WY/ID state line to the Trail Creek

Campground ; plan, permit, and design a

pathway from Trail Creek Campground to

Coal Creek Trailhead; plan and permit a

pathway from Coal Creek Trailhead to the

Teton Pass summit. Construction FLAP $1,512,116 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WY-at large

FS

Intermountain

- Region 4

WY NPS GRTE 700(4) Grand Teton Park Pathways,

Phase IV Roundabout 2020 WY Teton County

Grand Teton National

Park Road construction intersection. Reconstruction OTHER $5,223,802 Title 23

Western

Federal

Lands

Highway

Division,

FHWA Construction WY-at large

NPS

Intermountain

Region

WY NPS YELL 10(22) Canyon to Tower, Phase 3

(NSFLTP funded) 2020 WY Park County

Yellowstone National

Park

Canyon to Tower, phase 3 reconstruct 8.7

miles of road from Canyon (Chittenden road)

to Tower jct. to a 24 foot top width. Reconstruction FLTP-NPS $43,518,750 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WY-at large

NPS

Intermountain

Region

WY NPS YELL 12(3) Northeast Entrance Road (Design

Only) 2020 WY Park County

Yellowstone National

Park

Reconstruction of NE Entrance Road to 4R,

bridge widenings and potential realignment

areas. Rehabilitation FLTP-NPS $5,000,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WY-at large

NPS

Intermountain

Region

WY NPS YELL 2019(1) Roosevelt Lodge Parking Lot 2020 WY Park County

Yellowstone National

Park

Reconstruct Roosevelt Lodge Parking Lot

within Yellowstone National Park. Rehabilitation OTHER $4,125,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WY-at large

NPS

Intermountain

Region

WY NPS YELL 2020(1) Conduct ATS Study in Focal

Corridors of YNP

Feasibility Study in Focal Corridors of

Yellowstone National Park 2020 WY Park County

Yellowstone National

Park

Conduct Alternative Transportation

Feasibility Study in Focal Corridors of

Yellowstone National Park. Planning FLTP-NPS $405,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WY-at large

NPS

Intermountain

Region

Page 63

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

WY PRA GRTE 100(2) Moose Wilson Rd Realignment 2020 WY Teton County

Grand Teton National

Park

Preferred alternative is $32 million with

minor re-alignment, improvements along the

road way and movement of 2 entrance

stations. Reconstruction FLTP-NPS $31,250,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WY-at large

NPS

Intermountain

Region

WY NPS GRTE 2017(1) Moose Wilson Road Phase 1 2021 WY Teton County

Grand Teton National

Park

Provide design and program management

support for delivery of Moose Wilson

Corridor Construction. Rehabilitation FLTP-NPS $50,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WY-at large

NPS

Intermountain

Region

WY NPS YELL 10(23) Grand Loop Rd-Old Faithful to

West Thumb (Design Only) 2022 WY Park County

Yellowstone National

Park

3R treatment is needed at this time to

preserve this reconstructed road, road needs

an overlay or a cold in place recycle with an

overlay. Rehabilitation FLTP-NPS $300,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WY - at Large

NPS

Intermountain

Region

WY NPS YELL 10(24) Grand Loop Road Norris to

Golden Gate, Phase 3 2022 WY Park County

Yellowstone National

Park Reconstruction Norris to Golden Gate. Reconstruction FLTP-NPS $27,500,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WY-at large

NPS

Intermountain

Region

WY NPS YELL 12(2) Yellowstone River Bridge 2022 WY Park County

Yellowstone National

Park Repair Yellowstone River Bridge. Rehabilitation FLTP-NPS $35,000,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WY-at large

NPS

Intermountain

Region

WY NPS YELL 14(1) Lewis River Bridge 2022 WY Park County

Yellowstone National

Park Replace Lewis River Bridge. Rehabilitation FLTP-NPS $21,250,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WY-at large

NPS

Intermountain

Region

WY NPS YELL 2015(2) Yellowstone 3 Parking Lots

(Design Only) 2022 WY Park County

Yellowstone National

Park

Reconstruct three parking areas within

Yellowstone National Park. These parking

areas are located at Norris Geyser Basin,

Roosevelt Lodge, and at the Brink of Upper

Falls. Rehabilitation FLTP-NPS $1,500,000 Title 23

Western

Federal

Lands

Highway

Division,

FHWA In Design WY-at large

NPS

Intermountain

Region

WY FTFS BLACK MOUNTAIN ROAD 2021 WY Sheridan Bighorn NF Road reconditioning/culvert replacement 3R FTFS $197,000 Title 23 FS-R2 Not Started WY-1 FS-R2

WY FTFS BUCKING MULE FALLS TRAIL 2021 WY Big Horn Bighorn NF

Reconstruction and restoration of 8 miles of

National Recreation Trail 3R FTFS $37,100 Title 23 FS-R2 Active WY-1 FS-R2

WY FTNP DETO Upper Parking 2020 WY Crook Devils Tower NM Repave Upper Parking lot (accessibility) Other FTNP $412,000 Title 23 NPS-DSC Not Started WY-1 NPS-IMR

Various (EFL)Regional Pavement Preservation Project 2019 ZZ Various Various Regional Pavement Preservation Project 2R FLTP $720,000 Title 23 USFS Under Construction_VARIOUS USFS

SER Geotech FY19 2019 ZZ Various Various Geotech Slope Stability Study Study FLTP $500,000 Title 23 EFLHD Planned _VARIOUS NPS

Page 64

Transportation Improvement Program, FY 2020 to FY 2023

Consolidated Federal Lands Highway Divisions

Federal Highway Administration

Project Name

Award

Year State County FLMA Unit Project Description Type of Work

Primary

Fund Source

Program

Amount

Funds

From Title

Delivered

By Phase

Congressional

District FLMA Region

SER Bridge Deck Studies FY 19 2019 ZZ Various Various

Bridge Deck Studies (BLRI, GSRM, NATR,

RUCA) Study FLTP $400,000 Title 23 EFLHD Planned _VARIOUS NPS

GRSM Park Road Slope Assessments 2019 ZZ Various

Great Smoky Mountains

NP GRSM Park Road Slope Assessments Study FLTP $40,000 Title 23 NPS Planned _VARIOUS NPS

NP_SER_BMS_FY18(2) 2019 ZZ Various Various

FY 18 REGION WIDE BMS, VNM Park 11

Structures BRRH FLTP $350,000 Title 23 EFLHD In Acquisitions _VARIOUS NPS

SER_PMS_FY18(1) 2019 ZZ Various Various Pvmt Preservation Projects for Small Parks 2R FLTP $2,000,000 Title 23 EFLHD Planned _VARIOUS NPS

SER Geotech FY20 2020 ZZ Various Various Geotech Slope Stability Study Study FLTP $500,000 Title 23 EFLHD Planned _VARIOUS NPS

SER Bridge Deck Studies FY 20 2020 ZZ Various Various

Bridge Deck Studies (BLRI, GSRM, NATR,

RUCA) Study FLTP $100,000 Title 23 EFLHD Planned _VARIOUS NPS

NP SER PMS FY19(2) 2020 ZZ Various Various Pavement preservation for small parks FY19. 2R FLTP $4,850,000 Title 23 EFLHD In Design _VARIOUS NPS

NP SER PMS FY19(3) 2020 ZZ Various Various Pavement preservation for small parks FY19. 2R FLTP $2,850,000 Title 23 EFLHD In Acquisitions _VARIOUS NPS

NP SER PMS FY19(4) 2020 ZZ Various Various

FY19 PMS for FODO & ABLI National

Historical Park. 2R FLTP $3,177,000 Title 23 EFLHD In Design _VARIOUS NPS

NP SER PMS FY20 2020 ZZ Various Various Pavement preservation for small parks FY20. 2R FLTP $6,000,000 Title 23 EFLHD In Design _VARIOUS NPS

SER_PMS_FY19(1) 2020 ZZ Various Various

FY19 REGION WIDE PAVEMENT

PRESERVATION PROJECTS. 2R FLTP $2,000,000 Title 23 EFLHD In Design _VARIOUS NPS

SER Bridge Deck Studies FY 21 2021 ZZ Various Various

Bridge Deck Studies (BLRI, GSRM, NATR,

RUCA) Study FLTP $100,000 Title 23 EFLHD Planned _VARIOUS NPS

NP SER PMS FY21 2021 ZZ Various Various Pavement Preservation for Small Parks 2R FLTP $6,000,000 Title 23 EFLHD Planned _VARIOUS NPS

NP BLRI BMS FY21(1) 2021 ZZ Various BLRI FY21 Bridge Preventive Maintenance at BLRI. BRRH FLTP $500,000 Title 23 EFLHD Planned _VARIOUS NPS

NP NATR BMS FY21(1) 2021 ZZ Various Various FY 21 REGION WIDE BMS, AT NATR PKWY. BRRH FLTP $500,000 Title 23 EFLHD Planned _VARIOUS NPS

SER Bridge Deck Studies FY 22 2022 ZZ Various Various

Bridge Deck Studies (BLRI, GSRM, NATR,

RUCA) Study FLTP $100,000 Title 23 EFLHD Planned _VARIOUS NPS

NP SER PMS FY22 2022 ZZ Various Various Pavement Preservation for Small Parks 2R FLTP $6,000,000 Title 23 EFLHD Planned _VARIOUS NPS

NP NATR BMS FY22(1) 2022 ZZ Various Various FY 22 REGION WIDE BMS, AT NATR PKWY. BRRH FLTP $500,000 Title 23 EFLHD Planned _VARIOUS NPS

Page 65