Transportation Systems Management Engineering
Design ProcessJosé Romero
Assistant Engineer, Electrical
October 12, 2017
Introduction
• The process contains a Concept Development Phase and a Final Design Phase before project goes into Construction.
• TSM Procedure Manual
• Projects• Traffic Signal
• Adaptive • Signal Optimization
• ITS• Camera Surveillance Systems (CSS)• Dynamic Message Signs (DMS)• Truck Safety Warning Systems (TSWS)• Travel Time Systems (TTS)• Fiber Optic Network
Initiate CD
• Obtain Management System and Stakeholder input
• Update PRS• Update with all available information. PM responsible to
update regularly.
• Tier Assignment• If traffic signal project, tier is assigned to proposed
corridor based off the COAST-NJ study.
Data Collection & Analysis
• Perform Environmental screening
• Gather information needed such as As-builts, ROW information
• Field visit to verify and evaluate existing conditions
• TSM CD Checklist
• Identify existing utilities
• ITS Site location flexibility
Alternatives Analysis & CD Report
• Develop Alternatives• The alternatives should provide cost effective quality
solutions.
• Preliminary Preferred Alternative (PPA) is chosen.
• Designer develops a preliminary location plan based off the chosen PPA.
• OIT/IT Coordination
• Systems Engineering Review Form (SERF)
• CD Report
Obtain Approvals
• FHWA reviews the CD Report for all federally funded projects.
• Project Manger presents the PPA to Capital Program Screening Committee (CPSC).
• CPC approves advancement of project to Final Design.
• Designer updates the report indicating CPC approval, CD Report is Finalized.
Final Design
• Conduct Surveys
• Conduct Gap Assessment
• Utility Engineering• Subsurface Utility Engineering
• Agreements
Traffic Signal Optimization
• COAST – Ranking
• Concept Development
• Data Collection
• Modeling
• Optimization
• Final Implementation / Design & Construction
• Studies and Performance Measures
Systems Engineering
• Systems Engineering Review Forms
Design
• ITS Facilities Layout Plan
• Confirm Service Provision
• HUB/TOC As Built Confirmation with ITS Maintenance
• Coordination with OIT • System Architectural Review (SAR)
• Review and Update ITS Architecture
• Network Diagram
Submission
• Interim Submission
• Final Design Submission
• FHWA Submission (for PODI projects)
• PS&E Submission
Construction
• Software Integration
• Device Testing
• Burn in Period
• Virtual and Physical Servers
Links
Mobility & Systems Engineering http://www.state.nj.us/transportation/eng/elec/ITS/
TSM Procedures Manualhttp://www.state.nj.us/transportation/eng/elec/ITS/design.sht
m
TSM Limited Scope Processhttp://www.state.nj.us/transportation/eng/elec/ITS/tsmproces
s.shtm
FHWA Systems Engineering https://ops.fhwa.dot.gov/publications/seitsguide/section3.htm