travel costs lecture 18 october 31, 2005 12-706 / 19-702 / 73-359
Post on 22-Dec-2015
216 views
TRANSCRIPT
Admin Issues
Final Project OutlinesLandfill Gas ProjectsHW 5 Due next Monday (sorry).
This week’s office hours Thurs 4pm, Fri 1:30pm.
Next week back to normal (Pauli Mon AM).
Schedule Set for Rest of Semester HW due dates a bit flexible - you decide.
Travel Costs
Time is a valuable commodity (time is $) Most major transportation/infrastructure projects built to ‘save travel costs’ Need to tradeoff project costs with benefits Ex: new highway that shortens commutes
Differences between ‘travel’ and ‘waiting’ Waiting time disutility might be orders of magnitude higher than just ‘travel disutility’
Why? Travelling itself might be fun
Valuation: Travel Cost Method
Estimate economic use values associated with ecosystems or sites that are used for recreation changes in access costs for a recreational site
elimination of an existing recreational site
addition of a new recreational site changes in environmental quality
www.ecosystemvaluation.org/travel_costs.htm
Travel Cost Method
Basic premise - time and travel cost expenses incurred to visit a site represent the “price” of access to the site.
Thus, peoples’ WTP to visit the site can be estimated based on the number of trips that they make at different travel costs. This is analogous to estimating peoples’ WTP for a marketed good based on the quantity demanded at different prices.
Example Case
A site used mainly for recreational fishing is threatened by development.
Pollution and other impacts from this development could destroy the fish habitat Resulting in a serious decline in, or total loss of, the site’s ability to provide recreational fishing services.
Resource agency staff want to determine the value of programs or actions to protect fish habitat at the site.
Why Use Travel Cost?
Site is primarily valuable to people as a recreational site. There are no endangered species or other highly unique qualities that would make non-use values for the site significant.
The expenditures for projects to protect the site are relatively low. Thus, using a relatively inexpensive method like travel cost makes the most sense.
Relatively simple compared to other methods
Options for Method
A simple zonal travel cost approach, using mostly secondary data, with some simple data collected from visitors.
An individual travel cost approach, using a more detailed survey of visitors.
A random utility approach using survey and other data, and more complicated statistical techniques.
Zonal MethodSimplest approach, estimates a value for recreational services of the site as a whole. Cannot easily be used to value a change in quality of recreation for a site
Collect info. on number of visits to site from different distances. Calculate number of visits “purchased” at different “prices.”
Used to construct demand function for site, estimate consumer surplus for recreational services of the site.
Zonal Method Steps
1. define set of zones around site. May be defined by concentric circles around the site, or by geographic divisions, such as metropolitan areas or counties surrounding the site
2. collect info. on number of visitors from each zone, and the number of visits made in the last year.
3. calculate the visitation rates per 1000 population in each zone. This is simply the total visits per year from the zone, divided by the zone’s population in thousands.
Sample Data
Zone Total
Visits/YearZone
PopulationVisits/1000
0 400 1000 4001 400 2000 2002 400 4000 1003 400 8000 50
Beyond 3 0Total Visits 1600
Estimating Costs
4. calculate average round-trip travel distance and travel time to site for each zone. Assume Zone 0 has zero travel distance and time. Use average cost per mile and per hour of travel time, to calculate
travel cost per trip. Standard cost per mile is $0.30. The cost of time is from average
hourly wage. Assume that it is $9/hour, or $.15/minute, for all zones, although in
practice it is likely to differ by zone.
Data
Zone RoundTrip Dist .
Rou ndTrip Time
Dist ancetime s
Cost /Mile($.30)
Trave lTimetime s
Cost /Minute($.15)
TotalTrave lCost /Trip
0 0 0 0 0 01 20 30 $6 $4.50 $10.502 40 60 $12 $9.00 $21.003 80 120 $24 $18.00 $42.00
5. Use regression to find relationship between visits and travel costs,e.g. Visits/1000 = 330 – 7.755*(Travel Cost)
Final steps 6. construct demand for visits with regression. First point on demand curve is
total visitors to site at current costs (with no entry fee), which is 1600 visits. Other points by estimating number of visitors with different hypothetical entrance fees (assuming that an entrance fee is valued same as travel costs). Start with $10 entrance fee. Plugging this into the estimated regression equation, V = 330 – 7.755C:
Zone Travel Costplus $10
Visits/1000 Population Total Visits
0 $10 252 1000 2521 $20.50 171 2000 3422 $31.00 90 4000 3603 $52.00 0 8000 0
Total Visits 954
Demand curve
This gives the second point on the demand curve—954 visits at an entry fee of $10. In the same way, the number of visits for increasing entry fees can be calculated:
Entry Fee Total Visits$20 409$30 129$40 20$50 0
Graph
Consumer surplus = area under demand curve = benefits from recreational uses of site around $23,000 per year, or around $14.38 per visit ($23,000/1,600).
Agency’s objective was to decide feasibility to spend money to protect this site. If actions cost less than $23,000 per year, the cost will be less than the benefits provided by the site.
Recreation Benefits
Value of recreation studies‘Values per trip’ -> ‘value per activity day’
Activity day results (Sorg and Loomis 84) Sport fishing: $25-$100, hunting $20-$130 Camping $5-$25, Skiing $25, Boating $6-$40 Wilderness recreation $13-$75
Are there issues behind these results?
Value - travel time savings
Many studies seek to estimate VTTS Can then be used easily in CBAs
Book reminds us of Waters 1993 (56 studies) Many different methods used in studies Route, speed, mode, location choices Results as % of hourly wages not a $ amount Mean value of 48% of wage rate (median 40) North America: 59%/42%
Good resource for studies like this: www.vtpi.org
Government Analyses
DOT (1997): Use % of wage rates for local/intercity and personal/business travel Personal: 50% for local, 70% intercity Business: 100% for all trips These are the values we will use in class
Income levels are important themselves VTTS not purely proportional to income Waters suggests ‘square root’ relation E.g. if income increases factor 4, VTTS by 2
Office of Secretary of Transportation, “Guidance for the Valuation ofTravel Time in Economic Analysis”, US DOT, April 1997.
Introduction - Congestion
Congestion (i.e. highway traffic) has impacts on movement of people & goods Leads to increased travel time and fuel costs
Long commutes -> stress -> quality of life Impacts freight costs (higher labor costs) and thus increases costs of goods & services
http://tti.tamu.edu/inside/hdv/programs/ama/mobility/study/report.stm (TTI report)
Literature Review
Texas Transportation Institute’s 1999 Annual Mobility Report 15-year study to assess costs of congestion Average daily traffic volumes Binary congestion values
‘Congested’ roads assumed both ways
Assumed 5% trucks all times/all roads Assumed 1.25 persons/vehicle, $12/hour Assumed roadway sizes for 3 classes of roads Four different peak hour speeds (both ways)
Results
An admirable study at the national level
In 1997, congestion cost U.S. 4.3 billion hours of delay, 6.6 billion gallons of wasted fuel, thus $72 billion of total cost
New Jersey wanted to validate results with its own data
New Jersey Method
Used New Jersey Congestion Management System (NJCMS) - 21 counties total
Hourly data! Much more info. than TTI report
For 4,000 two-direction linksFreeways principal arteries, other arteries
Detailed data on truck volumes Average vehicle occupancy data per county, per roadway type
Detailed data on individual road sizes, etc.
Level of Service
Description of traffic flow (A-F) A is best, F is worst (A-C ‘ok’, D-F not)
Peak hour travel speeds calculated Compared to ‘free flow’ speeds A-C classes not considered as congested D-F congestion estimated by free-peak speed
All attempts to make specific findings on New Jersey compared to national
http://www.njit.edu/Home/congestion/
Definitions
Roadway Congestion Index - cars per road space, measures vehicle density Found per urban area (compared to avgs) > 1.0 undesirable
Travel Rate Index Amount of extra time needed on a road peak vs. off-peak (e.g. 1.20 = 20% more)
Definitions (cont.)
Travel Delay - time difference between actual time and ‘zero volume’ travel time
Congestion Cost - delay and fuel costs Fuel assumed at $1.28 per gallon VTTS - used wage by county (100%) Also, truck delays $2.65/mile (same as TTI)
Congestion cost per licensed driver Took results divided by licenses Assumed 69.2% of all residents each county
Details
County wages $10.83-$23.20 per hour
Found RCI for each roadway link in NJ Aggregated by class for each county
Effects
Could find annual hours of delay per driver by aggregating roadway delays Then dividing by number of drivers
Total annual congestion cost $4.9 B Over 5% of total of TTI study 75% for autos (190 M hours, $0.5 B fuel cost)
25% for trucks (inc. labor/operating cost)
Avg annual delay per driver = 34 hours