Workshop Agenda
• Public Involvement Summary
• Analysis Results
• Conceptual Networks
– Roadway
– Bike and Pedestrian
• Overall Strategy
• Short/Mid/Long-term Plans
TRANSPORTATION MASTER PLAN UPDATE
Public Involvement Summary - Issues
Regional • Mobility to Austin • More options to
enter and exit Buda
City • East/west mobility • Cyclists on major
roads • Crossing IH 35 • No alternate routes • Downtown
Local • Subdivision access • All forms of
connectivity • Intersection layouts • Walking or biking
are not options
TRANSPORTATION MASTER PLAN UPDATE
Public Involvement Summary - Needs
Regional • Ramps on IH 35 • SH 45 to Mopac • Commuter rail
City • Additional E/W
corridors • Bike facilities on
key roads
Local • Turn lanes • Add sidewalks to
major roads • Alternate routes
TRANSPORTATION MASTER PLAN UPDATE
Public Involvement Summary - Priorities How would you spend $1.00 on
transportation? • High demand for better mobility
– especially roads and sidewalks
• Many comments about issues
where respondents live
• Public opinion divided on bike
facilities and transit service
TRANSPORTATION MASTER PLAN UPDATE
Expand Existing
Roads, 0.29
Build New Roads, 0.19
Build Bike Lanes, 0.09
Add sidewalk connections,
0.18
Add local bus service, 0.07
Add commuter bus to Austin
and San Marcos, 0.13
Other, 0.04
Analysis – Existing Conditions
Many projects ongoing or completed
$61M in planned transportation projects –
with uncertain funding
Many major roads need reconstruction or
expansion, plus addition of sidewalks
Main Street - Four-Lanes to IH 35
Overpass at Robert S. Light/Hillside
FM 1626 North of FM 967 (going to bid)
Main/Bradfield traffic signal (at bid)
IH 35 ramp changes (under design)
Safe Routes to School
TRANSPORTATION MASTER PLAN UPDATE
Analysis – Future Growth
2010 2035 Growth
2035 Density
TRANSPORTATION MASTER PLAN UPDATE
Analysis – Future Transportation Needs
More East/West Corridors
Use major projects to complete bike
and pedestrian network
Use Transportation Plan to create
connectivity within new subdivisions
• West of IH 35 – The Main/FM 967 corridor will be overloaded if
Robert S. Light & SH 45 South are not done
– Robert S. Light (to FM 2770) is short-term
– SH 45 South: Most beneficial, but very long term
• East of IH 35
– FM 2001 is projected to be overcapacity
– Develop: Old Goforth and Hillside Terrace
TRANSPORTATION MASTER PLAN UPDATE
Draft Roadway and Bike/Pedestrian Plans
Review Existing
Conditions
Determine Short & Long Term Needs
Propose Solutions
Develop Short/Long Range Plans
Program & Build
• Overall Networks
• General Strategy
• Recommendations
– Short-Term
– Mid-Term
– Long-Term
TRANSPORTATION MASTER PLAN UPDATE
Recommended Roadway Network Plan
Recommended Pedestrian and Bicycle Network Plan
General Strategy Two conclusions: 1. Buda will undergo rapid transportation network changes in the next few years.
2. Network changes could radically alter major traffic movements. Two recommendations: 1. Develop the Truck Bypass to FM 2770.
2. Rebuild existing corridors; add pedestrian and bike facilities based on nearby
development.
TRANSPORTATION MASTER PLAN UPDATE
Context-Sensitive & Complete Streets
Complete Streets: Account for bike/pedestrian needs in all phases.
Crossing with median refuge
Bike Lane
Source: National Complete Streets Coalition
Context-Sensitive: Design for existing/anticipated use
Context–Sensitive: Pedestrian Facilities Land-Use Solution Single-family homes 6-foot sidewalks Retail 10-foot sidewalks
Context–Sensitive: Median Context Solution
Few cross streets Undivided, with turn bays at cross streets
Many cross streets – low volume Center-turn lane
TRANSPORTATION MASTER PLAN UPDATE
Context-Sensitive & Complete Streets
Complete Streets: Account for bike/pedestrian needs in all phases.
Crossing with median refuge
Bike Lane
Source: National Complete Streets Coalition
Context-Sensitive: Design for existing/anticipated use
Context–Sensitive: Pedestrian Facilities Land-Use Solution Single-family homes 6-foot sidewalks Retail 10-foot sidewalks
Context–Sensitive: Median Context Solution
Few cross streets Undivided, with turn bays at cross streets
Many cross streets – low volume Center-turn lane
TRANSPORTATION MASTER PLAN UPDATE
Project Development and Prioritization
What is the benefit of the project? (safety, mobility, connectivity) Is the project fiscally prudent? (“bang for the buck”) Is there support for the project, and is it city-wide or specific area? (build widely accepted projects first)
Typical Section
Road Classification
Context-Sensitive
Complete Streets
TRANSPORTATION MASTER PLAN UPDATE
Consider Roundabouts instead of Traffic Signals
Strengths of Roundabouts – Work Well at Unusual Intersections – Handles High Volume of Turns – Traffic Calming Benefits – Generally Safer than Signals
Weaknesses of Roundabouts – $$ for ROW Requirements – Nearby Traffic Lights Reduce Effectiveness
TRANSPORTATION MASTER PLAN UPDATE
Potential Roundabout Locations
– Bluff/W. Goforth/FM 967
– Hillside Terrace/Old Goforth
– Old FM 2001/Old Goforth/Glenview
Truck Bypass + IH 35 Ramps Will Have a Major Impact • Trucks have alternative to downtown • Direct access to Truck Bypass • More routes to/from IH 35 for west Buda residents
TRANSPORTATION MASTER PLAN UPDATE
The Truck Bypass is the Top Priority • Only Improvement with Consensus • Addresses Comprehensive Plan Concerns • Phase II is south of Onion Creek
TRANSPORTATION MASTER PLAN UPDATE
TRANSPORTATION MASTER PLAN UPDATE
Short-Term Recommendations - Corridors Type Project From To Cost Project Description
Roadway
Robert S. Light Blvd FM 2770 FM 967 $12,600,000 Construct four-lane divided road with sidewalks. Construct bridge over railroad
Old Goforth Rd Old FM 2001 Hillside Terrace $4,560,000 Reconstruct two-lane road, add center turn lane and
sidewalks
Old Black Colony Rd FM 1626 FM 967 $9,450,000 Reconstruct two-lane road, construct sidewalks, construct bridge structure to form new intersection with FM 967
Bluff St FM 2770 FM 967 $1,620,000 Reconstruct two-lane road with sidewalks
FM 967 FM 1626 Onion Creek $7,240,000 Reconstruct two-lane road, add turn lane and shoulders, add sidewalks. Connect to proposed Garlic Creek Trail.
Main St Cedar St Cabela's Dr $4,340,000 Reconstruct and widen to four-lanes with bike lanes and sidewalks. Minimize tree removals.
Old FM 2001 FM 2001 Old Goforth Rd $1,670,000 Reconstruct two-lane road, add center turn lane and
sidewalks
W. Goforth Rd Cedar St IH 35 $4,090,000 Reconstruct with bike lanes
Pedestrian / Bike
New FM 2001 Old FM 2001 Sunbright Blvd $210,000 Add 10' sidewalks on both sides
W. Goforth Rd FM 967 Cedar St $40,000 Add sidewalk on one side
Garlic Creek Trail Pedestrian Bridge FM 967 $400,000 Construct 10' hike/bike path
Short-Term Recommendations - Intersections
Road 1 Road 2 Cost Improvement Note Main St Cabela's Dr $5,000 Signal Coordination on Main Street Main St Old San Antonio Rd $5,000 Signal Coordination on Main Street Main St IH 35 $5,000 Signal Coordination on Main Street Main St Garison $300,000 Intersection Improvements Pending further study
Main St FM 967 $50,000 Add southbound right-turn lane
IH 35 Cabela's Dr $160,000 Intersection improvements, relocate signal poles. Sunfield TIA
New FM 2001 Sunbright Blvd $170,000 Study traffic signal warrant, construct signal Sunfield TIA
Main St Firecracker Rd $170,000 Study traffic signal warrant, construct signal Sunfield TIA
Main St Sequoyah St $170,000 Study traffic signal warrant, construct signal
Main St FM 2770 $20,000 Intersection Analysis FM 967 Garlic Creek Dr N/A – Note Intersection Analysis Part of FM 967 project FM 2770 Bluff Street N/A – Note Intersection Analysis Part of Bluff St project FM 967 Bluff Street N/A – Note Intersection Analysis Part of Bluff St project
TRANSPORTATION MASTER PLAN UPDATE
Mid-Term Recommendations - Corridors
Type Project From To Cost Project Description
Roadway
Bluff St Extension FM 2770 FM 967 $1,100,000 Construct two-lane collector with sidewalks
Robert S. Light Blvd FM 1626 FM 2770 $24,160,000 Construct four-lane divided arterial with sidewalks
Hillside Terrace IH 35 Old Goforth Rd $2,990,000 Construct four-lane road with sidewalks
Cabela's - Goforth W. Goforth Rd Cabela's Dr $2,560,000 Construct two-lane road with sidewalks
FM 967 W. Goforth Robert S. Light Blvd $2,490,000 Construct four-lane undivided with
sidewalks
Dacy Ln Hillside Terrace
Beebe Rd (Kyle) $16,400,000
Reconstruct and widen to four-lane undivided, add center turn lane at key intersections
Pedestrian / Bike
Old San Antonio Rd Cabela's Dr Main St $90,000 Add sidewalk on one side
FM 2770 Bluff St Main St $30,000 Add sidewalk on one side
Garlic Creek Trail FM 967 GC Pedestrian Bridge
$170,000 Construct 10' hike/bike path
TRANSPORTATION MASTER PLAN UPDATE
Mid-Term Recommendations - Intersections
Road 1 Road 2 Cost Improvement Note Glenview Ln Old Goforth Rd $500,000 Intersection Analysis - Potential
Roundabout
Hillside Terrace Old Goforth Rd N/A – Note Intersection Analysis - Potential Roundabout
Part of Hillside Terrace Project
Bluff St/W. Goforth/FM 967 Main St $500,000 Potential Roundabout Coordinate with Union
Pacific, TxDOT
Main St Collector 4 $170,000 Study traffic signal warrant, construct signal Sunfield TIA
Robert S. Light Blvd FM 1626 $170,000 Study traffic signal warrant, construct signal
TRANSPORTATION MASTER PLAN UPDATE
Long-Term Recommendations
Project From To Cost Project Description Main St IH 35 Collector 2 $1,667,000 Widen to six-lanes, recommended by Sunfield TIA
Old San Antonio Rd Main St ETJ $2,060,000 Reconstruct two-lane road with sidewalks
Hillside Terrace Old Goforth FM 2001 $5,330,000 Construct four-lane road with sidewalks
Garison Rd Main St current terminus $4,410,000 Reconstruct two-lane road with sidewalks
Garlic Creek Parkway FM 967 SH 45 (S) $18,110,000 Construct four-lane divided parkway with sidewalks. Alignment TBD after identification of interchange with SH 45
Main St Cabela's Dr IH 35 $800,000 Widen to six-lanes
Kelly Smith Ln IH 35 Dacy Ln $2,880,000 Reconstruct two-lane road, add turn lane and sidewalks.
TRANSPORTATION MASTER PLAN UPDATE
Road 1 Road 2 Cost Improvement Note FM 967 FM 1626 $20,000,000 Overpass Coordinate with TxDOT
Transit Strategies
Express Bus – Coordinate with Cap Metro to plan express routes to Austin and San Marcos
– Park-and-Ride to complement express routes
– Coordinate with Hays County, Kyle, San Marcos, Texas State University
Special Event – discuss with Chamber of Commerce to plan events and funding sources
Commuter Rail – Continue discussions with LSTAR
TRANSPORTATION MASTER PLAN UPDATE
Potential Park and Ride Locations
1. Lease from store lots
2. Rehabilitate Old Truck Stop
3. Add parking to Sportsplex
4. Downtown by City Hall
TRANSPORTATION MASTER PLAN UPDATE
CONSULTANT TEAM REPRESENTATIVES: Project Manager: Graham Moore, PE [email protected] Project Planner: David Manuel, AICP [email protected] Project Engineer: Tom Gerrity, PE [email protected]
CITY TEAM REPRESENTATIVES:
City Engineer: Stanley Fees, PE [email protected]
Director of Planning: Chance Sparks, AICP [email protected] Assistant City Manager: Brian LaBorde, AICP [email protected]
DISCUSSION
TRANSPORTATION MASTER PLAN UPDATE