TRANSPORTATION OF HOUSE
It has Mainly two Steps As Mentioned Below;(1) House and Building Lifting(2) House and Building Moving
Reasons for transporting ahouse
i. A new house is built off-site by a buildingcompany that either specialises in building
removable homes, or is selling a show home.
-
7/31/2019 Transportation of House-2
3/20
ii. A house is built in the contractors yard and latermoved to a new site.
iii. An old house is bought, either from a buildingremoval companys sale-yard, or from an existingsection, and transported to a new site for
restoration and renovation.
iv. A house is moved to a better position on the samesite to allow for a subdivision or better use of thesection.
1)House and Building Lifting
-
7/31/2019 Transportation of House-2
4/20
House Movers has the latest and best in structurallifting technology in their Unified Hydraulic Jacking
System. The hydraulic jacking pump synchronizes the
pressure to the jacks so that the whole building willlift evenly without racking. This keeps the cracks in
the drywall or plaster to a minimum and sometimes
non-existent.
There are many scenarios where lifting your home can
be a viable option. Some of the most common examples
are flooding, short basement/crawlspace, adding
another story and commercial renovation.
Each year different areas of the country get more rainthan what the local rivers, canals and storm drains canhandle. If your home or local business is in one of these
areas and has been flooded once or many times, we can
help. You will need to find out from the town where the
100 year flood plain is for your property.
Lifting above this level will give you added protectionfrom the big storms and many times will cut your floodinsurance drastically. Sometimes houses need lifted just
one block (8) and sometimes they need 12 or more.
No matter what height you would like to lift your
structure, Wolfe House and Building Movers can handle
-
7/31/2019 Transportation of House-2
5/20
your project with ease and support it in place while
your mason builds the foundation up underneath.
Adding Head Room to Your Basement/Crawlspace: If you live in a house with only a 6 basement, a
partial basement or even just a crawlspace, than this
service could be an excellent choice for you. In this case
there are two different options or combinations that can
happen. Option number one is to raise your house to an
elevation that gives you the desired head room in yourbasement area.
Option number two is to support your houseright where it is and excavate below it for the desired
basement space. Any combination of those two options
is possible and we at Wolfe House Building Movers
would be happy to discuss those options with you tofigure out what the best solution would be. Also, it
would be wise in many cases to consult an architect for
a professional opinion on what option should be chosen.
Concrete Slab Floors Although concrete slab floors seem to be immovable,
House Movers have lifted and moved many structures
-
7/31/2019 Transportation of House-2
6/20
including their concrete floors. For a residence or a
business; if the building is nice inside and you cant afford
to be out of it long at all, we can lift the slab floor right up
with the building. Once lifted, there must be at least a 4crawl space built under it and permanent steel beams set
under it every 5 for support.
The alternate to lifting the slab floor would be to lift thehouse up off of the slab.
This would require the entire lower floor of the house to
be emptied (lower cabinets, furniture, appliances,
bathroom fixtures, etc.) and the steel lifting beams to be
installed through the frame walls at approximately 3 to 4
above the floor. Once the house is lifted, the foundation
walls can be built up and a new wood floor system built.
Then the house will be set back down onto the wood floorsystem. This will require a significant amount of
remodeling (drywalling, painting, etc.) to be done on the
lower 4 of the walls.
-
7/31/2019 Transportation of House-2
7/20
(2)House and Building Moving
Structural moving includes the combination ofSupporting & Lifting and then things start going in a
whole different direction pun intended. With the
latest in radio remote-controlled hydraulic dollies, the
Buckingham Power and Coaster Dollies brings the levels
of stress on your building to a historic low.
Structural moving includes the combination ofSupporting & Lifting and then things start going in a
whole different direction pun intended. With the
latest in radio remote-controlled hydraulic dollies, theBuckingham Power and Coaster Dollies brings the levels
of stress on your building to a historic low.
-
7/31/2019 Transportation of House-2
8/20
The Buckingham Dollies are designed and built in houseand then used for all of our relocation projects as well
as rented and sold to other riggers and structural
movers around the world.
It can move structures of any size, weight or typeincluding frame, stone, brick, block, log and steel along
with the possibility of moving the concrete slab floor along
with some buildings. The reasons for moving a structure
can vary across the board from saving a piece of history
from demolition, to moving a building sideways 2 because
it was built too close to the property line, to the problem
of a house being built in an area that is repeatedly
flooding. Any structure can be moved for any reason and
there has never been a structure large enough or heavy
enough that it could not be moved. Rather the feasibility of
the project hinges on a clear move route being possible totake it where you want it to go.
There are four basic things to check into for eachmove route: tree trimming/removal, traffic control,
overhead utility line removal and if your project goes
off-road, then excavation may apply as well.
Tree trimming is fairly self explanatory; any trees or
limbs that would be within the projected move route
must be cut down or cut back ahead of time. Most times
our customers hire a professional tree trimmer to clear
-
7/31/2019 Transportation of House-2
9/20
the route before hand and also to be along the day of the
move in case of anything that might have been missed.
Traffic control can be as little at stopping traffic whilewe cross the road or as much as a full detour on a mainroad while we come through. Many times a Local or
State Police escort will be required when going down
the road. You or your contractor must talk with the local
police or traffic planner to see what will be required for
you specifically. If a detour is proposed, than usually atraffic plan will need to be submitted as well.
3)Even a single story house will usually be up into thelowest of these wires by the time we get it onto the steel
and wheels that we use for moving. To check into the
cost of moving these wires, you or your contractor
-
7/31/2019 Transportation of House-2
10/20
should plan a route for the house, geta loaded height
from Wolfe House Movers and then call each of the
utility companies that own wires in that route. Most
cases require calls to the electric, cable and telephonecompanies. They will likely have to come out, drive the
route themselves and then they may give you a firm
price or they might give you a per hour charge for each
of their crews that they will send out. This can be a
deciding factor in some moves so it would be wise to
check into these prices before making the decision tomove ahead with your project.
4) Overhead utility lines can be very expensive and timeconsuming to move. For this reason, most of the moves
that we do on the East Coast are within several miles.
Overhead lines can be as low as 13 6 above the road,
although in most rural areas they are usually morearound 15 to 18 above the road.
-
7/31/2019 Transportation of House-2
11/20
5) Excavation applies to getting out of the old property,into the new property and any off-road traveling that we
might do in between.
House Movers has the equipment to easily travel most
fields, meadows and rolling pastures. We can put down
large steel plates to build a road if the ground is too soft and
it can even build bridges with steel beams to cross over
ditches, streams and creeks. Depending on the terrain,
excavation may be required to bring the building through to
where it is going.
In can handle fairly steep grades but too steep of hills or
drop offs can cause problems. This is something you can go
over with the estimator when he comes out for a site visit.
Another part of excavating the move route is digging a ramp
from ground level down to the footers of the new
foundation if it is required for your project.
STEPS TO MOVING OLD HOUSES
These are the steps in a house moving project:
1. Choose the houseit may be on an existing site or
for sale in a building removal companys yard.
2. Check the house - have the house checked by a
plumber, electrician and builder. It pays to take care when
choosing an old house for relocation. While it might seem
-
7/31/2019 Transportation of House-2
12/20
cheap, the cost of restoring it could negate any savings you
make and cost you far more than buying or building new.
3. Choose the building removal company - talk to people
who have done it before and find out who they would
recommend. Choose a firm with a good reputation. You can
find building removal companies in the Yellow Pages.
4. Contact the building consent authority - find out
what you need in the way of building and resource consents.
5. Organise insuranceyoull need cover for the house
while it is being moved and while the renovation work is
being done.
6. Moving the house - the building removal company
moves it from its yard or its existing site onto the new site
and places it onto the foundations.
-
7/31/2019 Transportation of House-2
13/20
7. Connecting to services and upgrading the house -
you will have to organise for services to be connected, i.e.
telephone, electrical, and plumbing. Then you can begin the
necessary alterations, renovations and decorating, making
sure you obtain the right consents from the council and your
building consent authority.
Reasons for transporting a house A new house is built off-site by a building company that
either specialises in building removable homes, or is
selling a show home.
A house is built in the contractors yard and later moved toa new site.
An old house is bought, either from a building removalcompanys sale-yard, or from an existing section, and
transported to a new site for restoration and renovation.
A house is moved to a better position on the same site toallow for a subdivision or better use of the section.
Old homes for relocation
People choose to recycle an old house rather than building
new because:
-
7/31/2019 Transportation of House-2
14/20
They can acquire a character home which they canrenovate.
They like the native timbers used in a lot of older homesand which are now becoming harder to obtain.
It can work out cheaper than building new.
Consents requiredWhen you relocate a house you will have to apply for:
Building consents to uplift the house from its current siteand to re-establish it on the new site.
A Project Information Memorandum (PIM) for both theorigin and destination.
Resource consent, in most cases.
-
7/31/2019 Transportation of House-2
15/20
Talk to your building consent authority before you start, and
ask for details of their application requirements.
It is best to apply for the building and resource consents at the
same time so that building and environmental factors can be
considered together.
Building consentsAt the place of origin you will need building consents for:
Lifting the building off its foundations and separating itfrom the services.
Any necessary temporary strengthening or separation ofthe building into parts for transportation.
Loading the building onto its transport vehicles. Any necessary demolition of the existing foundations,services and subsequent work to restore the site.
Constructing foundations and services.
Unloading the building and connecting it to thosefoundations and services.
Re-connecting any parts of the building which wereseparated for transportation, and fixing any damage done
during transportation.
http://www.consumerbuild.org.nz/publish/tools/councilfinder.phphttp://www.consumerbuild.org.nz/publish/tools/councilfinder.php -
7/31/2019 Transportation of House-2
16/20
Doing any renovation work on the house.
Building consent for removal from the old site Building consent needed to remove a house from the old
site is often called demolition consent, and it is your
responsibility to organise (not the responsibility of the
previous owner or the building removal company). Note
that buildings purchased directly from a recognised house
remover's yard will not require building consent.
The demolition consent removes any reference to thehouse from the files on that property (if it is going to a
different councils area). It also requires inspection of the
services that were connected to the house.
The building consent authority may do an assessment tosee if the house is structurally sound enough to berelocated as part of the removal consent. And the building
consent authority may require the building to be
upgraded.
Note this is no guarantee that a building consent authorityin the other council's jurisdiction at the new location will
allow the house onto a new site.
-
7/31/2019 Transportation of House-2
17/20
Building Code requirements for a newhouse
If the house is new, it will have to meet all the relevantBuilding Code requirements when it is being built, i.e. it
requires building consent, inspections during and at the
end of construction, and a code compliance certificate.
Because the destination is probably not known when they
are being built, these homes should be built to worst case
scenario standard, i.e. for location in the worst earthquake
and wind zones.
As with old homes, when the house is sold for relocation anew Project Information Memorandum (PIM) and building
consent are required for the re-siting, foundations and
drainage.
-
7/31/2019 Transportation of House-2
18/20
Resource consentResource consent may be required if locating the house on the
new site is likely to impact on the environment in some way.For example, there may be rules in the district plan about the
age, style, or size of the house allowed in some new
subdivisions. Or you may need permission to remove native
trees. This needs to be applied for at the same time, or before,
you apply for a building consent.
When applying for resource consent you will have to provide
some or all of the following, depending on council
requirements:
A completed application form giving details of the newsite.
The address where the building can be inspected. A dimensioned site plan of the new site showing where
the house will go.
Elevation plans showing the height of the building relativeto the ground.
Photos of the elevations of the building to be relocated. A statement of the proposed exterior work such as
painting, additions and alterations intended to bring the
building up to an acceptable standard.
-
7/31/2019 Transportation of House-2
19/20
A recent copy of the certificate of title.
Details of trees that require removal to get the building offits existing site or onto its new one.
A pegging certificate from a registered surveyor.
A statement of the work proposed on the house afterrelocation.
The council will assess the application on the following grounds:
The proposed appearance of the house and itscompatibility with other houses in the vicinity.
The condition and quality of the exterior materials.
InsuranceWhen the house is in transit from the old site to the new
location, you will need to organiseinsurance for the move. This
will provide cover for any damage during the move, for
example, if the house falls off the truck. If this happens, you will
only get back what you paid for the house. It is unlikely to cover
consequential loss, for example, recompense for the cost of the
new foundations which are no longer able to be used if the
house is destroyed in transit. If this happens you will have to
http://www.consumerbuild.org.nz/publish/site/section-ground-wind.phphttp://www.consumerbuild.org.nz/publish/site/section-ground-wind.php -